Loading...
HomeMy WebLinkAbout20170239 Ver 1_Site #7 - Temporary Stream Crossing - Permit Inquiry_20180325Strickland, Bev From: Sent: To: Cc: Subject: Attachments: Kirkman, Christopher D Sunday, March 25, 2018 4:32 PM Bailey, David E SAW (David.E.Bailey2@usace.army.mil); Norton, April R Robinson, Stephen J; Williams, J. Michael; Kirkman, Christopher D; Harper, Aaron A; Joe St. Clair; Walker, James M; Patton, Vance H; Kenny Register; John Hilton (jhilton@rkk.com); Tyler Burns (tburns@rkk.com); Ken Brewer; Steve Ivey; Tyler Shropshire; Wright Archer - Son ; Chad Walsh (cwalsh@rkk.com); Parker, Jerry A Site #7 - Temporary Stream Crossing - Permit Inquiry BMP_Manual.pdf; C203844 Combined EC Plans Permits for Site 7.pdf; 410 Structure Plans SITE 7 Triple Barrel Culvert 11 by 9- Culverts.pdf C203844 — NC 119 Bypass in Mebane, NC $Ite #7 — Temporary Stream Crossing for clearing & transporting materials David & April , Hope all is well. Great afternoon. I will call you on Monday prior 11AM for feedback & confirmation. Thanks in advance for your review & feedback to confirm permit compliance. My mobile @ 336-451-6836. The Prime Contractor requesting a temporary stream crossing within the permitted foot print. Used for clearing equipment and transporting materials ( Rock & Soil) — stream section of crossing is permitted to be filled in later once triple culvert barrel ( 3@11 ` x 9") is constructed . Culvert plans attached. **options we will discuss with contractor - Temporary bridging or temporary pipes crossing — both should be allowed but must complv with BMP Manual & within permitted area where stream is permitted to be filled later. ** We are meeting with Prime Contractor about option tomorrow (3/26/2018) @ 11AM. The Department has allowed in the past a myriad of temporary crossings (temporary fording, temporary piped crossing, temporary access bridge ) within permitted areas as long as it is in compliance with Best Management Practices Manual (BMP)- see attached (Section 5.5). Temporary stream crossings area inherent to constructing a project while maintaining environmental excellence by providing a least damaging approach. The following attached to provide background information for clarity for discussion : 1. BMP Manual (August 2003 with Agencies) — Temporary Stream Crossings — Section 5.5 — 3 options outlines (PDF pages 96-103) a. Option 1 by Contractor — Bridging — A quick (very rough) sketch below of the bridging idea for your info — Contractor would submit official details for review & approval b. Option 2 by Contractor—Temporary Pipe Crossing (BMP Manual )- pipe sizing to prevent overtopping @ minimum 2 year storm (Q2) required by COE — David please confirm current requirement. That is what John (COE) tau�ht me years a�o ( YEAR 2004). c. Probably will require multiple pipes @ crossin� for hydraulics to prevent overtopping @ crossin�. 2. Combined/Extracted EC plans & Permits for Site #7 a. Noted on sequence approx. location of crossing 3. Culvert Plans for Tipple Barrel Culvert ( 3@ 11x9) with right barrel with sill a. Attached for reference 4. NCDOT Roadside Design Manual (For further background information) https://www.ncdot.�ov/doh/operations/dp chief en�/roadside/soil water/desi�n construction manu al �. �'?, �i� , '�-� . � � -i�; -` 1 � � -- � ._ _ �, � Safe travels, � �., .y��_•r- �€� �' �-r �a ' � i - t- p 7 +'�-�-. ` -� , w •'+^'�h � � r 2 Chris Kirkman,PE,CPM Resident Engineer NCDOT Division 7 Graham Construction 336 570 6830 office 336 451 6836 mobile cdkulcman cr,ncdot.gov 115 E Crescent Square Dr. Graham, NC 27253 Office Location (Google Maps Hyperlink) htt�s://�oo. gUma�s/ 1 j cGQTysNWQ2 Emai! correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. /�� �-- % ,� r. .�F/ r"' �) .� �Y;- 'i Y,� �.r, � . �� C � ,l rl .- - =-.V ✓ `�T _;� 2� ( .. L...i�W'�� ,-�� . . I+ " i.t. {