Loading...
HomeMy WebLinkAbout20180087 Ver 1_USACE Permit_20180320U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-00459 County: Davie U.S.G.S. Quad: NC-Mocksville GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Piedmont Natural Gas Tom Morris Address: 4720 Piedmont Row Drive Charlotte, NC 28210 Telephone Number: 704-364-3120 E-mail: tom.morrisApiedmontng.org Size (acres) 65.0 Nearest Town Mocksville Nearest Waterway Dutchman Creek River Basin Upper Pee Dee USGS HUC 03040101 Coordinates Latitude: 35.939184 Longitude: -80.517469 Location description: The review area is approximately 7.2 miles in length within the utility line easement (approximately 50 feet wide). The approximate start and end points of the review area are 35.878994, -80.560372 and 35.959489, -80.509042, respectively. Reference review area description in Pre -Construction Notification Package entitled "Figure 1, Site Vicinitv Exhibit" and Printed Date of 12/28/2017. Description of projects area and activity: This verification authorizes the temporary grading and placement of fill material in 1.509 linear feet of stream and 1.358 acres of wetlands. the loss of 0.08 acre of open water. and permanent conversion impacts to 1.11 acres of wetlands to facilitate the installation of approximately 7.2 miles of natural gas transmission pipeline. Permanent wetland impacts would result from the conversion of forested wetlands to herbaceous while the open water would be drained and filled. Seventeen (17) perennial streams, 6 intermittent streams, 14 wetland areas, and 1 open water area would be affected. The temporary stream and wetland impacts would result from installation of the gas line and the construction of road crossings for construction access. In addition, a coffer dam will be constructed and stream flow will be pumped downstream of the work area. Tenmorary impacts to vegetation in wetlands would occur for construction access and would be re -vegetated after construction has commenced. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities and NWP 18. Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 3/7/2018, and the enclosed plans Impact Drawings, Figures 9-46 dated 1/18/2018. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Bryan Roden -Reynolds at 704-510-1440 or bryan.roden-reynolds(ii)usace.army.mil. RODEN D9.�„D8�m—EN 8E3ND8D5.88v8N-NNE 1263385574 DN: c=US,o=US.Go ,er ,ntou=D.D,.u=Pp,.u=US&,m=RODEN Corps Regulatory Official: REYNOLDS.BRYAN.KENNETH.1263385574 Date20o8.03111N.2''6:jl: _.4tlP33855]6 Date: 03/20/2018 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/Pp=136:4:0 Copy furnished: Agent: S&ME, Inc. Walter Cole Address: 3201 Sprint! Forest Road Raleigh, NC 27616 Telephone Number: 919-801-3798 E-mail: wcole(&smeinc.com SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW -2018-00459 County: Davie Permittee: Piedmont Natural Gas, Tom Morris Project Name: Clemmons 443 Line Upgrade Date Verification Issued: 03/20/2018 Project Manager: Bryan Roden -Reynolds Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Bryan Roden -Reynolds Asheville Regulatory Office U.S Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date CESAW—RD (File Number, SAW -2018-00459) MEMORANDUM FOR RECORD SUBJECT: Department of the Army Memorandum Documenting General Permit Verification 1.0 Introduction and overview: Information about the proposal subject to one or more of the Corps regulatory authorities is provided in Section 1, detailed evaluation of the activity is found in Sections 2 through 4 and findings are documented in Section 5 of this memorandum. Further, summary information about the activity including administrative history of actions taken during project evaluation is attached (ORM2 summary). 1.1 Applicant name: Piedmont Natural Gas, Tom Morris 1.2 Activity location: Latitude: 35.939184 Longitude: -80.517469 Location description: The review area is approximately 7.2 miles in length within the utility line easement (approximately 50 feet wide). The approximate start and end points of the review area are 35.878994, - 80.560372 and 35.959489, -80.509042, respectively. Reference review area description in Pre -Construction Notification Package entitled "Figure 1, Site Vicinity Exhibit" and Printed Date of 12/28/2017. 1.3 Description of activity requiring verification: This verification would authorize the temporary grading and placement of fill material in 1,509 linear feet of stream and 1.358 acres of wetlands, the loss of 0.08 acre of open water, and permanent conversion impacts to 1.11 acres of wetlands to facilitate the installation of approximately 7.2 miles of natural gas transmission pipeline. Permanent wetland impacts would result from the conversion of forested wetlands to herbaceous while the open water would be drained and filled. Seventeen (17) perennial streams, 6 intermittent streams, 14 wetland areas, and 1 open water area would be affected. The temporary stream and wetland impacts would result from installation of the gas line and the construction of road crossings for construction access. In addition, a coffer dam will be constructed and stream flow will be pumped downstream of the work area. Temporary impacts to vegetation in wetlands would occur for construction access and would be re -vegetated after construction has commenced. 1.4 Permit authority: Section 404 of the Clean Water Act (33 USC 1344) 1.5 Applicable Permit: NWP 12. Utility Line Activities and NWP 18. Minor Discharges 1.6 Activity requires written waiver? No. A waiver is not required for the applicant to begin work because the project did not exceed any established thresholds that require a waiver. 2.0 Evaluation of the Pre -Construction Notification 2.1 Direct and indirect effects caused by the GP activity: The direct effects of the proposed activity in waters would include the loss of jurisdictional waters (as specified in Section 1.3) and their associated aquatic resource functions. The proposed activity also has the potential to result in indirect effects to waters including excess sedimentation in downstream waters, disruption and/or killing of aquatic life in the direct vicinity of the project area, increase of downstream flows, and blocking/restricting aquatic life passage transiting in and through the project area. These indirect effects are expected CESAW—RD (File Number, SAW -2018-00459) to be minimal due to design criteria and Best Management Practices (BMPs) required by Nationwide Permit General and Regional Conditions. Additionally, indirect effects would be further reduced through the implementation of BMPs required by state, local, and Federal ordinances and regulations. 2.2 Site specific factors: The project area is part of a 10 square mile watershed that is 5.0 percent impervious surfaces. This area has a long history of intensive farming practices which has resulted in long term degradation to aquatic resources. Given the urban nature of the watershed, the waters within the project area provide important aquatic resource functions to downstream waters. The loss of these functions in this setting and in the proposed quantities necessitates compensatory mitigation to ensure that cumulative impacts to onsite and downstream aquatic resources are individually and cumulatively minimal. 2.3 Coordination 2.3.1 Was the PCN coordinated with other agencies? Yes. Agency coordination with the USFWS is required for the Northern Long Eared Bat. However, the Corps is not required to wait for a response from the USFWS Asheville Office in accordance with local procedures. 2.3.2 Was the PCN coordinated with other Corps offices? No. 2.4 Mitigation 2.4.1 Provide brief description of how the activity has been designed on-site to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site: The applicant provided the following information regarding their efforts to avoid and minimize adverse effects: "With respect to pipe installation methodology, crossings have been designed as conventional trenching in wetland areas and dry isolation at stream crossings. Multiple factors affected selection of traditional methods rather than the use of trenchless technologies such as horizontal directional drills. The rolling terrain present within the project area prohibited the safe use of bored crossings for most streams due to the limited space available between the stream and hillside. At proposed stream crossings, dam and pumps or flume systems will be used to divert clean water flow around the work area until the crossing is completed (i.e. conventional isolation methodology)." 2.4.2 Is compensatory mitigation required for unavoidable impacts to jurisdictional aquatic resources to reduce the individual and cumulative adverse environmental effects to a minimal level? Yes. Provide rationale: Compensatory mitigation is required by Regional Condition 4.1.10. This condition states "A compensatory mitigation plan will be required for all such impacts associated with the requested activity if the activity requires PCN and the cumulative total of permanent forested wetland impacts exceeds 1/10 -acre." 2.4.3 Type and location of compensatory mitigation Is the impact in the service area of an approved mitigation bank? No. CESAW—RD (File Number, SAW -2018-00459) If yes, does the mitigation bank have appropriate number and resource type of credits available? No. Is the impact in the service area of an approved in -lieu fee program? Yes. It yes, does the in -lieu tee program nave the appropriate number and resource type of credits available? Yes. Selected compensatory mitigation type/location(s): See Table 1 Table 1: Mitigation Type and Location Mitigation bank credits In -lieu fee program credits X Permittee -responsible mitigation under a watershed approach Permittee -responsible mitigation, on-site and in-kind Permittee -responsible mitigation, off-site and/or out of kind Does the selected compensatory mitigation option deviate from the order of the options presented in §332.3(b)(2)-(6)? No. if yes, provide the rationale for the deviation, including the likelihood for ecological success and sustainability, location of the compensation site relative to the impact site and their significance within the watershed, and/or the costs of the compensatory mitigation project (see 33 CFR §332.3(a)(1)): N/A 2.4.4 Amount of compensatory mitigation: 1.1 acres of wetlands credits Rationale for required compensatory mitigation amount: Compensatory mitigation for permanent conversion of 1.11 acres of wetlands would be required at a ratio of 1:1. This ration is appropriate because the impacts would not result in a complete loss of waters. 3.0 Compliance with Other Laws, Policies and Requirements 3.1 Section 7(a)(2) of the Endangered Species Act (ESA) 3.1.1 ESA action area: The action area includes the waters of the United States that will be directly affected by the proposed work or structures and uplands directly affected as a result of authorizing the work or structures. 3.1.2 Has another federal agency taken steps to document compliance with Section 7 of the ESA and completed consultation(s) as required? No. 3.1.3 Known species/critical habitat present? No. The Corps has determined that it has fulfilled its responsibilities under Section 7(a)(2) of the ESA. Listed Species in Davie County: Northern Long-eared Bat (Myotis septentrionalis) - Threatened Michaux's Sumac (Rhus michauxii) - Endangered Effect determination(s), including no effect, for all known species/habitat, and basis for determination(s): CESAW—RD (File Number, SAW -2018-00459) On March 20, 2018, the North Carolina Natural Heritage Program database dated 2018 was consulted for the presence/absence of federally listed threatened or endangered species. There are no federally threatened or endangered species listed in the Natural Heritage database within the action and/or project area. The USACE reviewed this project in accordance with (IAW) the NLEB Standard Local Operating Procedures for Endangered Species (SLOPES) between the USACE, Wilmington District, and the Asheville and Raleigh U.S. Fish and Wildlife Service (Service) Offices, and determined that the action area for this project is located outside of the highlighted areas/red 12 -digit HUCs and activities in the action area do not require prohibited incidental take; as such, this project meets the criteria for the 4(d) rule and any associated take is exempted/excepted. IAW the NLEB SLOPES, the USACE sent a Situation 1 email to the Service on 03/20/2018, informing them about this project. Service Concurrence: as established in the NLEB SLOPES, this project does not require prohibited intentional take of the NLEB and it meets the criteria for the 4(d) rule; therefore any associated take is exempt and it is not necessary for the USACE to wait 30 days for the Service to object or concur. Based upon the Natural Heritage Program database and a Threatened and Endangered Species Assessment prepared by a qualified environmental consultant and included in the administrative record, the Corps believes the project would have no effect on listed species. 3.1.4 Consultation with either the National Marine Fisheries Service and/or the U.S. Fish and Wildlife Service was initiated and completed as required, for any determinations other than "no effect" (see the attached "Summary" sheet for begin date, end date and closure method of the consultation). Based on a review of the information above, the Corps has determined that it has fulfilled its responsibilities under Section 7(a)(2) of the ESA. 3.2 Magnuson -Stevens Fishery Conservation and Management Act, Essential Fish Habitat (EFH) N/A, there is no essential fish habitat in this district's area of responsibility. 3.2.1 Has another federal agency taken steps to comply with EFH provisions of Magnuson -Stevens Act? No. 3.2.2 Did the proposed project require review under the Magnuson -Stevens Act? No. 3.3 Section 106 of the National Historic Preservation Act (Section 106) 3.3.1 Section 106 permit area: The permit area includes only those areas comprising waters of the United States that will be directly affected by the proposed work or structures. Activities outside of waters of the U.S. are not included because all three tests identified in 33 CFR 325, Appendix C(g)(1) have not been met. Final description of the permit area: The permit area for this project includes the waters of the United States directly impacted and the uplands that would be impacted to accomplish the work within waters of the United States CESAW—RD (File Number, SAW -2018-00459) 3.3.2 Has another federal agency taken steps to comply with Section 106 of the National Historic Preservation Act and completed consultation(s) as required? No. 3.3.3 Known cultural resource sites present and/or survey or other additional information needed? No. On 03/20/2018, the most recent version (SHPO ArcGIS Mapservice) of the North Carolina State Historic Preservation Office database was consulted for the presence or absence of historic properties within the permit area. No properties are listed within the boundaries of the Corps permit area as described in Section 3.3.1. Basis for effect determination(s) for all known site(s) and/or site(s) identified by a survey: The Corps has determined the proposed action has no potential or little likelihood to cause effect to any historic property listed, or eligible for listing, in the National Register of Historic Places because there are no known historic properties within or in close proximity to the Corps permit area. 3.3.4 Consultation was initiated and completed as required with the appropriate agencies, tribes and/or other parties for any determinations other than "no potential to cause effects" (see the attached "Summary" sheet for consultation type, begin date, end date and closure method of the consultation). The Corps has determined that it has fulfilled its responsibilities under Section 106 of the NHPA. 3.4 Tribal Trust Responsibilities 3.4.1 Was government -to -government consultation conducted with Federally -recognized Tribe(s)? No. There are no known tribal interests in the project area. Provide a description of any consultation(s) conducted including results and how concerns about significant effects to protected tribal resources, tribal rights and/or Indian lands were addressed. The Corps has determined that it has fulfilled its tribal trust responsibilities. 3.5 Section 401 of the Clean Water Act — Water Quality Certification (WQC) 3.5.1 Is a Section 401 WQC required, and if so, has the certification been issued or waived? An individual water quality certification is required and has been issued by the certifying agency. 3.6 Coastal Zone Management Act (CZMA) 3.6.1 Is a CZMA consistency concurrence required, and if so, has the concurrence been issued, waived or presumed? N/A, a CZMA consistency concurrence is not required. 3.7 Wild and Scenic Rivers Act 3.7.1 Is the project located in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system? No. According to http://www.rivers.gov, the proposed project area is not within a designated or study river. 3.8 Effects on Corps Civil Works Projects (33 USC 408) CESAW—RD (File Number, SAW -2018-00459) 3.8.1 Does the applicant also require permission under Section 14 of the Rivers and Harbors Act (33 USC 408) because the activity, in whole or in part, would alter, occupy, or use a Corps Civil Works project? No, there are no Corps Civil Works project(s) in or near the vicinity of the proposal. 4.0 Special Conditions 4.1 Are special conditions required to ensure minimal effects, protect the public interest and/or ensure compliance of the activity with any of the laws above? Yes. If no, provide rationale: N/A 4.2 Required special condition(s) Special condition: a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Rationale: See Section 4.2 (Mitigation) 5.0 Determination 5.1 Waiver request conclusion, if required or select N/A: N/A. 5.2 The activity, with the required mitigation, will result in no more than minimal individual and cumulative adverse effects on the aquatic environment and will not be contrary to the public interest. 5.3 This activity, as described, complies with all terms and conditions of the permits identified in Section 1.5. PREPARED BY: RO D E N Dlgitally signed by RODEN REYNOLDS.BRYAN.KENNETH.12633855]4 REYNOLDS.BRYAN.KENN ON. USAS-RODEOVeY""e"`'° °°°'°°-RK'' ETH.1263385574 REYNOLDS.BRYAN.KENNETH.12633R5574 Date: 2018.03.21 16:12:52-0400 Bryan Roden -Reynolds Date: 03/20/2018 Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Natural Gas, Tom Morris Action ID: SAW -2018-00459 Project Name: Clemmons 443 Line Upgrade County: Davie Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03040101, Yadkin River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 1.11 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03040101, Yadkin River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 1.11 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming their willing and able to accept the applicants compensatory mitigation responsibility, dated 1/2/2018was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd. tugwell@usace. army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: Bryan Roden -Reynolds USACE Field Office: Asheville Regulatory Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Email: bryan.roden-reynolds@usace.army.mil RODEN Digitally signed by RODEN REYNOLDS.BRYAN.KENNETH.1263385574 REYNOLDS.BRYAN.KENNETH.1263385 ON:c=us, U.S. Government, ou=DoD,oU=PKI,ou=USA, cn=RODEN REYNOLDS.BRYAN.KENNETH.1263385574 574 Date: 2018.03.21 16:13:12 -04'00' 03/20/2018 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil VNI1OdVD Hi'dON 'AlNnoD 3IAVa SVE) iv2mIVN 1NOW43Id ^ ° E17173NI1 3aV219df1 V321V SNOW W317 w w 9 z M _ II p Z V G I I HdVII901OHd'IVFd3V SIOZ N & t�S 1Od�334-3 a eek - G z �T• �r L_3NIlH �1VW� , 'R w J •ti� C 7 - U w �4D f w. m Z ? w w w J z z LLI o O w¢ w 2 P z LL FU m o w O rn Z �FY�� •I ,,. 7' �ya�,�.Q °�p,yh O.� �, U cn wJ w w H w .i• p �, w > w w �. 5 M oQ P 1� of Ojcy •• D- U w a S�?r • i >>! �' •` !%, x e``2 4' br>>f �-- ��P•.. t . r� °° r'r�Fr �'j� � II II � AC `-F I_li ��.I®u i ti �' _ �/ :;tom .; �:-.:-5���� �''ti ` •�yJ:. �p C o x z o" as o z z w F W w z � o i u 0 ..0 �• - °2�az -i 4 o�zra o O��F,S q 0, Qol- o o a a u F.PCip�2Q0 Jp4' } ,zRz� Pp�o F F m g Q o-Pp�P a Q J v IS IIDNIIOA hoy`5``�` a4 ( r' ._ _ m ..IsAd. i� �O• �' r 0.v,1 wl y. BSIIbS S --I 5p&, O o a�ANIIBSIIVS J�QOP`?��� G 1 s` '1S r o P VNIIO'dVD HildON 'AlN nOD 3IAVO sv!D iv niVN 1NOWO31d o o 0 III ~ E" 3NIl - 3OV2Ddn V3dV SNOW MIDw Z z p G I I HdV119010Hd IVIU3 d SIOZ N & ' z w z w W G � 1 ca LL co w OvUi w a¢ z� U ,, w w ¢ U ~i� ai O ce` 117 1 i I , h lz r die htiy h�4, Xh�Ph� Q ° a ��ti 000� <d �Wt; ►� z�vWi o z � 0 J��o `/ sY z Cu a o a Q z zro H o >Go�o o ¢ a=do 4, $ l�' y �ie�2�QeC C z o o f z6w O 0, u, 3¢�d0 3a o y a 0 z 0 m W m p2 W p Z w Z a FULTON ST-- . 1 1 � - •fiIr v. .1 � Ph110 '-\ II •k►�4�. �- hie �$P� Jeeti � �I p I�, li ' FSr �C% ti � ` � i � 4`> '•' x yah d'y _ �"� • "�►" OPS LTOZ-9Z-ZT suewoHO AqPauo1 P"u+ltl1a3V80-£0\NJd\41\S19\tl1tl0\apw H8Z£auH-suoww-ID V9H STO\LT\—AU-4>ed ui, 00, VNI1OdVD Hl'dON'AlNnOD 31AVO SVq ivdn1VN 1NOW43Id ^ II� £bb3NI1-30V21E)dnV3dVSNOWW31D w w Z o z p I I HdVII901OHd IVIU3 d SIOZ N & w z UJ zw 'z P� .r h1 ca Z z /��P°Q wLU w ��p���a Y S ppo lzQ�p� fi mat _ J w o o w z w EIDE PY.�. w H W W - Y ,ti •:�: is d 2 UFL 5 P P w a ` o w �� IL og,o .;' o��sQ 1 i <oa01 DoE =`m` �awz Z. \-043Q�do o m oz a qL -7b�. O# . "G dp 4. 2 Z. r0 I - Q, f- Id N3�b ��ti F'• 3y. 1w pfd• � .� 3;, ; , ��� `... ///� 4o ��O .. gP tip �b � � s %�. • �.� .�, �. �� ' .0000 O� LIOZ-BZ-ZI suewoHO 9 PaUol P"w1tl183tl 80-£0\NJd\ 4z\Sl9\tl1tl0\a Pei fl 8Z£ auil-suowwalJ V9H SIO\LT\Sf4L\U-41ed ul .l ol VNrlO'dVD Hi'dON AlNnOD 3IAVG SvE) ivH iVN 1NOW03Id II�,^� 0 bb E3NIl 30V210df1 V321V SNOW W31D o w v w m z z _ V II p G D I I HdVII901OHd'IVFd3V SIOZ N & w Z i U� /z w w < Z Z W 2 w - Z U 0 W o 0 W Q W L-LLW_ W O U) Z 2i OMO U In N W Q Q Q W ~ (wJ J w W H W W a- m - .� O O �k G aQ' OJ o 0 0 2 a d ce f� wNww JQ0I� o f iV 0 0 Id z O' o ANO �=6Jo od. °�8a w & oY� LL O� z z6 O�,FP u, Shy • r P� � �'�P�- o 9 2 zo SFJ ,�.��..w, Ir.• of zzz I- VF SS �• oR Om Sti S j �5<oa r _ - O L� P F, QQ- JQ- _ S S I f MPJ HLINEO LTOZ-BZ-Zl suewoH4 9Pa11ol Pxw1Mtl3V�8o-£0\NJd\ 4s\SI9\tl1tl0\apw f18Z£auil-suowwal�V9H Sio\LT\5£bL\U-filed umeid