HomeMy WebLinkAbout20170429 Ver 1_March 2018 inspection_20180327Wetland Inspection Report
Project Num: 20170429 Version: 1
Project Name: NCDOT - Bank Stabilization SR 1611 Main Street
County: Forsyth�Bethania)
Location: NCDOT - Bank Stabilization SR 1611 Main Street (Bethania)
Latitude: +36° 11' 25"
SW Plan Location
Site Owner Name NC DOT Division 9
Inspection Date: 3/23/2018
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: ❑ Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Title:
� Not Compliant
Status: Issued
Project Type: Bank Stabilization & Shoreline
Stabilization (sills, rip rap)
Region: Winston-Salem
Longitude: -80° 20' 15"
Phone:
Phone: 336-776-9703
DOT staff were contacted about the deficiencies and agreed to make repairs and remove rip rap from channel.
page: 1
Site Number: 20170429
Inspection Date: 3/23/2018
Owner: Tippett, Lyndo
Inspection Type: Site Inspection (DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: A headcut has formed and riprap was washed into the stream.
Reason for Visit: Routine
Yes No NA NE
� ❑ ❑ ❑
❑ � ❑ ❑
� ❑ ❑ ❑
page: 2