Loading...
HomeMy WebLinkAboutSW8011022_NOV_20180307Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY March 7, 2018 CERTIFIED MAIL #7008 0150 0002 2652 2459 RE,TU RN RECEIPT REQUESTED Hardsmith, Inc Attn- Grady Hardwick, President PO Box 535 Worth Myrtle Beach, SC 29597 Subject: NOTICE OF VIOLATION, NOV-2018-PC-0078 Greenbay Subdivision Phase 1 Stormwater Permit No. SW8 011022 Brunswick County Dear Mr Hardwick. ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR Interim Director 14418 S�0 M� A�10 QUA �R�'�Ri� TTNG On November 17, 2014 and January 22, 2015, Wilmington Regional Office staff of the Division of Energy, Mineral and Land Resources (DEMLR) performed a Compliance Inspection of the subject project, located off Forest Street Extension, Shallotte, Brunswick County, North Carolina. A copy of each compliance inspection report was sent to you on November 21, 2014 and February 4, 2015. The inspections were performed to determine the status of compliance with Stormwater Pen -nit Number SW8 011022, issued to you on March 20, 2002 The project has been found in violation of Stormwater Permit Number SW8 011022, issued pursuant to the requirements of the stormwater rules, 15A NCAC 2H.1000 The violations found are - Schedule of Conznlzance Condition 11.3 - Failure to Operate and Maintain the Stormwater System. The Permittee shall provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency, including those listed below_ Both inspections cite erosion of the swales, an overall lack of vegetation on the slopes, and a general lack of overall maintenance The site has not been restored to compliance._:; • Inspections; o Sediment Removal, • Mowing and re -vegetation of side slopes; o Immediate repair of eroded areas, • Maintenance of side slopes in accordance with the approved plans and specifications; 2 Schedule of Compliance Condition 11.12 - Failure to submit a time schedule to the Director The permittee has not provided a response to either the November 21, 2014 inspection report or to the February 4, 2015 inspection report Schedule of Compliance Condition 1111 - Failure to certify the Stormwater system. Within 30 days of completing the project, the permittee is required to certify in writing that the project's stormwater controls and impervious surfaces have been constructed within substantial intent of the approved plans and specifications To date, no such Certification has been received Schedule of Compliance 11.7 - Failure to limit piping Piping must be limited to just that minimum needed under the road to allow for drainage, or for a driveway to provide access to the lot Several lots in the subdivision have piped their entire front road ditch State of Nol th Carolina I Environmental Quality I Energy Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Esdension I Wilmington NC 28405 910 796 7315 NOV-2018-PC-0078 State Stormwater PermitNo SW8 011022 Pa eg_2 of 2 ti General Condition III9 —Failure to 710t1fy the Division of an ownership change within 30 daps The NCSOS filings for Hardwick, Inc , indicate that the articles of dissolution for Hardsmith, Inc were filed on March 20, 2014 The dissolution of the corporate entity is considered an ownership change No notification was provided to the Division To correct the above -listed violations, please provide the following actions and/or documents 1 Restore and maintain the roadside swale drainage system 2 Respond to the previous inspection reports and to this Notice of Violation. 3 Certify the project 4 Remove all unpermitted piping and restore the roadside drainage swales 5 Submit a completed and signed Permit Transfer application to transfer this permit to an HOA or to a new development company for the continued implementation of the permit requirements to limit built -upon area and piping and to maintain the roadside drainage swales ZD Please provide a "Plan of Action" by April 7, 2018 to DEMLR that states how and when these violations will be corrected If we do not receive your plan of action by this date you will be in violation of 15A \CAC 211. 1000, which could result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215 6A The Permit Transfer application may be downloaded from our website at Imps //deg.ne.gov/about/divisions/enertr,--mineral-land-resouices/ener<,?v-mineia1-land-rules/storrnwater- pro grain/post-co 11 stru ct 1011 If you have any questions concerning this matter, please call Linda Lewis at (910)-796-7215 Sincerely, J William E (Toby) Vinson, Jr, PE, CPESC, CPM, Interim Director Division of Energy, Mineral, and Land Resources Enclosures Compliance Inspection Report GDS\arl G \\\Stormwater\Permits & Projects\2001\011022 LD\2018 03 NOV 011022 cc Cary D Smith (1402 Martin Street, N Myrtle Beach SC 29582) Grady Hardwick (1109 Golf View Drive, N Myrtle Beach SC 29582) Grady Hardwick, Registered Agent (20 Wildwood St NW, Shallotte NC 28459) Brunswick County Buildinc p.�Spections �A �r_ietle ueas, =�1Il `( oii"�11i7avatl' orgette S�ilmington Regional Office Stormwater Supervisor Wilmington Regional Office Stormwater Pile Statc of North Carolina 1 Envrronmcnial Quakh, I Fnergv \hnc ai end Land Resources %Vil nengton Regional Office 1 127 Cai dura! Dr nvc Emetwon I Wilmington, NC 25405 010 796 7215 Compliance Inspection Report Permit SW8011022 Effective 03/20/02 Expiration Protect Greenbay Subdivision Phase I Owner Hardsmith Inc County Brunswick Region Wilmington Adress OffForest St Ext NW City/State/Zip Shallotte NC 28459 Contact Person Grady P Hardwick Title Owner Phone 910-471-3107 Directions to Protect At intersection of US Hwy and Business 17 Shallotte (East end of Shallotte) Travel North on Forest St extension NW approximately 1 25 Type of Project State Stormwater- Low Density Drain Areas 1 - (Shallotte River) (03-07-59 ) ( SC,HQW) On -Site Representative(s) Related Permits SW8051011 Hardsmith Inc - Greenbay Subdivision Phase 2 Inspection Date 03/07/2018 Entry Time 09 OOAM Primary Inspector Alida R Lewis Secondary Inspector(s) Reason for Inspection Follow-up Permit Inspection Type State Stormwater Facility Status ❑ Compliant ® Not Compliant Question Areas ® State Stormwater (See attachment summary) Exit Time 09 05AM Phone 910-796-7215 Inspection Type Compliance Evaluation page 1 Permit SWBO11022 Owner - Protect Hardsmith Inc Inspection Date 03/07/2018 Inspection Type Compliance Evaluation Reason for Visit Follow-up Inspection Summary On March 20, 2002, the Division Issued low density stormwater permit #SW8 011022 to Hardsmith Inc for the development of a 119 lot subdivision known as Greenbay Subdivision On November 21, 2014 and on February 4, 2015, respectively, the Division sent you a Notice of Inspection and a Notice of Deficiency No reply to either letter has been received The Division is moving to a Notice of Violation Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ❑ ® ❑ ❑ Comment 1 The permittee has not responded to the Notice of Deficiency sent on February 4 2015 Moving to NOV page 2