Loading...
HomeMy WebLinkAboutWQ0039862_Issuance of Permit_20180319Water Resources ENVIRONMENTAL QUALITY March 19, 2018 Leonard Wiggins Chairman of County Commissioners and WSD 1 Edgecombe County WSD 1 P O Box 10 Tarboro, NC 27886 Subject• Permit No. WQ0039862 Edgecombe County WSD 1 Kingsboro Industrial Park Utilities Extension Wastewater Collection System Extension Permit Edgecombe County Dear Mr Wiggins ROY COOPER Gove of MICHAEL S REGAN Seo etas y LINDA CULPEPPER Into un Du ectaa In accordance with your application received January 30, 2018, and additional information received on March 13, 2018, we are forwarding herewith Permit No WQ0039862 dated March 19, 2018, to the Edgecombe County WSD 1(Permittee) for the construction and operation upon certification of the subject wastewater collection system extension This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit Condition I 1 This permit shall become voidable unless the agreement between Edgecombe County WSD 1 and the City of Rocky Mount for the collection and final treatment of wastewater is in full force and effect Condition 1 2 Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump station identifying name/number, 24 -Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency Condition II 1 This permit shall not be automatically transferable, a permit modification request for a name change must first be approved by this office Condition II 4 Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T 0403 or any individual system -wide collection system permit issued to the Permittee It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215 6A through §143-215 6C, construction of additional or replacement Division of Watei Resources, Raleigh Regional Office, Watei Quality Operations Section www ncwaterquality oig 1628 Mail Sei vice Centei, Raleigh, NC 27699-1628 Phone (919) 791-4200 Edgecombe County WSD 1 Permit No WQ0039862 wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC --"27699--6714--Unless such -demands are made -,-this permit shall b -e final and binding - - - — ---- - -- - -- - If you need additional information concerning this matter, please contact Ted Cashion at (919) 791-4254 or via e-mail at ted cashion@ncdenr gov Sincerely, for Linda Culpepper Interim Director, Division of Water Resources by S. Daniel Smith, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc William A Larsen, P.E., The Wooten Company (via email wlarsen@thewootencompany com) Jonathan Boone, P E , Rocky Moun= Director of Public Works and Water Resources (via email Jonathan boone@rockymountnc gov) Edgecombe County Health Department Raleigh Regional Office Files Water Resources Central Files Page 2 of 8 North Carolina Department of Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Edgecombe County WSD 1 Edgecombe County for the construction and operation of approximately 2,550 linear feet of 18 -inch gravity sewer and approximately 1,800 linear feet of 30 -inch gravity sewer, a 500—gallon per minute pump station with duplex pumps, on-site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch as well as approximately 6,670 linear feet of 10 -inch force main to serve a tire manufacturer and a pharmaceutical company as part of the Kingsboro Industrial Park Utilities Extension project, and the discharge of 330,000 gallons per day of collected domestic/commercial/industrial wastewater into the City of Rocky Mount's existing sewerage system, pursuant to the application received January 30, 2018, and additional information received on March 13, 2018 and in conformity with 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated in March 2008, as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable, and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit This permit shall be effective frofrf'the da''te of issuance until rescinded and shall be subject to the specified conditions and limitatio s c wine yt�erein ,,sd` Linda Culpepper Interim Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0039862 Permit Issued: March 19, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Edgecombe County WSD 1 is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension The sewage and wastewater collected by this system shall be treated in the Rocky Mount Tar River Regional Wastewater Treatment Facility in accordance with Permit Number NC0030317. ------ - - -- Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated March 2008, as applicable, and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable, unless specifically mentioned herein Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below I. SPECIAL CONDITIONS 1 This permit shall become voidable unless the agreement between Edgecombe County WSD 1 and the City of Rocky Mount for the collection and final treatment of wastewater is in full force and effect [15A NCAC 02T 0304(h)] 2 Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump station identifying name/number, 24 -Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. [15A NCAC 02T 0305(h)(2)] II. STANDARD CONDITIONS 1 This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G S 143-215 1(d3)] 2 This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit, 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated March 2008, as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable, and other supporting materials unless specifically mentioned herein [15A NCAC 02T.0110] 3 This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T 0110] Page 4 of 8 4 The wastewater collection facilities shall be properly maintained and operated at all times The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T 0403 If an individual permit is not required, the following performance criteria shall be met. [15A NCAC 02T 0108(b)]. a The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards b A map of the sewer system shall be developed and shall be actively maintained c An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented d Pump stations that are not connected to a telemetry system shall be inspected every day (i e 365 days per year) Pump stations that are connected to a telemetry system shall be inspected at least once per week e High-priority sewer lines shall be inspected at least once per every six -months and inspections are documented f A general observation of the entire sewer system shall be conducted at least once per year g Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B 0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215 1C h A Grease Control Program is in place as follows 1 For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems 2 For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3 Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows I Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system Page 5 of 8 5 The Permittee shall report by telephone to a water resources staff member at the Raleigh Regional Office, telephone number (919) 791-4200, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following a Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc , or b Any SSO and/or spill over 1,000 gallons, or c Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300 Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control [GS 143-215 1C(a1)] 6 Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State [15A NCAC 02T 0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided cn the form A complete certification is one where the form is fully executed and the supporting documents are provided as applicable Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting dccumentation shall include the following a One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities Page 6 of 8 and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided c Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form Prior to Certification (Final or Partial) Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-case basis and each on its own merit Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation [15A NCAC 02T 0116] 8 Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation This shall be done through a permit modification with fee Such variance requests will be evaluated on a case-by-case basis Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T 0105(n)] 9 A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities [15A NCAC 02T 0116] 10 Failure to abide by the conditions and limitations contained in this permit, 15A NCAC 2T, the Division's Gravity Sewer Design Criteria adopted February 12, 1996 and updated March 2008, as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 and updated March 2008 as applicable, and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215 6A through §143-215 6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board [15A NCAC 02T 0104, 15A NCAC 02T 0108(b -c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T.0110, 15A NCAC 02T 0108(b)] 12 The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have Jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies [G S 143-215 1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Edgecombe County WSD 1 PERMIT #: WQ0039862 PROJECT: Kingsboro Industrial Park Utilities Extension ISSUE DATE: March 19, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation It should be submitted in a manner that documents the Division's receipt Send the required documentation ----the Regional -Supervisor, Water -Quality Regional Operations Section at the address at the bottom Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considerec a violation of the permit and shall subject the Permittee to appropriate enforcement actions The Permittee is responsible for tracking all partial certifications up until a final certification is received A F -nal Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof Printed Name, Title Signature ENGINEERS CERTIFICATION Date I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as references above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 15A NCAC 02T, the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated March 2008, as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable, and other supporting materials North Carolina Professional Engineer's Seal w/signature & date ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): Dig islon of Nater Resources, Raleigh Regional Office, Nk atci Quality Opeiatlons Section www newatei quality oig 1628 Maul Ser%ice Center, Raleigh, NC 27699-1628 Phone (919) 791-4200 1,,,..,t,, ,ROOP er ffT) - P -,1P 1, 1\rr'?7rnQ Fes, /01Q1'7QQ_71SQ