Loading...
HomeMy WebLinkAbout20180310 Ver 1_Approval Letter_20180326s Water Resources Environmental Quality March 27, 2018 Parker J. Platt 397 Bent River Farm Road Pisgah Forest, NC 28768 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director DWR # 18-0310 Transylvania County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Platt French Broad River Bank Stabilization Dear Mr. Platt: You have our approval for the impacts listed below for the purpose described in your application dated March 5, 2017, and received by the Division of Water Resources (Division) on March 5, 2018, with additional information received on March 15, 2018. These impacts are covered by the attached Water Quality General Certification Number 4134 and the additional conditions listed below. This certification is associated with the use of Nationwide Permit Number 13 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary Stream Impact Impact S 1 300 (linear feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division State of North Carolina I Environmental Quality I Water Resources 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 828-296-4500 Platt French Broad River Bank Stabilization DWR# 18-0310 401 Approval Page 2 of 4 and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. [I 5A NCAC 02H .0507(d)(2)] 3. The proposed project shall follow the recommendations stated in the North Carolina Wildlife Resources Commission (NCWRC) comment letter dated March 22, 2018 (attached) to the maximum extent practicable. Before construction begins, the permittee shall coordinate with NCWRC to ensure that the mussel surveys are complete. [15A NCAC 02H .0506(b)(2)] 4. This authorization exempts the Permittee from meeting Condition II.9 (dewatering) in the attached general certification for the placement of in -stream structure material into the French Broad River. The Permittee shall take all reasonable measures to construct the in -stream structure while keeping heavy equipment out of the stream channel. Baseflow water will be diverted away from the excavation using a low cobble berm. All reasonable steps must be taken to limit the amount of disturbance in the channel and to therefore reduce downstream turbidity during construction. This exemption does not relieve the Permittee of meeting stream standards as indicated in 15A NCAC 02B. [I 5A NCAC 02H .0506(f)] 5. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Resources, between the hours of 8 am to 5 pm at the Asheville Regional Office at 828.296.4500 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H.0506 (b)(3) and (c)(3), 15A NCAC 02B .0211(12), and GS 143 Article 21A] 6. Natural fiber matting is required for streambank stabilization over plastic matting that can entrap small animals. [ 15A NCAC 02H .0506(b)(2)] 7. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation may require future repairs or replacement, which requires coordination with the Asheville Regional Office to ensure the stability and water quality of the stream and downstream waters. [I 5A NCAC 02H .0506(b)(2) and (b)(3)] 8. All temporary impacted areas shall be restored to pre -construction natural conditions upon completion of the project. Native vegetation shall be used for stream bank stabilization. [15A NCAC 02H.0506 (b)(2) and (c)(2)] Platt French Broad River Bank Stabilization DWR# 18-0310 401 Approval Page 3 of 4 9. The permitee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this Certification. A copy of this Certification, including all conditions shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H.0506 (b)(2) and (c)(2)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at hqp://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Kevin Mitchell at 828-296-4650 or kevin.mitchell(d),ncdenr.gov if you have any questions or concerns. Platt French Broad River Bank Stabilization DWR# 18-0310 401 Approval Page 4 of 4 Sincerely, N�� Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 4134 Certificate of Completion NCWRC letter dated March 22, 2018 cc: David Brown— USACE Asheville Regulatory Field Office (via email) Andrea Leslie — NCWRC (via email) Stan Aiken — Division of Energy, Mineral, and Land Resources (via email) Greg Jennings — Jennings Environmental (via email) DWR ARO 401 files G:\WR\WQ\Transylvania\401 s\Non-DOT\Platt French Broad River Bank Stabilization\20180327_Platt French Broad River Bank Stabilization APRV.docx