Loading...
HomeMy WebLinkAbout20180159 Ver 1_Approval Letter_20180320K" Water Resources Environmental Quality March 20, 2018 Dionna Rymer Long P.O. Box 430 Fairview, NC 28730 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director DWR # 18-0159 McDowell County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Long, 131 Clear Sail Way — Lake James Dear Ms. Long: You have our approval for the impacts listed below for the purpose described in your application dated January 23, 2018, and received by the Division of Water Resources (Division) on February 1, 2018, with additional information received on February 12, 2018, March 6, 2018, and March 12, 2018. These impacts are covered by the attached Water Quality General Certification Number 4145 and the additional conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit, and/or Buffer Rules are met. This approval includes grading at the shoreline to achieve a 2:1 slope. No other impacts are approved, including incidental impacts. [ 15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved Permanent Open Waters Above Pool Below Pool 0.0196 (acres) 0.0065 (acres) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and State of North Carolina I Environmental Quality 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828-296-4500 Long, 131 Clear Sail Way DWR # 18-0159 401 Approval Page 2 of 4 you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [I 5A NCAC 02H .0507(d)(2)] 3. The proposed project must comply with the McDowell County local riparian buffer ordinance approved by the Division of Water Resources under the Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers, 15A NCAC 02B .0243(3)(b). 4. All banks shall be laid back to at least a 2:1 (length : height) slope and riprap applied at the water / land interface (at full pool). Riprap shall be placed as a linear protective measure upon the regraded slopes. Stone used in stabilization shall be of a size and density sufficient to prevent movement by wave or current action or stream flows and shall consist of clean rock or masonry material free of debris or toxic pollutants. The riprap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized area. All exposed soils, above the riprap stabilized area, to a distance of 30 feet from the top of bank shall be replanted in accordance with the attached Guidelines for Riparian Buffer Restoration. This authorization shall in no way be construed as allowing the installation of a bulkhead or seawall. [ 15A NCAC 02H .0507 (c)] 5. Immediately following construction, disturbed soils must be stabilized as quickly as possible by providing a temporary ground cover. This ground cover is a temporary measure used to address erosion until buffer restoration can be accomplished. [I 5A NCAC 02B .02 (4) and (5)] 6. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.) Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [ 15A NCAC 02H.0507 (c), 15A NCAC 02H.0506 (b)(3), and Table of Use for Catawba River Buffer Rule] 7. Stabilization techniques must meet the General Conditions listed in the Shoreline Stabilization Technique Selection Process found in Duke Energy's Shoreline Management Guidelines for the Catawba-Wateree river system 2006 Shoreline Management Plan. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Long, 131 Clear Sail Way DWR # 18-0159 401 Approval Page 3 of 4 This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at hM2://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H.0500. Please contact Amy Annino at 828-296-4656 or amy.annin0&ncdenr.gov if you have any questions or concerns. Sincerely, ,t n, Ki, Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 4145 Certificate of Completion Long, 131 Clear Sail Way DWR # 18-0159 401 Approval Page 4 of 4 Guidelines For Riparian Buffer Restoration cc: William Elliot — USACE (via email) Andrea Leslie — NCWRC (via email) Ron Harmon — McDowell County Planning (via email) Wade Harmon — Duke Energy (via email) DWR ARO 401 files G:\WR\WQ\McDowell\401s\Non-DOT\Long, 131 Clear Sail Way\20180320_Long, 131 Clear Sail Way_APRVL.doex