Loading...
HomeMy WebLinkAboutWQ0000020_GW Monitoring Sampling and Analysis Results_20180109(� DUKE ' ENERGY, GarryeralA. M neer Plant General Manager PROGRESS Asheville Steam Electric Plant Duke Energy Progress ASVL PLT 1200 CP&L of Arden, NC 28704 Certified Mail: 7016 2140 000102310725 o: 828-687-5201 File Pt.: 12520-Q r. 628-687-5204garry.whisnant®duke-energycom December 27, 2017 NCDEQ Division of Water Resources Information Processing Unit RECENED/NCDEO/M 1617 Mail Service Center Raleigh, NC 27699-1617 JAN - 9 2018 RE: Duke Energy Progress, LLC. Non -Discharge Permit WQ0000020 Asheville Regional Airport, CCP Structural Fills Project Permitting Unit November 2017 Groundwater Monitoring Sampling and Analysis Results. Dear Sir or Madam: Attached are the results from the most recent semi-annual groundwater monitoring sampling event conducted in November 2017 for the wells near the Area I, III and IV structural fills at the Asheville Regional Airport. The results from these sampling events are included on the GW59CCR forms per permit WQ0000020. As these structural fill sampling events are not part of an NPDES permit, these forms were slightly modified and are not signed. Area I groundwater monitoring wells and surface water samples were collected on November 1, 2017. Please note DEQ personnel were also on-site to split samples and collect additional 'surface water' samples as part of additional requested work at Area I. The results from these additional 'surface water' samples are include on the enclosed forms. Area III groundwater monitoring wells were sampled on November 1 & 2, 2017 and Area IV groundwater monitoring wells were sampled on November 2, 2017. Per our letter to Mr. Brett Laverty, NC DENR, dated March 2, 2105, DEP contacted the MSD Industrial Waste Section and asked that they contact Mr. Laverty such that Mr. Laverty could retrieve information directly from MSD regarding leachate quantity and quality for Area III and Area IV leachate discharges. If this arrangement has proved unsuitable, please let Ms. Teresa Williams know at 828-687-5240. Sincerely, GA A.WhP anty Asheville Plant Manager Attachments cc: Mr. G. Landon Davidson NCDEQ/Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778 www.duke-energy.com