HomeMy WebLinkAbout20090347 Ver 1_401 Application_2009030900-0'; A 7
_4?
E N G I N E E R S • P L A N N E R S - S C I E N T I S T S - C O N S T R U C T I O N M A N A G E R S
KCI Landmark Center II, Suite 220.4601 Six Forks Road • Raleigh, NC 27609 • Phone 919-783-9214 • Fax 919-783-9266
ASSOCIATES of NC 0 U1 R T E S" Y
! cr' i f
COPY
Date: March 27, 2009 MAR 8 0 2009
Company:
Contact:
DENR - WA1 ER WALL Y
Job Number 12082159R WETLANDS AND STQRMWATER BRANCH
Division of water Quality
401 Oversite/Express Project:
Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Hawkside Site
Cyndi Karoly, Supervisor Subject:
PCN Notification Only
? In accordance with your request ? For your use/files
® For your review ? Please call when ready
® For processing ? Please return to this office
? Plans reviewed and accepted ? Approval requested
? Plans reviewed and accepted as noted ? Conference requested
? For revision by you at your convenience
Comments: Cyndi, if you have any questions, please contact me at 919-278-2517 or by cell
(919) 210-5481. My email is sstokes@kci.com. Thanks, Steven
Steven F. Stokes, LSS
Licensed Soil Scientist
cc: Eric Kohl
Files
L? u?lin; through [_?rt llinrr WWW.I,(I.COM
09-0347
o?0F W A TF90G
O -c
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
c
f
1. Processing ? U_ a
h'
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit ? Section 10 Permit 7v
0 FT
1b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
® Yes ? No For the record only for Corps Permit:
? Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ® Yes ? No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Hawkside/Site ID # 214-027
2b. County: Onslow r F1*? i -
2c. Nearest municipality / town: Jacksonville 7 ?-•- ..? L Pp
2d. Subdivision name: None r
2e. NCDOT only, T.I.P. or state
project no:
DENR - WATER QUALITY
3. Owner Information WETLANDS A ND STORMATER BRANUM
3a. Name(s) on Recorded Deed: Willie Ruth Shepard
3b. Deed Book and Page No. 1022790
3c. Responsible Party (for LLC if
applicable): Stephen Howard, Real Estate Manager of the Carolinas
3d. Street address: 1065 th Avenue
3e. City, state, zip: Jacksonville, NC 28546-6507
3f. Telephone no.: (910) 347-4761
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name: Stephen Howard
4c. Business name
(if applicable): AT&T Mobility
4d. Street address: 2002 Pisgah Church Road, Suite 300
4e. City, state, zip: Greensboro, NC 27455
4f. Telephone no.: (336) 508-5869
4g. Fax no.: (866) 447-9585
4h. Email address: sh0548@att.com
5. Agent/Consultant Information (if applicable)
5a. Name: Steven F. Stokes
5b. Business name
(if applicable): KCI Associates of North Carolina
5c. Street address: Landmark Center II, 4601 Six Forks Road, Suite 220
5d. City, state, zip: Raleigh, NC, 276
5e. Telephone no.: (919) 278-2517
5f. Fax no.. (919) 783-9266
5g. Email address: sstokes@kci.com
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): PIN # 438713046018 Parcel # 346-96
1 b. Site coordinates (in decimal degrees): Latitude: 34.767556 Longitude: - 77.39936
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 2.0 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Sandy Run Branch
proposed project:
2b. Water Quality Classification of nearest receiving water: SQNSW
2c. River basin: White Oak 01
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The site is accessed by a public easement off of Market Street. A vehicular path begins at the property line and continues
about60 feet to the existing Progress Energy transmission tower. Progress Energy has a 50 foot Right-Of-Way along the
easement which is mowed regularly. Sandy Run Branch is located more than 75 feet to the east. The general land use is
single family residential to the west and east and predominantly woodland to the north and south along the Sandy Run
Branch.
3b. List the total estimated acreage of all existing wetlands on the property:
0.28-ac
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
270-ft
3d. Explain the purpose of the proposed project:
To provide AT&T cell coverage to Jacksonville area.
3e. Describe the overall project in detail, including the type of equipment to be used:
Cell site equipment will be placed on an elevated steel platform and antennas will be placed on existing Progress Energy
lattice transmission tower. A gravel 12' wide access road to the cell tower site will be constructed and turn around. Seven
concrete pads will be constructed within the tower footprint to support the raised platform. Six pads will measure 2'x2' in
size and the seventh pad for the stairs landing will measure 2'x4' in size. Gravel will be placed within the tower footprint to
restrict vegetsative growth.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
®Yes ? No ? Unknown
project (including all prior phases) in the past?
Comments: Requested USACE concurrence.
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: KCI Associates of NC
Name (if known): Steven F. Stokes Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ? No ® Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ? Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ®P ? T Fill Riverine Swamp ? Yes ® Corps 0
014
Forest ® No ? DWQ .
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number PER or
(Corps - 404, 10
stream
length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ? T ? PER ? Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet)
Pond ID Proposed use or purpose
number of pond
Flooded Filled Excavated Flooded Filled Excavated
Upland
(acres)
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No if yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
6b. 6c. 6d.
Buffer impact
number - Reason
Permanent (P) or for
Temporary T im act
B1 ?P?T
B2 ?P?T
B3 ?P?T
6i. Comments:
? Neuse ? Tar-Pamlico ? Other:
? Catawba ? Randleman
6e. 6f. 6g.
Buffer
Stream name mitigation
required?
? Yes
? No
? Yes
? No
? Yes
? No
6h. Total buffer impacts
Zone 1 impact Zone 2 impact
(square feet) (square feet)
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
No other access points to the site and the other landowners are not willing to give access.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Cell site equipment placed within the existing Progress Energy transmission tower piers and elevated to minimize impacts.
The location of the access road was designed to avoid as many wetlands as possible. Erosion control measures will be
implemented prior to construction and the use of smaller equipment for construction will protect adjacent vegetation.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ? No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 3%
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No stormwater management plan
needed because impervious surface is less than 24% and water will sheetflow off access road and pads through
vegetated conveyance.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a.
Which of the following state-implemented stormwater management programs apply ? HOW
? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Element of Occurrences data from Natural Heritage Program and USFWS list for County.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Ron Sechler, said no significant habitat impacted by project-3-27-09.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Delores Hall, State Archaeologist on March 19, 2009 checked there maps and files and determined that they have no
recorded archaeological sites in the vicinity of our project.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ®Yes ? No
8b. If yes, explain how project meets FEMA requirements: By scaling off FIRM mapthe tower is in floodplain but not in
floodway.
8c. What source(s) did you use to make the floodplain determination? FEMA FIRM Map Panel # 4387
Steven F. Stokes 3-27-09
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 1 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
MANORCT
4N
1
O?
INE PLt
'Y OF
5
1?1
z
C >
m < ?O
ksr
r
° R r2C
? Q FR
Jar SS?
O
z X51
?G o
P z
v
O
O
OR
g?NSO A
ON st,
JEONE 6 24
1 undn,ark ( enter II. Still, '10 PHASE I ESA N
4601 Six Fork, Road TOWER SITE 214-027 Fees
sommob? Raleigh. NC 27609 SITE VICINITY MAP 0 1.000 2900
Phone(919)793-9214
K C I Fax (919) 783-9266 NSORO. LLC
J f Approximate Subject Area ??(1n (,?i»h,_i land Parh??a?. Suiic IOU
AcSOCLUFS OF NC http:/; n:we?.kci.com
0
z
? a
G
Pk,
r>
l 7 t?
1
a 7C Y.r 3p ??
-. ??{mss zsx
tia am 50
/ • / bduonvitle ? ?
_. r Akpo?i f. •.
BAA 47 • G'
9 v?
' N`
T?
rr7 18116 -lor•
N
W
m
z
H
W
W
S
(n
Q
Z
O
Q
C)
z
O
Z
}
Z
D
O
U
O
J
Z
O
LL-
O
w
J_
O
U '.
U
z?
9Z ON VNIIOHVO H1HON kLNnoo MOISNO
?uu v,a noon pue --s uonv?•;,suop nas •=,.„i,.,?„ae .. ,uaw.,va.Q -sn av. v
VZ ON VNIIOHV:) H1HON &kNnoo MO-lSNO
m
m
R `? m ~
0.
!
LBW all
s
to - R
f
t0 w ? ) 1?a
r ` t? .5 f
R l7
R ?
I
h:
a
0
E?
0
N( c
?1
13
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE Wetlands Determination Manual)
Project / Site: #214-027 Date: 1-14-2009
Applicant / Owner: KCI Associates of NC, P.A. County: Onslow
Investigator: Steven F. Stokes, LSS State: NC
Do normal circumstances exist on the site? Yes No X Community ID:
Is the site significantly disturbed (Atypical situation)? Yes No X Transect ID:
Is the area a potential problem area? Yes No X Plot ID: DP # 1 Wet
(explain on reverse if needed)
VEGETATION
Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator
1. Ligustrum sinense 2 FAC 9.
2. Sambucus canadensis 2 FACW- 10.
3. Juncus effusus 3 FACW+ 11.
4. Salix nigra 2 OBL 12.
5. 13.
6. 14.
7. 15.
8. 16.
Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 100%
Remarks:
Site is in High Tension Power Line Right of Way that was recently mowed.
HYDROLOGY
Recorded Data (Describe In Remarks): Wetland Hydrology Indicators
Stream, Lake, or Tide Gauge
Aerial Photographs Primary Indicators:
Other Inundated
X Saturated in Upper 12"
X No Recorded Data Available Water Marks
Drift Lines
Field Observations: Sediment Deposits
Drainage Patterns in Wetlands
Depth of Surface Water: (in.) Secondary Indicators:
Depth to Free Water in Pit: 1-2 (in.) Oxidized Roots Channels in Upper 12"
Water-Stained Leaves
X Local Soil Survey Data
Depth to Saturated Soil: 1-2 (in.) x FAC-Neutral Test
Other (Explain in Remarks)
Remarks:
SOILS
Map Unit Name
(Series and Phase): Torhunta Drainage Class: Very Poorly Drained
Taxonomy (Subgroup): Typic Humaquepts Confirm Mapped Type? Yes X No
Profile Description:
Depth Matrix Colors Mottle Colors Mottle Texture, Concretions,
inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc.
0-11 Al IOYR 2/1 fsl, IfRrr,
11-18 A2 IOYR 2/1 IOYR 5/2 c2d fsl, lmgr
18-30 BA 10YR 3/1 fsl, Imgr
Hydric Soil Indicators:
Histosol Concretions
Histic Epipedon High Organic Content in Surface Layer in Sandy Soils
Sulfidic Odor Organic Streaking in Sandy Soils
Aquic Moisture Regime x Listed On Local Hydric Soils List
Reducing Conditions x Listed on National Hydric Soils List
X Gleyed or Low-Chroma Colors Other (Explain in Remarks)
Remarks:
Soil is mapped as Muckalee on County Soil Survey maps. I believe the soil exhibits the characteristics of the
Torhunta soils instead of Muckalee. The Torhunta soil unit was likely to small to delineate at the scale NRCS was
mapping and just called it all Muckalee for the soils along Sandy Run Branch.
WETLAND DETERMINATION
Hydrophytic Vegetation Present? Yes X
Wetland Hydrology Present? Yes X
Hydric Soils Present? Yes X
Remarks:
No Is the Sampling Point
No Within a Wetland? Yes No X
No
N:enviro.StokesS_Projects//Hawkside_12082159R/Permits - WetlandDataForm.l_wetland
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE Wetlands Determination Manual)
Project / Site: #214-027 Date: 1-14-09
Applicant / Owner: KCI Associates of NC, PA County: Onslow
Investigator: Steven F. Stokes, LSS State: NC
Do normal circumstances exist on the site? Yes X No Community ID:
Is the site significantly disturbed (Atypical situation)? Yes No X Transect ID:
Is the area a potential problem area? Yes No X Plot ID: DP# 2 NW
(explain on reverse if needed)
VEGETATION
Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator
1. Lonicera japonica 4 FAG 9.
2. Liquidambar styraciflua I FAC+ 10.
3. Carpinus caroliniana 2 FAC 11.
4. Vitis rotundifolia 4 FAC 12.
5._ Quercus nigra 1 FAC 13.
6. Persea Borbonia 2 FACW 14.
7. 15.
8. 16.
Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 83%
Remarks:
HYDROLOGY
Recorded Data (Describe In Remarks): Wetland Hydrology Indicators
Stream, Lake, or Tide Gauge
Aerial Photographs Primary Indicators:
Other Inundated
Saturated in Upper 12"
X No Recorded Data Available Water Marks
Drift Lines
Field Observations: Sediment Deposits
Drainage Patterns in Wetlands
Depth of Surface Water: (in.) Secondary Indicators:
Depth to Free Water in Pit: >30 (in.) Oxidized Roots Channels in Upper 12"
Water-Stained Leaves
Local Soil Survey Data
Depth to Saturated Soil: >30 (in.) x FAC-Neutral Test
Other (Explain in Remarks)
Remarks:
SOILS
Map Unit Name
(Series and Phase): Goldsboro-Urban Land Complex Drainage Class: Moderately Well
Taxonomy (Subgroup): Aquic Paleudults Confirm Mapped Type? Yes No X
Profile Description:
Depth Matrix Colors M ottle Colors Mottle Texture, Concretions,
(inches) Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc.
0-14 A 1 OYR 2/1 fsl, 1 fgr
14-16 E1 10YR 3/2 s, Ifgr
16-20 E2 I OYR 3/3 s, I fgr
20-30 Btgl IOYR 5/6 IOYR 5/3 c2d scl, Ifsbk
30+ Btg2 10YR 6/1 1OYR 4/3 c2d scl, Ifsbk
Hydric Soil Indicators:
Histosol Concretions
Histic Epipedon High Organic Content in Surface Layer in Sandy Soils
Sulfidic Odor Organic Streaking in Sandy Soils
Aquic Moisture Regime Listed On Local Hydric Soils List
Reducing Conditions Listed on National Hydric Soils List
Gleyed or Low-Chroma Colors Other (Explain in Remarks)
Remarks:
Soil is a Goldsboro Variant that has an arenic surface (20 inches of sand in surface horizon).
WETLAND DETERMINATION
Hydrophytic Vegetation Present?
Wetland Hydrology Present?
Hydric Soils Present?
Remarks:
Yes X No Is the Sampling Point
Yes No X Within a Wetland? Yes_ No X
Yes No X
N:Sstokes/Projects/Hawkside/Permits/Wetland Data Form.2 Wetland
APPROVED JURISDICTIONAL DETERMINATION FORM
U.S. Army Corps of Engineers
This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook.
SECTION I: BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD):
B. DISTRICT OFFICE, FILE NAME, AND NUMBER:
C. PROJECT LOCATION AND BACKGROUND INFORMATION:
State:NC County/parish/borough: Onslow City: Jacksonville
Center coordinates of site (lat/long in degree decimal format): Lat. 34.767556° N, Long. 77.3993611 W.
Universal Transverse Mercator:
Name of nearest waterbody: Sandy Run Branch
Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: New River
Name of watershed or Hydrologic Unit Code (HUC): White Oak-01
® Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request.
? Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a
different JD form.
D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
[( Office (Desk) Determination. Date:
Field Determination. Date(s): 1-14-09
SECTION II: SUMMARY OF FINDINGS
A. RHA SECTION 10 DETERMINATION OF JURISDICTION.
There Pick List "navigable waters of the U.S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the
review area. [Required]
? Waters subject to the ebb and flow of the tide.
? Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce.
Explain:
B. CWA SECTION 404 DETERMINATION OF JURISDICTION.
There Pick List "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required]
1. Waters of the U.S.
Indicate presence of waters of U.S. in review area (check all that apply): t
TNWs, including territorial seas
? Wetlands adjacent to TNWs
Relatively permanent waters2 (RPWs) that flow directly or indirectly into TNWs
? Non-RPWs that flow directly or indirectly into TNWs
? Wetlands directly abutting RPWs that flow directly or indirectly into TNWs
? Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs
? Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs
Impoundments of jurisdictional waters
Isolated (interstate or intrastate) waters, including isolated wetlands
b. Identify (estimate) size of waters of the U.S. in the review area:
Non-wetland waters: linear feet: width (ft) and/or
Wetlands:
acres.
C. Limits (boundaries) of jurisdiction based on: Pick List
Elevation of established OHWM (if known):
acres.
2. Non-regulated waters/wetlands (check if applicable):3
Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional.
Explain:
Boxes checked below shall be supported by completing the appropriate sections in Section III below.
z For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally"
(e.g., typically 3 months).
3 Supporting documentation is presented in Section III.F.
SECTION III: CWA ANALYSIS
A. TNWs AND WETLANDS ADJACENT TO TNWs
The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete
Section III.A.1 and Section III.D.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections III.A.1 and 2
and Section III.D.1.; otherwise, see Section III.B below.
1. TNW
Identify TNW:
Summarize rationale supporting determination:
2. Wetland adjacent to TNW
Summarize rationale supporting conclusion that wetland is "adjacent":
B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (1F ANY):
This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps
determine whether or not the standards for jurisdiction established under Rapanorhave been met.
The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are "relatively permanent
waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3
months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round
(perennial) flow, skip to Section III.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow,
skip to Section III.D.4.
A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and
EPA regions will include in the record any available information that documents the existence of a significant nexus between a
relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even
though a significant nexus finding is not required as a matter of law.
If the waterbody4 is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the
waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must
consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for
analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is
the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section III.B.1 for
the tributary, Section III.B.2 for any onsite wetlands, and Section III.B.3 for all wetlands adjacent to that tributary, both onsite
and offsite. The determination whether a significant nexus exists is determined in Section III.C below.
1. Characteristics of non.TNWs that flow directly or indirectly into TNW
(i) General Area Conditions:
Watershed size: Pick List
Drainage area: 440 acres
Average annual rainfall: inches
Average annual snowfall: inches
(ii) Physical Characteristics:
(a) Relationship with TNW
? Tributary flows directly into TNW.
® Tributary flows through 2 tributaries before entering TNW.
Project waters are 2-5 river miles from TNW.
Project waters are I (or less) river miles from RPW.
Project waters are 1-2 aerial (straight) miles from TNW.
Project waters are 1 (or less) aerial (straight) miles from RPW.
Project waters cross or serve as state boundaries. Explain:
Identify flow route to TNW5: Tributary I Sandy Run Branch runs into Chainey Creek which then flows into the New
River.
4 Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the and
West.
5 Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW.
Tributary stream order, if known:
(b) General Tributary Characteristics (check all that apply):
Tributary is: ? Natural
? Artificial (man-made). Explain:
® Manipulated (man-altered). Explain: Channelized stream.
Tributary properties with respect to top of bank (estimate):
Average width: 4 feet
Average depth: 0.8 feet
Average side slopes: Vertical (1:1 or less}.
Primary tributary substrate composition (check all that apply):
® Silts ® Sands ? Concrete
? Cobbles ? Gravel ? Muck
? Bedrock ? Vegetation. Type/% cover:
? Other. Explain:
Tributary condition/stability [e.g., highly eroding, sloughing banks]. Explain: Moderately eroding-unsercut banks and
2:1 slopes observed.
Presence of run/riffle/pool complexes. Explain: Run/riffle/pools have formed in certain areas.
Tributary geometry: Relatively straight
Tributary gradient (approximate average slope): 1/2 %
(c) Flow:
Tributary provides for: Intermittent but not seasonal' flow
Estimate average number of flow events in review area/year: 1
Describe flow regime:
Other information on duration and volume:
Surface flow is: Confined. Characteristics:
Subsurface flow: No. Explain findings: No signs of seepage or other signs of subsurface flow.
? Dye (or other) test performed:
Tributary has (check all that apply):
® Bed and banks
? OHWM6 (check all indicators that apply):
® clear, natural line impressed on the bank ?
? changes in the character of soil ?
® shelving ?
? vegetation matted down, bent, or absent ?
? leaf litter disturbed or washed away ?
? sediment deposition ?
? water staining ?
? other (list):
? Discontinuous OHWM.7 Explain:
If factors other than the OHWM were used to determ
High Tide Line indicated by: 0
? oil or scum line along shore objects
? fine shell or debris deposits (foreshore)
? physical markings/characteristics
? tidal gauges
? other (list):
the presence of litter and debris
destruction of terrestrial vegetation
the presence of wrack line
sediment sorting
scour
multiple observed or predicted flow events
abrupt change in plant community
ne lateral extent of CWA jurisdiction (check all that apply):
Mean High Water Mark indicated by:
? survey to available datum;
? physical markings;
? vegetation lines/changes in vegetation types.
(iii) Chemical Characteristics:
Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics, etc.).
Explain: water is clear and no odors.
Identify specific pollutants, if known:
6A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where
the OHWM has been removed by development or agricultural practices). Where there is a break in the OHWM that is unrelated to the waterbody's flow
regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break.
7Ibid.
(iv) Biological Characteristics. Channel supports (check all that apply):
® Riparian corridor. Characteristics (type, average width): 50' powerline R-O-W is mowed. Riparian corridor outside RO-
W is 100' or more upstream and downstream.
® Wetland fringe. Characteristics: wooded.
? Habitat for:
? Federally Listed species. Explain findings:
? Fish/spawn areas. Explain findings:
? Other environmentally-sensitive species. Explain findings:
? Aquatic/wildlife diversity. Explain findings:
2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW
(i) Physical Characteristics:
(a) General Wetland Characteristics•
Properties:
Wetland size:0.28acres
Wetland type. Explain:Riverine Swamp Forest.
Wetland quality. Explain:fair.
Project wetlands cross or serve as state boundaries. Explain:
(b) General Flow Relationship with Non-TNW:
Flow is: Intermittent flow. Explain: natl
Surface flow is: Confined
Characteristics:
Subsurface flow: No. Explain findings:
? Dye (or other) test performed:
(c) Wetland Adiacencv Determination with Non-TNW
? Directly abutting
® Not directly abutting
? Discrete wetland hydrologic connection. Explain:
? Ecological connection. Explain:
® Separated by berm/barrier. Explain: Slight spoil along edge of channel that ponds water behind top of bank.
(d) Proximity (Relationship) to TNW
Project wetlands are 1-2 river miles from TNW.
Project waters are I (or less) aerial (straight) miles from TNW.
Flow is from: Wetland to navigable waters.
Estimate approximate location of wetland as within the 2-year or Iess floodplain.
(ii) Chemical Characteristics:
Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed
characteristics; etc.). Explain: water color is clear.
Identify specific pollutants, if known:
(iii) Biological Characteristics. Wetland supports (check all that apply):
® Riparian buffer. Characteristics (type, average width):50' R-O-W is mowed. Riverine swamp forst at least 100' on both
sides of creek outside of R-O-W.
® Vegetation type/percent cover. Explain:Riverine Swamp Forest.
? Habitat for:
? Federally Listed species. Explain findings:
? Fish/spawn areas. Explain findings:
? Other environmentally-sensitive species. Explain findings:
? Aquatic/wildlife diversity. Explain findings:
3. Characteristics of all wetlands adjacent to the tributary (if any)
All wetland(s) being considered in the cumulative analysis: Pick List
Approximately ( ) acres in total are being considered in the cumulative analysis.
For each wetland, specify the following:
Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres)
Summarize overall biological, chemical and physical functions being performed:
C. SIGNIFICANT NEXUS DETERMINATION
A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed
by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity
of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent
wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW.
Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow
of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent
wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a
tributary and its adjacent wetland or between a tributary and the TNW). Similarly, the fact an adjacent wetland lies within or
outside of a floodplain is not solely determinative of significant nexus.
Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and
discussed in the Instructional Guidebook. Factors to consider include, for example:
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to
TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and
other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that
support downstream foodwebs?
• Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or
biological integrity of the TNW?
Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented
below:
Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain
findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section III.D:
Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into
TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its
adjacent wetlands, then go to Section III.D:
Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of
presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to
Section III.D: The adjacent wetlands has the capacity to reduce the amount of pollutants to the TNC.
D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL
THAT APPLY):
TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area:
? TNWs: linear feet width (ft), Or, acres.
? Wetlands adjacent to TNWs: acres.
RPWs that flow directly or indirectly into TNWs.
Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that
tributary is perennial:
Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year) are
jurisdictional. Data supporting this conclusion is provided at Section III.B. Provide rationale indicating that tributary flows
seasonally:
Provide estimates for jurisdictional waters in the review area (check all that apply):
? Tributary waters: linear feet width (ft).
Other non-wetland waters: acres.
Identify type(s) of waters:
3. Non-RPWss that flow directly or indirectly into TNWs.
? Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a
TNW is jurisdictional. Data supporting this conclusion is provided at Section III.C.
Provide estimates for jurisdictional waters within the review area (check all that apply):
Tributary waters: linear feet width (ft).
Other non-wetland waters: acres.
Identify type(s) of waters:
Wetlands directly abutting an RPW that flow directly or indirectly into TNWs.
EJ Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands.
?, Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale
indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is
directly abutting an RPW:
? Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is
seasonal in Section III.B and rationale in Section III.D.2, above. Provide rationale indicating that wetland is directly
abutting an RPW:
Provide acreage estimates for jurisdictional wetlands in the review area: acres.
Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs.
Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent
and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this
conclusion is provided at Section III.C.
Provide acreage estimates for jurisdictional wetlands in the review area: 0.28 acres.
6. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs.
? Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and
with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this
conclusion is provided at Section III.C.
Provide estimates for jurisdictional wetlands in the review area: acres.
Impoundments of jurisdictional waters.
As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional.
Demonstrate that impoundment was created from "waters of the U.S.," or
? Demonstrate that water meets the criteria for one of the categories presented above (1-6), or
Demonstrate that water is isolated with a nexus to commerce (see E below).
E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE,
DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY
SUCH WATERS (CHECK ALL THAT APPLY):to
? which are or could be used by interstate or foreign travelers for recreational or other purposes.
? from which fish or shellfish are or could be taken and sold in interstate or foreign commerce.
which are or could be used for industrial purposes by industries in interstate commerce.
? Interstate isolated waters. Explain:
? Other factors. Explain:
Identify water body and summarize rationale supporting determination:
'See Footnote # 3.
9 To complete the analysis refer to the key in Section III.D.6 of the Instructional Guidebook.
io Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for
review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos.
Provide estimates for jurisdictional waters in the review area (check all that apply):
? Tributary waters: linear feet width (ft).
Other non-wetland waters: acres.
Identify type(s) of waters:
? Wetlands: acres.
F. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY):
If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers
Wetland Delineation Manual and/or appropriate Regional Supplements.
? Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce.
? Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the
"Migratory Bird Rule" (MBR).
? Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain:
? Other: (explain, if not covered above):
Provide acreage estimates for non-jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR
factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional
judgment (check all that apply):
? Non-wetland waters (i.e., rivers, streams): linear feet width (ft).
? Lakes/ponds: acres.
?? Other non-wetland waters: acres. List type of aquatic resource:
Wetlands: acres.
Provide acreage estimates for non-jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such
a finding is required for jurisdiction (check all that apply):
? Non-wetland waters (i.e., rivers, streams): linear feet, width (ft).
? Lakes/ponds: acres.
Other non-wetland waters: acres. List type of aquatic resource:
? Wetlands: acres.
SECTION IV: DATA SOURCES.
A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked
and requested, appropriately reference sources below):
® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant:
® Data sheets prepared/submitted by or on behalf of the applicant/consultant.
? Office concurs with data sheets/delineation report.
? Office does not concur with data sheets/delineation report.
? Data sheets prepared by the Corps:
? Corps navigable waters' study:
U.S. Geological Survey Hydrologic Atlas:
? USGS NHD data.
? USGS 8 and 12 digit HUC maps.
U.S. Geological Survey map(s). Cite scale & quad name:
USDA Natural Resources Conservation Service Soil Survey. Citation:
? National wetlands inventory map(s). Cite name:
? State/Local wetland inventory map(s):
? FEMA/FIRM maps:
? 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929)
? Photographs: ? Aerial (Name & Date):
or ? Other (Name & Date):
? Previous determination(s). File no. and date of response letter:
Applicable/supporting case law:
? Applicable/supporting scientific literature:
? Other information (please specify):
B. ADDITIONAL COMMENTS TO SUPPORT JD:
AGENT AUTHORIZATION FORM
PROPERTY LEGAL DESCRIPTION:
LOT NO, PLAN NO. KCI Job # 12082159 PARCEL ID: 346A-66
Site Coordinates in (decimal degrees) Lat: 34.767556 Long: 77.399361
STREET ADDRESS: 1065 th Avenue
Jacksonville. NC 28546-6507
Please print:
Property Owner: _ AT&T (LEASED TOWER EASMENT)
Property Owner:
The undersigned, registered property owners of the above noted property, do hereby authorize
Steven F Stokes , of KCI Associates of NC
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
AT&T Mobility 2002 Pisgah Church Road site 300 Gre nshnrn, NC 27455
Telephone: (336) 508-5869
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
GJ
A red Signature) Authorized Signature
Date:--. '3/b ! 5 Date:
(6) PROPOSED AT&T ANTENNAS
(2) KATHREIN 742-215 ANTENNAS (PER SECTOR)
(2) RFS ATM 192012-0 TMAs (PER SECTOR)
+1
o?
N
F-
S
U
W
S
W
U
J
J
Q
W
O
U
z
I
X
W
TOWER ELEVATION
NOT TO SCALE
TRANSMISSION LINE
SUPPORT (TYP.)
EXISTING PROGRESS ENERGY
TRANSMISSION TOWER
(12) PROPOSED 1-5/8"0 AT&T COAX
CABLES ROUTED PER STRUCTURAL
ANALYSIS (STRUCTURAL BY OTHERS)
PROPOSED AT&T ICE BRIDGE
PROPOSED AT&T 15'x15'
EQUIPMENT PLATFORM
(TOP OF STEEL AT 5' AGL)
PROPOSED AT&T 21'X27'
FENCED LEASE AREA
LOCATED UNDERNEATH
EXISTING TOWER
NOT FOR CONSTRUCTION
KC1 ^•? SITE NAME: DATE: REV/: DATE:
't&'t A HAWKSIDE e?15?oAPPROV1 s
ASSOCIATES OF NC ` a TITLE: DATE, SITE ID /. KCI JOBk.
Landmark Center II, Suite 220 214-027 12082159
4601 Six Forks Road PROPERTY OWNER INFORMATION ADDRESS: 1DRAWINGIF.
Raleigh, NC 27609-5210 PROPERTY OWNER: RUTH SHEPARD: 1O6 5th AVENUE
(919) 783-9214 (Phone) PROPERTY TAX ID/: 348C-98 DA? (PROPERTY) DRAWN BY: BRL ELEVATION
(919) 783-9266 (Fax) APPROVAL: TITLE: JACKSONVILLE, NC 28540 CHECKED BY: EK
V? W p
z N
C9. W, cv o
Z
O CO
?..r 0
w?aox N Y J w -j U d
O R: W?N? M w O O? N (n j Z
¢ Wpwz , N ?p - m am Y Q J
r? co H w Y w a' 5
U cn 2 r- N z U w U) ai H m N aj Q U) Z
O ow^? ?? U) w(n 2 2 2 Z cop
w w wQ m O M W W Fw_- U U O z w
¢¢ O Z Y U Fn O Q ?- w
¢ 1 ¢
a 0
EL w
0
H
J
W
z D
? z
w a
w w z
Z _j O ?
O W
J L'i > N
O 0 0 CD r )
p F W Z Z Z Q
Z ~ U ~ F- F- J
Z D J x> z U) U) n
(wj D ? CD L, w w w 3
W
J II
li ?U)
z
I (~n 0
W w
in
iV O
z
co ?L-u P:
o~CUw
?O=
w w J W W W
?0 9 V) ¢z
W~~- aww
06 _j ? C) aW(L ?a aawD
U) LU
< LL
a;a0J
x?C=l0a- W
Wu
a?wt"(n
0
z
J
w
c?
z
NU
U?
W J
w
wo
z
+, z
0) W
O
U) U)
U) U)
zw2
'0
way /
Z
c7
} W /
/
W W
/
W
U) W
W /
Z_
J
0
OO
w
0? /
z
°
:>
o? / Z o
/ g
/ a o
w
/
I
If
W Iii
J
z
A Q U
/
Y
LL / ?N U
w
Y
W
=
a am
c, / > q
F- LL
\ ?`Z \\ W O / O O
U) a.
\\\ CC) O F
z
{l`j N?'g77-
C- z }} w
ZF? w `?.
H J \ I I ? i7 \\ -Y/?' W
/ / \ \ 7 , \t2 \ x w
(n w() a00
W d / / \\ \ Z\ \+ ca w w WI nM?
\ > = C7 C7 w
z N J ?N"?aaa O
W ? - ZF- ^NO a.
.rmm
O(A XZ
EL W W -j
00
w a.
w
0 J it \
U) -28
>- 04
7 W u) CO
AZ 1 00 1000,
q:l .0- CD
M 1 00 co
LLI v) CL CL
/, \\ Zr^ON
E 00 M
YM a
CL
0
\Y >- 0 co
* a \
CD I
/ / \ ? ?O(0: ZOV.?
f I a. 0
/ \ / // / \ / // \ \Y^aa \ \ Z"T`°N /
Z V! 04 rl
CID 03 / ? ? w \ fl)
00 PI) a. ?Oy \ \ oa /
-k 0
(D IL
\ P
: > B
Ln W B /
wZ
?° \/ / / \ \ ?,' '\ \ \