Loading...
HomeMy WebLinkAbout20110841 Ver 1_Buffer and/or Stream Determination_20180327Kra Water Resources Environmental Quality March 27, 2018 Andrea Eckardt Wildlands Engineering Inc. 1430 South Mint Street, Suite 104 Charlotte NC 28203 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: On -Site Determination for Applicability to the Randleman Lake Buffer Rules (15A NCAC 2B .0250) Subject Property: Burnett's Chapel Mitigation Site, 1323 Bumetts Chapel Rd, Greensboro NC Guilford County DWR# 2011-0841 Dear Ms. Eckardt: On March 26, 2018, at your request, Sue Homewood conducted an on-site determination to review features located on the subject project for stream determinations with regards to the above noted state regulations. Katie Merritt with the Division of Water Resources (Division) was also present during the site visit. During the site visit the upper portions of Reach B4 and Reach B5, as shown in green on the attached map, were reviewed. Both areas were representative of vegetated swales and had characteristics of wetlands and were therefore were determined not to be subject to the Randleman Buffer Rules as stated above. The owner (or future owners) should notify the Division (and other relevant agencies) of this decision in any future correspondences concerning this property. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the Division or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o 401 & Buffer Permitting Branch, 1650 Mail Service Center, Raleigh, NC 27699-1650. Individuals that dispute a determination by the Division or Delegated Local Authority that "exempts" surface water from the buffer rule may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60 -day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. The Division recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. State of North Carolina I Environmental Quality 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336-776-9800 This letter only addresses the applicability to the buffer rules and does not approve any activity within Waters of the United States or Waters of the State or their associated buffers. If you have any additional questions or require additional information, please contact me at 336-776-9693 or sue.homewoodkncdenr. aov. Sincerely, Sue Homewood Winston-Salem Regional Office Enclosures: USGS Topo Map Wildlands Features Map Cc: Rick & Val Ingram, 1323 Burnetts Chapel Rd, Greensboro NC 27406 Katie Merritt, DWR (via email) DWR, Winston-Salem Regional Office