HomeMy WebLinkAbout20180396 Ver 1_Email_20180321 (2)Strickland, Bev
From: Pullinger, Robert C
Sent: Wednesday, March 21, 2018 5:44 PM
To: Hardison, Lyn
Subject: FW: [External] Turner Run Express Review
Attachments: D-1127 - Turner Run CONST-Impact.pdf
Just to keep you in the loop/FYI
Chris Pullinger
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3922 office
chris.pullinger(a)ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
From: Brian O'Kane[mailto:brian.okane@arkconsultinggroup.com]
Sent: Wednesday, March 21, 2018 4:13 PM
To: Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Cc: Bryan Fagundus <Bryan@arkconsultinggroup.com>
Subject: [External] Turner Run Express Review
External email. Do not click links or open attachments unless verifie
Report Spam.
Chris —
The dropbox link below is to the submittal that we reviewed on Monday at the express review meeting for the Turner
Run Subdivision on HWY33. I've also attached a PDF of the impact exhibit as we discussed on Monday.
https://www.d ropbox.com/s/99sq 1831fayOf3q/2018-03-19%20-%20PCN%2OExpress%2OReview%2OCom bi ned. pdf?d 1=0
We are working on getting the agent authorization executed and I'll send that over as soon as we have it.
Thanks,
Brian
Brian O'Kane, PE
Project Manager
ARK CONSULTING GROUP, PLLC
2755-B Charles Blvd.
Greenville, NC 27858
www.arkconsultinggroup.com
252.565.1026 (Direct Office Line)
252.558.0888 (Office) Ext. 104
252.702.7104 (Mobile)
brian.okane@arkconsultinggroup.com
CONSULTING
R U R PLLC
si Qx K .NGtNEE RS & PL.ANNERS
Ido
I
/
/ I
/ I
/
I /
I /
/
/I
/
/
/
v
/ (L
/ r1, \
/ Stream and Wetland Impacts
/ SCALE: 1"=10'
10' 0 5' 10'
SCALE 1 inch = 10 ft
10' 0 5' 10'
SCALE 1 inch = 10 ft
z
0
u
u
F ~
Z
Z
O
O u
CL
u �
w
CL
0
00
w�
aM
o�
0
II REVISIONS:
F—
LU
LU
Cl)
F—
U
Q
a.
o�
LL
LL
M
m
Z
0
Drawn By:
LEGEND:
�
ENVIRONMENTAL FEATURES
V
a u�
w
Drawing Number:
STREAM ------------------
Q
BUFFER ZONE 1 — — ZONE 1 — — —
J a
W
M
M
BUFFER ZONE 2 — — ZONE 2 — — —
a`a
J
STREAM AND WETLAND IMPACTS
Z
PERMANENT STREAM IMPACT W1/S1 - 83 L.F.
z zOw
(CULVERT)
LL,
O0
C)
TEMPORARY STREAM IMPACT - 22 L.F.
V�w
�
(CULVERT)
W
� 00
RIPARIAN BUFFER IMPACTS
Z
CON
PERMANENT BUFFER IMPACT (ZONE 1) /� B1 - 1,695 S.F.
V)00
(ROADWAY)
�ZOo
PERMANENT BUFFER IMPACT (ZONE 2) ��\\\\\\\ B1 - 1,055 S.F.
r,_
0
-C v Co
(ROADWAY)
UC9 Ln
PERMANENT BUFFER IMPACT (ZONE 1)\\\\\\\ B2 - 1,531 S.F.
74)(
� Lr)
(LAND CLEARING)
Ln N fV
PERMANENT BUFFER IMPACT (ZONE 1) B4 - 1,556 S.F.
Lnv ,n
(RIP RAP STABILIZATION)
c-1 (D N
TEMPORARY BUFFER IMPACT (ZONE 1)\\\\\\\ B3 - 1,819 S.F.
(GRADING)
TEMPORARY BUFFER IMPACT (ZONE 2) \\\\\\\\ B3 - 2,420 S.F.
(GRADING)
10' 0 5' 10'
SCALE 1 inch = 10 ft
z
0
u
u
F ~
Z
Z
O
O u
CL
u �
w
CL
0
00
w�
aM
o�
0
II REVISIONS:
F—
LU
LU
Cl)
F—
U
Q
a.
o�
LL
LL
M
m
Z
0
Drawn By:
O
�
FEEV
V
a u�
w
Drawing Number:
L
Q
O
z
J a
W
M
M
*-0
a`a
J
�
O
Z
a
z zOw
o
LL,
O0
C)
N
V�w
�
3
H
W
� 00
102>
Z
CON
10
a_.,
rn r^
rn V
Drawn By:
EW/BTO
E
FEEV
Project Number:
rn r^
rn V
Drawn By:
EW/BTO
Z
BTO
Project Number:
a u�
w
Drawing Number:
D-1127
d z
J a
a`a
J
�
o
E
z zOw
o
LL,
O0
V�w
�
� 00
102>
CON
10
a_.,
V)00
=s0)000 V)
�ZOo
U
r,_
0
-C v Co
0
UC9 Ln
L
74)(
� Lr)
M
Ln N fV
Lnv ,n
c-1 (D N
Project Manager: BCF
Drawn By:
EW/BTO
Checked By:
BTO
Project Number:
17050
Drawing Number:
D-1127
Biml
Date: 01-26-18
H