Loading...
HomeMy WebLinkAboutWQ0000020_Owner Name Change_20130611i � DUKE ENERGY June 10, 2013 Cia�f_ Environmental Services Mr: Charles Wakild, Director North Carolina Division of Water Quality North Carolina Department_ Of, Environment and, Naturq .Resources .. 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Name Change of Carolina Power & Light Co. d/b/a/ Progress Energy Carolinas, Inc. to Duke Energy Progress, Inca Dear Mr. Wakild: On April 29, 2013, Duke Energy Corporation (Duke Energy) changed the name of Carolina Power & Light Co. d/b/a/ Progress Energy Carolinas, Inc. to Duke Energy Progress, Inc. d/b/a/Duke Energy Progress. This is a name change only; it is -not an ownershipcange to the legal entity nor are we intending to transfer any permits. Your agency has issued licenses, permits, registrations or environmental documents (hereinafter collectively "permits") using the former corporate. name. As per the suggestion of Mr. Jeff Poupart of your staff, Duke Energy requests, by this letter, a "universal change" to the new owner name, Duke Energy Progress. Inc., for all the permits listed on the attached table. It is our understanding that this letter, with the attachment,. will be used to effect the name change for all permits as required and no additional name -change form submittals are necessary. Please forward as necessary to ensure all affected record systems are updated. understand that the owner name on c 1. urrent permits will remain as -issued The new Duke Energy Progress, Inc. name should appear on renewed, modified, ar newly -issued permits. Sincerely, f 1 Richard Baker, Director Water .& Natural Resources REB/rb Attachment. Duke Energy 526 South Church Street Charlotte, NC 26202 rY _ '' 10� Mailing Address: Mail Code EC13K/ P.O. Box 1006 ,j 1 Charlotte, NC 28201-1006 f �y ZX- r�, Mr: Charles Wakild, Director North Carolina Division of Water Quality North Carolina Department_ Of, Environment and, Naturq .Resources .. 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Name Change of Carolina Power & Light Co. d/b/a/ Progress Energy Carolinas, Inc. to Duke Energy Progress, Inca Dear Mr. Wakild: On April 29, 2013, Duke Energy Corporation (Duke Energy) changed the name of Carolina Power & Light Co. d/b/a/ Progress Energy Carolinas, Inc. to Duke Energy Progress, Inc. d/b/a/Duke Energy Progress. This is a name change only; it is -not an ownershipcange to the legal entity nor are we intending to transfer any permits. Your agency has issued licenses, permits, registrations or environmental documents (hereinafter collectively "permits") using the former corporate. name. As per the suggestion of Mr. Jeff Poupart of your staff, Duke Energy requests, by this letter, a "universal change" to the new owner name, Duke Energy Progress. Inc., for all the permits listed on the attached table. It is our understanding that this letter, with the attachment,. will be used to effect the name change for all permits as required and no additional name -change form submittals are necessary. Please forward as necessary to ensure all affected record systems are updated. understand that the owner name on c 1. urrent permits will remain as -issued The new Duke Energy Progress, Inc. name should appear on renewed, modified, ar newly -issued permits. Sincerely, f 1 Richard Baker, Director Water .& Natural Resources REB/rb Attachment. c: Ms. Robin Bryson Mr. John Velte Mr. Jeff Poupart, DWQ Mr. Garry Rice Record Type. Code: 50-02 Document Number: 8-6 UPS: 1Z 212 456 01 9243 0595 Duke Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 Permit Number Facility Name County Name patmit Status PermitTyp. Program Category ls,u.d Date Effective - • Expiration • d Owner WR0600056 Progress Energy Robeson Inactive Recovery Well Construction Ground Water 04-21-2008 04-21-2008 04-20-2009 Energy Carolinas Inc WR0800805 Brunswick Steam Electric Plant Brunswick Inactive Recovery Well Construction Ground Water 10-10-2008 10-10-2008 0411-2009 Power and Light Company ress Energ Inc WRO800806 Brunswick Steam Electric Plant Brunswick Inactive Remove Wall Construction Ground Water 01-05-2009 01-05-2009 07-06-2009 EPmgmss Power and LightCompany ress Ene y Inc W50800932 Sutton Steam Electric Plant New Hanover Active Water Suppl Well Construction Ground Water 12-14-2012 12-1420120644=2013 Power and Light Company ress Energy Inc Progress Energy Ash DisMbution Dismbution of Residual Solids (503 W00000020 Program Unknown Active Exem Non -discharge 02.17-2006 02-17-2006 02-28-2015 Ene Carolinas Inc Progress Energy Ash Distribution Distribution of Residual Solids (503 WO0000020 Program Unknown Inactive_ Exempt) Non -discharge 07-09-1998 07-09-1998 1031-2002 Progress Energy Carolinas Inc Gravity Sewer Extension, Pump Stations, & Pressure Sewer WQ0013514 Brunswick Plant Visitors Center Brunswick Active Extensions Non—discharge 04-08-1997 04.08.1997 Progress Energy Carolinas Inc Gravity Sewer Extension, Pump Stations, & Pressure Sewer WO0023612 Asheville FGD Sewer Extension -New Line Buncombe Active Extensions Non -discharge 03-01-2004 03-01-2004 Progress Energy Carolbias Inc Gravity Sewer Extension, Pump Stations, & Pressure Sewer WO0031612 Mao Sewer Line Relocation Person Active - Extensions Non -discharge 06-03-2007 05-03-2007 Progress Fnerav Carolinas Inc Gravity Sower Extension, Pump Stations, & Pressure Sewer Wct0035843 NPP Tem ora omce Complex Wake Active Extensions Non-discharga 03-29-2012 03-29-2012 Progress Energy Carolinas Inc Land Application of Raaidual send. WO0003604 Co& L - Roxboro Steam Plant Person Inactive (503 Exempt) Non --discharge 08-09-1990 03-28-1993 0131-1998 Progress Energy Carolinas Inc Land Application of Shead l Solids WO0004714 Cp & L -Asheville Steam Plant Buncombe Inactive (503 Exem t Non -discharge 07-09-1960 03-26-1993 0131-1998 Progress Energ Carolinas Inc Land Application of Residual Solids WO0006109 Carolina Power & Light New Hanover —Inactive 503 Exempt Non -discharge 01-01.1989 03-26-1983 0131-1998 Progress Energy Carolinas Inc Land Application at Residual Solids VVQ0007254 Carolina Power & Light Cc Wayne Inactive 503 Exempt) Non -discharge 01-01-1989 02-12.1993 0131-1998 Progress Energy Carolinas Inc Land Application of Residual Solids WQ0007255 Carolina Power & Light Company Chatham Inactive (503 Exempt Non -discharge 02.12-1993 02-12-1993 0131-1998 Pro ress Energy Carolinas Inc Land Appliaa9on or Residual. Solids WO0009475 Cp&L-A Sludge/Harris Nude Wake Inactive 503) Non -discharge 12-21-1994 12-21-1994 1130-1999 Progress Energy Carolinas Inc Wt10019931 Hants Nuclear Plant Wake Inactive Wastewater Pump and Haul Non -discharge 05-29-2001 05-29.2001 1130-Z001 Progress Energy Carolinas Inc VvOc030120 Shearon Harris Nuclear Power Plant Wake Inactive Wastewater Pump and Haul Non—discharge 0417-2008 0417.2008 0531-2006 Carolina Power an g t ompany ODA Pro! ress Energy Inc WO0032281 Shearon Harris Nuclear Power Plant Wake Inactive I Wastewater Pump and Haul Nondischar a 10-03-2007 10-03-2007 04-02-2008 Carollna Power and Light Company DBA Progress Energy Inc Page 1 of 11 Duke Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 i Permit Number W00033884 W00034893 Facility Name Harris Nuclear Plant Harris Nuclear Plant County Name Wake Wake Permit St,IW, I— rise vs Inactive ' Wastewater Pump and Haul Wastewater Pump and Haul Program .. Nan -discharge Non—discharge • 03-09-2009 09-16-2010 Effective,�4., Expiration •. - 03-09-2C05 09A8-2009 09-16-2010 03-15-2011 Combined Owner Progress Energy Carolinas Inc Progress Energy Carolinas Inc W000358es Shearon Hartis Nuclear Power Plant Wake Inactive Wastewater Pum and Haul Non -discharge a 9 04-06-2012 04-052072 01-01- 2013 Caroline Power end Light Company DBA Progressr and Energy Inc W00036332 NCR000780 Shearon Harris Nuclear Power Plant Electronic Date Center Wake Wake Active Active Wastewater Pump eM Haul Construction Stormwater Nondischa a NPDES SW Ot-152013 03-12.2008 07- 15-2013 03-12.2008 Carolina Power and Light Company - DBA P ress Energy Inc -Pro ress Ene y Carolinas Inc NCROO2962 Ramseur 115KV Substation NCG120032 CP&L-Hems Plant Sanitary Lan NCG120032 CP&L-Harris Plant Sanitary Lan NCG120033 CP&L•Brunswidt Plant Landfill NCG120033 FP plant Landfill Randolph Wake Wake Brunswick Brunswick /%five Inactive Inactive Inactive Inactive Construction Slomnveter Landfill Stormwater Discharge COC Landfill Stonnwater Discharge COC Landfill Stomaveter Discharge COC Landfill Stormwater Discharge COC NPDES SW NPDES SW NPDES SW NPDES SW NPDES SW 09-15- 2010 09.10-1997 09-01-2002 09.10- 1997 09-01-2002 09-15-2010 09-10-1997 09-01-2002 09-10-1997 09-01-2002 08.31-2002. 08-31-2007 08-31-2002 3B-01-2007 Caroline Power and light Company DBA Progress Energy Inc Progress Energy Carorinas Inc frograss Energy 9 Y Carolinas Inc Progreso Energy Carolinas Inc ' Progress Energy Carolinas Inc NCS000550 Cape Fear Steam Electric Power Plant NCGNE0636 Weetherspoon Steam Electric Plant NC0026735 C &L Shearon Halls Env CV NC0045071 C &L Roxboro S.E. WWiP) NCO049280 C&L Shearon Hems Conat. G6 NC006139 &L VisilorlMsale Center Chatham Robeson Wake Person Wake I Brunswick Withdrawn In review Inactive Inactive Inactive inacave Stormwater Discharge, Individual Slormweter Discharge, No Exposure Certificate 100%Oomestic<1MGD 100%Domestic 41 MGD 700%Domestic<1MGD 100%Domestic <1 MGD NPDES SW NPDES SW NPDESWW NPDES WW NPDES WW NPDESWvv 07-2277996 04-30-1979 09-01-188] 0a04-7996 07-22-1996 04-30-1979 09-01-1987 39.41996 03317001 1231-1983 68.91-1992 oea0-2001.progress Carolina Power and Light Company DBA Pro ress Ener y Inc Carolina Power end Light Company DBA Progress Energy Inc Progress Energy Carolinas ln0 • P ress Ena Carolinas Inc Progr_as Fnergy Carolinas Inc Ener Cemlinas lnc NCO083895 0000396AC 0001422AC 0003433AC 000396A01 00039SA02 000396A03 Br incwlck Steam Electric Plant Asheville Steam Electric Power Plant Sutton Steam Electric Plant Roxboro Steam Electric Power Plant Cape Fear Steam Electric Power Plant Asheville Steam Electric Power Plant Asheville Steam Electric Power Plant Asheville Steam Electric Power Plant Brunswick Buncombe New Hanover Person Chatham Buncombe Buncombe Buncombe Inactive Active Active Active Active Active Active Active 100% Domestic <1MGD AuthonWast to Construct NPDES Wastewater Facility Authorization to Construct NPDES Wastewater Facility Authorization to Construct NPDES Wastewater Facility Authorization to Construct NPDES Wastewater Fadi' Authorization to Construct NPDES Wastewater Facility Authorization to Construct NPDES Wastewater Facility Authorization to Construct NPDES Wastewater Facili NPDES WW NPDES W W NPDEB W W NPDES W W NPDES W W NPDES WW NPDES W W NPDES W W 09-041996 06-08-1993 OB -151883 06-17-1983 01-16-1984 12-21-2001 11-052004 03-29.2005 10.01-1996 06-09.1993 OB -151983 08-17-1983 01-16-1984 12-21-2007 11-052004 03-29-2005 1130.2001 , DBACarolina Power and _qrese EnergyLight ht Company Lro Caroline Power and Light Company DBA Pr ress Energy Inc Carolina Power and Light Company DBA Progress Energy Inc Carolina Power arid Company tl Light DBA Progress EnergyInc Carolina Power and Light Company DBA Progress Ener Inc Carolina Power and Light Company DBA Progress Energy Inc Carolina Power and Light Company DBA Progress Energy Inc Carolina Power and Light Company DBA Progress Energy Inc Page 2 of 11 I Duke Energy Progress, Inc. NCDENR Permit Listing June 5, 2013 NumberEiO _.... .. s ■ Date Combineate . ■. - 000396A04 Asheville Steam Electric Power -Plant "eG'nccinbe"' " gcflVe' Authonzation to Construct NPDES " "" Wastewater Facility ...... NPDES WVV 05-18-2010 05-18-2010 -". Carolina.Power and. LightCompany............. Progress DBA Energy Inc 000396ACA Asheville Steam Electric Power Plant Buncombe Active' Authorization to Construct NPDES Wastewater Facility NPDES WW 11-21-1994 11-21-i 994 Carolina Power and Light Company 'Authorization DBA Progress Energy Inc 000396AC8 Asheville Steam Electric Power Plant Buncombe Active o Construct NPDES Waste astewater.:Facility... 1.1-21.-'1994 1:994.:.: Carolina Power and Light Company DBA Progress 00039BACC Asheville Steam Electric Power Plant Buncombe Active _.....-._ ..._NP.DES.WW._ Authorization to Construct'NPDES Wastewater Facility NPDES WW . ......1.1-2.1 02-15-1999 02-15-1999 ......:. ._ Energy Inc.. Carolina. Power and Light Company DBA Progress Energy Inc 00039SACD Asheville Steam Electric Power Plant Buncombe 4cUve Authorization* to Construct NPDES Wastewater Facility NPDES WW 07-23-1999 07-23-1`999 Carolina Power and Light Company DBA Progress Energy Inc 0007064AC Brunswick:Steam Electric Plant Brunswick Active Authorization to Construct NPDES Wastewater Facility NPDES WW 08-02-1983 i 08-02-1983 Carolina Power and Light Company DBA Progress Energy Inc 001422A01 Sutton.Steam Electric Plant New Hanover Active Authorization to Construct NPDES Wastewater Facility NPDES WW 03 25-2003 03-25-2003 Carolina Power and. Light Company DBA. Progress Energy Inc 001422A02 Sutton Steam Electric Plant New Hanover Active Authorization to Construct NPDESj Wastewater Facility NPDES WW 11-13-2006 11-13-2006 Carolina.PowerandLight.Company DBA Progress Energy Inc Pr 001422A03 Sutton Steam Electric Plant New Hanover Active Authorization to Construct NPDES Wastewater Facility. NPDES WW 06-10-2009, 06-10-2009 j Carolina Power and Light Company DBA Progress Energy inc 001422A04 Sutton Steam Electric Plant New Hanover Active Authorization-totConstruct NPDES WastewaterW Facility NPDES W 05-18-2011. 05-18-2011 Carolina Power and.Light Company DBA.P�ogress Energy Inc 001422AOA Sutton Steam Electric Plant New Hanover Active Authorization to Construct NPDES Wastewater Facility NPDES VVW 05-0.0-1984 06-06-1964 Carolina Power and Light. Company DBA Progress Energy Inc - 001422ACC Sutton Steam Electric Plant •. New Hanover Active Authorization to Construct NPDESCarolina Wastewater Facility NPDES WW 11-25-1998 11-25-1998 Power and Light Company DBA Progress Energy Inc 003417A02 Lee Steam Electric Plant Wayne Active' Authorization to Construct NPDES Wastewater Facility. NPDES WW 03-01-2011 Carolina Power and Light Company .03-01-2011 DBA Progress Energy Inc 003417A03 Lee Steam Electric Plant Wayne Returned Authorization to Construct NPDES Wastewater Facility NPDES WW Carolina Power and Light Compan y DBA Progress Energy Inc 003425A01 Roxboro Steam.Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 10.20.2004 10-20-2004 Carolina Power and Light Company DBA Progress Energy Inc 003425A02 Roxboro Steam .Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW D3-03-2006 03-03-2005 Carolina Power and Light Company DBA Progress Energy Inc 003425A03 I Roxboro Steam Electric Power Plant Person Active Authorization to. Construct NPDES Wastewater Facility NPDES WW 07-05-2006 07-05-2006 Carolina Powerand Light Company Authorization to. Construct NPDES DBA Progress Energy Inc Carolina Power and Light Company 003425A04 Roxboro Steam Electric Power Plant Person Active Wastewater Facility NPDES WW 04-18-2008 04-18-2008 Authorization to Construct NPDES DBA Progress Energy Inc Carolina -Power and Light Company 003425A05 Roxboro Steam Electric Power Plant Person Active Wastewater Facility NPDES: WW DS -15-2009 05-15-2009 j IDBA Progress Energy Inc Duke Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 Number 'Facility Name County Name, Statusfi�606'� .. . o .. 003425A06 Roxboro Steam Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW wner Carolina Power and Light Company 06-15-2009 06-15-2009 DBA Progress Energy Inc 003425A07 Roxboro Steam Electric Power Plant Person Active .Authorization to Construct.NPDES Wastewater Facility NPDES WW 04-14-2010 04-14-2010 Carolina Power and Light Company DBA Progress Energy Inc 003425A08 Roxboro Steam Electric Power Plant Person Active Authorization to Construct.NPDES Wastewater Facility. NPDES WW 06-29-2010 06-29-2010 Carolina Power and Light Company DBA Progress Energy Inc 003425ACA Roxboro Steam Electric Power Plant Person y Active Autharizatiorto Construct NPDES Wastewater Facility NPDES WW 05-08-1987 Carolina Power and Light Company .05-08-1987 DBA Progress Energy Inc 003425ACB Roxboro Steam Electric Power Plant Person Active Authorization to Construct. NPDES Wastewater Facility NPDES WW 08-07-1989 CarolinaPower and Light Company 08-07-1989 DBA Progress Energy Inc 003433A01 Cape Fear Steam Electric Power Plant Chatham Active. Authorization to Constrict NPDES Wastewater Facility NPDES WW 07-162009.07-16-2009 Carolina Power and Light Company DBA Progress Energy Inc 003433A02 Cape Fear Steam Electric Power Plant Chatham Active Authorization to Constrict NPDES Wastewater Facility NPDES WW 07-16-2009 Carolina Power and Light Company 07-16-2009 DBA Progress Energy Inc 003433ACA Cape Fear Steam Electric Power Plant Chatham Active Authorization to Construct NPDES Wastewater Facility NPDES WW 03-05-1992 03-05-1992 Carolina Power and Light Company DBA Progress Energy Inc 0039566AC Shearon Harris Nuclear Power Plant Wake Active Authorization to Construct NPDES Wastewater Facility NPDES WW 03-15-1988 Carolina Power and Light Company 03-15-1988 DBA Progress Energy, Inc 007064A01 Brunswick Steam'Electric Plant Brunswick Active Authorization to. Construct.NPDES Wastewater Facility NPDES WW 07-16-2009 Carolina Power and Light Company 07-16-2009 DBA Progress Energy Inc 007064A02 Brunswick Steam Electric Plant Brunswick Active. Authorization to Construct.NPDES Wastewater Facility NPDES WW 12-21-2009 12-21-2009 Carolina Power and Light Company DBA Progress Energy Inc 03425ACA1 Roxboro Steam Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 03-26-1986 03-26-1986 Carolina Power and Light Company DBA Progress Energy Inc 038377A01 Mayo Steam Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 11-28=2007 11-28-2007 Carolina Power and Light Company DBA Progress Energy Inc 038377A02 Mayo Steam Electric Power:Pl'ant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 05-21-2008 05-21-2008 Carolina Power and Light Company DBA Progress Energy Inc 038377A03 Mayo Steam Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 02-23-2009 02-23.2009 Carolina Power and Light Company DBA Progress Energy Inc 038377A04 Mayo Steam Electric Power Plant Person Active Authorization to Construct NPDES Wastewater Facility NPDES WW 09-09-2010 09-09-2010 Carolina.Power and Light Company DBA Progress Energy Inc 039586A01 Shearon Harris Nuclear Power Plant Wake Active Authorization to Construct NPDES Wastewater Facility NPDES WW 02-27-2004 02-27-2004 Carolina Power and Light Company 1 DBA Progress Energy Inc 063895ACA Brunswick Steam Electric Plant Brunswick Active Authorization. to Construct NPDES Wastewater Facility NPDES WW 05-13-1994 Carolina Power and Light Company 05-13-1994 DBA Progress Energy Inc NC0000396 Asheville Steam Electric Power Plant I Buncombe Eypired Industrial Process & Commercial NPDES WW 09-12-2007 11-01-2007 12-31-2010 Carolina Power and Light Company DBA Progress Energy Inc Page 4 of 11 Duke Energy Progress, Inc NCDENR Permit Listing June 6,2013 ermW­ Nqntber Facility Name County qn e tin Status Permit Type, q9teggry. lss4pd Dat-. NC0000396 Asheville Steam Electric Power Plant Buncombe Inactive Industrial Process & Commercial NPDES WW 12-17-2001 02-01-2002 Carolina. Power and Light Company 12-31-2005 DBA Progress Energy Inc NC0000396 Asheville Steam Electric Power Plant Buncombe Inactive Industrial Process &Commercial NPDES'WW OS -28-2004 07-01-2004 Carolina Power and Light Company 12-31-2005 DBA Progress Energy Inc NC0000396 Asheville Steam Electric Power Plant Buncombe Inactive Industrial Process &Commercial NPDES WW 11-16-2005 01-01-2006 Carolina Power and Light Company 1 12-31-2010 DBA Progress Energy Inc NC0000398 Asheville Steam Electric Power Plant Buncombe In draft Industrial Process & Commercial NPDES VWV I Carolina Power and Light Company I DBA Progress Energy Inc NC0001422 Sutton Steam Electric Plant New Hanover Active Industrial Process &Commercial NPDES WW 12-02-2011 0.1-01 -2012 Carolina Power and Light Company 12-31-2016 DBA Progress Energy Inc NCO001422 Sutton Steam Electric Plant New Hanover Inactive Industrial Process & Commercial NPDES WW 0731-1996 09-01-1996 Carolina Power and Light Company 1231-2001 DBA Progress Energy Inc NC0001422 Sutton Steam, Electric Plant New Hanover Inactive Industrial Process & Commercial NPDES WW 12-27-2002 024)1-2003 Carolina Power and Light Company 12-31-2006 DBA Progress Energy Inc NC0001422 Sinton Steam Electric Plant i New Hanover Inactive Industrial Process & Commercial NPDES VWV 12-14-2006 01-01-2007 Carolina. Power and Light Company 12-31-2011 DBA Progress Energy Inc NC000341.7 Lee Steam Electric Plant Wayne Aefive Industrial Process & Commercial NPDES WW 07-23-2010 09701-2010 Carolina Power and Light Company 05-31-2013 DBA Progress Energy Inc NC0003417 Lee Steam Electric Plant 'Wayne Inactive Industrial Process & Commercial NPDES WW 10-23-2000 12-01-2000 Carolina Power and Light Company 02-28-2003 DBA Progress Energy Inc . NC0003417 Lea Steam'Etectric Plant Wayne inactive Inslustrtal,Prucess & Gemmerolal NPDES WW 10-13.2004. 11-01-2004 Carolina Power and Light Company 05.31-2009 DBA Progress Energy Inc N00003417 Lee Steam Electric -Plant Wayne Inactive Industrial Process & Commercial NPDES WW 03-23-2007 05-01-2007 Carolina Power and Light Company 05-31-2008 DBA Progress Energy Inc NC0003417 Lee Steam Electric Plant Wayne. Inactive. Industrial. Process:& Commercial NPDES'WW 10-14-2009 11-01-2009 Carolina Power and Light Company 05-31-2013 DBA Progress Energy Inc NC000341.7 Lee Steam Electric Plant Wayne In draft Industrial Process &Commercial NPDES WW Carolina Power and Light Company DBA Progress Energy Inc NC0003425 Roxboro Steam Electric Power Plant Person Expired Industrial Process & Commercial NPDES WW 06-10-2009 07-01-2009 Carolina Power and Light Company 03-31-2012 DBA Progress Energy Inc NC0003425 Roxboro Steam Electric Power Plant Person- Inactive Industrial Process & Commercial NPDES WW 01-26-1998 03-01=1998 Carolina Power and Light Company 04-30-2002 DBA Progress Energy Inc NC0003425 RoxboroElectric Fower'Plant Person Inactive Industrial Process &Commercial NPDES WW 12-31-2002 02-01-2003 Carolina Power and Light Company DBA 031-2007 DBA Progress Energy Inc NC0003425 Roxboro Steam Electric Power Plant Person Inactive Industrial Process &Commercial NPDES WW 08-10-2005 09 01-2005 Carolina Power and Light Company 03-31-2007 DBA Progress Energy Inc NC0003425 Roxboro Steam Electrio-Power PlantCaroPower Person Inactive. Industrial Process & Commercial NPDES WW 04-09-2007 05-01-2007 and Light 03-31-2012 DBAIina Progress Energy IncCompany Page 5of11 • 1 1p Duke Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 Number NC0003425 NCOOD3433 Facility Name Roxboro Steam Electric Power Plant Cape Fear Steam Electric Power Plant County Name Person Chatham Status in review Active Permit Type Industrial Process & Commercial Industrial Process & Commercial Pr6grain 77' Category NPDES WW NPDES WW 'I — . !rUxp1ra*fl d Date •�- 07-22-2011 09-01-2011 Tj_• Carolina P.cwer and Light Company DBA Progress Energy Inc 07-31-201e Power and Light DBAIina P ogress Energy IncCompany NC0003433 Cape Fear Steam Electric Power Plant ChathamInactive Industrial Process & Commercial NPDES WW 08-01-1996 08-01-1996 07-31-2001 DBA IP ogress Eneina Power anrgy9ncht Company NC0003433 Cape Fear Steam Electric -Power PlantChatham Inactive Industrial Process & Commercial NPDES WW 09-24-2003: 11-01-2003 07-31-2006 DBAIP ogress Energy Inc ina PqweC and Light Company NC0003433 Cape Fear Steam Electric Power Plant Chatham Inactive Industriai'Process & Commercial NPDES WW i 08-11-2006 09-01-2006 07-31-2011 Carolina. Power- and -Light Comp any-- --- DBA Progress Energy Inc NC0005363 Weatherspoon Steam Electric Plant Robeson Active Industrial Process & Commercial NPDES W W 11-20-2009 01-01-2010 0731-2014 Power and Light . DBAIina P ogress Energy IncCompany NC0005363 Weatherspoon Steam Electric Plant Robeson Inactive Industrial Process & Commercial NPDES WW 1 06-23-2000 08-01-2000 07-31-2004 Carolina Power and Light Company DBA Progress Energy Inc NC0005363 Weatherspoon Steam Electric Plant Robeson Inactive Industrial Process & Commercial NPDES WW 09-27-2004 11-01-2004 .07-31-2009 Power and DBAIina Prog ss:Enerrgyi Inc Company NC0005363 Weatherspoon Steam Electric Plant Robeson Inactive Industrial Process& Co'r imercial NPDES WW 05-01-2005 05-01-2005 07-31-2009 Carolina Power and Light Company DBA Progress Energy Inc NC0005363 Weathersp- ni Steam Electric Plant Robeson. Withdrawn Industrial Process & Commercial NPDES WW Carolina Power and Light Company DBA Progress Energy Inc NC0007064 Brunswick Steam Electric Plant Brunswick Active .Industrial Process ,& Commercial NPDES WW 01-13-2012 .02-01-2012 11-30-2016 Carolina Power and Light Company . DBA Progress Energy Inc NC0007064 Brunswick Steam Electric Plant Brunswick Inactive Industrial Process & Commercial NPDES WW 09-04-1996 10-01-1996 01-1996 11-30-2001 — DBACaroIina Power and P ogr ss Egerg Light Company nc Brunswick Steam Electric Plant Brunswick Inactive Industrial Process & Commercial NPDES WW 06-30-2003 08-01-2003 11-30-2006 Power and Liht DBAIina Progress Energy9ncCompany NC0007064 Brunswick Steam Electric Plant Brunswick Inactive Industrial Process & Commercial NPDES WW 02-21.2068 04-01-2008 11-30-2011 DBAIP o9gress Energy y IncCompany NC0007064 Brunswick Steam Electric Plant Brunswick Inactive Industrial Process & Commercial NPDES WW 10-30-2009 12-01-2009 1130-2011 ina CaroPower and DBAIP ogress nergyLight IncCompany NC0007054 NC0027511 Brunswick Steam Electric Plant Cp&L Brunswick Inactive Industrial Process & Commercial NPDES WW09-19-2011 12-01-2011 1130-2016 DBA Progress Power and Light ss EnergCompany (no NCO027529 Walters Hydroelectric Pit Cp&L Tillery Hydroelectric Pit Haywood Montgomery Inactive Inactive Industrial Process & Commercial NPDES WW 08-12-1981 08-12-1981 07-31-1997 Progress Energy Carolinas Inc NCO027537 Cp&L Blewett Hydroelectric Pit Anson Inactive Industrial Process & Commercial Industrial Process & Commercial NPDES WW 01-29-1982 01-29-1982 0731-1997 Progress Energy Carolinas Inc NCO027545 Cp&L Marshall Hydroelectric PI Madison Inactive Industrial Process &.Commercial NPDES WW NPDES W W 01-29-1982 01.29-1982 09-16-1996 07-31-1993 Progress Energy Carolinas Inc 10-31-2001 Progress Energy Carolinas Inc 09-16-1996 NCO038377 Mayo'Steam Electric Power Plant Person Expired Industrial Process & Commercial NPDES WW 10-14-2009 '11-01-2009 03-31-2012 Carolina Power and Light Company DBA Progress Energy Inc Page 6 of 11 Duke Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 Page 7of11 • NC0038377 Mayo Steam Electric Power Plant Person Inactive. Industrial Process & Commercial NPDES WW. .12-.13-2000 02-01-2001 01 31 2006 Carolina Power and Light Company CBA Progress Energy Inc 03-01-2007 We DBAIP ogress Energya Power and 9ncht Company NC0038377 Mayo Steam Electrid�Power Plant Person Inactive• Industrial Process & Commercial NPDES WW 12-05-2005 01-01-2D06 NCO038377 Mayo Steam Electric Power Plant Person Inactive Industrial Process .*& Commercial NPDES WW 09-14-2006 10-01,2006 03-31-2007 _ DBACaroIP ogress Energy n. Power and 9ncht NCO038377 Mayo Steam Electric Power.Plant Person Inactive Industrial Process& Commercial NPDES WW 04-10-2007 05-01-2007 03.-31-2012 CaroCompany Light DBAIina Progress EnPower ergy Inc Company NCo038377 Mayo Steam Electric Power Plant Person Inactive Industrial Process &Commercial NPDES WW 12-14 2007 01-D1-2008 03-31-2012 Carolina Power and Light Company DBA Progress Energy Inc NCO038377 Mayo Steam Electric Power Plant PersonIn In -draft Industrial Process &Commercial NPDES WW Carolina Power and Light Company DBA Progress Energy Inc NC0039586 Shearon Harris Nuclear Power Plant Wake Expired Industrial Process & Commercial NPDES WW 02-09-2007 03-01-2007 l 07-31-2011 Carolina Power and Light Company DBA Progress. Energy Inc NC0039586 Shearon* Harris Nuclear Power Plant Wake InactiveIndustrial Process & Commercial NPDES WW 08-01-1996 08,01-1996 07-31-2001 ina Power and Light Company DBA IPro gress Energy Ina NC0039586 Shearon Hams Nuclear Power Plant Wake Inactive Industrial Process Si Commercial NPDES WIN 04-12-2002 05,01-2002 07-31-2006 Carolina Power and Light Company DBA Progress Energy Inc NCO039586 NCO059323 Shearon Harris Nuclear Power Plant I Cp&L Bioassay -New Hill Wake Wake. In review Inactive Industrial Process & Commercial Industrial Process & Commercial NPDES. WW NPDES WW 03-18-1996 03-18-1996 03-31-2001 Carolina Power and Light Company DBA Progress Energy Inc Progress Energy Carolinas Inc NCO02sao9 9—ri—I k Steam Elaotric Plant NC0049450 Cape Fear Steam Electric Plant WWfP NCO050121 Cp&L Mayo S.E.. (WWrP) NCG50018B Walters Hydroelectric Plant NCG500188 Walters Hydroelectric Plant NCG500188' Welters Hydroelectric Plant NCG500188 Walters Hydroelectric Plant NCG500189 Tillery Hydroelectric Plant NCG500189 Tillery Hydroelectric -Plant NCG500189 Tillery Hydroelectric Plant Brunswick Chatham Person Haywood Haywood Haywood Haywood Montgomery Montgomery Montgomery Inactive Inactive Inactive "Active Inactive Inactive Inactive Active Inactive' Inactive Municipal, < 1 MGD Municipal, < 1MGD Municipal, < 1MGD Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooiing,_Boiier Blowdown COC: Non -contact Cooling, Boiler Blowdown COC Non-contact Cooling, Boiler Blowdown COC NPDES. W W NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES-WW NPDES WW 07-12-1982 11-16.1981 11-20-1981 08-03-2012 07-24-1997 08-01-2002 07-23-2007 1. 08-03-2012 07-241997 08-01-2002 07-12-1982 11-16-1981 11-20-1961 08-03-2012 09-01-1997 08-01-2002 08-01-2007 08-03-2012 , 09-01-1997 08-01-2002 06-00-1987 10-31-1986 Carolina Power and Light Company DBA Progress Energy Inc Progress Energy Carolinas Inc 10-31-1986 07-31-2015 Progress Energy Carolinas Inc Progress Energy Carolinas Inc 07-31-2002 07-31-2007 07-31-2012 Progress Energy Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc 07 31.2D15 Progress Energy Carolinas Inc 07-01-2002 Pro ress 9 Energy Carolinas Inc 07.31-2007 Progress Energy Carolinas Inc Page 7of11 Duke. Energy Progress, Inc. NCDENR Permit Listing June 6, 2013 NCG500189 Tillery Hydroelectric Plant NCG500190 Blewett Falls H droelecfric Plant Y NCG500190 Blewett Falls H droelectric Plant Y Montgomery Anson Anson Inactive Active Inactive Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC NODES WW NPDES WW NODES WW 07-23-2007 08-01-2007 08-03-2012 08-03-2012 07-24-1997 09-01-1997 07-31-2012 07-01-2015 07-31-2002 . Progress Energy Carolinas Inc ; progress.Energy Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc NCG500190 NCG500190 Blewett Falls Hydroelectric Plant Blewett Fails Hydroelectric Plant Anson Anson Inactive Inactive Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC NPDES WW NPDES NMI 08-01-2002 08-01-2002 07-23-2007 08-01-2007 07-31-2007 S 07-31-2012 '. Progress 9 Energy Carolinas Inc Progress Energy Carolinas Inc NCG500591 Marshall Hydroelectric Plant NCG500591 Marshall Hydroelectric Plant NCG500591 Marshall H droelectric.Plant Y NCG600591 Marshall Hydroelectric Plant Richmond County Combustion Turbine NCG500594 Plant Richmond County Combustion Turbine NCG500594Plant Rich Richmond, County Combustion Turbine' NCG500594 Plant Richmond County Combustion Turbine NCG500594 Plant Richmond County Combustion Turbine NCG500594 Plant Richmond County CombustionTurbine NCG500594 Plant Madison Madison Madison Madison Richmorid Richmond Richmond Richmond Richmond Richmond Active Inactive Inactive Inactive Active Inactive Inactive Inactive Inactive With yawn Non -contact Cooling,. Boiler Blowdown COC Non -contact Cooling, Boller Blowdown COC Non -contact Cooling, Boiler Blowdown .COC Non -contact Cooling, Boiler Blowdown COC Non-contact.Cooling, Boller Slowdown COC Non -contact cooling, Boiler Blowdown COC Non-contact Cooling, Boller Blowdown' COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC Non -contact Cooling, Boiler Blowdown COC NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES WW NPDES W W NPDES WW NPDES WW 08-03-2012 08-03-2012 01-19-2001 03-01-2001 08-01-2002 08-01-2002 07-23-2007 08-01-2007 08-03-2012 08-03-2012 02-05-2001 03-01-2001 08-17-2001 08-17-2001 08-01-2002 08-01-2002 07-23-2007 08-01-2007 07-31-2015. 07-31-2002 07-31-2007 'Progress 07-01-2012 07-01-2015 07-31-2002 07-31-2002 07-31-2007 07-01-2012 Progress Energy Carolinas Inc Energy Carolinas Inc Progress Energy 9 Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc Progress. Energy Carolinas Inc Progress Energy Carolinas Inc NCG500597 NCG560006 SW5071101 SW5080801 SW7011001 SW7011022 SW7030305 Cp&L-Combustion Turbine Gen II Progress Energy Vegetation Control Siler City 230 kV Substation Expansion Gamer 140 230 W Electric Substation NCNG, New Bern Operations Center NCNG, New Bern Operations Center Eastern NCNG - Phase 3A Richmond Wake Chatham Wake Craven Craven Beaufort Returned . Active Active. Active Active Active n�rvo Non -contact Cooling, Boiler Blowdown COC Pesticide General Permit COC State Stormwater State Stormwater State Stormwater State Stormwater o. s �.__..._. NPDES WW NPDES WW State SW State SW State SW State SW 03-01-2D12 03-01-2012 12-14-2007 12-14-2007 0848-2008 08-28-20D8 10-16-2001 10-16-2001 11-09-2001 11-09-2001 10-31-2016 10-16-2015 Progress Energy Carolinas Inc Progress Energy Carolinas Inc Progress Energy Carolinas Inc Carolina Power and Light Camp DBA Progress Energy Inc Progress Energy Carolinas Inc Progress Enerqv Carolinas Inc Page 8 of 11 Duke Energy Progre.ss, Inc. June 6, 2013 ermit 196.mLier Fac'llity Name.. qamp: status Permit Typ- Iss ed'Date, Mate ite Combined Owner SW7091123 Bank Addition Craven Returned State Stormwater State SW Carolina Power and Light Company IJBA Progress Energy Inc sw7ibo304 Havelock 230kV Substation - Install 60/ F66 MVAR-230 kV Cap Carofina Power and Light Company- Craven Aefive State Stormwater State SW 03-15-2010 03-15-�010 DBA. Progress Energy Inc SW7950408 CpI -.Aurora Sta Beaufort Active State Stormwater State SW 05-23-1995 05-23-1.995 Progress Energy Carolinas Inc SW7971215 CpI - New Bern Transmission Fac. Craven Aclive State Stormwater State SW 61 -16-1998 01-16-11998 Progress Energy Carolinas Inc SW7980205 Cp&L -Final. Plan Ind -Site Craven Active State Stoftwater State SW 10-03-2008 10-03 -2008 10-03-2022 Progress Energy Carolinas Inc, SW7980205 Cp&L - Final Plan Ind Site Craven Inactive State Stormwater State SW 05-19-1998 05-19-1.998 05-19-2008 Progress Energy Carolinas Inc SW8000301 Cp&L Scotts Hill 230 Kv Tap Line New Hanover Active State Stormwater' State SW 03-01-2000 03-01 -�000 fEag2ss Energy Carolinas Inc Progress Energy NorW Wilmington SW8000333 Operations Comolax New Hanover Active State Stormwater State SW 02-26-2010 02-26-2 010 06-09-2024 Progress Energy Carolinas Ind Progress Energy.North Wilmington SW8000I333 Operations Complex New Hanover Inactive State Storinwater State SW 06-09-2000 or,09-2boo Progress Energy Carolinas Inc SW8000510 CP&L Leland Transmiss'ion Facility Brunswick Active State Stormwater State. SW 05-10-2010 I 05-10-2010 09-07-2024 Carolina Power and Light Company DBA Progress*Energy Ind SW8000510, CP&I_ Leland Transmission Facility Brunswick Inactive State Stormwater State Sw '09-07-2000 09-07-20;00 Carolina Power and Light Company DBA Progress Energy Inc Cg&L SE Regional Industrial, Park SW8010223 Substation Columbus Active State S I tormwater State. SW 02-26-2001 02-26-2001 Progress Energy Carolinas Inc Cp&L WhitevilleSE. Regional Park Tap SW8010428 Line Columbus Active State Stormwater 9tte. Svv* 06-23,2601 06-23-2601 Progress Energy Varolinas Inc Castle Hayna 230 KV SubiEtion-Rebuild SW8010529 A New Hanover Active State , Stormwater State SW 07-06-2001 07-06-2001 Progress Energy Carolinas Inc SW802031 0 Murraysville 230 kV Substation New Hanover Active State Stormwater State SW 05-06-2002 oTor,2602 Progress Energy Carolinas Inc SW8020412 Substation - Carteret Active State. Stormwater, State SW 06-13-2002 06-13-2602 Progress Energy Carolinas Inc Barge Unloading Facility SW8020421 Button Plant New Hanover Active State Stormwater State SW 04-23-2002 04-23-2002 progress Energy Carolinas Inc Progress Energy Site (Lot 5 Progress SW8020809 Point) New Hanover Active State Stormwater State SW 12-06-2002 12-06-2602 Progress Energy Carolinas Inc SW8030211 Ash Pond Vertical Dike Extension Brunswick Acilve State Stormwater State SW b2-17-2003 02-17-2003 rogess Energy Carolinas Inc SW8030811 Brunswick Steam Elect6b Plant Brunswick Active State Stormwater State SW 08-25-2003 08-25-2003 Uarolina Power and Light Company DBA,Progress Energy Inc SWBQ40344 Progress Energy Spoll Area 4 & 6 Brunswick ---Aggve State Stormwater State SW 05-13-2004 0.5-13-2004 Progress Energy Carolinas Inc SW8040748 Clinton -Lee Substation Duplin Active State Stormwater State SW 10-21-2004 10-21-2004 Progress Energy Carolinas Inc SW8041125 River Road I I 5kV Substation New Hanover Aativ� State Stormwater State SW 02-11-2005 1 02-11-2005 Progress Energy Carolinas Inc SW8050220 Rocky Point 230kV Substation Pander Active ------- 2!ate Stormwater State SW 04-15-2005 04-15-2005 Progress Energy Carolinas Inc Progress Energy Marion-Whiteville 230k 111-07-2005 1 SW80507Z9 1V Line Columbus Aefive State Stormwater State SW 11-07-2005 Progress Energy Carol . inas Inc � paau9cv11 / ! } Duke Energy Progress, Inc. NCDENR Permit Listing June b, 2013 SW8060735 Transmission Line Relocation-Brunswickram Nuciear'Plant Brunswick Active State Stormwater Carolina Power and Light Company SW8061004 Progress Energy MGP Site New Hanover Active State Stotmwater State SW State SW 07-27-2006 07-27-2006 DBA Progress Energy Inc Progress Energy./ Brunswick Un.(t 2 10-09-2006 10 09-2006 = Progress Energy Carolinas Inc SW8081006 Capacitor Bank Progress Energy /Brunswick Unit 2. Brunswick Active State Stormwater State SW 07-13-2009 07-13-2009 05-03-2021 Progress Energy Carolinas Inc SW8081006 Capacitor Bank Independent Spent:Fuel Storage Brunswick Inactive State Stormwater State SW 11-14-2008 11-14-2008 11-14-2018 Progress Energy Carolinas Inc SW8081010 Installation Independent Spent Fuel Storage Brunswick Active State Stormwater State SW 11-25-2009 1 1-25-2009 12-19-2020 Progress Energy Carolinas Inc SW8081010 Installation Progress Energy/Brunswick Unit 1 Brunswick . Inactive Slate Storinwater State SW 11-14-2008 11-14-2008 11-14-2018 Progress Energy Carolinas Inc SW8090528 Capacitor Bank Brunswick Active State Stormwater State SW 07-23-2009 07-23-2009 12-30-2021 Progress Energy Carolinas Inc SW8091122 Progress Energy Sury Street Site New Hanover ActiveCarolina.Power State Stormwater State SW and Light Company Brunswick Nuclear Plant Stabilization .12-14-2009 12-14-2009 DBA ProgressEnergy Inc SW8100225 PondCarolina Brunswick Active State Stormwater State SW 05-24-2010 05-24-2010 Power and. Light Company Progress Energy Carolinas. Folkstone DBA Progress Energy Inc SW8110205 230k V Substation Onslow Active • State Stormwater State SW 03-03-2011 03-03-2i"011 Carolina Power and Light Company BamaNs Creek and Town Creek 230k -V DSA Progress Energy Inc SW8110805 Transition Stations -Trailer New Hanover Active State Stormwater State SW08 30-2011 OS Power and Light Company Progress Energy Modular Office -30-2011 DBAIina P ogress SW8120103 Project Brunswick Active State Stormwater State SW 08-15-2012' 08-15-2012 ina and Light Company I DBAIP ogress SW8890602 WImington.Ogden 230 Kv Substation New Hanover Active State Stormwater State SW Carolina Power and Light Company SW8911007' C &L Belvedere 230 KvTa P P Pander Active State Stormwater 07-01-1989 07-01-1889 DBA Progress Energy Inc SW8911203 Cp&L Office Building Brunswick Active State Stormwater State SW 11-01-1991 11-01-1991 Progress Energy Carolinas Inc SW8920710 Cp&L Pole Yard Castle Hayne New Hanover Active State Stormwater State SW 05-13-1992 05-13-1992 Progress Energy Carolinas Inc State SW 09-23-1992 09-23-1992 Progress Energy Carolinas Inc SW8931024 Brunswick Steam Electric Plant Brunswick Active State Stormwater State SW 12-17-1993 Carolina Power and Light Company SW8940404 Cp&L North River Substation Carteret Active State Stonnwater State SW 12-17-1993 DBA Progress Energy Inc Progress Energy Wimington South 05-03-1994 05-03-1994 Progress Energy Carolinas Iho SW8981209 Operations CenterF Progress Energy Wilmington South New Hanover Active State Stormwater State SW 09-25-2008 09-25-2008 09-25-2022 Progress Energy g rgy Carolinas Inc SW8981209 Operations Center New Hanover Inactive State Stormwater State'SW 02-23-1999 02-23-1899 SW8981230 Cp&L Transmission Line Camp Geiger Onslow Active State Stormwater Progress Energy Carolinas Inc State SW 01-28-1999 01-28-1999 Progress Energy Carolinas Inc SW8990245 Cp&L Leland Industrial 115 Kv Substation Brunswick ALtive State Stormwater State SW' 05-21-2003. 05-21-2003 Progress Energy Carolinas Inc Page 10 of 11 .0 Duke Energy Progress, Inc. wooswePermit Listing June 5,xmx 713fis 166 SW8990245 Cp&L Leland Industrial 115 Kv Substation Brunswick Inactive State Stormwater State SW 04-15-1099 04-15-1b99 FP7r.,ess 'Energy Carolinas Inc SW8991207 Cp&L Scotts Hill 2N ry Substation Pender Active State Stormwater state SW 0-2001 1 Progr ss Energy Carolinas Ino SW8991207 Cp&L Scotts Hill 230 Kv. Substation Pender Inactive State Stormwater I State SW 12-17-1999 1 12-17-1999 Progress Energy Carolinas Inc i | ' pwoe 11 of 11 ' | . | ; - '� --' ----`'- ---'----------------- ---...... ... ...... ......... —'--~`--~~~~~~~--^---- --- '°r�----'------ —.----- - � -