Loading...
HomeMy WebLinkAbout20180396 Ver 1_Riparian Buffer Authorization_20180320Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NWP14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit X❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes Q No ❑ Yes Q No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Turner Run Subdivision 2b. County: Pitt 2c. Nearest municipality / town: Simpson 2d. Subdivision name: Turner Run Subdivision 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Centerfield Properties, LLC 3b. Deed Book and Page No. Deed Book 2060, Page No. 724 and Deed Book 2060, Page No. 721 3c. Responsible Party (for LLC if applicable): Centerfield Properties, LLC 3d. Street address: P.O. Box 30930 3e. City, state, zip: Greenville, NC 27833 3f. Telephone no.: (252)355-7757 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Bryan C. Fagundus, P.E. 5b. Business name (if applicable): Ark Consulting Group, PLLC 5c. Street address: 2755-B Charles Blvd. 5d. City, state, zip: Greenville, NC 27858 5e. Telephone no.: (252)558-0888 5f. Fax no.: (252)565-8839 5g. Email address: bryan@arkconsultinggroup.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 02723 and 52966 1 b. Site coordinates (in decimal degrees): Latitude: 35.585191 Longitude: 77.284827 1 c. Property size: 39.79 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Mill Branch (28-98.5) 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Tar-Pamlico -...... T... .............. -.......... . 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently open agricultural land with an existing UT to Mill Branch bisecting the property. 3b. List the total estimated acreage of all existing wetlands on the property: 0.45 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,300 3d. Explain the purpose of the proposed project: The proposed project installs a road culvert for a new residential street. 3e. Describe the overall project in detail, including the type of equipment to be used: Refer to Attachment 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Yes Q No Unknown ❑ Corps or State been requested or obtained for this property / Comments: project (including all prior phases) in the past? 4b. If the Corps made the jurisdictional determination, what type El Preliminary Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory Page 4 of 10 PCN Form —Version 1.4 January 2009 1a. Which sections were completed below for your project (check all that apply): Q Wetlands ❑X Streams —tributaries Q Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 P Culvert Unknown Yes DWQ 0.01 W2 T Land Clearing Unknown Yes DWQ 0.002 W3 Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.012 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert UT to Mill Branch PER DWQ 5 83 S2 T Culvert UT to Mill Branch PER DWQ 5 22 S3 - Choose one _ S4 - Choose one -i S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 105 3i. Comments: Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts 1IC, UUIIUSIG GC j�LIIGIG Glc V1UPU0CU 1111 lGLdJ LU 10MV01 PullUOt C.JLUGIICil, LIIUulasS , LIIC MLIMIL%JdHI, UH dlly ULI ICH UF.ICHI WdLC.H UI e U.S. then individuall;e list all open water impacts below. 4a. 4b. Open water Name of waterbody 4c. mm .... 4d. 4e. impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Tem orary 'TI 01 Choose Choose Choose ! Choose one ..... .................................. -------- 02 Choose one 03 - Choose one 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, thenou MUST fill out Section D of this form. 6a. Project is in which protected basin? E] Neuse 0 Tar -Pamlico E] Catawba E] Randleman ❑Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent (P) or : required? (square (square Tem ora T feet' feet,, B1 P Roadway Crossing UT to Mill Branch No 1,695 _ ­ 1,055 B2 P Land Clearing UT to Mill Branch No 1,531 0 B3 T Grading UT to Mill Branch No 1,819 2,420 B4 P Rip Rap Stabilization UT to Mill Branch No 1,556 0 B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6,601 3,475 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The design utilizes head walls to minimize the impact area required for crossing. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Minimize construction time by utilizing aluminum structural plate head walls. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): 2c. If yes, which mitigation option will be used for this project? 3. Complete if Using a Mil 3a. Name of Mitigation Bank: Bank ❑ DWQ ❑ Corps ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one 3c. Comments: Quantity: Quantity: 4. Complete if Making a Pa ment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: 4h. Comments: T ........... 5_ Cemnle+P if Ucinn a Parmiftaa Racnnncihla Mi4inc+inn Plan acres i 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes buffer mitigation? ❑ ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) j (square feet) Zone 1 Zone 2 3 (2 for Catawba) 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑X Yes ❑ No Q Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 23 2b. Does this project require a Stormwater Management Plan? ❑X Yes 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: ■L. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? Pitt County 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): Village of Simpson / Pitt County 1 0 Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: ❑ Yes ❑X No ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006-246 ❑Other: 1 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes 5b. Have all of the 401 Unit submittal requirements been met? 0 Yes Page 8 of 10 PCN Form — Version 1.4 January 2009 ❑ No I ❑ No ❑ No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the El Yes use of public (federal/state) land? Q No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: .................... _ ......... 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes Q No additional development, which could impact nearby downstream water quality. - - ......�... _................. 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. On-site septic in accordance with Pitt County Department of Environmental Health. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Yes ❑X No ❑ Yes ❑X No 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USACE GIS Data 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ' ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Fisheries Service GIS map 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes Q No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Pitt County Planning Department 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Insurance Risk Maps (FIRM Maps) (q l IS, Applicant/Agent's Printed Nameplicant/Ag 's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form — Version 1.4 January 2009 B. Project Information and Prior Project History 3. Project Description 3e. The project will involve the construction of a roadway crossing with a culvert and headwalls. Grading of the stream banks will be accomplished using traditional construction equipment consisting of hydraulic excavators and tracked graders such as dozers and skid -steers. Excess excavated material will be disposed of onsite. The construction methodology will implore by-pass pumping for day-to-day construction. Erosion & Sedimentation Control is to be accomplished on a day-to-day basis by installing temporary sandbags at the upstream and downstream ends of the "current day work zone" to minimize the base flow rate within the work zone each day. The contractor shall place a centrifugal pump within Zone 1 of the Riparian Buffer and the suction hose will be placed in the stream immediately upstream of the first sand bags. The discharge hose will be laid on existing grade within the Riparian Buffer and will outlet through a temporary silt bag to be placed on flat ground within Buffer Zone 1. Discharge coming from the temporary silt bag will sheet flow across the Buffer into the stream downstream of the second set of sand bags. Disturbed slopes will be stabilized at the end of each work day with permanent seeding and turf reinforcement matting. / / ENVIRONMENTAL FEATURES STREAM ------------------ / BUFFERZONE 1 r71 STREAM AND WETLAND IMPACTS r PERMANENTSTREAN11— WL/SL-83 LF. (CULVERT) TEMPORARY SIRFAM IMPACT W2/S2-23LF. (CULVERT) RIPARIAN BUFFER IMPACTS I / � / (ROADWAY) PERMANENT BUFFER IMPAR(ZONE 2) BS -1,055 S.F. (ROADWAY) PERMANENT BUFFER IMPACF(ZONE 1) (LAND CLFARINGI B2-1,531 S.F. PERMANENT BUFFER IMPAR(ZONE l) /����/, BR-1,556S.F. (RIP RAP STABILPATION) 74 TEMPORARY BUFFER IMPACT (ZONE 11 W-1,819S.F. (GRADING) TEMPORARY BUFFER IMI—(ZONE 2) 63-2,420 S.F. (GRADING) e f / Prujea Manager: BCF. / , /' Drawn BY: EWIBTO Stream and Wetland Impacts 'r / / ENVIRONMENTAL FEATURES STREAM ------------------ / BUFFERZONE 1 BUFFERZONE 2 STREAM AND WETLAND IMPACTS PERMANENTSTREAN11— WL/SL-83 LF. (CULVERT) TEMPORARY SIRFAM IMPACT W2/S2-23LF. (CULVERT) RIPARIAN BUFFER IMPACTS r � / (ROADWAY) PERMANENT BUFFER IMPAR(ZONE 2) BS -1,055 S.F. (ROADWAY) PERMANENT BUFFER IMPACF(ZONE 1) (LAND CLFARINGI B2-1,531 S.F. PERMANENT BUFFER IMPAR(ZONE l) /����/, BR-1,556S.F. (RIP RAP STABILPATION) 74 TEMPORARY BUFFER IMPACT (ZONE 11 W-1,819S.F. (GRADING) TEMPORARY BUFFER IMI—(ZONE 2) 63-2,420 S.F. (GRADING) f / Prujea Manager: BCF. / , /' Drawn BY: EWIBTO Stream and Wetland Impacts 'r Checked By: BTO g r / Riparian Buffer Impacts Project Number. 77(150 Drawi09 Number: D-1127 y 1D' 0 s 10' 1V U 0' 10' F SCALE 1 inch = 10 N /•' VI / SCALE 1 inch= 10 N LEGEND: ENVIRONMENTAL FEATURES STREAM ------------------ / BUFFERZONE 1 BUFFERZONE 2 STREAM AND WETLAND IMPACTS PERMANENTSTREAN11— WL/SL-83 LF. (CULVERT) TEMPORARY SIRFAM IMPACT W2/S2-23LF. (CULVERT) RIPARIAN BUFFER IMPACTS PERMANENT BUFFER IM—(ZONE I) B1-1,695 S.F. (ROADWAY) PERMANENT BUFFER IMPAR(ZONE 2) BS -1,055 S.F. (ROADWAY) PERMANENT BUFFER IMPACF(ZONE 1) (LAND CLFARINGI B2-1,531 S.F. PERMANENT BUFFER IMPAR(ZONE l) /����/, BR-1,556S.F. (RIP RAP STABILPATION) EN TEMPORARY BUFFER IMPACT (ZONE 11 W-1,819S.F. (GRADING) TEMPORARY BUFFER IMI—(ZONE 2) 63-2,420 S.F. (GRADING) / r / a % / ! Z a �' g a inn EN r z2- Prujea Manager: BCF. / , /' Drawn BY: EWIBTO 'r Checked By: BTO g r / Riparian Buffer Impacts Project Number. 77(150 Drawi09 Number: D-1127 y 1D' 0 s 10' F SCALE 1 inch = 10 N VI Date: 01-25-18 USDA United States Department of Agriculture NRCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Pitt County, North Carolina December 5, 2017 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wp. portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/con tus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Fitt County, North Carolina............................................................................. 13 AgB—Alaga loamy sand, banded substratum, 0 to 6 percent slopes (Alpin)....................................................................................................13 Bb—Bibb complex.......................................................................................14 Cr132—Craven fine sandy loam, 1 to 6 percent slopes, eroded .................. 15 CrC—Craven fine sandy loam, 6 to 10 percent slopes ............................... 16 MaB—Masada sandy loam, 0 to 4 percent slopes (State)..........................17 NrB—Norfolk sandy loam, 1 to 6 percent slopes ........................................ 18 W—Water....................................................................................................19 WaB—Wagram loamy sand, 0 to 6 percent slopes.....................................20 WaC—Wagram loamy sand, 6 to 10 percent slopes...................................21 References................................................................ ............................................ 23 4 How Soil Surveys Are Made Soil surreys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 9 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 2 WaE� WaB #E Bb i t Wac ,� Mafl ti4 MaB Was Was CrC k i Wa6 I - qgB, Cr82 33- -NNEB§ kSN T '_ �- �_ MAP LEGEND Area of Interest (AOQ Spoil Area Area of Interest (AOI) Soils Very Stony Spot Soil Map Unit Polygons w Soil Map Unit Unes p Sail Map Unit Points Special Point Features W Blowout ® Borrow Pit Rails Clay Spot 0 Closed Depression X Gravel Pit Major Roads Gravelly Spot 0 Landfill Lava Flow Marsh or swamp Mine or Ouarry 0 Miscellaneous Water OPerennial Water V Rock Outcrop + Saline Spot Sandy Spot 4D Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Custom Soil Resource Report 1@ Spoil Area Stony Spot Very Stony Spot Wet Spot Other •� Special Line Features Water Features Streams and Canals Transportation *4.4 Rails Interstate Highways -- US Routes Major Roads Local Roads Background Aerial Photography 10 MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Pitt County, North Carolina Survey Area Data: Version 14, Oct 3, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 13, 2015—Feb 1, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a resuR, some minor shiftfn4 of maD unit boundaries may be evident. Custom Soil Resource Report Map Unit Legend Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the 11 Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgB Alaga loamy sand, banded substratum, 0 to 6 percent slopes (Alpin) 3.7 6.5% Bb CrB2 Bibb complex ....................................................... . Craven fine sandy loam, 1 to 6 percent slopes, eroded 17.2 0.8 30.7% 1.5% CrC Craven fine sandy loam, 6 to 10 percent slopes 2.1 3.7% MaB Masada sandy loam, 0 to 4 percent slopes (State) 8.3 14.8% NrB W WaB WaC Totals for Area of Interest Norfolk sandy loam, 1 to 6 percent slopes Water Wagram loamy sand, 0 to 6 percent slopes Wagram loamy sand, 6 to 10 percent slopes 0.8 0.7 19.9 2.5 56.1 1.4% 1.3% 35.5% 4.5% 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the 11 Custom Soil Resource Report scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Pitt County, North Carolina AgB—Alaga loamy sand, banded substratum, 0 to 6 percent slopes (Alpin) Map Unit Setting National map unit symbol. 3tyc Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Not prime farmland Map Unit Composition Alpin and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Alpin Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across -slope shape: Convex Parent material. Eolian sands and/or sandy fluviomarine deposits Typical profile A - 0 to 7 inches: fine sand E - 7 to 38 inches: fine sand EBt - 38 to 72 inches: fine sand C - 72 to 80 inches: sand Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: Rare Frequency of ponding: None Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Low (about 4.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Hydric soil rating: No 13 Custom Soil Resource Report Bb—Bibb complex Map Unit Setting National map unit symbol. 3tyj Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period. 200 to 280 days Farmland classification: Not prime farmland Map Unit Composition Bibb, undrained, and similar soils: 65 percent Johnston, undrained, and similar soils: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bibb, Undrained Setting Landform: Flood plains Landform position (two-dimensional): Toeslope Down-slope shape: Concave Across -slope shape: Linear Parent material: Sandy and loamy alluvium Typical profile A - 0 to 6 inches: loamy sand Cgl - 6 to 60 inches: sandy loam Cg2 - 60 to 80 inches: loamy sand Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water storage in profile: Moderate (about 7.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: A/D Hydric soil rating: Yes Description of Johnston, Undrained Setting Landform: Flood plains Down-slope shape: Concave 14 Custom Soil Resource Report Across -slope shape: Linear Parent material. Sandy and loamy alluvium Typical profile A - 0 to 30 inches: mucky loam Cg1 - 30 to 34 inches: loamy fine sand Cg2 - 34 to 80 inches: fine sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: About 0 inches Frequency of flooding: Frequent Frequency of ponding: Frequent Available water storage in profile: High (about 9.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7w Hydrologic Soil Group: A/D Hydric soil rating: Yes CrB2—Craven fine sandy loam, 1 to 6 percent slopes, eroded Map Unit Setting National map unit symbol. 3tys Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period. 200 to 280 days Farmland classification: Farmland of statewide importance Map Unit Composition Craven and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Craven Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across -slope shape: Convex Parent material. Clayey marine deposits 15 Custom Soil Resource Report Typical profile A - 0 to 3 inches: fine sandy loam Bt - 3 to 48 inches: clay Cg - 48 to 80 inches: sandy loam Properties and qualities Slope: 4 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 24 to 36 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: D Hydric soil rating: No CrC—Craven fine sandy loam, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 3tyt Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Farmland of statewide importance Map Unit Composition Craven and similar soils: 80 percent Minor components: 6 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Craven Setting Landform: Ridges on marine terraces Landform position (two-dimensional): Shoulder Down-slope shape: Convex Across -slope shape: Convex Parent material: Clayey marine deposits Typical profile Ap - 0 to 7 inches: fine sandy loam E - 7 to 9 inches: fine sandy loam Bt - 9 to 54 inches: clay C - 54 to 80 inches: sandy loam 16 Custom Soil Resource Report Properties and qualities Slope: 4 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 24 to 36 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: D Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit. 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down-slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down-slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Muckalee, undrained Percent of map unit. 1 percent Landform: Flood plains Down-slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes MaB—Masada sandy loam, 0 to 4 percent slopes (State) Map Unit Setting National map unit symbol: 3tz4 Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days 17 Custom Soil Resource Report Farmland classification: All areas are prime farmland Map Unit Composition State and similar soils: 80 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of State Setting Landform: Stream terraces Landform position (three-dimensional): Tread Down-slope shape: Convex Across -slope shape: Linear Parent material: Old loamy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 10 inches: loamy sand Bt - 10 to 45 inches: sandy clay loam C - 45 to 90 inches: loamy sand Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 48 to 72 inches Frequency of flooding: Rare Frequency of ponding: None Available water storage in profile: Moderate (about 7.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Hydric soil rating: No NrB—Norfolk sandy loam, 1 to 6 percent slopes Map Unit Setting National map unit symbol: 3tz7 Elevation: 20 to 160 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: All areas are prime farmland Map Unit Composition Norfolk and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. 18 Custom Soil Resource Report Description of Norfolk Setting Landform: Ridges on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across -slope shape: Convex Parent material. Loamy marine deposits Typical profile Ap - 0 to 9 inches: sandy loam E - 9 to 15 inches: sandy loam Bt1 - 15 to 19 inches: sandy clay loam Bt2 - 19 to 100 inches: sandy clay loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 40 to 72 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 6.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Hydric soil rating: No W—Water Map Unit Composition Water. 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No 19 Custom Soil Resource Report WaB—Wagram loamy sand, 0 to 6 percent slopes Map Unit Setting National map unit symbol: 3tzm Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Wagram and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wagram Setting Landform: Ridges on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest Down-slope shape: Convex Across -slope shape: Convex Parent material: Loamy marine deposits Typical profile Ap - 0 to 8 inches: loamy sand E - 8 to 24 inches: loamy sand Bt - 24 to 75 inches: sandy clay loam BC - 75 to 83 inches: sandy loam Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 60 to 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 67 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2s Hydrologic Soil Group: A Hydric soil rating: No 20 Custom Soil Resource Report Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Down-slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit. 2 percent Landform: Flood plains Down-slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes WAC—Wagram loamy sand, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 3tzn Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Wagram and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wagram Setting Landform: Ridges on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across -slope shape: Convex Parent material: Loamy marine deposits Typical profile Ap - 0 to 8 inches: loamy sand E - 8 to 24 inches: loamy sand Bt - 24 to 75 inches: sandy clay loam BC - 75 to 83 inches: sandy loam Properties and qualities Slope: 6 to 10 percent 21 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 60 to 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 6.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Hydric soil rating: No 22 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ r cs/detail/nationa I/soils/?cid=nres 142 p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soi Is/?cid=nres l42p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// ,roww. nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres l42p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ h ome/?cid=nres 142 p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nresi detail/national/land use/rangepasture/?cid=stel prdb 1043084 23 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430 -VI. http://www.nres.usda.gov/wps/portal/ nres/deta il/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nresl42p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nres.usda.go nternet/FSE_DOCUMENTS/nresl42p2_ 52290.pdf 24 22U ��S U.S. DEPARTMENT OF THE GREENVILLE SE QUADRANGLE , U.S. GEOLOGICAL SUF NORTH CAROLINA -PITT CO. accsrwacpMraw 7.5 -MINUTE SERIES 70 s � � _4111■ MGM- -r- Rainbow +o -r _461110 =°LBank— �- r�C Id 5im*n �Cem 71 0 500 1000 2000 Feet GREENVILLE SE, NC 1:12000 2016 VFM GRID AND 207 MAGNETIC NORTH CONTOUR NJTERVAL 5 FEET DECLINATION AT CENTER OF SHEET NORTH AMERICAN VERTICAL DATUM OF 1988 Project Mgr.: BTO Project No.: 17023NCLimn.:P-1199 SITE LOCATION PLAN EXHIBIT Drawn By: STA Scare: AS SHOWN 6� Consulting Group, PLLC TURNER RUN SUBDIVISION Checked By: BCF Date: 01123/18 Engineers &Planners 2755-B Charles Blvd. I Greenville, NC 27858 NC Highway East Grimesland Township, Pitt Coo unty, North Carolina �y CGEB 0 R. :5 z a in or x_ o o C) H � D w Ykn SITE A CONSTRUCTION PLANS CIO z? 2 o 0 U 8� NC HIGHWAY 33 E., GRIMESLAND TWSP. w d PITT COUNTY, NORTH CAROLINA oo0 J EDC EBROOK DRIVE '18) a N/F J� 11 0 n RAWLS KEVIN D. C �J s� o D.B. 2762, PG. 652 N/F --- RESIDENTIAL RESIDENTIAL GONZALEZ EDDIE N/F 7 ZONED: A/R D48, DBAMABRIISPVEG $ WILSON WALTER J. J RUFINO& N/F HUSGENTILE ; REVISIONS: & WF. RESIDENTIAL MARIAN F. DOUGLAS ZONED: A/R D.B. 1282, PG. 22 ct� Vicinity Map RESIDENTIAL D.B. S D TI 698 LLJ ZONED: A/R RESIDENTIAL J WHICHARD KENNETH P. JR. I SCALE: 1":1000' \ ZONED: A/R L & WF. Q TIMOTHY KYLE ALLIGOOD CORAL J. N10'26'33"E N30'33 59 W D.B. 1782, PG. 257 74.84' (TL) 66.41' �vJ D & WF. MISTY RESIDENTIAL 10 A�. D.B. 3498, PG. 381 N34 6 X101 1� RESIDENTIAL ZONED: A/R N/F A� 6`� ss�� - NO9'23'45"W ZONED: A/R LEAVY, JR. BROCK Site Data: 00 33.99' & WF• PARCEL NUMBER ................02723 & 52966 TOTAL AREA IN TRACT ........... 39.79± AC. N/F CO ��" �j-fir' ,°n' M � KATHRYN W. NUMBER OF LOTS CREATED ....... 30 RANDOLPH BENEDICT BOSWELL JR. �i D.B. 2101, PG. 576 q �No 6 3NOZ - VALLEY LANDING SUBDIVISION ` cV n RESIDENTIAL & WE - 2 _ i \ PHASE 1, SECTION A & B LINEAR FT IN PROPOSED STREETS. . 2,856± LF KARINA ROBLES ,Z 3N°Z \ 12.88' 60 X62 M.S. 38, PG. 24 & 25 o W 3 3 ZONED: A/R AREA IN OPEN SPACE ............ NONE I D.B. 1812, PG. 202 � � '�I- N 01-45, 4g„ O M � cV M LO RESIDENTIAL \ �'' / �/ ` cV - - - N ZONING ........................ SFR ZONED: GENERAL BUSINESS '� \ N0Z F "E Dc R� 148.6' /� P N cp o Z 3NOZ \ \ 7>> 6 `L�26 22 , - S �9, N (0 N o LO do y 6S, N ►�'I �� �° ti 2p Qz92�,, z z z N LO �T N18'56'46W /Zg'I 6°A° , °� Ne �, z � 71.0 N N 1 9*34'S.3" yy 4 T N 20� \ \ z?Ss. N °1 / �� ZONE. fI 131.72' SIIII III R -- IIIIIIIII INN" Iw as O aZ Oz O NZ-1-,-�%8 -31407— `v \ 92 61 " \2 N/F WHITE CHRIST OP HE R F. A\3NOZ LEGEND: �� ,\ oRESIDENTIALN '• ZONED: A/R EXISTING PG. 501 PROPOSED 4�1 Q N78'33'00"E EIP -EXISTING IRON PIPEo 40.78' 26.40'°IPS- IRON PIPE SET 51,771 S.F. w0 20,107 S.F. 48,737 S.F. "Op \ N 15'28'10" W N70'47'33"E / I I I 34,436 S.F. \ R W= RIGHT OF WAY a I I z ��o � , 30.09' B/B - BACK TO BACK BROWN FARM DRIVE I I �� ` �2�• P/P POWER POLE w9865' O N ( �� - - ZONE 1 303 , o TEL/PED - TELEPHONE PEDESTAL w o (50' PUBLIC R/W; 26' 6/B) Z I - - '8F` LIP - LIGHT POLE ^� ji37.66'i�T�/i� 92.34' 96,396 S.F. 0 I � ZON \ � / 14090 -` I 11 F 2 \ N82'41'1 0"E F/H - EXISTING FIRE HYDRANT S10° 12'36"E — W W NI°° 55.66' 0 WM - WA TER METER • 0 •O S13 -57'19"E — R=125.00', L=196.35', o� zo 11'g2„ 125,288 S.F. I I 1 S31°02'41.36"W 32 N N N 83614 F �� �2 WV - WA TER VALVE N L �'��, 116.00' 123.64' °o N31 a1 ss' \ I o / I N 6 ��• W 335'47 TSP - TRAFFIC SIGNAL POLE N15'42'36"W I ��� �n 0.79' � 3zz �'' do � �`��� I z ��6s��•. N 22.15'02„ 0.79' 1 N15'42'36"W I 30 107 6g• 18W 'o£ � I � "' ❑ GM - GAS METER V \ 10 s\ / ❑ ES - ELECTRICAL BOX ti IS �" m 19'21 I 28,524 S.F. -19W X \ \\ 53,576 S.F. a� I ❑ AC - AIR CONDITIONING > w ti o I o CO - CLEAN OUT • Q �` 29 28 N V 27 I a R=100.00', L=62.29', �a ,�I CS - CA TCH BASIN Z "° O O O 6 ` o NOS Nsz°oo'z6.33"w I I I I ❑ DI - DROP INLET ^� 20,234 S.F. z 20,379 S.F. z 23,549 S.F. �) N O \ \ 0;" W N \ \ 36909 q`F /� 12 I z co E/FE ROAD ELEVA TION FE �+ F I I I I I y 63,039 S.F. Z\ 1 1- I I w M r o I 269,578 S.F. o M U° I I N I I \ PROPOSED ROAD GRADE 1.0 W U ca inm Z I I I 90.00' 171.14' 115.00' 145.00' I I I ry � = 146.14' 125.00' N15° 37' 23"W N 130.00' 120.00' w � � C° Z':' } o �' 1 O 100 YEAR FLOOD `\ \ \ 41 LIMIT OF DISTURBANCE LOD tt>! _ Cn 0 M Z m I 1 367.17' N a 9 m SILT FENCE SF V z I co BOUNDARY PER \ I _ - _ _ _ _ _ STORM DRAIN PIPE M o W 4 a J m I I a w 47,106 S.F. o DF[RM MAPS }` 20 - ZONE 1— t o x z 2 \ o "' 3720561700J AND \ IF Z � > � � � - w - - WA TER MAIN SER VICE w 0 0 o N I 3720560700J r 2pN - ZONE 2- 20 F ^ w W �' I 0 23 24 25 26 O _ I 3 244.72' I e 2 N - —� - S - - SANITARY SEWER MAIN/SERVICE s \ a x H a a a �/ w I to I w o D ^� ^ 0 7 ti° NO3° o o m S03°06'39"E ZONE - 2 - GAS - - GAS MAIN SERVICE GAS 23,037 S.F. 21,131 S.F. I DEMO/TO BE REMOVED 1 <U I I r 25,416 S.F. 22,151 S.F. ^ ti 0q'43"W wI m / DRAINAGE 2 ~" / ° ^ 61,003 S.F. / / M W '0" Z N N 28>.3$' �I l y / o � o N EASEMENT (TYP) N a co z I R=225.00', L=76.98', �`� / O S02.19p.16, FLOODWAY BOUNDARY UNDERGROUND ELECTRIC uGe Z U J O I 30' MBL 30' MBL i SO4°09'14.14"E / / �,° ti U 2Z \ 46" PER DFIRM MAPS TEMPORARY DIVERSION DITCH TDD 3 7.m a F I \3 // o=` Og 1\ CC R 3720561700J AND I x x v, a � _ I T/ / O Mg n, / � W u 13 / 37205607001 I � TREE LINE o Q � 14�iS O tF J/� / 1�G'/3T� /tel 307.45' ( N / 56,867 S.F. � M N z � 30' MBL C ° _ I//�� oz / a �v a 54,076 S.F. L N N Q _ _ 539.94' _ _ _ 152.09' _ / R=200.00', L=20.32', o Q' ROCK INLET SEDIMENT TRAP S13° 57' 19"E S13° 57' 19"E DRAINAGE S77°14'11.56"W w � I EASEMENT I LU i39.i7'9 \11s.00'\ 7 47.2oL\��77\145z.4z' ��\ / (TYPICAL) R=325.00', L=120.94', 071.73 GROUND ELEVA TION �/ U) 30'MBL 30'MBL TURNER RUN DRIVE 1$2.>3 S05°00'48.35"E LIL S74° 17'14"W 50' PUBLIC R W• 35'B/B) �� Q 30' MBL m w �' ` BACK OF CURB X BC 22.00 r 25.01 ( / fit( / �V ^, �E w 22�Q 207.44'����� G 76.63' o o l o o p L w W O 21 20 �`� �' Ig60 , o" ` CONCRETE o o g 19 \�P Q� / \� 123.23 18 .16 °v\ m° 10' WIDE " W 23,291 S.F. 20,086 S.F. 26,130 S.F. DRAINAGE O}QPM / o \ 30 - 5° 40' 27"E 4 7"E ELECTRICAL 22, / _ _ r o 0 84,123 S.F. �v RIGHT OF WA Y ^ ^ EASEMENT Q y o \ 115188, \�1s4s9' \ (TYPICAL) q , p. / PROPOSED PL J N N (TYP1 P EASEMENT w (Q 9S , / / / ��v C.j 121.83'\ 2 30' MBL 30'M 14 rn BACTERIOLOGICAL SAMPLE POINT BSP I 20.05'34.13' �r - -ZONE 2 /ti°� / /PQ��J 104,649 S.F. -� L 44.16' 70.88' 101.91' �E —ZONE 1 _ S 11'40'04" E 198.34' (TL) S 13'57'19" E 172.7% (iL q80� (. 2pNF 2 . 1QQ�\ 18 o 16 Z I 0 ONE 20 / o�'� / Q�,Q� 55,232 S.F. N �° 17 ° �I ° 15 m Z NF 1titi ti �vI PQ h� v 23,150 S.F. �I �ti m 32,831 S.F. r 1111\/lllli///,// 17' I92.S / o�' 23,699 S.F. °° a o). `N CARQ , ? ^ h 33.161.96' / /'V v M N May ^ �`O� . • f/Ij� N/F 2 N i / ` �� ••• RIGGS STANLEY ROBERT / i °NE _ 'v I I & WF. Z F 1 &0 6S, ZONE / RIGGS ANN GRAY ZONE _ z 291.86' 139.51' 13s.ao' 342.45' c�33 9, 9l •' _ D.B. 683, PG. 445 2 — — — 21.19' 116.56' M.B. 33, PG. 48 N/F S 11'08'39" E 6 I RESIDENTIAL / RIGGS STANLEY ROBERT S 15'40'27' E 729.00' (TL) I 3197 ZONED: A/R & WF. Sheet Index ��•�iVG�N``�•�J� RIGGS ANN GRAY \ RIGGS STANLEY ROBERT N/Fi�'q/l/C D.B. 868, PG. 536 RIGGS STANLEY ROBERT SHEET NO. C-1 COVER SHEET �,, F 1. M.B. ID TI 48 \ & WF. & WF. //11111111111 RESIDENTIAL RIGGS ANN GRAY RIGGS ANN SHEET NO. C-2 DEMOLITION & EROSION CONTROL PLAN ZONED: A/R D.B. 939, PG. 451 D.B. 091, PG. 0087 rn V1 03/ 191 8 M.B. 33, PG. 48 M.B. 33, PG. 48 SHEET NO. C-3 CONSTRUCTION PLAN -TURNER RUN DRIVE RES ZONEDD:NA/R ZONED: A/R SHEET NO. C-4 CONSTRUCTION PLAN -TURNER RUN DRIVE 0- z u W J z SHEET NO. C-5 CONSTRUCTION PLAN - BROWN FARM DRIVE _ ~ a23 SHEET NO. C-6 CONSTRUCTION PLAN -TURNER COURT � o6 E Notes: Utility Providers: SHEET NO. C-7 CONSTRUCTION PLAN - STREAM CROSSING Z z O z CL SHEET NO. C-8 ROAD WIDENING PLAN O �' 0 1. THIS SITE IS LOCATED IN SIMPSON FIRE DISTRICT. STORM DRAINAGE: ELECTRIC UTILITIES: V w 00 2. THE NEAREST FIRE STATION IS±I.5MILES AWAY. SHEET NO. C-9 CIVIL DETAILS _ on 3. WATER SUPPLY TO BE PROVIDED BY EASTERN PINES WATER CORPORATION. NCDOT Greenville Utilities Commission m N 4.1 4. ELECTRICAL SUPPLY TO BE PROVIDED BY GREENVILLE UTILITIES COMMISSION. Contact: Gene Pittman Contact: Brian Murphy SHEET NO. C-10 CIVIL DETAILS u 00 N 5. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. Phone: (252) 946-3689 Phone: (252) 329-2173 SHEET NO. C-11 CIVIL DETAILS v z o 0 6. SEWAGE DISPOSAL TO BE BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. SHEET NO. C-12 ROAD WIDENING DETAILS u Y 7. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARDOUS m L AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT WATER: TELEPHONE: SHEET NO. C-13 ROAD WIDENING DETAILS `n v N 3 AGENCY. REF: FIRM 37205607001 AND 3720561700) DATED JANUARY 2, 2004. N N 8. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND Eastern Pine Water Corporation CenturyLink SEDIMENTATION CONTROL PLAN AND AN ONSITE PRECONSTRUCTION Contact: Barry Sutton Contact: Sharon Jones MEETING HAS OCCURRED WITH PITT COUNTY STAFF. Phone: (252) 752-7420 Phone: (252) 332-9411 9. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON Project Manager: BCF TAKEN FROM SURVEY PERFORMED BY RIVERS & ASSOCIATES, INC. ENTITLED Drawn By: EW/BTO Checked By: BTO BROWN HEIRS BOUNDARY SURVEY. GAS: CABLE TV: Owner: Project Number: 17050 Greenville Utilities Commission SuddenLink Drawing Number: D-1127 Contact: Jason Cyphers Contact: Brad Alabaster CENTERFIELD PROPERTIES, L.L.C. TURNER RUN SUBDIVISION Phone: (252) 551-3313 Phone: (252) 451-6320 PO BOX 30930 GREENVILLE, NC 27833 PUBLIC STREETS: (252) 355-7757 100' 0 50' 100' C=1 NCDOT Contact: Gene Pittman Phone: (252) 946-3689 SCALE 1 inch = 100 ft Date: 01-26-18 z00Ij� I \ \ \ 02 \��\ %// \\\\ / \ \\\ / RIP RAP PAD \ I1� \ // /�_-_�\\�\ \ - E,\\ \ 777 001 1, \/� CLASSWRIP RAP SILT FENCE / \\ I \I \ \ \ \\ z NER zW/ UNDERLI_% REFER TO DETAIL z V / � = - / Z\3\NO-Z REMOVE 0, EXISTING \� /20/ye 2 o TREES (NP) p- >~wowc II 42 �- --- / LIMITS OF\\ "' DISTURBANCE \\\ ��/) I I I I I A\ \ I V A v ��_ = ��_ SILT FENLE v N \ _ _ (5.90 ACRES)/,IAA\ \ VA� �v`� 1 01 \ V A / �/� - REMOVE \ _ v / - - yv EXISTING N \ /- - , - /� - z - I I REVISIONS: 1 IIJI I l l 2_ v vSII I I I v _/ - _ v (TYP) Q07 / \ \ \\\\)\ /\ I I I 1 I 1 \\�\ \ \\\\ / j - = - - / \ \TREES TYP \ BROWN FARM DRIVE; a� �\ II III I \ _ ,2, ��__� -��_, \I I I l l l II I \\ 1\ s\ � �\ 7`I0N771� �\\ 1 4 III / I i I (50 PUBLIC R/W; 26 B/B) 1 1 1 I I z4 __ 24 vv� 1 LOD LOI� i 3,3 \ \ A 1 I / I�I I / / I / \ - - -24 - / \ �-f� F __ \ I \ \ \\\\ I Zs / 1 / Z E \V A RIP RAP PAD I / M 777�m M ROCK INLET \ \ w 1 I IMI I 111 III / / A I \ \ V A (RR -5) VAA� \� \ (O'k SEDIMENT TRAP A \ \ I IIID _ A I CLASS 'B' RIP RAP \ VA /� Q Q M (TYP) v I I1 1� V 28.0 .9\ cP \ V 6` � l� \ I I I� � ( � \ \ \ 25_ � W/UNDERLINER T i I o v S �57'"Ev v -v 11 I v I�I 1 I I v v v (REFER TO DETAIL v I / v 11 I I v R-1200 ,4,=196.35', v I IIII \ I I I \ ) \ I / �I `-5,31002'41.36'V_1 vV �IIIIII�I\AVA 1111 I �) ( I / / \ A A \ \ \ \\ m 1 /� \ vl I ao, v ao v ` v v zs -- AA v v \v I v \ v 1 v � v I LIMITS OF LOD �V x DISTURBANCE V \ // 36 (5.90 ACRES) I�/I/III �z 0 25 ' I I �� � ` 3I v \ \ I v \ 1 IVA \\ v \ R=100.00 , L=62.29 , � I III N8200b 26.33"W V ` V �/ X I� IIIA A� LIMITS OF 1:0 I DISTURBANCE vv 0 1 I 49I 1 � V \ V (5.90 ACRES) \ < k (\ \ V A \ \ I I I\ II Q ( I I o A I ^ SILT FENCE \ \ \ \ \ N oC / \ \ \ \ \ \ III I \ \ 3 \ \ \\\\\� \• U � U it o m p m o �' I� I \ \ \ \ \ \ \ \ \ \ V A I / IIII I I \\ \� SILT FENCE \ d � I � / � II � III � M \ \ \ \ \ I \\ I I \6 \ a \\ \\\;�, w C� \ v \ \ \ 111 X 111 \ " \ \ V A A \ \ \ 100 YEAR POR DFBOUNDARY \ \ I z M o z �� I v ��� v v V A � 1 \ \ \ \ \ w Ihll �. II I \\ " \ \ z I I Ili \� \ \ 3720561700J AND \� Q •0 \ \ \ \ 1 1 \ \ \ \ '0' IIII AV�V� V A 3720560700) ��% / / . LU w II I \ N LU DLL � o I I � � i \ \ o v \ ✓� _ \ \ N J z w Q �I / A \ 1 V / I� % %// �� a o s\ \ \ \ 1 ti \ I II\ �/ / \ o0 o m \ /� - / O LLJIII I \, V A V A \ I oz� \ / I II\ \�/ /Z/// / o \ v m - V % //�/ ti / / \ v I � /�/ // z ■ 06 I CONCRETE j \ \ I / 2 III / // / / 00 O N \ \ /// // z OC Q b \ i o \ o ISI WASHOUT (REFER / / \ \ I R -225.0q, L=716.98% \ I I ��//�// / //1/ \ W A U U Z �I I� TO DETAIL) ROCK INLET /04�p9�14' 4"E� / 1 ���/�///� // // SILT FENCE OUTLET v ` 111TIN 1111 I �■+ ■ J O / \ �� SEDIMENT TRAP 3 SILT FENCE �'� / I //�// / / A \ RIP RAP PAD 11 I I 11 I 1 \ M CIO Q 1 1 i �� (TYP) / I I / 1/ ��/ / / / (TYP) (RR -3) D 2 Cn �� �o� / I CIV/ / �����/\h� / \�19 W U 1 CLASS 'B' RIP RAP I1I I1I 1 i 11 \ z !� O d I I I LOD � I LOD L,OD- LOD / L(�D Loo - i�n I I o`er / /, \ \ 1 (REFER TO O Q w - / w ` ^� I� ////� /, RIP RAP PAD �o Z \ ( RTO DETAIL /�/ (RR -2) Q 153 .94- 15 .09� 1 1 //"y\ \// / / CLASS 'B' RIP RAP _ _ \ �°� I �' \ \ �� SILT FENCE :�// 1 I I ~ N / / / / 2 1 / / // W/ UNDERLINER R=200.00 , L-20.32 , O 2 x I �b 0 3 p L / D� / �O / �' 3 5 7 1 „50 I 32� 1 '3 I! iV� '' / // o i n o 0 / li 1 o a I a 513 57 1 A _ \ (REFER TO DETAIL) S77 1411.56 W \ �' \@ ) I / / W �W) Of n/ v �o ovv \ i I LL C� Q LU I I coil aoi Tom. CIO aoi S -�S ��mr� N o33� 1j o I w 29, 3 R=32500 ; L 120.94', \ \\\\ \` REMOVE z to I 0 ` \ \\ TURNER RUN DRIVE 3z, �h a / s 505 00 48.35 L � , \ \ / \\\ EXISTING Z 3 "lL RAR GRAVEL / i I I ��� \ \ VA \VA TREES (TYP) O ��� � � � �°` ��' �� (50' PUBLIC R/W; 35' B/B) �� SILT � II / � �;� �' / rn = vv N\�\ § C T I ENTRANCE � � � It l pFER TO DETAIL ON SHEET C 8) I / ^\�o v L \ Cr)�� o\ \ \ ` \\\\\\\\ J I 25.a�. I� LU � / SILT FENCE 4�' I �`v I � d / �� _ - \\ I 1 1 1 I I DISTURBANCE I / o I //�/// : �9 3Z� -- F w \ // 1 \\\\�\ \�\= O z - ti o / w� w w \ Ln - I / // b w 31 m o I 1 I 1 1 (5.90 ACRES) I I / ? / j// i > �1 1 3.23 \ 2y 159.16 " N � \ \ ` _\ \\�__ ` /I j/°�//�/A i REMOVE ` oO� o �i 15 27 E V A W TREES (TYP) EXISTINGS15 0 27 E o i \ \ I \ \ 00 I / RIP RAP PAD I I 8 , (RR -1) v / I �w / / \/ /// v Loo aa, CLASS 'B' RIP RAP W/UNDERLINER o N I /// LIMITS OF � SILT FENCE (REFER TO DETAIL - J j/ / //� / x / / DISTURBANCE I \ ® INSTALL PREFORMED / 2-- / (5.90 ACRES)4g �' op SCOUR HOLE (REFER TO DETAIL) - - - \ \ \ // M - - - - _ - - J /- / �° - l r\\= _\ - y �i ,`� /i \ / /j/jj �� /j // \ , C41 I / ``��.�u�n���,,��� ;�n;//\,i tion ///� 3 n I I / - CAR17p _ _ _ _ (/%qV m;0. •0 9 - 31970 ' \ 10N� 2 ` Zi3RE ��L ate\ \ y r 2i//// \ l SILT FENCE / / / / , F �,•\��� NE 1 ON% i/ \ l / _ l / / / ''i �9••!1!GINE�;•'�O ---� --- \2p�E2- Z'oN"�_ - --- FA _ --- _ - - - - - - - _ 0/19/18 Demolition Notes:z Erosion Control Provisions Construction Sequence 60 0 30 60 CL J w 1. CONTRACTOR SHALL CONTACT NORTH CAROLINA ONE -CALL CENTER 7. ASBESTOS OR HAZARDOUS MATERIALS, IF FOUND ON SITE, SHALL BE N 1. NO PERSON MAY INITIATE A LAND DISTURBING ACTIVITY BEFORE THE PROJECT CONSISTS OF CONSTRUCTING 825± LF OF 35' B/B CURB AND GUTTER J a a (NC 811) BY DIALING 811 OR 1-800-632-4949 AT LEAST 72 HOURS IN REMOVED BY A LICENSED HAZARDOUS MATERIALS CONTRACTOR. NOTIFYING THE ENGINEER OF THE DATE THAT THE LAND DISTURBING 7. ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON ADVANCE OF ANY LAND DISTURBING ACTIVITY OR DIGGING AND HAVE CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY IF HAZARDOUS ROAD, 2000± LF OF 26 B/B CURB AND GUTTER ROAD, A STORM SEWER SYSTEM, SCALE 1 inch = 60 ft Jod ACTIVITY WILL BEGIN. YOUR COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY ELECTRIC, TELEPHONE, GAS, WATER AND SANITARY SEWER. v (A D u E ALL UNDERGROUND UTILITIES LOCATED PRIOR TO EXCAVATING OR MATERIALS ARE ENCOUNTERED. z w o LAWS, REGULATION AND RULES. IN ADDITION LOCAL CITY AND Z 0 w � TRENCHING. 2. SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES OR COUNTY ORDINANCES OR RULES MAY ALSO APPLY TO THIS LAND 8. CONTRACTOR SHALL PROTECT ALL CORNER PINS, MONUMENTS, 1. CONTRACTOR MUST SCHEDULE A PRE CONSTRUCTION CONFERENCE WITH O STRUCTURES SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED DISTURBING ACTIVITY. APPROVAL BY THE COUNTY DOES NOT z o 2. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL LOCAL AND PROPERTY CORNERS, AND BENCHMARKS DURING DEMOLITION THE EROSION CONTROL OFFICER PRIOR TO INITIATING ANY LAND V Q w ao SLOPES WITHIN 7 DAYS OF COMPLETION OF ANY PHASE OF GRADING SUPERSEDE ANY OTHER PERMIT OR APPROVAL. -6 °A STATE PERMITS REQUIRED FOR DEMOLITION WORK. ACTIVITIES. IF DISTURBED, CONTRACTOR SHALL HAVE DISTURBED ITEMS DISTURBING ACTIVITY. Do ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1. ALL OTHER RESET BY A LICENSED SURVEYOR AT NO ADDITIONAL COST TO THE m cel +� 3 THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THEOWNER CONSTRUCTION AND IMPLEMENTATION OF AlEROSION AND AREAS SHALL BE STABILIZED WITHIN 14 DAYS. 8. LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL 0 oo _=32 OWNER AND/OR ENGINEER FOR ANY AND ALL INJURIES AND/OR LIMITATIONS ASSOCIATED WITH INSTALLING AND MAINTAINING 5. EROSION CONTROL MEASURES SHALL BE MAINTAINED AND APPROPRIATE EROSION CONTROL MAY NOT PROCEED UNTIL SEDIMENTATION CONTROL MEASURES. 1 WEEK DAMAGES TO PERSONNEL, EQUIPMENT AND/OR EXISTING FACILITIES IN 9. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE, FEDERAL, AND 3. CONTRACTOR SHALL INSPECT AND MAINTAIN AS NEEDED ALL EROSION CONTROL MEASURES ARE INSPECTED AND APPROVED BY BCF Drawn By: THE DEMOLITION AND CONSTRUCTION DESCRIBED IN THE PLANS AND OSHA REGULATIONS WHEN OPERATING DEMOLITION EQUIPMENT EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH THE ENGINEER. 3. CONSTRUCTION OF STORM DRAINAGE SYSTEM 3 WEEKS SPECIFICATIONS. AROUND UTILITIES. MAJOR STORM EVENT. FAILURE TO KEEP ALL EROSION CONTROL 9. LANDSCAPING AND SEEDING & MULCHING 1 WEEK 5. ALL DEMOLITION WASTE AND DEBRIS SHALL BE REMOVED BY THE AND ITEMS FROM DAMAGE DUE TO DEMOLITION OR CONSTRUCTION DEVICES IN PROPER WORKING ORDER MAY RESULT IN A STOP WORK 9. INSTALL ROCK INLET SEDIMENT TRAPS AROUND ALL CATCH BASINS, 4. ROUGH GRADING SITE 3 WEEKS 4. EXISTING CONDITIONS AS DEPICTED ON THESE PLANS ARE GENERAL 10. CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL ORDER OR CIVIL PENALTIES UP TO $5,000.00 PER DAY OF VIOLATION. DROP INLETS, AND YARD INLETS. AND ILLUSTRATIVE IN NATURE AND DO NOT INCLUDE MECHANICAL, MEASURES IN ACCORDANCE WITH THE NCDOT STANDARDS, AND AS DIVISION OF WATER QUALITY (DWQ). DIRECT ANY QUESTIONS ABOUT THE APPLICABILITY OF THESE RULES TO YOUR PROJECT TO AN ANTICIPATED TIME SCHEDULE OF 3 MONTHS IS EXPECTED FOR THIS PROJECT. 5. INSTALLATION OF UTILITIES 6 WEEKS ELECTRICAL AND MISCELLANEOUS STRUCTURES. IT IS THE REQUIRED BY LOCAL AGENCIES WHEN WORKING IN AND/OR ALONG 4. THE ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL 10. PROVIDE 20'X 100'X 6" STONE CONSTRUCTION ENTRANCE AS RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE SITE AND BE STREETS, ROADS, HIGHWAYS, ETC. IT SHALL BE THE CONTRACTOR'S EROSION CONTROL MEASURES SHOULD THE PLAN OR ITS SHOWN ON PLAN. 6. INSTALLATION OF CONCRETE CURB & GUTTER 2 WEEKS FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BIDDING ON THE RESPONSIBILITY TO OBTAIN APPROVAL AND COORDINATE WITH THE IMPLEMENTATION PROVE TO BE INADEQUATE. DEMOLITION WORK FOR THIS PROJECT. IF CONDITIONS ENCOUNTERED LOCAL AND/OR STATE AGENCIES REGARDING THE NEED, EXTENT, AND 7. FINE GRADING 1 WEEK DURING EXAMINATION ARE SIGNIFICANTLY DIFFERENT THAN THOSE LIMITATIONS ASSOCIATED WITH INSTALLING AND MAINTAINING 5. EROSION CONTROL MEASURES SHALL BE MAINTAINED AND w U 0014 i Z 00 C t ai oo Y m Ln c`o UI a) N 3 Ln a, ,n 3 L r4 C7 3 Project Number: 17050 SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TRAFFIC CONTROL MEASURES. Project Manager: 8. PLACEMENT OF ASPHALT PAVEMENT 1 WEEK BCF Drawn By: EW/BTO Checked By: BTO DURING EXAMINATION ARE SIGNIFICANTLY DIFFERENT THAN THOSE LIMITATIONS ASSOCIATED WITH INSTALLING AND MAINTAINING 5. EROSION CONTROL MEASURES SHALL BE MAINTAINED AND Project Number: 17050 SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TRAFFIC CONTROL MEASURES. INSPECTED AS PER THE DETAIL SHEETS SHOWN. 8. PLACEMENT OF ASPHALT PAVEMENT 1 WEEK IMMEDIATELY. Drawing Number: D-1127 11. CONTRACTOR SHALL PROTECT AT ALL TIMES ADJACENT STRUCTURES 6. PLEASE BE ADVISED OF THE RULES TO PROTECT AND MAINTAIN 9. LANDSCAPING AND SEEDING & MULCHING 1 WEEK 5. ALL DEMOLITION WASTE AND DEBRIS SHALL BE REMOVED BY THE AND ITEMS FROM DAMAGE DUE TO DEMOLITION OR CONSTRUCTION EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE AND CONTRACTOR AND DISPOSED OF IN A STATE APPROVED WASTE SITE ACTIVITIES. TAR/PAMLICO RIVER BASINS. THESE RULES ARE ENFORCED BY THE SEVERAL OF THE ITEMS LISTED ABOVE MAY BE CONSTRUCTED SIMULTANEOUSLY. AND IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND PERMIT REQUIREMENTS. 12. CONTRACTOR SHALL REMOVE EXISTING VEGETATION AND IMPROVEMENTS WITHIN LIMITS OF DISTURBANCE UNLESS NOTED DIVISION OF WATER QUALITY (DWQ). DIRECT ANY QUESTIONS ABOUT THE APPLICABILITY OF THESE RULES TO YOUR PROJECT TO AN ANTICIPATED TIME SCHEDULE OF 3 MONTHS IS EXPECTED FOR THIS PROJECT. C=2 6. THE BURNING OF CLEARED MATERIAL AND DEBRIS SHALL NOT BE OTHERWISE. THE REGIONAL WATER QUALITY SUPERVISOR, WASHINGTON ALLOWED UNLESS CONTRACTOR GETS WRITTEN AUTHORIZATION FROM REGIONAL OFFICE AT (252) 946-6481. THE LOCAL AUTHORITIES. 13. TREES OUTSIDE OF CONSTRUCTION LIMITS OR TREES NOT INDICATED TO BE REMOVED SHALL BE PROTECTED. Date: 01-26-18 I w w w w w� w w w w w w w w w w� w w w w wv w ° o CB 1 ° 36" VALLEY GUTTER I -2.51% -1.90% 1.90/ BC BC I O I 24" ROLL CURB o o TOP=41.96 _ 8" DIP WATER MAIN � I I � I I�; o o I o o o / � o � �,,� o 0 40.27 / 0 38.23 � (RESTRAINED) T I I I I I w ti -1 I N N m m a o w � 55 LF 16" STEEL I I I I I — I — � + + — + N 35B71aLfal W + — + — + — + N13° 57' 18.64"W + INV.=38.50 � — + — + OU— — ENCASEMENT I III t1.8± /FE I I I o W 1 �i �— — - o°� + FE BEGIN BROWN FARM DRIVE STA 0+00.00 I I I I x u R 24" ROLL CURB p� �1 �� CB 2 / (JACK &BORE) II �'p ~ h0 (TYP.) �1' z TOP -41.96 ti -1.90% RO 39.23 TURNER RUN DRIVE STA 5+L''i%6 (CROSS UNDER EXIST. I I I I I i I I p, 2.51% 1.90% �� INV.=38.41 4" ACP WATER MAIN) I lD 60 55 50 45 40 35 30 25 t'7 N1 lS L I I I 7 I\ 30 M I I e1 10' WATER EASEMENT 61, 03 S.F. 10' EASEMENT .o M ATC\11 H L I N E -SEE SHEET C -S z I I I' Z II ► I ii III I III L- I 30' MBL h a 30' MBL M ATC H L I N E -SEE SHEET x C-7 J 1/4" / FT.1/4" / BC "" HT / +50 39.36 GV / 26 / BC I W W I I - S. WATER MAIN TO CROSS 25 16 S.F. ) FORC( MAIN rR 22,151 S.F. / / C 39.59- 9.59 ZNOZ 23,037 S.F. LEV. 45.15 21,131S.,8"x6"TEUNDER 10 WATER EASEMENT�SsaT 8" 90° BEND( I �� 44j/ 8" P W R IN / — / / g" GV 6.. GV I w w w w w� w w w w w w w w w w� w w w w wv w ° o CB 1 ° 36" VALLEY GUTTER I -2.51% -1.90% 1.90/ BC BC I O I 24" ROLL CURB o o TOP=41.96 _ 8" DIP WATER MAIN � I I � I I�; o o I o o o / � o � �,,� o 0 40.27 / 0 38.23 � (RESTRAINED) T I I I I I w ti -1 I N N m m a o w � 55 LF 16" STEEL I I I I I — I — � + + — + N 35B71aLfal W + — + — + — + N13° 57' 18.64"W + INV.=38.50 � — + — + OU— — ENCASEMENT I III t1.8± /FE I I I o W 1 �i �— — - o°� + FE BEGIN BROWN FARM DRIVE STA 0+00.00 I I I I x u R 24" ROLL CURB p� �1 �� CB 2 / (JACK &BORE) II �'p ~ h0 (TYP.) �1' z TOP -41.96 ti -1.90% RO 39.23 TURNER RUN DRIVE STA 5+L''i%6 (CROSS UNDER EXIST. I I I I I i I I p, 2.51% 1.90% �� INV.=38.41 4" ACP WATER MAIN) I lD 60 55 50 45 40 35 30 25 t'7 N1 lS L I I I 7 I\ 30 M I I e1 10' WATER EASEMENT 61, 03 S.F. 10' EASEMENT .o 7.5' 7'� T�moi PROP. 8" PVC WATER MAIN/11.25° I V Z w _ BEND 11.25° _ BEND J 1/4" / FT.1/4" o W W w ( W.. , U c Z O o TAPER FROM N n 44j/ z H -2.19% ::, + U 35' B B cn l� � o �• TO 26' B -B o ou FL v x- Z O Z 3 PC.7+425 \ w N o -2.19% �h i PT: 8+19.03 Aj (BEGIN TURNER RUN DRIVE\77 7L�1�7 77 ���� ����/7 7 / o (STA 0+00.001 1 / / 33 M 10' ELECTRIC EASEMENT 10' ELECTRIC EASEMENT / � I I CLUSTER / / TRANSITION FROM / ( / / �,1g° I MAILBOXES / ROLL CURB TO STD. , CURB (TYP.) TURNER RUN DRIVE I I o I I 30' MBL 30' MBL / / 30' MBL / jl Ixl I �I IIIA( I �i;o 00 *> HEADWALL(/ I I (DESIGNED BY OTHER) / I III \ \ I I I I I I 4 I III I I I j 1' I 84,123 S.F. o / PP I O O I O -- I // ; _ I 20,086 S.F. — I 23,291 S.F. 1 26,130 S.F. j I I I so I I I I 20' DRAINAGE EASEMENT o /��/// FES NV 35.22 0 15 30 RIP RAP,, - PAD. RR -1) 50' RIPARIAN BUFFER 30 ZONE 2 A /� tiON / IONZONE 2� i— — --- �F�---- ------ � SCALE 1 inch30 f PREFORMED 49 SCOUR HOLE ZONE t (REFER T6.DE-TRr2-- I � — 10' EASEMENT 50' R/W 10' EASEMENT .o 7.5' 35' B/B 7.5' V Z BIT. CONC. J 1/4" / FT.1/4" / FT. SURFACE COURSE 1/4" / FT. 2:1 W.. , 2:1 Z O M .ti HCl) 10' EASEMENT o 1/4" / FT. A.B.C. STONE Q WATER BASE COURSE MAIN _ 24" CONC. ROLL � \� \\\ CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON RMINATION OF SOIL SUPPORT AND C.B.R. VALUES. 1� Typical Street Section N.T.S. / =--__t=N BUF��RE�� \` \ (50' R/W, 35' B/B) 50 cR2PAR P _ 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 II REVISIONS: Z r- V oH C A Rp�rti9 197 9 W 19/ 18 Z a UW W d z J a a`a J o6 CDU) E z z0W o z Q- OW0 L V w Ln 00 on m N a- 00 Q) U 000 Ln =ZoU UU 0 0 N o0b Y — Ln L m > un m Ln v ,n 3 '-- 1-4 cV ( N Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C=3 Date: 01-26-18 0 .o V Z J Q 0 Z W.. , w � Z O M ++ HCl) ::, v U z a•+ U v CL Z O Z F - v W Z A� W V oH C A Rp�rti9 197 9 W 19/ 18 Z a UW W d z J a a`a J o6 CDU) E z z0W o z Q- OW0 L V w Ln 00 on m N a- 00 Q) U 000 Ln =ZoU UU 0 0 N o0b Y — Ln L m > un m Ln v ,n 3 '-- 1-4 cV ( N Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C=3 Date: 01-26-18 N s r 7 61, 03 S. F.11 �\ T I BEND I BEND I — W W o TAPER F \ ROM W 35'B_ uu, TO 26' B -B o -PC: 7+42.b5 I II � i'iv j,V \ BY OT I/ I JF�o� 45 40 35 30 25 20 15 PROPOSED rL GRADE �Q0 L� 1p Ln ri + m Cn w U ci> > U Q0 m I'II �' � � �,, RA � Q I Iv I07 /x-/ k +50 cl-, 4 LU w Q U w 54,076 S.F. Ln 26' B -B LLI \� cc rzo- <Q, LU LLJ+50 EXISTING GRADE \ EXISTING 3RADE \ \ EXISTING GRADE1 PVI TSTA: 10+10.51 P�I ELEV: 30.02 K: 54.88 VC: 150.00 LOW FIT STA: 10+55.74 r' rn Ln LOWPT ELEV: 30.35 ori o 00 m 8" PVC I WATER MAIN PVI ELEV: 31.21 o M I / / LVC: 100.00 o LLi HIGH PT. STA: 12+07.53 rl U U LU \ I EXISTIN GRADE I GRADE l 6 Uw 1FULL JOINT OF / IRON PIPE J W I IDUCTILE CB #4 > GRADE 2 STA 10+52.23 w ++ Ln m TOP 30.38 am rn \vi INV. 27.84 FIRE HYDRANT LU 00 om CB #5 - (REFER TO PLAN FOR LL w STA 10+52.23 NOZZLE ELEVATION) U TOP30.38 V U m INV. 27.78 —' — -- --- --> 72" CMP 1 I 15" 8+00 9+00 10t00 11+00 PROPOSED (L GRADE PVI STA: 12+28.95 8" PVC I WATER MAIN PVI ELEV: 31.21 o M I / / LVC: 100.00 12" MIN HIGH PT. STA: 12+07.53 U LU \ I EXISTIN GRADE I GRADE l 6 0 Z 1FULL JOINT OF / IRON PIPE J W I IDUCTILE \ GRADE 2 � I ++ � I I \vi V LU I LL — 2 LU V Q Z 0 mr N � 72" CMP 1 I H W (REFER TO I I Z LU z CROSSING DETAIL I I ON SHEET C-7) I I A� W J II 104,649 S. = I I U Q 15" 8+00 9+00 10t00 11+00 PROPOSED (L GRADE PVI STA: 12+28.95 O PVI ELEV: 31.21 o K: 52.70 � LVC: 100.00 L V HIGH PT. STA: 12+07.53 n' HIGH PT ELEV: 31.01 l 6 0 Z co EXISTING W U , \ GRADE w ++ LU ::, \vi V Z LL — 2 V) V Q Z 0 mr N � 3 8" PVC WATER MAIN Notes: 1. THIS SITE IS LOCATED IN SIMPSON FIRE DISTRICT. 2. THE NEAREST FIRE STATION IS ±1.5 MILES AWAY. 3. WATER SUPPLY TO BE PROVIDED BY EASTERN PINES WATER CORPORATION. 4. ELECTRICAL SUPPLY TO BE PROVIDED BY GREENVILLE UTILITIES COMMISSION. 5. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. 6. SEWAGE DISPOSAL TO BE BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. 7. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARDOUS AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. REF: FIRM 3720560700J AND 3720561700J DATED JANUARY 2, 2004. 8. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND SEDIMENTATION CONTROL PLAN AND AN ONSITE PRECONSTRUCTION MEETING HAS OCCURRED WITH PITT COUNTY STAFF. 9. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON TAKEN FROM SURVEY PERFORMED BY RIVERS & ASSOCIATES, INC. ENTITLED BROWN HEIRS BOUNDARY SURVEY. 12+00 13+00 R I I � � I \ / v R PFFD' � / I I ( \ \\ \ x F. 30' 0 15' 30' SCALE 1 inch= 30 ft 10' EASEMENT 50' R/W 10' EASEMENT 12' 26' B/B 12' BIT. CONC. 1/4" / FT. 1/4" / FT. SURFACE COURSE 1/4" / FT. 2:1 2:1 A.B.C. STONE 0 WATER BASE COURSE MAIN 24" CONC. ROLL 5 CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON DETERMINATION OF SOIL SUPPORT AND C.B.R. VALUES. Typical Street Section N.T.S. (50' R/W, 26' B/B) —� — 14+00 15+00 LU w REFER TO PLAN FOR DETAIL OF GRADES AROUND THE CUL-DE-SAC FIRE HYDRANT (REFER TO PLAN FOR NOZZLE ELEVATION) SCALE: HORIZONT/ L: 1"=30' VERTICAL: 1"=3' 16+00 45 40 35 II REVISIONS: Z r_ O o � L V Z l Q 0 Z ti W U , \ Z 0Cl) M ++ ::, \vi V Z LL V) V Q Z 0 Z 3 H W Z A� W \ 104,649 S. 10' EASEMENT 50' R/W 10' EASEMENT 12' 26' B/B 12' BIT. CONC. 1/4" / FT. 1/4" / FT. SURFACE COURSE 1/4" / FT. 2:1 2:1 A.B.C. STONE 0 WATER BASE COURSE MAIN 24" CONC. ROLL 5 CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON DETERMINATION OF SOIL SUPPORT AND C.B.R. VALUES. Typical Street Section N.T.S. (50' R/W, 26' B/B) —� — 14+00 15+00 LU w REFER TO PLAN FOR DETAIL OF GRADES AROUND THE CUL-DE-SAC FIRE HYDRANT (REFER TO PLAN FOR NOZZLE ELEVATION) SCALE: HORIZONT/ L: 1"=30' VERTICAL: 1"=3' 16+00 45 40 35 II REVISIONS: Z r_ F CD CARp•:�9�, 31970 30 9 W 19/ 18 Z a UW W d z J a j a`a J o6 C) (ADU);_ z zOW O 25 OWz Q- L V w Ln bD to �� 0 CO N a.-: Q)lsz U 00 Ln =ZOo d,ym,- U — Ln L m Ln Ln v N 3 Ln v ,n 3 N U' N 20 Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-4 16+50 II Date: 01-26-18 O o � L V Z J Q 0 Z 0 W U , w � Z 0Cl) M ++ ::, V V Z LL V) V Q Z 0 Z 3 H W Z A� W F CD CARp•:�9�, 31970 30 9 W 19/ 18 Z a UW W d z J a j a`a J o6 C) (ADU);_ z zOW O 25 OWz Q- L V w Ln bD to �� 0 CO N a.-: Q)lsz U 00 Ln =ZOo d,ym,- U — Ln L m Ln Ln v N 3 Ln v ,n 3 N U' N 20 Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-4 16+50 II Date: 01-26-18 \ 30 MBC \ A \ \ � O �� 6"x6" HT5 \ 30' MBL _ 6" PLUG " GV z w z �: EV. 44.65 a '7 LU 1 4+50\ , 10' ELECTRIC EASEMENT X BEND CL 15"RCP@0.30% I/PZT4+ I MATCHLINE - THIS SHEET'�- w <O W z 0w z -n 00 77 S � � N NWA�00 ir, O= n X \00 c O z N rn in in o rn �' �� 2 m \� I �� a o -2\75% \ o 0 24" ROLL CURB n o R60' BC o rn M aAo z n cn < z - \ 8-a ISE A 4 i � 3, / i� w O oj4 v I 3s / I PT: 4+75.7 LUUJ ~ Ln m m S13° 57' 18.64"E + r- 43.09 \ o vw0 0 z I T \ ui i T +5p / \ A� - c� -2.75% N \\� \ 24" ROLL CURB r� REVISIONS: //' � O Q1 / 22.5° J I \ 0 00 W w N / / / BEND T w ` w w w 45° BEND / / CB 9 S' I � V � / TOP=35.49 / INV. =31.54 Z4� l RZ PROP. 6" PVC WATER MAIN C rn 0 m / / / / / o CB 10 TOP=35.49 24" INV. IN=31.4 -- Q \ / / /moi / / 10' WATER EASEMENT BEND 11.25° I BEND I 1� 24" INV. OUT=27.20 / 30'MB / \ / / J`Op �' i `0 / A� W 45° srp / +2s \ TRANSITION FROM ROLL ,° �� ti� 1po /� / / �� / 30' MB jc� / k 45° BEND / 0 BC 40_27 / s 10' ELECTRIC EASEMENT -� Q) / �o / CURB TO STD. CURB (TYP.) / o� BEND BEND � \ I O 1 CB 8 - - TOP=36.34' V CB 6 / a INV.=32.58 h / - - �- FE 39.23 D BC 1 / 39.59 / TOP=38.60 / / " / INV.=35.00 15" RCP 2.24/0 / lb 2 /� p ORq - - - / r r c�Oo 00 W - ' o ` �� / /��GF x 24" ROLL CURB o -/1.08% rn + o �n / +� + s w" F9S �9 \c < <_M J _ _-4 / / + S76° 02' 41.36"W `� - / o q / ��� W c m / �..-- N U �f. / / __ o -1.08/0 6 24 ROLL CURB / 114 �L �/� / / CB 7 22.5° 3 / Z Z6+00 V TOP=36.34 BEND o X oo C nnn N w w- w w < Q - / INV.=32.65 / w- w wT w / / / / 24" FES z / / �/ / / INV. 23.0 zn PROP. 6oWATER MAIN BEND O 1 9 6� �� F �+ N o >� BC 38.23 10' WATER EASEMENT 5� M r �n + m I O _33- '�• ' �' / /T '7 / / / / PREFORMED rn �dw / z > / / / / / SCOUR HOLE RIP RAP PAD ((RR / M ` �\ 0 6+50 30' MBL , / / / / / (REFER TO DETAIL) / / I -4) ` \ ( ) / ( M 0 o �� - / / \ \ 30' 0 15' 30' z _ , - / / / /l/1111 1 I SCALE 1 inch= 30 ft / Z O J Q Z Notes: 10' EASEMENT 50' R/W 10' EASEMENT 0. W - 55 12' 26' B/B 12' 55 Z M M 1. THIS SITE IS LOCATED IN SIMPSON FIRE DISTRICT. O 2. THE NEAREST FIRE STATION IS ±1.5 MILES AWAY. �O 3. WATER SUPPLY TO BE PROVIDED BY EASTERN PINES WATER CORPORATION. v 4. ELECTRICAL SUPPLY TO BE PROVIDED BY GREENVILLE UTILITIES COMMISSION. BIT. CONC. 1/4 / FT. SURFACE COURSE 1/4 / FT. 1/4" / FT. U ♦"� 5. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. 2:1 2:1 Z ate•+ 6. SEWAGE DISPOSAL TO BE BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. 7. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARDOUS ::i':::':`::':;_:•.% •; ' '` _ a AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. REF: FIRM 37205607001 AND 37205617001 DATED JANUARY 2, 2004. A.B.C. STONE Q WATER BASE COURSE MAIN '^ V Q 50 8. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND 24" CONC. ROLL 5 50 Z Z SEDIMENTATION CONTROL PLAN AND AN ONSITE PRECONSTRUCTION CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON MEETING HAS OCCURRED WITH PITT COUNTY STAFF. DETERMINATION OF SOIL SUPPORT AND C.B.R. VALUES. II 0 9. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON U O TAKEN FROM SURVEY PERFORMED BY RIVERS & ASSOCIATES, INC. ENTITLED Typical Street Section N.T.S. (00 LU BROWN HEIRS BOUNDARY SURVEY. r O (50' R/W, 26' B/B) CVS ILLN O 4) II REFER TO PLAN FOR DETAIL OF GRADES •i Q PVI STA: 0+59.57 W J AROUND THE 45 CUL-DE-SAC 45 CIO~ Y N K: 16.21 PVI STN: 2+53.86 PVI STA: 3495.47 FIRE HYDRANT (REFER TO PLAN FOR Ld K: 31.74 K: 32.39 NOZZLE ELEVATION) M IGH PT. STA: 0+76.9 r" w II 4 OiHIGH PT ELE : 39.834 0iLV% IAAJ PROPOSED > + m 0) M 00 m OW PT. STA: 3+94.07 r` � q GRADE � w iii � 6ii m m ^o M LOW PT ELE :35.42 00 M U Qa U w IN w ui + + `����uun�q�� .`�HCARp'. °a LU CB#6 > m du > w Ji U U > CB#8 m cii U U > w 40 - - STA 2+02.21 40 .`%�Q�••• ••�9�9 ' ` - - - - TOP 38.60 m CB #9 w -2.00% 2.00% - _ - - - - - 7 Qg.�_ _ INV. 35.00 T IN P 36.34 .32.58 ST 4+17.45 �. ? Q� / •• 31970 PROPOSED CB #7 TOP 14V. 3 .49 31.54 N 9GRADE �_- ST T 3+17.34 P 36.34 ST 4+17.45 � �' 'A •'. �.•J�`� `•" 77��-2-6o INV. 32.65 OP 35.49 i��,'9N •••. ..v� `,�� 24" IN 24" INV OUT. IN 31.40 27.20 z X 6" PVC WATER MAIN 6" PVC WATER MAIN W 19118 35 m� 35 a Z U w 15" RCP PROPOSED GRADE w z H aQ j a`a J � KLP Z 7 O W V O w Z 0- U t7 W 00 L -6 Ln oto 'A 00 o Ca N a-=: 8" MINIMUM W U 30 30 00 i Z 00 C t 0 0 ai oo Y C? u 24" RCP � a) N 3 Lf) a, ,n 3 SCALE: N 3 HORIZONTAL: "=30' Project Manager: BCF Drawn By: EW/BTO Checked By: BTO 25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 25 8+00 8+50 Project Number: 17050 Drawing Number: D-1127 C=5 Date: 01-26-18 SLq Z /AA I ' i D N I I _ o rn PT: +9 VI m CZ W I I 0 I I I v ryl o ) I m rn rvi I n I I D °° / I I - m i 3:�- 12+ D� 30'MBL m _ 0 ' 10WATER EASEMENT BC S g 30.63 + M OP. 6" PVC WATER MA N ry 30.63 T 8'x6 HT 8" PLUG O w w w w w w w w� S80° 08'50.19"W �ti ti BEGIN TURNER COURT II I I_1- 30.26 A N 29_83 - - STA 0+00.00 I FE 31_00 Ln � / TYPE IV I - - I z �cd, .�• / 10' ELECTRIC EASEMENT BARRICADE cf) I - 13+5 ory \ I C EASEMENT � BC 10 ELECTRC C / Z-1 BC 29.47 I N 30' MBL ZZm/29_47 / � 0 i / rn / 3 70 W N I \ -/ O z I v tm' / I I 30' MBL C ';0/ z Z ti 0 Dco / \ / N 1 v m / -i I �I w ' 0 + I C� I �; 9-9 '9Z m nNi i I III \\ I, z v W /2$/moi 1m / \ \ / 28 62 28.59) 28 62 \ \p / / D 6 r (1 � v O < I `n D < \ / m I z n ^a m \Z v ti I \ V 27.98 \ I� L� LniD lul ' �� V o m viso ' W I I I \ I I m `" a `L 40 35 30 25 20 L-- A 50' R/W 12' 26' B/B 12' BIT. CONC. 1/4" / FT. 1/4" / FT. SURFACE COURSE 1/4" / FT. 2:1 �---- 2:1 A.B.C. STONE Q WATER BASE COURSE MAIN 24" CONC. ROLL 5 CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON DETERMINATION OF SOIL SUPPORT AND C.B.R. VALUES. Typical Street Section N.T.S. (50' R/W, 26' B/B) 22.5° BEND \11.25° BEND 45° W •22.5° \ BEND BEND o -1y / ' +Ln �� m / 1.06% I 45 \ Xoo � -Z.Zg/ / BEND 26 N64* 09'42.85"W EP: 6+12.61 / CB 11 \ DI 1 6+13 P=24.7\3 RIM=24.00 PT: 5+92.61 TRANS ,ION FROM I .=20.61 INV.=20.03 LL, CURB TO ST .-CURB (TYP.) \ I \ I I 1 \ 18" RCP @ 0.6% (I I CROSS WATERLINE UNDER STORM HTI Ln', (REFER TO DETAIL) 6" PLUG 6" GV I FH NOZ. ELEV. 26.96 n I 'OQ q I l -\=g/ / PREFORMED \ SCOUR HOLE (REFER TO DETAIL) � / / 18" FES INV/19.50,� 30' MBL 30' 0 15' 30' SCALE 1 inch= 30 ft Notes: 1. THIS SITE IS LOCATED IN SIMPSON FIRE DISTRICT. 2. THE NEAREST FIRE STATION IS ±1.5 MILES AWAY. 3. WATER SUPPLY TO BE PROVIDED BY EASTERN PINES WATER CORPORATION. 4. ELECTRICAL SUPPLY TO BE PROVIDED BY GREENVILLE UTILITIES COMMISSION. 5. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. 6. SEWAGE DISPOSAL TO BE BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. 7. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARDOUS AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. REF: FIRM 3720560700J AND 3720561700J DATED JANUARY 2, 2004. 8. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND SEDIMENTATION CONTROL PLAN AND AN ONSITE PRECONSTRUCTION MEETING HAS OCCURRED WITH PITT COUNTY STAFF. 9. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON TAKEN FROM SURVEY PERFORMED BY RIVERS & ASSOCIATES, INC. ENTITLED BROWN HEIRS BOUNDARY SURVEY. 6" GV i 0`'� WV BC - w i II FH PROP. 8" PVC W=A 3+00 29.83lir -1y C:) NOZ. ELEV. 33.00 �i - W 1n -0=� 119 M N z, +O W�-W u _ D 0 + Cq N _ -; - �� W U Z Q 7:7W BC r cti �� - m X W > I 3 W W + 30.26 m r FE - " 0 00 -1.25% o+ m + "W - W - - BC 30 C 30.02 j� - m ry c N BC / S80° 08'50.19"W �ti ti BEGIN TURNER COURT II I I_1- 30.26 A N 29_83 - - STA 0+00.00 I FE 31_00 Ln � / TYPE IV I - - I z �cd, .�• / 10' ELECTRIC EASEMENT BARRICADE cf) I - 13+5 ory \ I C EASEMENT � BC 10 ELECTRC C / Z-1 BC 29.47 I N 30' MBL ZZm/29_47 / � 0 i / rn / 3 70 W N I \ -/ O z I v tm' / I I 30' MBL C ';0/ z Z ti 0 Dco / \ / N 1 v m / -i I �I w ' 0 + I C� I �; 9-9 '9Z m nNi i I III \\ I, z v W /2$/moi 1m / \ \ / 28 62 28.59) 28 62 \ \p / / D 6 r (1 � v O < I `n D < \ / m I z n ^a m \Z v ti I \ V 27.98 \ I� L� LniD lul ' �� V o m viso ' W I I I \ I I m `" a `L 40 35 30 25 20 L-- A 50' R/W 12' 26' B/B 12' BIT. CONC. 1/4" / FT. 1/4" / FT. SURFACE COURSE 1/4" / FT. 2:1 �---- 2:1 A.B.C. STONE Q WATER BASE COURSE MAIN 24" CONC. ROLL 5 CURB AND GUTTER PAVEMENT DESIGN TO BE SUBMITTED UPON DETERMINATION OF SOIL SUPPORT AND C.B.R. VALUES. Typical Street Section N.T.S. (50' R/W, 26' B/B) 22.5° BEND \11.25° BEND 45° W •22.5° \ BEND BEND o -1y / ' +Ln �� m / 1.06% I 45 \ Xoo � -Z.Zg/ / BEND 26 N64* 09'42.85"W EP: 6+12.61 / CB 11 \ DI 1 6+13 P=24.7\3 RIM=24.00 PT: 5+92.61 TRANS ,ION FROM I .=20.61 INV.=20.03 LL, CURB TO ST .-CURB (TYP.) \ I \ I I 1 \ 18" RCP @ 0.6% (I I CROSS WATERLINE UNDER STORM HTI Ln', (REFER TO DETAIL) 6" PLUG 6" GV I FH NOZ. ELEV. 26.96 n I 'OQ q I l -\=g/ / PREFORMED \ SCOUR HOLE (REFER TO DETAIL) � / / 18" FES INV/19.50,� 30' MBL 30' 0 15' 30' SCALE 1 inch= 30 ft Notes: 1. THIS SITE IS LOCATED IN SIMPSON FIRE DISTRICT. 2. THE NEAREST FIRE STATION IS ±1.5 MILES AWAY. 3. WATER SUPPLY TO BE PROVIDED BY EASTERN PINES WATER CORPORATION. 4. ELECTRICAL SUPPLY TO BE PROVIDED BY GREENVILLE UTILITIES COMMISSION. 5. ALL PROPOSED UTILITIES ARE TO BE UNDERGROUND. 6. SEWAGE DISPOSAL TO BE BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. 7. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARDOUS AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. REF: FIRM 3720560700J AND 3720561700J DATED JANUARY 2, 2004. 8. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND SEDIMENTATION CONTROL PLAN AND AN ONSITE PRECONSTRUCTION MEETING HAS OCCURRED WITH PITT COUNTY STAFF. 9. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON TAKEN FROM SURVEY PERFORMED BY RIVERS & ASSOCIATES, INC. ENTITLED BROWN HEIRS BOUNDARY SURVEY. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0 U U V r ~ z w z 0 0 U U H H a OC w CL 0 a O1 � o II REVISIONS: I_P AP PAD/ /\ z z 0 H U z 0 U Z O o �E L V O z W W M M � � O z, a U Z Q LU z 0 0 0 0 I I Q o V N + ry Q W 0 o u � O II Q LU 0 s w W m w o m II W Q 0 OC J EXISTING LU GRADE Q m N lD - - - - _ W LU I Q `" Y� PROPOSED Z Q (L GRADE _ - o I I w Iq W or m Ln N 6" PVC WATER MAIN M a T2 u - - p II - EXISTING w _ _ _ - - GRADE REFER TO PLAN FOR - - DETAIL OF GRADES AROUND THE _ - - - _ _ _ _ -1.06/ _ CUL-DE-SAC IF HYDRANT (REFER TO PLAN FOR PROPOSED NOZZLE ELEVATION) (L GRADE �io z x � N m � 6" PVC AIATER MAIN 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0 U U V r ~ z w z 0 0 U U H H a OC w CL 0 a O1 � o II REVISIONS: I_P AP PAD/ /\ z z 0 H U z 0 U Z O o �E L V O z W W M M � � O z, a U Z Q LU z 40 .,"%juunjjpi CARp�:9��' 1970 35 W 19118 z a U� w c ~ d z J Q � � a`a J � Z 7 O W V r0 z = �j 00 L U 11 W Ln 1� CLO on , 00 30 r` CD N a-=� U 0000 i Z 00 C Maio 0 U = Lo Y C? Ln c`0 Ln a, N 3 Ln a) ,n 3 rl L N C7 r*4 3 Project Manager: BCF Drawn By: EW/BTO 25 Checked By: BTO Project Number: 17050 Drawing Number: D-1127 20 7+50 SCALE: HORIZONTAL: 1"=30' VERTICAL: 1"=3' C-6 Date: 01-26-18 �E V 40 .,"%juunjjpi CARp�:9��' 1970 35 W 19118 z a U� w c ~ d z J Q � � a`a J � Z 7 O W V r0 z = �j 00 L U 11 W Ln 1� CLO on , 00 30 r` CD N a-=� U 0000 i Z 00 C Maio 0 U = Lo Y C? Ln c`0 Ln a, N 3 Ln a) ,n 3 rl L N C7 r*4 3 Project Manager: BCF Drawn By: EW/BTO 25 Checked By: BTO Project Number: 17050 Drawing Number: D-1127 20 7+50 SCALE: HORIZONTAL: 1"=30' VERTICAL: 1"=3' C-6 Date: 01-26-18 DETAIL CUT IN 8" GATE VALVE EXIST. 8" ACP WATER MAIN PROPOSED 8" WATERLINE SHALL PASS UNDER EXIST. MAIN CUT IN 8"x8" TEE 8" GATE VALVE 8" 90' BEND NOTES: 1. CONTRACTOR SHALL COORDINATE CUT -IN TEE & VALVE WORK WITH EASTERN PINES WATER CORPORATION. 72 HOUR NOTICE IS REQUIRED BY EASTERN PINES WATER CORPORATION TO SHUT DOWN EXISTING MAIN FOR CUT -IN WORK. 2. CONTRACTOR SHALL LOCATE VERTICALLY AND HORIZONTALLY ALL EXISTING UTILITIES THAT CROSS PROPOSED WATER MAIN PRIOR TO BEGINNING INSTALLATION OF NEW MAIN. 30' 0 15' 30' SCALE 1 inch = 30 ft a6 II Il;i� I � I � ITE I II I I Ilil I I I III I I I 28,524 S.F. II I I I 1 I I III I III I I m I I II m I III I II i I �� ZI li I ��y *wv it I I I it o M I III I it � 3 III I II 3 III A50 III \ I iIX l I I it I I I I I SM, III \ I1 I _ � - I I X11 I I IIS �I�► I II fM X00 11 I I II I o \ \ I 1 3 SII I I I ii I I I \\ I III I I III I I I I IIIAI I II I \ I D I� li 0I A 111;1 I Iii X \ f lel I j I I I Z I I z I I C I o v I� I cU, 23 \ M ATC H L I N E - SEE SHEET C-3 WATER MAIN TO CROSS UNDER FORCE MAIN i 8" 90° BEND II I I� I iI IIS I �+ I ILII I o 0 8" DIP WATER MAINIII I o Ln (RESTRAINED) 55 LF - 16" STEEL — �— — ; ENCASEMENT I, I I E/FE Ill I o (n p°� 24" ROLL CURB (JACK & BORE) I I 51.8+ I I I r - h� (CROSS UNDER EXIST. I I I I I I I I (TYP.) 4" ACP WATER MAIN) I i I I III I I I IBEGIN TURNER RUN DRIVE h I I ISTA 0+00.00 — �; j TURNER RUN DRIVE 01 111x1 III'I � IiIAI I!�oi I iM o 1 SCALE: 1" = 30' \ w 1 � 1 � \ 1 0 1 \ / N \ \ Zp F�FC R qC FgSF\ MFNT I / I / 09ho / / 11:7REVISIONS: / NJy W N �o 10' 0 5' 10' CONSTRUCTION PLAN SCALE: 1" = 10' SCALE 1 inch= 10 ft 35 30 25 20 15 1+00 2+00 CROSSING PROFILE SCALE: HORIZONTAL: 1" = 30' VERTICAL: 1"=3' 35 30 25 20 15 3+00 Z r_ O EW/BTO .o BTO V/ 17050 0 Z J Q PROPOSE GRADE 0 Z WL , w � Z 0 M ++ P cf) 0 V V Z V) V HEADWALL DESIG N ED BY OTHERS Z O Z W HEADWALL DESIGNED Z INVERT = 18.59 etal Pipe @ 0.50% INVERT = 19 Corrugated 00 CENTERLINE OF EXISTING DITCH CENTERLINE OF / EXISTING DITCH / — 1+00 2+00 CROSSING PROFILE SCALE: HORIZONTAL: 1" = 30' VERTICAL: 1"=3' 35 30 25 20 15 3+00 Z r_ V Project Manager: BCF O EW/BTO .o BTO V/ 17050 0 Z J Q 0 Z WL , w � Z 0 M ++ P cf) 0 V V Z V) V Q Z O Z W Z V Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-7 Date: 01-26-18 I 30' MBLLn / m 3 � M E I / TRANSITION TO ROLL / CURB ON SITE F-�r CONNECTTO 10'X EXISTING EX. 8' FORCEMAIN FORCEMAIN \ ' -- -- --- - MUCK OUTAND FILL IN / PROPOSED 8" PVC 10'X70 S' NCDOT STANDARD 840.14 (PROTECT) EXISTING ROADSIDE GRADE FORCEMAIN DROP INLET — — TO PROVIDE SMOOTH - - _ BRAT €LEVATION=41:75 —15" RCP @ 0 50% SLOPE MUCK OUT AND FIL IN /PROTECT EXISTING UTILITIES TRANSITION TO BACK OF 51 INVERT=38.98± NCDOT STANDARD 840.02 EXISTING ROADSID DITCH PROPSED 8" PVC (TYP) - - - - - - PROPOSED RIGHT-OF-WAY WAY - M FM FM FM FM TO PROVIDE SMOG H FORC MAIN PROPOSED CURB - � FM FM—FM—FM—FM FM CONNECT TO EXISTING CATCH BASIN TRANSITION TO BA K OF PROPOSED RIGHT-OF-WAY - - CURB AND GUTTER TOP OF HOOD=43.14 -- FM �FM FM FM FMNCDOT STD. 30" PROPOSED CURB EXISTING RIGHT-OF-WAY WAY - FM FM F FM FM CURB AND GUTTER Rap, (MATCH ELEVATION) INVERT=39.02± FM FM FM FM FM FM FM FM OH OHE FM FM —FM FM —FM —FM OHE RELOCATE EXISTING M FM _ -- FM OHE OHE P - _F _ P F,,;, _ _ FV - � 3Ho EX: B" FORCEMAIN NCDOT STD. 30" POLE AND PEDESTAL ---------------3H0 3HO _ 3Ho - OHE .r 3H0 j �� _ ,_ - _ _ _ � � (TO BE REMOVED) CURB AND GUTTER OHE OHE oHE D EX. 5 RCP O �� - - - - - - - - EXISTING RIGHT-OF-WAY - - - - - - - - - - - - - - - - = - - - - - _ --- ­ I �i --�-il.l-- -- -- T I� / FORCEMAIN � C 51'_+ - — — -- - - N 210'±R3' FM r i n� � -------- -- - - 296'± - -- - ---- - -- -- - MATCH EX 2" DEPTH MILL AND OVERLAY _ _ _ _ EXISTING EDGE OF PAVEMENT - - - W LL oq (REFER TO DETAIL) / / AO B O N B W Ln C v 0+00 10' MATCH EX. E �„ D 150'± n' C E �a 150'±11 5 - - - MATCH EX. E _--------- ----_ - ------ - - 3 - - - o EXISTING EDGE OF PAVEMENT 4" ACP WATER MAIN - W - - - W - - - W - - - w - - - W - - w I EXIST. 8"x4" REDUCER - - W - - - - - - - �� - --- --- -- PROPOSED LU MATCH EX. _ _ _ w _ _ ENCASEMENT PIPE w - - - - EXISTING EDGE OF PAVEMENT - - - - - - - - - - - _ t M M 'N — — — — — �-- — — — — — — — — — — — I M M M — — M M M /� v J ---- _ _ �_ _ _ - - _-_ -_ �_ _ _- - - - - - - - � - NC HIGHWAY 33 PROPOSED N W -W I -W - - W --- - —w— - - W- - - —w— - - —w— - 3 WV �w'� (VARIABLE WIDTH R/W; PAVEMENT WIDTH VARIES) 2 8" ACP WATER MAIN J (MAINTAINED BY NCDOT) ~ ,w I ' w I CL EXIST ROAD L U PUBLIC R/W J EXIST. PAVEMENT (WIDTH VARIES) PROP. PAVEMENT APPROXIMATE AND BASE COURSE EXIST GROUND (WIDTH VARIES) -- U MATCH EX. ° CROSS SLOPE 5 ° 4 ROAD WIDENING PLAN (WEST) EXISTING ASPHALT SECTION 4 Ali I SCALE: 1 = 20 OVERLAY EXISTING ASPHALT: 2" S-9.5 B PROPOSED ASPHALT PAVEMENT: 3" I-19.0 B PROPOSED ASPHALT BASE: / I I PROPOSED ASPHALT PAVEMENT: 5" B-25.0 B 1+00 2" S-9.5 B � TYPICAL CURB AND GUTTER SECTION - - II m °s 30' MBL N NOT TO SCALE Ln M i E Legend Surface Legend AOTHERMOPLASTIC PAVEMENT MARKING SYMBOLS (LEFT TURN ARROW) PROPOSED PAVEMENT AND .._. 1Y'S X 0 3 70' S.D.T. / - - I BO THERMOPLASTIC PAVEMENT MARKING LINES (4" WHITE LINE) BASE COURSE E --- E-+ - - - - CO THERMOPLASTIC PAVEMENT MARKING LINES (4" YELLOW CENTERLINE) "DOUBLE YELLOW" PROPOSED PAVEMENT ---- - 5FM FM FM PROPOSED 8" PVC OVERLAY 1 ' FM F FM FM FM FM FM FM O THERMOPLASTIC PAVEMENT MARKING LINES (4" WHITE MINI -SKIP) —FM FM FORCEMAIN CONN ECT TO EXISTING EO THERMOPLASTIC PAVEMENT MARKING LINES (12" YELLOW LINE) 10' WIDE X 2" DEPTH MILL AND EX. 8" FORCEMAIN Rap, 30 (TO BE REMOVED) \ FORCEMAIN OVERLAY F 0 E OHE EX. 8" FORCEMAIN OHE FM FM � OHE OHE OHE (PROTECT) - - — FM i I - - - - - - - 38 EXISTING EDGE OF PAVEMENT _ o'±_ _ — — — — General Notes: R3' — �- — — — — — — B 1. NO CONSTRUCTION TO BEGIN UNTIL APPROVAL OF AN EROSION AND SEDIMENTATION CONTROL PLAN BY THE MATCH EX. — — — PITT COUNTY PLANNING DEPT. ,� O W 01 E N \ 2. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN HEREON TAKEN FROM SURVEY PERFORMED BY \ C - 2" DEPTH MILL (REAND FER B RIVERS & ASSOCIATES, INC. ENTITLED BROWN HEIRS BOUNDARY SURVEY. - W Lr) (REFER TO DETAIL) `` C Xy B MATCH EX. 3. CONTRACTOR SHALL NOTIFY NCDOT DIVISION OFFICE 48 HOURS PRIOR TO MAKING CONNECTIONS TO EXISTING o+oo _ _ _ _ _ _ _ STORM DRAINS LOCATED WITHIN PUBLIC STORM DRAINAGE EASEMENTS OR R/W. N — — — — — — — - - - - - - - - - - - - - - - EXISTING EDGE OF PAVEMENT 4 NCDOT DRIVEWAY APPROVAL PERMIT REQUIRED — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ _w_ — - - 5 DOT ----------------- EX. 4' ACP WATER MAIN —-- ---- —w - --, - C 3 _ _w— —W— — — —W— — — —w— — — —W— — — —W— — — —w— — — —W— — — —W_ — — _ - r _ - _ - - -- - X - STANDARDS, AND ASREQUIRED BDY OCIALAGENC ES WHEN WORKING IN AND/ORA ALONG STREETS, OADS, - w - - - W - - - -W - - - - W - W - - - - - - -- - - - - - - - - - - - - / N C HIGHWAY 3 3 HIGHWAYS, ETC. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL AND COORDINATE WITH _- - — THE LOCAL AND/OR STATE AGENCIES REGARDING THE NEED, EXTENT, AND LIMITATIONS ASSOCIATED WITH PROPOSED — — — — — — (VARIABLE WIDTH R/W; PAVEMENT WIDTH VARIES) INSTALLING AND MAINTAINING TRAFFIC CONTROL MEASURES. ENCASEMENT PIPE- - - - M — — — — — — — (MAINTAINED BY NCDOT ROAD WIDENING PLAN (EAST) W SCALE: 1" = 20' LU EXISTING PAVEMENT PAVEMENT TO BE CONSTRUCTED Vi NOTES: 14 (%) UNDER THIS CONTRACT CL EXIST ROAD 1. SAW CUT LOCATION TO BE DETERMINED IN THE PROPOSED ASPHALT BASE: 5" B-25.0 B PROPOSED ASPHALT PAVEMENT: J MILL PAVEMENT 2.0" S-9.5 B PROPOSED ASPHALT PAVEMENT: TYPICAL SECTION 3" 1-19.0 B ROADWAY WIDENING NOT TO SCALE PAVEMENT JOINT DETAIL NOT TO SCALE ► ctwil I la►rr RIGHT OR LEFT TURN ARROW 6'-4" 36" 8" tv � ['7 Ctl z ao � 4" 32f; O R=40" 12" A R=28" GENERAL NOTES: 1- USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. 2- DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. 3- DO NOT PLACE SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, UNLESS APPROVED BY THE ENGINEER. 4- CONFORM ALL SYMBOLS TO THE FHWA "STANDARD HIGHWAY SIGNS" MANUAL WHICH INCLUDES PAVEMENT MARKINGS AND STANDARD ALPHABET$ [REFER TO SHEETS 6 THRU 9 DIMENSIONS CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE. HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE DEPARTMENT. PAVEMENT MARKING ARROWS 20' 0 10' 20' SCALE 1 inch= 20 ft II REVISIONS: Z Q J Ia. 0 Z z W Q O Z r - 0 .o PUBLIC R/W FIELD. 0 — Q 0 Z Uj M 2. CONTRACTOR SHALL INSTALL 2.0" MIN S-9.56 }z J Z � �+ ASPHALT OVERLAY OVER FULL WIDTH OF EXISTING V Z J 3 F- LU Z PAVEMENT ADJACENT TO PROPOSED WIDENING > a TYPICAL. SEE WIDENING PLAN FOR BEGINNING AND 0 p w END OF OVERLAY. MATCH SLOPE OF EXISTING p z Z EXIST. PAVEMENT (WIDTH VARIES) PROP. PAVEMENT 3' SHOULDER PAVEMENT IN OVERLAY AREAS. F o AND BASE COURSE APPROXIMATE 3. ASPHALT TO BE INSTALLED IN LAYERS/ LIFTS PER g 7- J 2.0" OVERLAY (WIDTH VARIES) EXIST GROUND NCDOT REQUIREMENTS. J MIN 2.0" MIN DEPTH SURFACE COURSE (S-9.5 B) MATCH EX.��- (PROVIDE SMOOTH TRANSITION .08'/FT. 10' MIN BETWEEN NEW PAVEMENT SURFACE AND EXISTING PAVEMENT SURFACE) i EXISTING PAVEMENT EXISTING ASPHALT SECTION _-'--- �\ 3:1 -- t PROPOSED ASPHALT BASE: 5" B-25.0 B PROPOSED ASPHALT PAVEMENT: J MILL PAVEMENT 2.0" S-9.5 B PROPOSED ASPHALT PAVEMENT: TYPICAL SECTION 3" 1-19.0 B ROADWAY WIDENING NOT TO SCALE PAVEMENT JOINT DETAIL NOT TO SCALE ► ctwil I la►rr RIGHT OR LEFT TURN ARROW 6'-4" 36" 8" tv � ['7 Ctl z ao � 4" 32f; O R=40" 12" A R=28" GENERAL NOTES: 1- USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. 2- DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. 3- DO NOT PLACE SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, UNLESS APPROVED BY THE ENGINEER. 4- CONFORM ALL SYMBOLS TO THE FHWA "STANDARD HIGHWAY SIGNS" MANUAL WHICH INCLUDES PAVEMENT MARKINGS AND STANDARD ALPHABET$ [REFER TO SHEETS 6 THRU 9 DIMENSIONS CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE. HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE DEPARTMENT. PAVEMENT MARKING ARROWS 20' 0 10' 20' SCALE 1 inch= 20 ft II REVISIONS: Z Q J Ia. 0 Z z W Q O Z r - 0 .o Cl) 0 — Q 0 Z Uj M w � Z � �+ V Z CL 3 F- LU Z ,o�CARp.rti9�, 197 c W 19/ 18 z a U w dz J <j J o6 C) (ADU) E z zOW o W CL 0 -6 L UVw Ln bD 00 to>c n m N a- v U 00 Ln c Z 00 C= N O 0 ULAJ Y Ln L m > Ln m Lrn v N 3 r� v Ln 3 L cV V' N Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 Com? Date: 01-26-18 .E V ,o�CARp.rti9�, 197 c W 19/ 18 z a U w dz J <j J o6 C) (ADU) E z zOW o W CL 0 -6 L UVw Ln bD 00 to>c n m N a- v U 00 Ln c Z 00 C= N O 0 ULAJ Y Ln L m > Ln m Lrn v N 3 r� v Ln 3 L cV V' N Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 Com? Date: 01-26-18 Erosion Control Measures: 1. All work will be done in accordance with the Pitt County Soil Erosion and Sedimentation Control Ordinance. No land disturbing activity beyond that required to install the appropriate erosion control measures may proceed until measures are inspected and approved by Pitt County. Call (252) 902-3250 to schedule an inspection. 2. Prior to topsoil removal, all perimeter silt fence and temporary gravel construction entrances shall be installed. After topsoil removal, storm drainage culverts and structures shall be installed. Rock Inlet Sediment Traps shall be placed around all drainage structures to collect surface runoff and control siltation and release water at a gradual rate. All easements outside the parking lot where storm pipes are installed will be graded, seeded and mulched. 3. Parking lots shall have stone base placed on them for stabilization and shoulders shall be seeded to stabilize the soil. Seed bed preparation shall be conducted according to North Carolina Department of Transportation Standard Specifications for Roads and Structures (D.O.T.). The ground surface shall be cleared of stumps, stones, roots, cables, wire, grade stakes, and other materials that might hinder proper grading, tillage, seeding or subsequent maintenance operations. Grades on the area to be seeded shall be maintained in a true and even condition. Maintenance shall include any necessary repairs to previously graded areas. All graded areas shall be thoroughly tilled to a depth of at least four (4) inches by plowing, disking, harrowing, or other approved methods until the condition of the soil is acceptable. On sites where soil conditions are such that high clay content and excessive compaction cause difficulty in getting clods and lumps effectively pulverized, the Contractor shall use the rotary tillage machinery until the mixing of the soil is acceptable and no clods or clumps remain larger than 1 1/2 inches in diameter. A firm and compact seed bed is required and after being graded, the seed bed shall be lightly compacted with a land roller, such as a cultipacker, before and after seeding. Limestone shall be dolomitic agriculture ground limestone containing not less than 10 percent magnesium oxide. Lime shall be uniformly applied at the rate of 2 tons per acre. Fertilizer shall be uniformly applied at a rate of 500 pounds per acre of 10-20-20 analysis. The fertilizer shall be incorporated into the upper three or four inches of prepared seed bed just prior to the last tillage operation, but in no case shall it be applied more than three days prior to seeding. Fertilizer shall be used immediately after delivery or stored in a manner that will not permit it to harden or destroy its effectiveness. When hydroseeding equipment is used for seeding, fertilizer shall be applied simultaneously with seed, using the above rates of application. Seed shall be certified seed or equivalent based on North Carolina Seed Improvement Association requirements for certification. All seed shall be furnished in sealed standard containers. Seed which has become wet, moldy, or otherwise damaged prior to seeding will not be acceptable. Seeding shall be accomplished with hand planters, power- drawn planters, hand packers, or hydroseeding equipment at the following rates: Permanent Seeding Schedule (Entire Site) Seed Bed Preparation Lime - 2 tons per acre Fertilizer (10-20-20) - 500 pounds per acre Seeding Mixture: (January 1 - March 31) Common Bermuda grass (unhulled) - 20 pounds per acre Rye (grain) - 25 pounds per acre (April 1 -July 31) Common bermudagrass (hulled) - 15 pounds per acre Weeping Lovegrass - 5 pounds per acre Centipede - 8 pounds per acre (August 1 - December 31) Common Bermuda grass (unhulled) - 20 pounds per care Tall Fescue - 60 pounds per acre Rye (grain) - 25 pounds per acre Seed Bed Protection: Straw Mulch - 2 tons per acre (visual) Asphalt Tack - 0.03 gallons per square yard 4. Ground Stabilization (Per NCG010000) a. Soil stabilization shall be achieved on any area of a site where land -disturbing activities have temporarily or permanently ceased according to the following schedule: i. All perimeter dikes, swales, ditches, perimeter slopes and all slopes steeper than 3 horizontal to 1 vertical (3:1) shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 7 calendar days from the last land -disturbing activity. ii. All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 14 calendar days from the last land -disturbing activity. b. Conditions - In meeting the stabilization requirements above, the following conditions or exemptions shall apply: i. Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable. ii. All slopes 50' in length or greater shall apply the ground cover within 7 days except when the slope is flatter than 4:1. Slopes less than 50' shall apply ground cover within 14 days except when slopes are steeper than 3:1, the 7 day -requirement applies. iii. Any sloped area flatter than 4:1 shall be exempt from the 7 -day ground cover requirement. iv. Slopes 10' or less in length shall be exempt from the 7 -day ground cover requirement except when the slope is steeper than 2:1. v. Although stabilization is usually specified as ground cover, other methods, such as chemical stabilization, may be allowed on a case-by-case basis. vi. For portions of projects within the Sediment Control Commission -defined "High Quality Water Zone" (15A NCAC 04A. 0105), stabilization with ground cover shall be achieved as soon as practicable but in any event on all areas of the site within 7 calendar days from the last land- disturbing act. vii. Portions of a site that are lower in elevation than adjacent discharge locations and are not expected to discharge during construction may be exempt from the temporary ground cover requirements if identified on the approved E&SC plan or added by the permitting authority. 5. Self Inspection and Reporting Requirements (Per NCG010000) Minimum self inspection and reporting requirements are as follows unless otherwise approved in writing by the Division of Water Quality. a. A rain gauge shall be maintained in good working order on the site unless another rain monitoring device has been approved by the permitting authority. b. A written record of the daily rainfall amounts shall be retained and all records shall be made available to DWQ or authorized agent upon request. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, the cumulative rain measurement for those un -attended days will determine if a site inspection is needed. (Note: if no rainfall occurred, the permittee must record "zero"). c. Erosion and sedimentation control measures shall be inspected to ensure that they are operating correctly. Inspection records must be maintained for each inspection event and for each measure. At a minimum, inspection of measures must occur at the frequency indicated below: i. All erosion and sedimentation control measures must be inspected by or under the direction of the permittee at least once every seven calendar days, and ii. All erosion and sediment control measures must be inspected by or under the direction of the permittee within 24 hours after any storm event of greater than 0.50 inches of rain per 24 hour period. iii. Times when a determination that adverse weather conditions prevented inspections should be documented on the Inspection Record. d. Once land disturbance has begun on the site, stormwater runoff discharge outfalls shall be inspected by observation for erosion, sedimentation and other stormwater discharge characteristics such as clarity, floating solids, and oil sheens. Inspections of the outfalls shall be made at least once every seven calendar days and within 24 hours after any storm event of greater than 0.50 inches of rain per 24 hour period. e. Inspections are only required to be made during normal business hours. When adverse weather conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection can be delayed until it is deemed safe to perform these duties. If the inspection cannot be done on that day, it must be completed on the following business day. f. Twenty-four Hour Reporting for visible sediment deposition i. The permittee shall report to the Division of Water Quality central office or the appropriate regional office any visible sediment being deposited in any stream or wetland or any noncompliance which may endanger health or the environment. Any information shall be provided orally or electronically within 24 hours from the time the permittee became aware of the circumstances. Visible discoloration or suspended solids in the effluent should be recorded on the Inspection Record. ii. A written submission shall be provided to the appropriate regional office of the DWQ within 5 days of the time the permittee becomes aware of the circumstances The written submission shall contain a description of the sediment deposition and actions taken to address the cause of the deposition. The Division of Water Quality staff may waive the requirement for a written report on a case-by-case basis. g. Records of inspections made during the previous 30 days shall remain on the site and available for agency inspectors at all times during normal working hours, unless the permitting authority provides a site-specific exemption based on unique site conditions that make this requirement not practical. Older records must be maintained for a period of one year after project completion and made available upon request. The records must provide the details of each inspection including observations, and actions taken in accordance with this permit. The permittee shall record the required rainfall and monitoring observations on the "Inspection Record for Activities Under Stormwater General Permit NCG010000" form provided by the Division or a similar inspection form that is inclusive of all of the elements contained in the Division's form. Electronic storage of records will be allowed if approved by the permitting authority. h. Inspection records must include, at a minimum, the following: i. Control Measure Inspections: Inspection records must include at a minimum: 1. identification of the measures inspected, 2. date and time of the inspection, 3. name of the person performing the inspection, 4. indication of whether the measures were operating properly, 5. description of maintenance needs for the measure, 6. corrective actions taken and 7. date of actions taken. ii. Stormwater Discharge Inspections: Inspection records must include at a minimum: 1. identification of the discharge outfall inspected, 2. date and time of the inspection, 3. name of the person performing the inspection, 4. evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. indication of visible sediment leaving the site, 6. actions taken to correct/prevent sedimentation and 7. date of actions taken. iii. Visible Sedimentation Found Outside the Site Limits: Inspection records must include: 1. an explanation as to the actions taken to control future releases, 2. actions taken to clean up or stabilize the sediment that has left the site limits and 3. the date of actions taken. iv. Visible Sedimentation Found in Streams or Wetlands: All inspections should include evaluation of streams or wetlands onsite or offsite (where accessible) to determine if visible sedimentation has occurred. 1. Visible Stream Turbidity - If the discharge from a site results in visible stream turbidity, inspection records must record that evidence and actions taken to reduce sediment contributions. Sites discharging to streams named on the state's 303(d) list as impaired for sediment -related causes may be required to perform additional monitoring, inspections or application of more -stringent management practices if it is determined that the additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. If a discharge covered by this permit enters a stream segment that is listed on the Impaired Stream List for sediment -related causes, and a Total Maximum Daily Load (TMDL) has been prepared for those polluntants, the permittee must implement measures to ensure that the discharge of pollutants from the site is consistent with the assumptions and meets the requirements of the approved TMDL. he DWQ 303(d) list can be found at: http://h2o.enr.state.nc.us/tmdl/General_303d.htm/ 6. All erosion and sedimentation control devices shall remain in place and be maintained by the Contractor until all seeding is established and construction areas have been stabilized. 7. Temporary Seeding - Seed in accordance with Soil Conservation Service recommendations with regard to seed type, rate of application, fertilizer, etc. 3' FILTER FABRIC ON GROUND BURY 6" OF UPPER BURY WI EDGE OF FILTER HARDW FABRIC IN TRENCH LJ SECTION VIEW 4' MIN. TOP OF SILT FENCE MUST BE AT LEAST V ABOVE THE TOP FILTER STONE J BURY WIRE FENCE, FILTER FRONT VIEWMAC FILTER OF 1" DIA. WASHED STONE RE FENCE AND ARE CLOTH SILT FENCE OUTLET NOT TO SCALE FABRIC AND HARDWARE CLOTH IN TRENCH U STEEL FENCE POST SET MAX 2' APARTI8" INTO SOLID GROUND STAPLES STRAW BALE BINDER WIRE (2 PER BALE) 10 mil PLASTIC LINING NATIVE MATERIAL (OPTIONAL) SECTION B -B WOOD OR METAL STAKES (2 PER BALE) 10' MINIMUM B VARIES PLYWOOD 48' X24" PAINTED WHITE CONCRETE WASHOUT T 36" _III -111-111 E 36" NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. BLACK LETTERS 6" HEIGHT LAG SCREWS WOOD POST 3.5"X3.5"X8' B CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) 8' MAX. STANDARD STRENGTH FABRIC W/ WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE 12 GAUGE. 4"x 4" WELDED WIRE FABRIC STEEL POST N WIRE FABRIC OQ UV RESISTANT GEOTEXTILE FABRIC n, N TAMPED BACKFILL GROUND LINE /ice /�, ; /ice 8" DOWN & 4" FORWARD ALONG THE TRENCH TEMPORARY SILT FENCE LATH AND FLAGGING ON 3 SIDE' W �2" 10 mil PLAST.- .� NOT TO SCALE 8 1.12" DIA STEEL WIRE TYPE "BELOW GRADE" STAPLE 10 mil PLASTIC LINING PLAN STRAW BALE DETAIL 10 mil PLASTIC LINING (TYP) TYPE "ABOVE GRADE" WITH STRAW BALES WOOD FRAME SECURELY SECTION B -B FASTENED AROUND NOTES: ENTIRE PERIMETER WITH TWO STAKES 1. ACTUAL LAYOUTTO BE DETERMINED IN THE FIELD. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND DISPOSED OF OR RECYCLED. 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. NOT TO SCALE SANDBAG 10 mil PLASTIC LINING -IIII- SECTION A -A 3' IIII111111 i' BERM CONCRETE WASHOUT NOT TO SCALE ISOMETRIC VIEW SILT FENCE 9 FT. POST 2' WOODEN STAKE 4 FT.� 2 �2 FT. 12" WATTLE J VIEW FROM SLOPE �10' MINIMUM I VARIE' SANDBAG CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. 2"-3" COARSE AGGREGATE NOTE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT A! NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE NOTES: A • --•-- o -a-- o --•-- 0 0 V 3. GRAVEL & RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED 2. TO PROTECT EXISTING PIPE INVERTS THAT 10 ACRES OR LESS SEDIMENT CONTROL STONE Q AREAS TO BE 0 Z DISTURBED 00 SHOULDER OR ANY DIVERSION POINT. (CUT, FILL, ETC.) STEEL POST SHALL BE 5 FT. IN HEIGHT, BE PLYWOOD 48' X24" PAINTED WHITE CONCRETE WASHOUT T 36" _III -111-111 E 36" NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. BLACK LETTERS 6" HEIGHT LAG SCREWS WOOD POST 3.5"X3.5"X8' B CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) 8' MAX. STANDARD STRENGTH FABRIC W/ WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE 12 GAUGE. 4"x 4" WELDED WIRE FABRIC STEEL POST N WIRE FABRIC OQ UV RESISTANT GEOTEXTILE FABRIC n, N TAMPED BACKFILL GROUND LINE /ice /�, ; /ice 8" DOWN & 4" FORWARD ALONG THE TRENCH TEMPORARY SILT FENCE LATH AND FLAGGING ON 3 SIDE' W �2" 10 mil PLAST.- .� NOT TO SCALE 8 1.12" DIA STEEL WIRE TYPE "BELOW GRADE" STAPLE 10 mil PLASTIC LINING PLAN STRAW BALE DETAIL 10 mil PLASTIC LINING (TYP) TYPE "ABOVE GRADE" WITH STRAW BALES WOOD FRAME SECURELY SECTION B -B FASTENED AROUND NOTES: ENTIRE PERIMETER WITH TWO STAKES 1. ACTUAL LAYOUTTO BE DETERMINED IN THE FIELD. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND DISPOSED OF OR RECYCLED. 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. NOT TO SCALE SANDBAG 10 mil PLASTIC LINING -IIII- SECTION A -A 3' IIII111111 i' BERM CONCRETE WASHOUT NOT TO SCALE ISOMETRIC VIEW SILT FENCE 9 FT. POST 2' WOODEN STAKE 4 FT.� 2 �2 FT. 12" WATTLE J VIEW FROM SLOPE �10' MINIMUM I VARIE' SANDBAG CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. 2"-3" COARSE AGGREGATE NOTE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT A! NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE NOTES: A 0 .,D . o, 1. STRUCTURAL STONE SHALL BE CLASS 1 RIP RAP A 2. SEDIMENT CONTROL STONE SHALL BE WASHED NO. 57 STONE PER NCDOT SSRS SECTION 1042 V 3. GRAVEL & RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED 2. TO PROTECT EXISTING PIPE INVERTS THAT 10 ACRES OR LESS SEDIMENT CONTROL STONE Q AREAS TO BE 0 Z DISTURBED 00 SHOULDER OR ANY DIVERSION POINT. (CUT, FILL, ETC.) STEEL POST SHALL BE 5 FT. IN HEIGHT, BE �. F LOO D THE SELF -FASTENER ANGLE STEEL TYPE. d .. STORAGE STRUCTURALSTONE Z., a ZONE (RIP RAP) 12' 12" 24" I IfMIN. MIN. MIN, 12' MIN. PLAN ERM DIVERSION POINT 1. __D___� FLOW:1 MIN. SEDIMENT STORAGE 1.5' (3' DEPTH) SEDIMENT CONTROL STONE FILTER FABRIC MAX. SEDIMENT DEPTH (CLEAN OUT POINT) SECTION A -A PLAN NOT TO SCALE PIPE A FLOW STRUCTURAL STONE NATURALGROUND TEMPORARY ROCK PIPE INLET PROTECTION TWO -STACKED 0 .,D . o, 2X12 ROUGH A WOOD FRAME 10 mil PLASTIC LINING V CONTROL STONE." 2. STAKE (TYP) Q ABOVE GROUND" vvri WOOD PLANKS NOTES: 1. USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. 2. EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. 3. DO NOT PLACE WATTLE ON TOE OF SLOPE. 4. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. 5. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. 6. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. 17. NSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. 8. WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED. 9. INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE STANDARD SPECIFICATIONS. INSET A NLL SILT FENCE SILT FENCE WATTLE BREAK DETAIL NOT TO SCALE SIDE VIEW 1 IA" %A/IRF A SEDIMENT CONTROL STONE V-6" 6'I 2 NOT TO SCALE NOTES: MESH 0 .,D . o, a;� •� NO. 57 AND SHALL BE PAID FOR AT THE CD V CONTROL STONE." 2. WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH Q OPENINGS.TOP OF WIRE MESH SHALL BE A 0 Z MINIMUM OF ONE FOOT BELOW THE 00 SHOULDER OR ANY DIVERSION POINT. 3. STEEL POST SHALL BE 5 FT. IN HEIGHT, BE �. INSTALLED 1.5 FT. DEEP MINIMUM, AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. d .. WOOD POST SHALL BE 6 FT. IN HEIGHT, BE Z., a INSTALLED TO 1.5 FT. DEEP MINIMUM, AND BE 3 INCHES IN DIAMETER. POST SPACING SHALL BE A MAXIMUM OF 4 FT. 12" V Z 5. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF W ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. Z 1 IA" %A/IRF A SEDIMENT CONTROL STONE V-6" 6'I 2 NOT TO SCALE NOTES: MESH A 1. SEDIMENT CONTROL STONE SHALL BE NO. 5 OR •� NO. 57 AND SHALL BE PAID FOR AT THE CONTRACT UNIT PRICE PER TON "SEDIMENT V CONTROL STONE." 2. WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH Q OPENINGS.TOP OF WIRE MESH SHALL BE A 0 Z MINIMUM OF ONE FOOT BELOW THE 00 SHOULDER OR ANY DIVERSION POINT. 3. STEEL POST SHALL BE 5 FT. IN HEIGHT, BE INSTALLED 1.5 FT. DEEP MINIMUM, AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WOOD POST SHALL BE 6 FT. IN HEIGHT, BE Z., a INSTALLED TO 1.5 FT. DEEP MINIMUM, AND BE 3 INCHES IN DIAMETER. POST SPACING SHALL BE A MAXIMUM OF 4 FT. 12" V Z 5. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF W ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. Z TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. \ / AVERAGE BOX v DIMENSION VARIABLE FILTERED WATER SECTION A -A ROCK INLET SEDIMENT TRAP MULTI -DIRECTIONAL FLOW NOT TO SCALE ILT FENCE POST INSTALL TEMPORARY SILT FENCE WHERE NECESSARY TO RETAIN SEDIMENT TEMPORARY STOCKPILE EE INSET A 3�tilMPxl DOWNSLOPE STAKE EXISTING GRADE TEMPORARILY SEED AS SOON AS POSSIBLE (NO MORE THAN 21 CALENDAR DAYS AFTER FORMATION OF THE STOCKPILE.) IF STOCKPILE WILL NOT BE USED WITHIN 90 DAYS STABILIZE WITH PERMANENT VEGETATION. Lu 3,1 (MqX/ X 0 TEMPORARY STOCKPILE NOT TO SCALE z w 0 U U z >- Z z Z) 0 0 U U r a 0 00 w o 1 REVISIONS: Z `,1111111111///,1 ,�0�-�H CAR p�tiy'-, 1970 =�'� •�.NG EF,`��.•' Jam: C. F ��1//1111111111 W/ 9 / 18 _z U) d ULU LU c ~ a z a, J oU z zOw o LU 0- 0 - OWC L uQzi 00 0 -� un OD > 00 nn r\ E m N +J oo 5 U 00 Zn i Z 00 C O O U - 00 Y ui L m � Iri co Ln W N Ln (V ,n 3 NL7�3 Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C=9 Date: 01-26-2018 O •� V Q 0 Z 00 W M w W � Z., a V Z Q W Z V `,1111111111///,1 ,�0�-�H CAR p�tiy'-, 1970 =�'� •�.NG EF,`��.•' Jam: C. F ��1//1111111111 W/ 9 / 18 _z U) d ULU LU c ~ a z a, J oU z zOw o LU 0- 0 - OWC L uQzi 00 0 -� un OD > 00 nn r\ E m N +J oo 5 U 00 Zn i Z 00 C O O U - 00 Y ui L m � Iri co Ln W N Ln (V ,n 3 NL7�3 Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C=9 Date: 01-26-2018 2'-6' V-6- 1/2' 6' 2'-0' 1/8' 9" 9" RAD, 13' RAD. RAD,N I 1 3/4" RAD. 1/8' •) 3/4" RAD. z3' RAD. RAD. , I 1/8' RAD. • • N ° • I� n a ° a m° °a 2'-6A CURB AND GUTTER 1'-6" CURB AND GUTTER 30" CURB AND GUTTER SHALL BE PLACED IN NCDOT R/W. (TO BE USED IN MEDIANS ONLY) 2'-0' 1/2" 6' 1'-6" J❑INT SEALER RAD, 3' RAD, 1/8" RADIUS 1/8" RADIUS COP OF CURB 1/8' 1/8" RADIUS SURFACE ;0 3' RAD. RAD. 1/8' RADIUS ❑F GUTTER O 4 ° ° • zn ° J❑INT FILLER 2'-0' CURB AND GUTTER yI 1/2' 24" CURB AND GUTTER SHALL BE PLACED IN RESIDENTIAL TRANSVERSE EXPANSION DEVELOPMENTS OR AS PROVIDED IN SEC. 490 OF THIS MANUAL. JOINT IN CURB AND GUTTER NOTES: 1. Contraction joints shall be placed at 10' intervals, except that 15' spacing may be used when a machine is used or when satisfactory support for the face form can be obtained without the use of templates at 10' intervals. Joint spacing may be altered by the engineer to prevent uncontrolled cracking. 2. Contraction joints may be installed by the use of templates or formed by other approved methods. Where such joints are not formed by templates, a minimum depth of 1 1/2" shall be obtained. 3. All contraction joints shall be filled with joint filler. 4. Expansion joints shall be spaced at 90' intervals, and adjacent to all rigid objects. 5. All curb and gutters are to be poured with class "A" concrete (3,000 PSI). 6. Flexible forms are to be used when radius is less than 200'. STANDARD CURB & GUTTER NOT TO SCALE a a a ° 1/2" EXPANSI❑N J❑INT STANDARD ffi C❑MBINATI❑N GRATE & HOOD STD. 614.01 ° 8N 9 1/2' EXPANSION J❑INT CURB AND GUTTER STD. 5,\O• a 411.01 1/2" EXPANSI❑N J❑IN 0 STANDARD C❑MBINATI❑N GRATE ° & HOOD STD. 614.01 a ROLL TYPE STANDARD CURB AND CURB AND GUTTER STD. NO. 411.01 A /GUTTER STD. NO. 411.02 1/2' EXPANSION J❑IN h CURB TRANSITI❑N STD. NO. 411.04 0 ti STANDARD CATCH BASIN FRAME 2l IN CURB AND GUTTER NOT TO SCALE 1'-3' 1'-3' 1'-3' 1'-3' r► A r - B r-- C 1� BACK OF CURB-, 0 a 4 Q N a a ° �I ° ° a (U a ° 4 ° LIP ❑F CUR L► A L► B L► C PLAN VIEW STANDARD CURB BEGIN 2'-0' ROLL - TYPE CURB AND GUTTER STD. 5'-0' AND GUTTER STD, NO, 411.02 NO. 411,01 ELEVATI❑N OF TOP OF CU `0 .GUTTER LIN 4 ♦ ° Q \ ZD a a ° L ° t0 FRONT ELEVATION �--�{ 7 1/2' �{ 8 3/4' IU• 2'-0" 2' -0 - NOTES: SECTION A -A SECTION B -B 1. Transition is NOT to be located within the curb radius. CURB TRANSITION - 2`l C&G TO 2l ROLL TYPE C&G NOT TO SCALE O d 2'-0" SECTION C -C NOTES: 1. PLACED CONCRETE BLOCKING SUCH THAT IT WILL NOT INTERFERE WITH REMOVAL OF BOLTS. 2. NO SERVICE CAN BE INSTALLED ON THE MAIN BETWEEN THE INLINE GATE VALVE AND THE LOCKED HYDRANT TEE. PIPE DIA. (IN.) MIN. FULL PIPE LENGTHS 6" 2 8" 3 10" 3 12" 3 FIRE HYDRANT (SEE TYP. HYD. DETAIL) - 6" PIPE 6" GATE VALVE - GATE VALVE LOCKED HYD. TEE OBTAIN MINIMUM FULL PIPE LENGTHS FROM TABLE M CL VALVE PAVED AREA GRASSED AREA I 4" MIN. 6" l l l l l rT� I I I I I SEE DETAIL MINIMUM 3000 P.S.I CONCRETE TERMINATION OF 6"-12" WATER MAIN VALVE BOX DETAIL (W-8) NOT TO SCALE FOR VALVES SMALLER THAN 12" (W 7) NOT TO SCALE a•_n• 6 1/2' a cru ♦ co 4 4 ° a ROLL TYPE CURB AND GUTTER NOTES: JOINT SEALER 1/8" RADIUS iJ'1/8' RADIUS T❑P OF CURB 1/8' RADIUS JGUTTER 1/8' RADIUS 4 1/2' TRANSVERSE EXPANSION JOINT IN CURB AND GUTTER VALVE 1. Contraction joints shall be placed at 10' intervals, except that 15' spacing may be used when a machine is used or when satisfactory support for the face form can be obtained without the use of templates at 10' intervals. Joint spacing may be altered by the engineer to prevent uncontrolled cracking. 2. Contraction joints may be installed by the use of templates or formed by other approved methods. Where such joints are not formed by templates, a minimum depth of 1 1/2" shall be obtained. 3. All contraction joints shall be filled with joint filler. 4. Expansion joints shall be spaced at 90' intervals, and adjacent to all rigid objects. 5. All curb and gutters are to be poured with class "A" concrete (3,000 PSI). 6. Flexible forms are to be used when radius is less than 200'. STANDARD ROLL -TYPE CURB AND GUTTER NOT TO SCALE STREET RIGHT-OF-WAY DETAIL SOIL PRECAST CONCRETE COLLAR PLUG (M.J.) (Ib/sq.ft.) 5"STORZ CONNECTION NOTES: SOFT CLAY 1. VALVE BOX SHALL NOT BE PUMPER NOZZLE TO BE INSTALLED IN CURB AND GUTTER. SANDY SILT 2. VALVE BOX SHALL BE IN PERPENDICULAR TO STREET ACCORDANCE WITH EASTERN CONCRETE PINES WATER CORPORATION BLOCKING REQUIREMENTS. 4,300 3. VALVE BOX SHALL BE CENTERED 1,100 AND PLUMBED OVER VALVE. M CL VALVE PAVED AREA GRASSED AREA I 4" MIN. 6" l l l l l rT� I I I I I SEE DETAIL MINIMUM 3000 P.S.I CONCRETE TERMINATION OF 6"-12" WATER MAIN VALVE BOX DETAIL (W-8) NOT TO SCALE FOR VALVES SMALLER THAN 12" (W 7) NOT TO SCALE a•_n• 6 1/2' a cru ♦ co 4 4 ° a ROLL TYPE CURB AND GUTTER NOTES: JOINT SEALER 1/8" RADIUS iJ'1/8' RADIUS T❑P OF CURB 1/8' RADIUS JGUTTER 1/8' RADIUS 4 1/2' TRANSVERSE EXPANSION JOINT IN CURB AND GUTTER VALVE 1. Contraction joints shall be placed at 10' intervals, except that 15' spacing may be used when a machine is used or when satisfactory support for the face form can be obtained without the use of templates at 10' intervals. Joint spacing may be altered by the engineer to prevent uncontrolled cracking. 2. Contraction joints may be installed by the use of templates or formed by other approved methods. Where such joints are not formed by templates, a minimum depth of 1 1/2" shall be obtained. 3. All contraction joints shall be filled with joint filler. 4. Expansion joints shall be spaced at 90' intervals, and adjacent to all rigid objects. 5. All curb and gutters are to be poured with class "A" concrete (3,000 PSI). 6. Flexible forms are to be used when radius is less than 200'. STANDARD ROLL -TYPE CURB AND GUTTER NOT TO SCALE STREET RIGHT-OF-WAY 2X PIPE DIA. SOIL BEARING LOAD 1'- 0" MIN. OR AS NOTED ON PLANS - (Ib/sq.ft.) 5"STORZ CONNECTION NOTES: SOFT CLAY DO oo PUMPER NOZZLE TO BE 1,500 SANDY SILT 3,000 PERPENDICULAR TO STREET 1. HYDRANT TO BE PLUMB. IF SANDY CLAY 6,000 HARD CLAY ADJUSTMENT IS NECESSARY AFTER 4,300 2,200 1,100 PRESSURE TEST,RETESTING MAY BE 6" 6" ENCLOSE END STAINLESS STEEL 13,600 ELEVATION AS REQUIRED BY GUC. 1,900 o U SHOWN ON PLAN 2. VALVE BOX SHALL NOT BE INSTALLED U 5,700 2,900 IN CURB & GUTTER. RESTRAINED JOINT 29,000 15,700 3. MECHANICAL RESTRAINT DEVICES 4,000 0 Id WILL NOT BE ALLOWED ON THE PIPE 21,100 11,000 5,400 CONNECTION TO THE HYDRANT BASE. 0 50,400 FINISHED VALVE BOX -1 N WOOD SKIDS - • GRADE 1 r PLACED 120° 10' O.C. SLOPE TO DRAIN 34,400 2" WEEP HOLE 9 11 \y 55,000 (10 CUFT. STONE) 42,100 ELEVATION PROVIDE #57CRUSHED NE AROUND WEEP HOLES $ LOCKED HYDRANT TEE SLOPE TOP OFO CONCRETE TO PROVIDE DRAINAGE FROM HYDRANT DRAIN 6" PIPE ° a CONCRETE �I BLOCKING UNIFORMED CONCRETE 6" GATE VALVE I_111- FIRE HYDRANT INSTALLATION (FOR AREAS WITH CURB AND GUTTER) (W 4) NOT TO SCALE BEARING AREA AGAINST UNDISTURBED m EARTH (SEE TABLE) M M z n x 3,000 PSI CONCRETE ENCASEMENT ALL AROUND FOR REACTION BACKING o,00 DIP p' - - t MECHANICAL RESTRAINT DEVICE NOTE: MIN. BEARING AREAS ARE BASED UPON THE TABLE ABOVE FOR SOILS HAVING BEARING CAPACITIES DIFFERENT THAN 2X PIPE DIA. SOIL BEARING LOAD 1'- 0" MIN. 2.7 (Ib/sq.ft.) MUCK 0 SOFT CLAY 1,000 SILT 1,500 SANDY SILT 3,000 SAND 4,000 SANDY CLAY 6,000 HARD CLAY 9,000 NOTE: MIN. BEARING AREAS ARE BASED UPON THE TABLE ABOVE FOR SOILS HAVING BEARING CAPACITIES DIFFERENT THAN CAR SECTION \RRIER PIPE IN CASING WITH WOOD SKIDS -120 & 10' O.C. STEEL ENCASEMENT PIPE EL STRAPPING PIPE ENCASEMENT DETAIL NOT TO SCALE RESULTANT THRUST AT FITTING TYPES OF THRUST BLOCKING AT 150 PSI WATER PRESSURE O TOTAL POUNDS •0 2.7 z DEAD END 90° BEND 45° BEND 22-1/2° BEND 11-1/4° BEND 4" 2,700 3.800 0 1,100 530 u 3'- W 8,000 4,300 2,200 1,100 8" 6" 6" ENCLOSE END STAINLESS STEEL 13,600 z STRAPPING WITH 8" BRICK 1 " BEVEL MASONRY 1,900 o U 14,500 20,500 U 5,700 2,900 w 0 RESTRAINED JOINT 29,000 15,700 CARRIER PIPE CLCARRIER PIPE 4,000 14" Id 39,000 21,100 11,000 5,400 16" STEEL • • • 50,400 ENCASEMENT PIPE 3-2X4 TREATED 2'- W •• • • • • • • • • 14,000 7,000 WOOD SKIDS - • 44,800 PLACED 120° 10' O.C. SLOPE TO DRAIN 34,400 2" WEEP HOLE 8,800 DRAINAGE GRAVEL 55,000 (10 CUFT. STONE) 42,100 ELEVATION 10,800 CAR SECTION \RRIER PIPE IN CASING WITH WOOD SKIDS -120 & 10' O.C. STEEL ENCASEMENT PIPE EL STRAPPING PIPE ENCASEMENT DETAIL NOT TO SCALE RESULTANT THRUST AT FITTING TYPES OF THRUST BLOCKING AT 150 PSI WATER PRESSURE - - - ll 1 - 2 D D,II 0 I P - v111= O II = D ® m I of >Vo_ p T © _ - 1111 II I I I v o11 o°.1. o00o a - =111- - 1I I�Ti_I I I -I I rl i t SOIL BEARING LOAD POLYWRAP SHALL BE USED TO COVER FITTINGS AND BOLTS. 1. THRU LINE CONNECTION, TEE (LB./SQ. FT.) 2. THRU LINE CONNECTION, TEE MUCK 0 TO DETERMINE THE SIZE OF A CONCRETE THRUST BLOCK, DIVIDE THE TOTAL FORCE BY CROSS USED AS TEE THE BEARING VALUES OF THE SOIL THE UOTIENT WILL BE THE SIZE OF THE BEARING DRE N R E ELB REVISIONS: Z O TOTAL POUNDS •0 2.7 NOM. PIPE DIA. DEAD END 90° BEND 45° BEND 22-1/2° BEND 11-1/4° BEND 4" 2,700 3.800 2,100 1,100 530 6" 5,600 8,000 4,300 2,200 1,100 8" 9,700 13,600 7,400 3,800 1,900 10" 14,500 20,500 11,100 5,700 2,900 12" 20,500 29,000 15,700 8,000 4,000 14" 27,600 39,000 21,100 11,000 5,400 16" 35,700 50,400 27,300 14,000 7,000 18" 44,800 63,400 34,400 17,500 8,800 20" 55,000 77,000 42,100 21,500 10,800 24" 78,500 110,000 60,000 31,600 15,400 30" 120,600 170,600 92,300 47,100 23,600 36" 172,800 244,400 132,300 67,500 33,900 42" 233,300 330,000 178,600 91,000 45,700 48" 304,000 430,000 232,700 118,600 59,600 54" 384,100 543,200 294,000 149,000 75,300 - - - ll 1 - 2 D D,II 0 I P - v111= O II = D ® m I of >Vo_ p T © _ - 1111 II I I I v o11 o°.1. o00o a - =111- - 1I I�Ti_I I I -I I rl i t SOIL BEARING LOAD POLYWRAP SHALL BE USED TO COVER FITTINGS AND BOLTS. 1. THRU LINE CONNECTION, TEE (LB./SQ. FT.) 2. THRU LINE CONNECTION, TEE MUCK 0 TO DETERMINE THE SIZE OF A CONCRETE THRUST BLOCK, DIVIDE THE TOTAL FORCE BY CROSS USED AS TEE THE BEARING VALUES OF THE SOIL THE UOTIENT WILL BE THE SIZE OF THE BEARING DRE N R E ELB REVISIONS: Z Q 3. I CTIO CHA G OW SOFT CLAY 1,000 SILT 1,500 TYPES OF SOIL AREAREA OF THE ST BLOCK IN LISTED ISTED IN TABLE. UARE FEET. APPROXIMATE VALUES FOR VARIOUS 4. CHANGE LINE SIZE, REDUCER 5. DIRECTION CHANGE, TEE USED SANDY SILT 3,000AS ELBOW ���` Off••• Cf-{� ���� SAND 4,000 NO RESPONSIBILITY CAN BE ASSUMED FOR THE ACCURACY OF THE DATA IN THIS TABLE 6. DIRECTION CHANGE, CROSS ?' 9 SANDY CLAY 6,000 �•• HARD CLAY 9,000 DUE TO THE WIDE VARIATION OF BEARING LOAD CAPABILITIES FOR EACH SOIL TYPE. USED AS ELBOW 7. DIRECTION CHANGE 970 THRUST BLOCKING DETAIL RESTRAINED PIPE 8"0 = 31 LF L_ 6"0=24 LF M.J. 45° BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE PIPE SIZE O MIN. BEARING AREA (SQ. FT.) SILT SANDY SILT SAND SAND CLAY HARD CLAY •0 2.7 1.8 1.0 1.0 1.0 V 6 5.6 3.7 1.9 1.4 1.0 1.0 Q 9.7 G Z 3.2 2.4 1.6 in Ujw M � J a 4.8 3.6 2.4 M V 0 z � �+ li 14 M 2 9.2 6.9 4.6 3.1 W 0 Z Q 12 8.9 5.9 4.0 18 45 30 W 5.0 M 55 Z 18 14 9.2 6.1 24 78 52 26 20 13 8.7 30 121 81 40 30 20 1 36 V Q 3. I CTIO CHA G OW SOFT CLAY 1,000 SILT 1,500 TYPES OF SOIL AREAREA OF THE ST BLOCK IN LISTED ISTED IN TABLE. UARE FEET. APPROXIMATE VALUES FOR VARIOUS 4. CHANGE LINE SIZE, REDUCER 5. DIRECTION CHANGE, TEE USED SANDY SILT 3,000AS ELBOW ���` Off••• Cf-{� ���� SAND 4,000 NO RESPONSIBILITY CAN BE ASSUMED FOR THE ACCURACY OF THE DATA IN THIS TABLE 6. DIRECTION CHANGE, CROSS ?' 9 SANDY CLAY 6,000 �•• HARD CLAY 9,000 DUE TO THE WIDE VARIATION OF BEARING LOAD CAPABILITIES FOR EACH SOIL TYPE. USED AS ELBOW 7. DIRECTION CHANGE 970 THRUST BLOCKING DETAIL RESTRAINED PIPE 8"0 = 31 LF L_ 6"0=24 LF M.J. 45° BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE PIPE SIZE SOFT CLAY MIN. BEARING AREA (SQ. FT.) SILT SANDY SILT SAND SAND CLAY HARD CLAY 4 2.7 1.8 1.0 1.0 1.0 1.0 6 5.6 3.7 1.9 1.4 1.0 1.0 8 9.7 6.4 3.2 2.4 1.6 1.1 10 15 10 4.8 3.6 2.4 12 21 14 6.8 5.1 3.4 2.3 14 28 18 9.2 6.9 4.6 3.1 16 36 24 12 8.9 5.9 4.0 18 45 30 15 11 7.4 5.0 20 55 37 18 14 9.2 6.1 24 78 52 26 20 13 8.7 30 121 81 40 30 20 1 36 173 115 56 43 29 19 THAT SHOWN ADJUST AREA AS NECESSARY TO PROVIDE NOTE: ALTERNATE METHOD OF RESTRAINT SHOULD BE CONSIDERED EQUIVALENT RESTRAINT. FOR SITUATIONS FALLING WITHIN OUTLINED AREA. THRUST RESTRAINT WITH ANCHOR RING (W-13) NOT TO SCALE M.J. 45° BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE OR CONCRETE THRUST BLOCKING NOTES: 1. PLACE CONCRETE BLOCKING SUCH THAT IT WILL NOT INTERFERE WITH REMOVAL OF B 0 LTS. 2. PIPE LENGTHS SHALL BE AS REQUIRED TO CONSTRUCT CROSSING. 3. ALLJOINTS TO BE RESTRAINED IN ACCORDANCE WITH EASTERN PINES WATER CORPORATION. NOT TO SCALE �i '9/1/ C, W 191 8 -6 Ln nD CO n0 r\ RESTRAINED PIPE 8"0 = 31 LF 6"0 = 24 LF a Z uw 00 �U00 i Z 00 C cLs O O U �_ 00 Y Ln L m > Ln Ln N N 3 Ln � Ln C14 (D M.J. 45° BEND (DIP) DIP W/ MECHANICAL RESTRAINT DEVICE F z ONE JOINT OF DIP c � a Q Project Manager: BCF OR CONCRETE THRUST BLOCKING a♦ M.J. 45° BEND (DIP) v (A _ U W/ MECHANICAL Z Z O w OU RESTRAINT DEVICE Z Q STORM DRAIN z o WATER MAIN AND STORM DRAIN CROSSING (W-14) NOT TO SCALE C-10 Date: 01-26-2018 uL -6 Ln nD CO n0 r\ 12" MIN. 00 �U00 i Z 00 C cLs O O U �_ 00 Y Ln L m > Ln Ln N N 3 Ln � Ln C14 (D M.J. 45° BEND (DIP) DIP W/ MECHANICAL RESTRAINT DEVICE Project Manager: BCF OR CONCRETE THRUST BLOCKING Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 WATER MAIN AND STORM DRAIN CROSSING (W-14) NOT TO SCALE C-10 Date: 01-26-2018 CL GENERAL NOTE: OVERFLOW FORMS TO BE USED FOR CONSTRUCTION OF BOTTOM SLABS. ALL PARTIALLY COMPLETED UPSTREAM END OF ALL MORTAR JOINTS TO BE 1/2" PLUS OR MINUS 1/8". FINISHED GRADE 18" x 18" (MINIMUM) STORM DRAINS SHALL BE STORM DRAIN (TYP.)7_'_ ° 1/3 PIPE DIA. JUMBO BRICK WILL BE PERMITTED. JUNCTION BOXES RETROREFLECTIVE RED PROTECTED AT THE END OFSHALL BE PROVIDED WITH STEPS V-2" ON CENTER. �\ \ X�\\�\\�\/ DIAMOND PANEL EACH DAY IN ACCORDANCE WITH THESE DETAILS.MANHOLE RING 3000 PSI CONC./ I AND COVER SLAB WITH NO. 6 I BARS AT 6" O.C. BACKFILL _ EACH WAY o ��� �, it ��-illll—III _ III ii 77 BURY BOTTOM - 0 OF PLYWOOD -17 Y4" EXTERIOR PLYWOOD X NOTE: q z ATTACH PANEL(S) WITH �� I o 5/16" DIA. GALVANIZED PLYWOOD INLET PROTECTION ----- / o HEX HEAD BOLT, NUT STEEL FENCE POST AND STANDARD WASHER (TYP.) OVERFLOW ---- 0 8" BRICK 8' w 12" MIN. o WALL Q \ N 1/3 PIPE DIA. > w 7' U -CHANNEL POSTS I EMBEDMENT (1.12 LB/FT) WASHED STONE FILTER ° ° D ACROSS PIPE INLET I D --- -- x PIPE GROUND LINE I 3000 PSI CONC F`�/�77777 �i��i��� iOiOO; O! O Oi �i-�i -� _III SLAB WITH N0. / tl V_ Oi00 O 5 BARS AT 12" 6 6 REVISIONS: 4' 0" O.C. EACH WAY 1/4 W (9'-0" MAX) 1/4 W (9'-0" MAX) N� � � � ��� HARDWARE CLOTH PLAN SECTION "A" CLASS "F" STONE FILTER INLET PROTECTION 1/2 W 1/2 W TRENCH SECTION DETAIL FOR THE W PIPE INLET PROTECTION (PLYWOOD AND STONE) JUNCTION BOX NOT TO SCALE INSTALLATION OF REINFORCED CONCRETE PIPE NOT TO SCALE NOT TO SCALE ELEVATION 7' U - CHANNEL X / \ FINISHED GRADE POSTS (1.12 LB/FT) \�\ X\\/ \\\�\\�\\ A B STORM PIPE (STANDARD F ROLL WIDTH) /\ BACKFILL j\ /\ 18 x 18 (MINIMUM) - \ / RETROREFLECTIVE RED N PERMANENT SOIL DIAMOND PANEL SQUARE PREFORMED REINFORCEMENT MATTING / SCOUR HOLE (PSH) (PSRM). PSRM SHALL BE / j SEEDING WITH VEGETATION X AT INSTALLATION. / 12" MIN. BACK OF CURB OR EDGE OF PAVEMENT /X\ / EMBEDMENT PLAN STORM PIPE PSRM INSTALL LEVEL AND / PIPE F/C�S�O DEPTH OF SCOUR HOLE FLUSH WITH NATURAL j 1/6 O.D. MIN. PF (V MIN. - 3' MAX.) GROUND TYPE IV STREET BARRICADE 7 c 00o0o0oOc o INFLOW NATURAL GRANULAR EMBED 0 ���o •L n NOT TO SCALE GROUND J J J J 4" MIN. Q 1• Z� oOc�Oc�Oc�Oc�Oo 0 0 0 � MIN. 1' TUC X� V I� LINER: CLASS B RIFFRAFF WITH TYPE 2 FILTER FABRIC CLASS "C" zo 3 TIMES PIPE DIA. BASE WIDTH = 10' MIN. (BOTH DIRECTIONS) LU zw TRENCH SECTION DETAIL FOR THE INSTALLATION OF 42" & 0 z LL W In in Uj LARGER RCP &ALL DIP STORM DRAINAGE PIPING M PREFORMED SCOUR HOLE M NNOT TO SCALE NOT TO SCALE O O 0 0w C LL - O °° W O �� g m a Q RIP -RAP Z =' < J O > Q MAX. 11/2-1 W (O O > NOTES: O O6 1. MORTAR JOINTS 1/2" ± 1/8" THICK. CLASS "AA" O O0 O VARIABLE CONCRETE TO BE USED. 3 TIMES PIPE DIA. TYPICAL ENERGY DISSIPATER WITH RIP -RAP 2. THE POURING OF FLOOR SLAB TO BE V Q ACCOMPLISHED BY FORMING. Z (n 3. ALL CATCH BASINS OVER 3'6" IN DEPTH SHALL BE PIPE DIA. NOTE: PROVIDED WITH STEPS 1'2" ON CENTERS. STANDARD BRICK DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN 15'-54' PIPE Vq FLARED END PIPES GREATER THAN 36" 4. STEPS SHALL BE IN ACCORDANCE WITH STD No. DIMENSIONS OF Box AND PIPE COVER REINFORCEMENT CUBIC YARDS OF BRICK MASONRY R/ PIPE SPAN WIDTH WIDTH SPAN HIEGHT HEIGHT DIMENSIONS BARS -U BARS -V BARS -W TOTAL CONCRETE IN BOX H' ABBE WILL REQUIRE CONC. SLAB AND OR 25.12. D A B C G MIN.H' H2 E F NO. LENGTH NO. L NO. L LBS. TOP SLAB FLOOR TOTAL CU. YDS, PER FT. OF HEIGHT RIP -RAP TO PROTECT BOTH ENDS OF PIPE 5. CONCRETE BRICK MAY BE USED IN LIEU OF CLAY 15' 3-0' 2-2- --- --- 2'-6- --- --- --- -- ----- -- --- -- --- ---- ---- 0.281 0.281 0,802 0.321 Uj BRICK. JUMBO BRICK WILL BE PERMITTED. 18' --- --- 2'-10- --- --- --- - ---- - -- - --- --- ---- 0.281 0.281 0.909 ABOVE o NOTE: 2 3/4" 3/4" 24' --- -- 3'-4- --- --- --- - ---- - -- -- --- --- ---- 0.281 0.281 1.070 MINIMUM H' Z M RIP -RAP DIMS. AS SHOWN ON FLAN FROM 3'-7° 13/4"' 6. FOR 8' 0" IN HEIGHT OR LESS USE 8" WALL. OVER 8' _ 7 USE TYPE "C' GRATE UNLESS � P P 30' 3'-4' --- 3'-2' V 1'-10' 4'-4' 4 1'-6' 3 4'-1' 3 4'-1' 45 0,147 0,374 0,521 1,306 � � CHANNEL THUS 4" FILTER STONE BED 0" IN HEIGHT USE 12" WALL TO 6' 0' FROM TOP OF 36' 3'-10' -- 3'-8' R 2'-4' 4'-4' 4 2'-0' 4 4'-1' 3 4'-1' 49 0.187 0.415 0.602 1.586 ABOVE N °° OTHERWISE INDICATED. JJJ O B p 7' WALL, AND 8" WALL FOR THE REMAINING 6' 0". 42' --- a' -s a' -a' IA 2'-r 3'-6' a r-9' 3 3'-3' 3 3'-3' 3s o.13s 0.373 0.508 1.811 H2 o J 7" 7. LEAVE WEEP HOLES AS DIRECTED BY THE ENGINEER. 48' --- s' -o' 4'-10' BL 2'-s' 3'-6' a 2'-6• a 3'-3' 3 3'-3• 40 0.173 o.alo ossa 2.146 m 4" FILTER STONE BED OR FILTER CLOTH NOTE: / C C 2 1/8 1' N N 54' 3'-0' 2'-2' --- 5'-T S'-4' E13'-3'13'-6'14 3'-0' 6 3'-3' 3 3'-3' 48 0.211 0.448 0.659 2,510 FOR PIPES ON MILD SLOPES NOTE: -I I-2 1/8' FRAME ,GRATE &HOOD = 1211 •L ! �� INSPECT RIFFRAFF OUTLET STRUCTURES WEEKLY io SECTION LL SECTION -MM __ BACK OF CURB ,�✓ AND AFTER SIGNIFICANT (z INCH OR GREATER) A A 12„ _ 8" o ����— Q\e 0000000000000 00 X 6 E TYPICAL CONCRETE / a k RAINFALL EVENTS TO SEE IF ANY EROSION s FLARED END SECTION % c�S �p� AROUND IF BELOW THE RIFFRAFF HAS TAKEN 1" 1 3/8"� 1 3/8" 2" g 3" #4 BARS "V" 6' #8 BARS"W" EQUALLY SPACED m 5Q\P�S DISLODOGEDFIMMED IMMEDIATELY MAKTHE STONES HAVE E ALL REPAIRS g 1 Y — — Y EQUALLY SPACED 1 o D SECTION BB �—J— E O NEEDED TO PREVENT FURTHER DAMAGE. A — _ 8" 8" o S RIP -RAP PROTECTION AT OUTLETS PLAN �T = __ c TYPICAL ENERGY D I S S I PATO RS FRAME,GRATE,& HOOD ASSEMBLY SECTION -PP SECTION -NN — — 8„ D Ln u 5' 0" 5' 0" w m a `1111111111111 ,� o i NOT TO SCALE X 6„ ; - 6„ , _ _ - > " FLOW .��% CAROB f i,� Rip Rap 1 [RR -1) 3„ 4" 1 3/4" PLAN SECTION - XX END ELEVATION Q ����••.••• '�9�' J 5/8" WHERE 30" TO 36" PIPE IS USED LU DIMENSIONS ENTRY WIDTH 5.0 FT SEE DETAIL #1 SECTION 11 S 5'-0" LENGTH 10.0ET 11/16" SLOT FOR PLAN 197 'cam i M[N IN WIDTH 1D.o ET T-0" 45/8 I 19" 1/2" BOLT N PLAN OF TOP SLAB ' CURB AND GUTTER W/CATCH BASIN ON STEEP GRADE ;� •••�;N F,�•• J: GINE • O MIN. THICKNESS 24 _ _ _ _ _ _ _ _ �j ,9Ai ..••••..•' �� 3 MIN. STONE DIAMETER 6 IN SECTION AA K K ^' q 6" 8" 6" STONE CLASS Class 8 L M am)101. 1 1 , ��///111111111 Rip Rap Z (RR -2) STEP 6" , V W I91 I8 0 DIMENSIONS 8" 8" #8 BARS "W' _ J L IV1 rn 5/8" 7" A� 6„ E USE ON FLAT GD. 2% D UNDER ENTRY WIDTH 5.0 FI 2 _ _ ` J o FRAME PLAN 4 BARS "V 1O w 3 LENGTH 10.0 FT T E 4 BARS"U" � J a¢ i EXIT WIDTH 12.0 TT SECTION JJ OUTLET D G —+ _ 8— U r a: a o MIN. THICKNESS 24 IN m06 MIN. STONE DIAMETER 6 IN 1 1/2" 5/8" 3/4" 6" = D 3'-0" 3'-O" C) (n = w O M SECTION -RR 3/4" 3/4" 3" 4' g GUTTER LN O Q STONE CLASS Ciass 8 DEPRESSED Z O w 3 3/4 � Ir T SECTION - YY ELEVATION V 0 Z 0 Rip Rap 3 (RR -3) l _ a DIMENSIONS 1 3/4" 1 1/2" 1 3/4" L � � 1/4 6 NORMAL CURB AND GUTTER ON LIGHT GRADE w m � •� LL 3 ENTRY WIDTH 5.0 TT DETAIL #1 SIDE ELEVATION N 00 5 m 3' 0' U 00 �n i LENGTH 10.0FT SECTION CC 3 1/2" WHERE 42" TO 54' PIPE IS USED NORMAL GUTTER LINE L Z 00 c EXIT WIDTH 1�.a Fr SECTION - MM crs o o N 3 1/2" #4 BARS "U" aj u o MIN. THICKNESS 24 IN SECTION KK EQUALLY SPD 8 o U = Y MIN. STONE DIAMETER 6 IN STONE CLASS Class B 5 7/8" 1/2" E 3 3 USE ON FLAT GD. 2/o AND VE Lit L io � L^ 3 3 3' RAD — F. T — N (D 0 Rip Rap 4 [RR -4} 1 1/2 3,_7/8„ 1„ 3i /4" 1/ 8, 1' 1 1/2" y g Y r — — — F T 2 3/4" 4 3/4' 11/16" I — — r I DEPRESSED DIMENSIONS R / F A r q SECTION -SS X GUTTER LINE ENTRY WIDTH 6.0 ET �� J 11/4' � = a Project Manager: BCF a m m — — 31/2„ M M 12" 22 5'-0' LENGTH 12.0 FT N 15/8" g Drawn By: EW/BTO 15 EXIT WIDTH 14.0 Fr I 11/2" 4 5/8 F EXIT 2a !N 11" 1 2 SECTION RR L L — — Checked By: BTO a 3/4' R 3/4 �- — — ELEVATION MIN. STONE DIAMETER a IN 11/2" L — — — NORMAL CURB AND GUTTER ON STEEP GRADE Project Number: 17050 a STONE CLASS Class 8 1 1/2" 2'-111/2" PLAN � Drawing Number: D-1127 SECTION DD PLAN i a 0 C7 o+ c 0 Y 0 o_ 0 0 HOOD ELEVATION Rip Rap S(RR-5) STANDARD BRICK CATCH BASIN 15" THROUGH 54" PIPE DIMENSIONS STANDARD BRICK CATCH BASIN 15" THROUGH 54" PIPE ENTRY WIDTH 5.0 FT NOT TO SCALE LENGTH 10.0 E7 STANDARD FRAME, GRATE AND HOOD NOT TO SCALE EXIT WIDTH 12.0 FT C 11 MIN- THICKNESS 24 IN FOR USE ON STANDARD CATCH BASIN MfN, STONE DIAMETER b IN NOT TO SCALE STONE CLASS Class e Date: 01-26-2018 v aM �0 C � H Z aDCDOp f- Cn mz =� z-n>nm = Cl)01 4 z--u-n C72�z nya (n (l7 '--' C] Z PLAN L -W- x TOP ELEVATION oa m CD + - M j z I 1 tryCD I M Z N x CD `= SECTION Y -Y n _z RISER HT. ;Z1 n VARIES - C7 a 8.1 > MIN. M N N T W z VM-7FRK WTO 3N" PIPE IR I Isr=h z �1 0 7] HEET 1 OF 2 840.01 C7 am H � H- Z Wv) 0 QmWC0 mz =00� -n>>MTl =Cn5o zHC) C7=�z . nya < v z SECTION X -X NOTES: MORTAR JOINTS 1�" +1- A" THICK. Z o� USE CLASS "B" CONCRETE THROUGHOUT. 1.4 >- N N USE FORMS FOR GONSTRUCTIDN CF THE BOTTOM SLAB. Q Q Q DEDUCT FOR PIPE(S) FROM TOTAL CU. YDS. OF BRICK MASONRY. - cc ELS AT 12 CENT USERS. &A H LDCATCH BASINS OVERE3''--6" IN DEPTH WITH STEPS 12" LL J 0. _ Z C) ON CENTER. USE STEPS WHICH COMPLY WITH $TD. DRAWING 040.88. 0 CI? USE TYPE "£", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. LU¢ d LL :IE USE BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS H 0 12 0 [} OF SECTION 840 OF THE STANDARD SPECIFICATIONS. � H IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB W L¢I~] � a J AS SHOWN ON STO. NO. 840.00. a FOR 8'•O" IN HEIGHT OR LESS, USE 8" WALL" OVER 8'-O" IN HEIGHT, USE 0 U) 12" WALL TO 6'-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING z H 6'-D", QUANTITES TO BE ADJUSTED ACCORDINGLY. .no . H CONSTRUCT WITH PIP£ CROWNS MATCHING. r U p CHAMFER ALL EXPOSED CORNERS 1". LU H o L1� DRAWING NOT TO SCALE. _rr _ TOP ELEVATION STEPS - STD. NO. 840.66 �.� B"METH .I . n ..."• :v-_ y ^ '.'. -a: _ y .^" - ;v_ • T SECTION J -J WHERE 30" TO 36" PIPE IS USED E WHERE 42" TO 54' PIPE IS USED BACK OF CURB x %1, Y o 7.7 Y <• . PLAN x HEET 1 OF 2 1840.02 v vm 1•-I a w' Z �Cnvv r- >1 --1CD mz =� =QA>m x0 0 zH-0r T1 nya> H O z m O -n M C � CIO r mmcCa Q� zCIO rA=� n a v 5 r > N v vy v naa n p z2 Z 2 OCC) LO z SHEET 1 OF 2 840.03 SECTION Y -Y RISER HT. VARIES o 61, •v, �h WHERE 30" TO 36" PIPE IS USED RISER HT. VARIESbo c A 6• - 9. WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION 6"MIN. SECTION M -M 3 WHERE 42" TC 54" PIPE IS USED GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-B" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR N4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. N0. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR W -D" IN HEIGHT ON LESS USE S" WALLS AND BOTTOM SLAB. OVER 0'-C" TO 16'-0" IN HEIGHT USE 0" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. SECTION X -X PLAN SEE NOTE arra - a,u. n TOP ELEVATION ml P 'p B E-4 -f S" v C 6,1 Lp . •p h '4 T SECTION J -J WHERE 30" TO 36" PIPE IS USED SEE NOTE J s.°�•- a J L __j -.'1 LL h.'I PLAN 4311 NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED" PLAN FRAME,GRATE, & HOOD ASS'Y !II I's`. r '31 r i e II iI�. life 11 �Il &rr 3 3'-011 �3W SECTION - KK ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT o WALL SECTION -$. SECTION K J Do' n" L rm- M J L FRAME PLAN 3'-0�" R TOP ELEVATION 1 STEPS - $TO. NO. 840.65 m71--� h• , 6" ' L h' p SECTION M -M WHERE 42" TO 54" PIPE IS USED M o. s h a o' . o M ' 0.1 o d• 1 W ➢� m PLAN iL SECTION - LL 1" SECTION - PP 11 2I -OH 611 C LI It 34 IF I of R HOOD ELEVATION HEET 1 OF 2 840.01 z aN �-r Q ¢ MCc = V LL J 0.1�-,IZ 0 0 U _ CC - CO LL O J OQu]Q z �CC 11 H CL [1 LU O 0 Z LL CD N m H x = CL Cc © lqr II] v ¢ W z I- IH N W _ccCV LQ Z J D t3 0 Z W HEET 1 OF 2 840.02 r . . z oU) MINIMUM DIMENSIONS AND QMANTI7IE$ FOR BR CATCH BASIN RASED ON MIX. HEIGHT H WITH NO RISER �r P p G) Q ¢ ��0�; PIPE 0 DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G I TDP SEAR DIMENSIONS E F LL.JU)HZ BARS -V NO. LENGTH ©FA ►� - r� oQ- I= w DEDUCTIONS ONE PIPE C. 11, R. C. 12" 3'-D" N N NN- ZW c~nmLLC3 SECTION - MIN .. .no . - - o� - a --- 0.026 LU H o L1� 0,883 _rr _ SECTION - N H �.� 1511 4" 2'-2" B"METH .I . n ..."• :v-_ y ^ '.'. -a: _ y .^" - ;v_ • T SECTION J -J WHERE 30" TO 36" PIPE IS USED E WHERE 42" TO 54' PIPE IS USED BACK OF CURB x %1, Y o 7.7 Y <• . PLAN x HEET 1 OF 2 1840.02 v vm 1•-I a w' Z �Cnvv r- >1 --1CD mz =� =QA>m x0 0 zH-0r T1 nya> H O z m O -n M C � CIO r mmcCa Q� zCIO rA=� n a v 5 r > N v vy v naa n p z2 Z 2 OCC) LO z SHEET 1 OF 2 840.03 SECTION Y -Y RISER HT. VARIES o 61, •v, �h WHERE 30" TO 36" PIPE IS USED RISER HT. VARIESbo c A 6• - 9. WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION 6"MIN. SECTION M -M 3 WHERE 42" TC 54" PIPE IS USED GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-B" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR N4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. N0. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR W -D" IN HEIGHT ON LESS USE S" WALLS AND BOTTOM SLAB. OVER 0'-C" TO 16'-0" IN HEIGHT USE 0" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. SECTION X -X PLAN SEE NOTE arra - a,u. n TOP ELEVATION ml P 'p B E-4 -f S" v C 6,1 Lp . •p h '4 T SECTION J -J WHERE 30" TO 36" PIPE IS USED SEE NOTE J s.°�•- a J L __j -.'1 LL h.'I PLAN 4311 NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED" PLAN FRAME,GRATE, & HOOD ASS'Y !II I's`. r '31 r i e II iI�. life 11 �Il &rr 3 3'-011 �3W SECTION - KK ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT o WALL SECTION -$. SECTION K J Do' n" L rm- M J L FRAME PLAN 3'-0�" R TOP ELEVATION 1 STEPS - $TO. NO. 840.65 m71--� h• , 6" ' L h' p SECTION M -M WHERE 42" TO 54" PIPE IS USED M o. s h a o' . o M ' 0.1 o d• 1 W ➢� m PLAN iL SECTION - LL 1" SECTION - PP 11 2I -OH 611 C LI It 34 IF I of R HOOD ELEVATION HEET 1 OF 2 840.01 z aN �-r Q ¢ MCc = V LL J 0.1�-,IZ 0 0 U _ CC - CO LL O J OQu]Q z �CC 11 H CL [1 LU O 0 Z LL CD N m H x = CL Cc © lqr II] v ¢ W z I- IH N W _ccCV LQ Z J D t3 0 Z W HEET 1 OF 2 840.02 0 M a� S� C � Wll CD C7 0 8 E H Z _ #4 EBAAL 'ISPACESI s•' 6' TOX)nm 3„ 112„ 1,1 mZM I I I =Cnao z,�Qr�1 0r] 1--I �¢ �H a a (n h N HLL z -T w = w S PLAN OF TOP SLAB SECTION S -S m z 0 W IL-1 N 8" E #a "W" DABS #4 BAR 6. T ak13 EQUAL'SPAGE - c � n n a _ ❑ 94 BARS "U" -10 M N � SECTION R -R DOWEL N z Z -n Q _ OF 2 .01 EXPANSION JOINT STD. 840.03 FRAME GRATE & H000 Br_O„ PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEVATION EXPANSION JOINT USE ON FLAT GRADES 21 AND UNDER T I 3'-0" 00 3'-O" DEPRESSED GUTTER LINE EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE ell EXPANSION JOINT USE ON GRADES OVER 25k T 1O" MAX EXPANSION JOINT 1' 0'r DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GLITTER ON STEEP GRADES DETAIL SROWI NG TYPES OF GRATES USE ACCORDING TO WATER FLOW. z oU) MINIMUM DIMENSIONS AND QMANTI7IE$ FOR BR CATCH BASIN RASED ON MIX. HEIGHT H WITH NO RISER �r P p G) Q ¢ ��0�; PIPE 0 DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G I TDP SEAR DIMENSIONS E F LL.JU)HZ BARS -V NO. LENGTH BARS -W N0. LENGTH TQTgL LBS. CU.YDS. GONG. TOP BOTTOM SLAB SLAB oQ- I= En DEDUCTIONS ONE PIPE C. 11, R. C. 12" 3'-D" N N ZW c~nmLLC3 SECTION - MIN CnH---------------------------------- z 0 O rj Q L $ 1�" �� o� z rti 1--1 0.026 LU H o L1� 0,883 1.184 SECTION - N H 0.042 1511 4" 2'-2" @ EQUAL SPACES 3'-6" M1 ,Y 11 I�- IH Z n v C) 0 CD LL o -Q= 18" 11 0.281 0.281 m 1.244 0.031 0.047 - 31-011 21.21' 0 = 9 0.235 1Ch 0.033 24" ¢ 2 Q 2'-2" r O q rr c i Ir �t3 6.281 0.281 1.043 1.324 �a0 ti 1k" ! _ 2'-2" 0.236 a n 0.059 0.005 30" 3'-0" Or- W o �Q 3'-4" 41 3" 1'-2" 4--0' 0.261 0,281 1.204 U) i � � SECTION - JJ 0.121 z (Z)n � LLI 3'-0" 5" 3'-4" 4'•3" I•-1 W J CI] 3,r R V-6" 3 4'•1" z OC 4'•1" 45 0.147 0.374 0.521 1.806 LL Cr U- 0,122 D.184 36" 3'-D" 2'-2" � Ir 4 -9' V-8" 4'•4" 4 2'-0" 4 4'•1" SECTION - RR 4'•1" SHEET 1 OF 2 . 0.187 0.415 0.602 s40.o3 0 M a� S� C � Wll CD C7 0 8 E H Z _ #4 EBAAL 'ISPACESI s•' 6' TOX)nm 3„ 112„ 1,1 mZM I I I =Cnao z,�Qr�1 0r] 1--I �¢ �H a a (n h N HLL z -T w = w S PLAN OF TOP SLAB SECTION S -S m z 0 W IL-1 N 8" E #a "W" DABS #4 BAR 6. T ak13 EQUAL'SPAGE - c � n n a _ ❑ 94 BARS "U" -10 M N � SECTION R -R DOWEL N z Z -n Q _ OF 2 .01 EXPANSION JOINT STD. 840.03 FRAME GRATE & H000 Br_O„ PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEVATION EXPANSION JOINT USE ON FLAT GRADES 21 AND UNDER T I 3'-0" 00 3'-O" DEPRESSED GUTTER LINE EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE ell EXPANSION JOINT USE ON GRADES OVER 25k T 1O" MAX EXPANSION JOINT 1' 0'r DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GLITTER ON STEEP GRADES O DETAIL SROWI NG TYPES OF GRATES USE ACCORDING TO WATER FLOW. M a.I MINIMUM DIMENSIONS AND QMANTI7IE$ FOR BR CATCH BASIN RASED ON MIX. HEIGHT H WITH NO RISER " Cn H Z _ #4 ARS G) SPACES6., 11,21, PIPE 0 DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G NIN. HEIGHT H TDP SEAR DIMENSIONS E F gpgS.0 N0. LENGTH BARS -V NO. LENGTH BARS -W N0. LENGTH TQTgL LBS. CU.YDS. GONG. TOP BOTTOM SLAB SLAB IN BOX TOTAL CONC. BRICK MASONRY Nil dfl{Rd[. TUTS 1X uLLS pip C'IpETE DEDUCTIONS ONE PIPE C. 11, R. C. 12" 3'-D" 2'-2" 21.9" m CnH---------------------------------- z nz L $ 1�" �� o� D.772 1--1 0.026 0,281 0.281 0,883 1.184 0.020 0.042 1511 3'-0" 2'-2" @ EQUAL SPACES 3'-6" CD � > a 0.235 Z n v ,y2„ -Q= 18" > 0.281 0.281 0.963 1.244 0.031 0.047 1811 31-011 21.21' a D 3'-3" 0.235 0,087 0.033 0.049 24" 3'-011 2'-2" r O q rr c i Ir �t3 6.281 0.281 1.043 1.324 0.044 0.065 24" W -O" 2'-2" 0.236 31-9" 0.059 0.005 30" 3'-0" 2'-2" 3'-4" 41 3" 1'-2" 4--0' 0.261 0,281 1.204 1.485 0.078 0.121 30" 3'-0" 2'-2" 3'-4" 4'•3" V' 2" 4'-4" 4 V-6" 3 4'•1" 3 4'•1" 45 0.147 0.374 0.521 1.806 2.217 0,122 D.184 36" 3'-D" 2'-2" 3'-10" 4 -9' V-8" 4'•4" 4 2'-0" 4 4'•1" 3 4'•1" 49 0.187 0.415 0.602 1.914 2.516 0.176 0,261 42" 31 0" 2' 2" 4'-5" -3 1' 511 31 6" 4 1'-9" 3 3' 3" 3 3'-3" 38 0.135 ❑.373 1,2 1.508 2.152 2.660 0.240 0.371 48" 3'-0" 2'-2" 5'-0" 5 -9" 2'•D" 3'-6" 4 2'-611 4 3`-3" 3 3'-3' W. 0.173 410 O.SB3 2.415 2.998 0.313 0.477 54" 3'-G" 2'-2" 5'-7" 6'-3" 1 2'-7" 1 T-6- 4 3'.0" 1 6 1 3'-3" 1 3 1 a'-3" 1 4 O DETAIL SROWI NG TYPES OF GRATES USE ACCORDING TO WATER FLOW. M a.I Si 77 CD - 0 > C3 " Cn H Z _ #4 ARS G) SPACES6., 11,21, m > n I•TI 3„ =Cnao n BARS -V NO. LENGTH Qr c,] F -I TOTAL LBS. c'�y R W R 7 [] a a H , z N cc 2'-9" m 'aw in tl. S �+� PLAN OF TOP SLAB m CnH---------------------------------- z nz L $ 1�" �� o� D.772 1--1 0.026 1511 3'-0" 2'-2" Om - M ( B" E N8 "W" BARS r MZ z -� WATER FLOW SAG WATER FLOW @ EQUAL SPACES �n> CD � > a 0.235 Z n v ,y2„ -Q= 18" > SECTION R -R M a z 3'-3" Co z y M N c - m = a a D (/ ,I T SHEET 2 OF 2 840.02 z aN H � Q ¢ z�=V LL 1-4 J0H-1 - OOU)= CC - QU O H H C!}FLLOJ ovr✓,a z OC ~ H (L LU C3 2 H H ¢ m a EC CL © _ - It Cc 1L7 v x V) CV 7 U-21110.448 0.659 2.806 3.465 ❑.398 0.595 $HEET 2 OF 2 " RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT 1840.01 EXPANSION JOINTS 4'•6" 4'-6" 61, STD. 840.03 FRAME 1142 „ GRATE & H0p0 F'�61.0„ y H PLAN W Q a CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES C1 TOP iq m USE ON FLAT ELEV. EXPANSION JOINT GRADES 2% AND UNDER 1 DEPRESSED GUTTER LINE EXPANSION JOINT m Ir--�-•..,I SECTION S -S �" ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE N4 BAR EXPANSION JOINT TDR IL USE ON GRADES OVER 2% ELEV. 011 DEPRESSED GUTTER LINE EXPANSION JOIll NT, DOWEL ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES 41 0.18010-386 2.387 0.297 0.401 • RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT z o� Q ¢ z cc may LL .J � I�-I Z C7 CSU= CC - ri�LL �oW �QI~i�Q z I --I °C � H LU o Z LL 0 CIO m 1-f-1 = R" qt v Z) Q W F- LU W - Z CC CV C = r J o C'3 v Z w HEET 2 OF 2 840.02 o M v z > C3 n DETAIL SROWI NG TYPES OF GRATES USE ACCORDING TO WATER FLOW. 244 p+_ 11'+ -•-� 2 1 jr2" I NINFMUM DIMENSIONS AN QUANTITIES FOR CONCRETE CATCH BASIN RASED ON MIN. NEI T, N WITH NQ RISER " B ,_I LLJ�HZ PIPE D DIMENSIONS OF BOX AND PTFE SPAR WIDTH WIDTH SPAR A B C G MIN. HEIGHT H COVER DIMENSION E F BARS -U NO. LENGTH BARS -V NO. LENGTH BARS -W NO. LENGTH TOTAL LBS. CU.YDS. CONG. IN BOX TOF BOTTOM Tyr• 31A0 SLAB DA Y1 AfYl/I H H DEDUCTIONS ONE PIPE C.M. H.C. 12" 3'-011 2'-2" WATER FLOW SAG WATER FLOW 2'-9" LL0 z Q I -I -I D� �+� aH CnH---------------------------------- z L $ 1�" �� 0.235 D.772 0.015 0.026 1511 3'-0" 2'-2" Om 3'-0" 1r, �i�rr I z -� WATER FLOW SAG WATER FLOW I� O Fz-1 p p Q CD 0.235 0,829 0.023 0.036 18" 3'-D" 2'-2" a o�C 3'-3" 9 BROW 2� „ RAISED%g'rFLOW HIGH �� z y M RAISED FLOW ARROW 234" Vis" WIGH c - Qo H Q a D (/ ,I T 0.235 0,087 0.033 0.049 24" 3'-011 2'-2" r O q rr c i Ir �t3 3'•91' o d �' 1rr �y 1 0 77 z 1 " 1 +, I lilt 2'-11$rr F -r- 11/20'R rr 2'-11„ � 0 Q 0.236 1.001 0.059 0.005 30" 3'-0" 2'-2" 3'-4" 41 3" 1'-2" 4--0' d 11_5" 2 9' 9" 3 3' 9" 39 0.123 0.321 1.433 0.092 0.127 361, 3'-0" 2'-2" 3'-10" 4 -9 1'-8" 4'-0" 4 11-11" 3 31-8" 3 3'-9" 43 0.161 0.356 1.714 0.132 0.178 42" 3'-0" 2'-2" 41-5" 5 •3 1' 5" 3'-2" 4 1'-8" 2 2'-11" 3 2'-71" 32 Q.112 0.318 1 .738 0.180 0.243 4B" 3' 011 21_2" 5,-0" 5' 9" 2'_0" 3'•2" 4 2'-3r' 3 2'•11" 3 2'•11" 35 0.145 0.352 2.052 0.235 0.317 5411 3'-01' 2'-2" 51_7„ W-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.18010-386 2.387 0.297 0.401 • RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT z o� Q ¢ z cc may LL .J � I�-I Z C7 CSU= CC - ri�LL �oW �QI~i�Q z I --I °C � H LU o Z LL 0 CIO m 1-f-1 = R" qt v Z) Q W F- LU W - Z CC CV C = r J o C'3 v Z w HEET 2 OF 2 840.02 o M v z > C3 n DETAIL SROWI NG TYPES OF GRATES USE ACCORDING TO WATER FLOW. 244 p+_ 11'+ -•-� 2 1 jr2" I z o>- ¢ ¢ z cc ,_, B ,_I LLJ�HZ rrnnam�� HZ�=y oaNz � -n> > m " TYPE "G" TYPE "E" TYPE rrF rr A A 1 rr� I 9 % Orl ` ¢ r¢j p W Z Q�T c7� LU ay WATER FLOW SAG WATER FLOW - I g%g" LL0 z Q I -I -I D� �+� aH CnH---------------------------------- z L $ 1�" �� o o - - - - - - - - - - - - - - - - - - - - - - - 11'42 I SECTION B -B Om ----------------------------•------ 1r, �i�rr I z -� WATER FLOW SAG WATER FLOW I� O Fz-1 p p Q CD SECTION A -A LL = In m Cl) z x TYPE „F" TYPE "E" TYPE "G" TYPE - E z 3 Z Cn CO a a o�C P 9 BROW 2� „ RAISED%g'rFLOW HIGH �� z y M RAISED FLOW ARROW 234" Vis" WIGH c - Qo H Q a D (/ ,I T ¢9co� a s 1 T I '� �112 �' z 0 z = z �+' r O q rr c i Ir �t3 H W W z o d �' 1rr �y 1 0 77 z 1 " 1 +, I lilt 2'-11$rr F -r- 11/20'R rr 2'-11„ � 0 Q 1�„ � �8,1 1�N „ 1 SECTION A -A 11/21, I 7z. If TYPE - F I SECTIION A -A TYPE G T HEET 2 OF 2 SHEET 2 OF 2 840.03 840.03 Z 0 L) L) F - z 0 u w a 0 > 1 REVISIONS: 11111111111/,�� CARo� .� p •. Oji �. 1970 r ///11111111111` V1 W I91 I8 d ULU LU rn ~ a z a, � a J � Z O w C) z O�w o L 0D > � r` E m N H-.' Ln 00 75 O) U 00 Ln z oI r- , O 0 U - 00 Y Ln >- CO Ln Ln Ln a) Ln C14 (D Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-12 Date: 01-26-2018 v v ITT a7 co o r- mZ r� Qoyam 2[1700 Z nnnn 1;1 Z M � r i Ch ro F-1 x = C) u, � � a x z C � C5 -0 Z n � F. _n C 2 v v ITS H� a7Ujpp r-Cm_� MZ =� sC>yam =050 Zwmr -n G7pE� nnna u' C ' Z 840.14 a f PLAN WITH COPING REMOVED m� SECTION X -X COPING (INCIDENTAL) fOP ELEVATION STD. 640.19 RAME AND GRATE TE GENERAL NOTES: MORTAR JOINTS 117" +J- Yg" THICK. USE CLASS "B" CONCRETE THROUGHOUT. USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB. USE #4 BAR DOWELS AT 12" CENTERS. DEDUCT FOR PIPE(S) FROM TOTAL CU. YOS. OF BRICK MASONRY. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 640.66. USE BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD, NO. 840.00. FOR W -O" IN HEIGHT OR LESS, USE 8" WALL. OVER 8'-0" IN HEIGHT, USE 12" WALL TO 6'-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING W -O', OUANTITES TO BE ADJUSTED ACCORDINGLY, CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES. DO NOT USE BRICK MASONRY DROP INLET IN LOCATIONS SUBJECT TO TRAFFIC. CHAMFER ALL EXPOSED CORNERS 1", DRAWING NOT TO SCALE. PIPE DOWEL I I 4 BAR MAX. PIPE THIS SIDE - 1 SECTION Y -Y 6" �a� DIMENSIONS AND allARTITIES FOR DROP INLET(IIASED ON MIH. HEIGHT, H] DIMENSIONS OF 50X & PIPE PIPE SPAN WIDTH MIN, HEIGHT CUBIC YARDS CONCRETE CUBIC YARDS BRICK MASONRY DEDUCTIONS FOR ONE D A B H BOTTOM SLAB WALL PER Toru BRICK FOOT HT. MIN. "EISHI, H C.S. R. C. 12" 3'-0" 2'-0" 2'-0" 0.268 0.313 0.522 0.020 0.032 15" 2'-3" 0.268 0,313 0.600 0.031 0.047 1s" 2'_g" 0.268 0.313 0.678 0.044 0.065 24" 3'-0" 0.268 0.313 0.935 0.078 0.133 3O" 3'-O" 2'-0" 3'-8" 0.266 0.313 0.991 0.122 0.170 ^." WEEP HOLES I Y PLAN WITH GRATE & FRAME REMOVED SECTION X -X Lr I HU( I NV I UU4! AL; IP ELEVATION - 640.16 FRAME - RATE (SEE NOTE) GENERAL NOTES; USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER, USE STEPS WHICH COMPLY WITH STD. DRAWING 040.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR M4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB, IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 640.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING W.25 FOR ATTACHMENT GF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF i CUBIC FOOT OF NO. 78M STONE INA POROUS FABRIC RAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. #4 BAR N 1 '0 1 L 1 6,. DOWEL MAX. PIPE THIS SIDE - 18" co SECTION Y -Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE PIPE SPAN WIDTH MIN. HEIGHT CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE D A B H BOTTOM WALL PER T°" °0NL"Z SLAB FT. HT, E Lew. h HEELfN C. M. R. C. 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 1 0.592 0.015 0.028 15" 2' 3" 0.640 0.023 0.036 UNLESS OTHERWISED SHOWN, USE 2'41SP MINI -SKIPS FOR Q 0.703 0.033 0.048 2a" 3'-D" O -B14 0.059 0.085 >140M r- Q�1�Ln 3 -6 0.222 0.222 0.925 0.092 0.127 z p 0 �Q Q EZ -Etre LLJiHZ QOcx CC Z QL) 0(, H U]H0JLL. Q0C¢ ~ H � O I L'I"I O L7 H Z W w J 0- CCN d QaQ C7 Q C z O x _ � he s) CJ = H C\1 N r H m J 0 Z LU z co >_�Q Q E2-Ex�� L.LJ2L-HZ OOcox CC Z LL ¢0OCO� H U]Hw0J 0 U) = ~ H LU w O a� LL W 0 J_ Z w Qxr�L gL. _ o - CC Q a Q W Y F_ H i- rn LU = C iV N Z Y �0 z 0 .14 v z M p v �1" 3' �,r ~ Q ,r � - yHp� 1" DEPRESSION m 1-5,8 r, 1 X1 ,8" ��pL) MZ�in 11-7%r I'-7%"_, 1'-7%" ��H F� Gpa=�` 7 t7 "\ d 00=n� II WQzLL =�z>m y _ �G- �_ G E E ��� z H I r w SECTION G -G " F►J PLAN OF FRAME U) CAST IRON r cv � �n M M PLAN OF GRATING cc F °° 0 p 2'-31,14 CAST IRON o CC Q r � _ 0 Uj r -1m� �x0 � i�r1 i errN 1811 a > � 9 In zo W CO 7D �� „ 1" 3'-34.'r 1 r, 1 " 2,-3�„ 1 rr Q CD f/] m a 1 ijs 2 j.y 11 i .8 re j G +r 1 18+r GO 0 v �� SECTION H -H I 3'-2"�J- 2r-2" z I� J ZVIA x Qao 21/8rE -�� 2�„ �� pCL� Z Cn j7 un r3' - 1 N N ry 2, 1 6 ,r C4 N w 0 Lu cc Cn -p. CO �4 3r 5r1 2, B1, ¢ a SECTION E -E SECTION F -F SHEET 1 OF i SHEET 1 OF 1 840.16 1840.16 vz v PAVEMENT Q u7 pf H H Z ,r Ye„ BAD. g 9 d RAD. 2" BAD . PAVEMENT 1YIAD,SURFACE ¢ d y H p 1" RAD. 6 2-D _ 3rg" RAD. 1 RAD. SURFACE311 ti 00 � � � � > 31r BAD. 1/s" BAD. N 0 0 in LL Z C7 r a .. CV 4 + p ...❑ 0 :Q ' 1 11Q LU �z-10 ��� ZLU ❑ o o r .:.p Nr v �RAD. t/DHwpJmay �_ 2'-$" J 1 RAD. 11 6„ ° QaCCr H r" 1'-6 CURB AND GUTTER $" 911 2~C 2'- 6 CURB AND GUTTER a z O" X 12'r OR 18" 9" X 12" OR 1S" a 4'-O" PROPOSED CONCRETE CURB CONCRETE CURB 2'-O" 2'-O" EDGE OF PAVEMENT 2" RAD. 2'_D11 v.Q 4: r $EE 2'-4" MIN. " RADIUS 1�,r i) -011_11 -off 12" v : ❑ ° o ❑. ❑ - 44` TTTT LL LU M ❑• CIP, o $i1 ❑•' ❑ ❑ �7 rr' 4 .' ❑, • ❑ .' ❑ ' ❑ ' 15er W [Y .Y. 7" O C a= pH $ L7 = EXPRESSWAY GUTTER SHOULDER BERM GUTTER z ~ W Cl) 1 B" X 6" MEDIAN CURB VALLEY GUTTER � RI z SECTION VIEW OF CURBS OR CURBS AND GUTTERS m w C y = = od Qo v GENERAL NOTES: FILL x 1" DEEP 07 GROOVED OR SAWN z w -PLACE CONTRACTION JOINTS AT 10INTERVALS, EXCEPT THAT JOINT WITH JOINT ¢ W C n A 15' SPACING MAY BE USED WHEN A MACHINE IS USED OR WHEN SEALER rn �[ a) � SATISFACTORY SUPPORT FOR THE FACE FORM CAN BE OBTAINED JOINT SEALER 2 Q � C z WITHOUT THE USE OF TEMPLATES AT 10' INTERVALS. 1 " RAD. GUTTER o -JOINT SPACING MAY BE ALTERED IF REQUIRED BY THE ENGINEER, Dl -t' RAD. PAVEMENT SURFACE ,�.L C7 Z -CONTRACTION JOINTS MAY BE INSTALLED WITH THE USE OF SURFACE J = Q Z o TEMPLATES OR FORMED BY OTHER APPROVED METHODS. .zCONSTRUCT NON -TEMPLATE FORMED JOINTS A MIN. OF 1 � DEEP.' ❑ o' :. ❑ . - n ri : rs r} '.' w -FILL ALL CONSTRUCTION JOINTS, EXCEPT IN $ x8 MEDIAN CURB, WITH JOINT FILLER AND SEALER. PD -SPACE EXPANSION JOINTS AT 90' INTERVALS AND ADJACENT TO CURB & GUTTER PROP." JOINT FILLER ALL RIGID OBJECTS. JOINT PAVEMENT LONGITUDINAL JOINT TRANSVERSE EXPANSION JOINT IN CURB AND GUTTER SHEET 1 OF 3 SECTION VIEW OF .JOINTS SHEET 1 OF 3 846.01 846.01 v CONTINUOUS LINES C0 10'-30'/SP SKIP LINE 2'-6'15P MINI -SKIP LINE Cy) 111 �/ rn Q 5 V d ULU Q I„ 4 a, a- a UNLESS OTHERWISED SHOWN, USE fO'-SO'!SP SKIPS FOR UNLESS OTHERWISED SHOWN, USE 2'41SP MINI -SKIPS FOR Q ,y Z �] M O EDGE L I N E Z Ow° SKIP LANE LINES AND SKIP CENTER LINES. LANE LINE EXTENSIONS THROUGH INTERSECTIONS, EDGE LINE EXTENSIONS THROMH INTERSECTIONS ANO MINT -SNIPS ¢ Q 0- >140M r- Q�1�Ln m N 10 30' USED FOR BICYCLE LANE LINES. HZ -L 'r -4 '-' Z � 1T YELLOW OR WHITE 4„16 liT Y L!1 m > Lf) OpyTZ Cr M -n>> L U•3 Q) 111 14 (D -� (� 4" C... 2' g' QU<LLH = w C O 00 z,--,or-n LANE LINE YELLOW OR WHITE Q L��a" �" � ���Z J G)4„Ig„ YELLOW OR WHITE CC O " Q y a WHITE z v x Z' H Cn �� 3'-3'/SP MINI -SKIP LINE 3'-9'/SP MINI -SKIP LINE w O z CENTER LINE 1 T 4„j6„ UNLESS OTHERWISED SHOWN, USE W -WISP MIkI-SKIPS FOR THE WHITE EDGE LINE ENTENSIONS AT ROUNDABOUTS, UNLESS OTHERWISED SHOWN, USE 3'-9'ISP MINI -SKIP$ FOR MINI -SKIP LANE LINES AND LINE EXTENSIONS THROUGH TAPERS. G YELLOW GORE LINE 3' 3' 3' 9' CI O -1 8"112" " WHITE WHITE MWHITE Cr 0 DIAGONAL LINE J 12" 45 MPH OR HIGHER LL LL CI] HrL1rI 8" LESS THAN 45 MPH N zZ M Z YELLOW OR WHITE (D -4 En 3 � H LL vac mn Cr 0cca N Z o CROSSWALK LINE a z > 8" TRANSVERSE ¢ ¢ z 0 -WHITE � 24" LONGITUDINAL 0 � On v = v O :0 Qz W a !- -n RxR LINE W ~ m�H z NJ U)'Cz L --I H C n WHITE � J CU Z w STOP OR TRANSVERSE BAR GENERAL NOTES: 1- USE 6" LANE, EDGE, AND CENTER LINES ON ALL FULL CONTROL OF ACCESS FACILITIES AND OTHER ROUTES 24" AS DIRECTED BY THE ENGINEER. WHITE 2- LANE LINES INDICATED AS "WIDE" ON THE ROADWAY STANDARD DRAWINGS SHALL BE AT LEAST TWICE THE WIDTH OF THE NORMAL LINE. 3- GORE LINES SHALL BE TWICE THE WIDTH OF THE NORMAL LINE. SHEET 1 OF 2 SHEET 1 OF 2 1205.01 1205.01 1 REVISIONS: W Z H W M M s Z •`����H CARp'',. Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-1 3 Date: 01-26-2018 C0 I//111110�/ Cy) 111 �/ rn Q 5 V d ULU _Z LU H az a, a- a J o6 o z zOw Z Ow° 0- UQLU 00 -� Ln ° L C0 >00E m N +J Ln 00 (1) U 00 75 1n Z 00 0 0 r- 0 U - 00 Y L!1 m > Lf) L U•3 Q) 111 14 (D ?� Project Manager: BCF Drawn By: EW/BTO Checked By: BTO Project Number: 17050 Drawing Number: D-1127 C-1 3 Date: 01-26-2018