Loading...
HomeMy WebLinkAbout20080399 Ver 2_More Info Received_20090330Beaverdam Land Conservancy, LLC D8-03At9 V2 P.O. Box 2486 Peachtree City, GA 30269 March 13, 2009 SENT VIA HAND DELIVERY Mr. Kevin Barnett NC DENR-DWQ - Surface Water Protection Section 2090 US HWY 70 Swannanoa, NC 28778 Subject: Bartram's Walk Beaverdam Land Conservancy, LLC and MTF, LLC NCG 010000 Buncombe County Dear Mr. Barnett: Q?c??oe?p MAR 3 0 2009 DM • WAMR OlN1M WETVM AND SMRMWAMR VA M Enclosed with this letter are the responses to your review letter dated February 11"', 2009. As we spoke on Today, all of our storm water and BMP facilities have been installed per our permit with Buncombe County, North Carolina. We used the 2 year storm versus the 1 year storm as required by DWQ. Also, some of the slopes located in the ponds are greater than 3:1 as required by the state but all have been stabilized and are holding with permanent vegetation. The county also required a 48 hour minimum on the drawdown portion of our water quality portion and therefore the ponds were designed to that requirement. With regards to our corporate contact info, we are having that updated to match our new address in Asheville. The new address and contact information will be the following: Brian Gulden, Esq. Patla, Straus, Robinson & Moore, P.A. 29 North Market Street, Suite 300 Asheville, NC 28801 Mr. Zyboyovski will no longer be the contact of this project. We apologize for this confusion. Number 2 has been revised per our site meeting and has been reviewed and approved by Ms. Beckwith at this point. rl i ? i .p ?. .. J ... S I have included our approved storm water plans and calculation along with your supplements as requested. We have sent the deed restrictions to our attorney for their review and addition to the ones we are imputing per the USCOE. I have also included the original Operation and Maintenance Agreement that we signed with Buncombe County for your review. The remaining items you have requested are included for your review and comments. If you have any questions or require any additional information, please do not hesitate to call at your convenience. Please use the address included on this letter and I would like to request that you email or call me with any questions so I can respond to you as quickly as possible. Sincerely, Tom Daniel Managing Member for Beaverdam and MTF Office Use Only: USACE Action ID No. 200800794 (If any particular item is not Processing DWQ No. 08-0399 Y '4. e to this project, please enter "Not Applicable" or "N/A 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide (NWP), Regional or General Permit Number(s) Requested: NWP 29 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section Vlll, and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? Applicant Information 1. Owner/Applicant Information Name: Thomas W. Daniel. Beaverdam Land Conservancy LLC Mailing Address: P.O. Box 2486. Peachtree Citv Georgia 30269 Telephone Number: 850-294-2501 Fax Number: 770-486-8398 E-mail Address: tdanielna.omnicons.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: R. Darrell Smith Ph.D.. PWS Company Affiliation: Register Nelson. Inc. Mailing Address: 3949 Jodeco Road McDonough GA 30253 Telephone Number: 678-432-2636 Fax Number: 678-432-2464 E-mail Address: dsmith ar' -registernelson.com Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Bartram's Walk 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 9750-17-21-1473 9750-14-42-1932 9750-17-21-2767 9750-18-32-7198 9750-17-21-4664 9750-14-33-0850 9750-18-22-8212 4. Location County: Buncombe Nearest Town: Asheville Subdivision name (include phasellot number): Bartram's Walk Directions to site (include road numbers/names, landmarks, etc.): From Asheville, take exit 5 on 1-240 (Merrimon Ave./ Hwy 25). Go north on Merrimon Ave for 2 miles. Turn right at Beaverdam Road (SR 2053) and continue for 3.5 miles. Turn right on Wolf Cove Road (SR 2061) for 0.5 mile until it intersects with Bassett Road. This is the northern extent of the site. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.632064°N 82.525045°W 6. Property size (acres): 156.47 acres 7. Name of nearest receiving body of water: Beaverdam Creek 8. River Basin: French Broad River Basin. HUC 06010105. Sub-Basin 04-03-02 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mal)s/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Currently, the project site is lightly forested and was formerly a single family residence. In general, the surrounding area is a mixture of residential houses and undevelopedlforested parcels. A field investigation of this site was conducted in February 2008, to determine the limits of USACE jurisdictional wetlands and waters of the US located within the project area. Subsequent investigations occurred in July and October 2008. During these inspections of the site, we followed the decisions of the Rapanos and Carabe/l court cases for the determination of traditional navigable waters (TNW), relatively permanent waters (RPW), and adjacent/abutting wetlands. The three- parameter approach outlined in the 1987 Corps' Wetlands Delineation Manual was used for the determination of wetland/upland interfaces. Also, "waters of the United States" were identified in accordance with the defining criteria set forth in Part 328 of Title 33 Code of Federal Regulation, the definitions found within paragraph E of the current Nationwide Permits, and Regulatory Guidance Letter No. 05-05. Three perennial streams, one intermittent stream, and one wetland swale are present within the project area, as indicated on the enclosed Limits of USACE JurisdictionlExisting Conditions map. Detailed descriptions of these features are found below. Page 2of12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22. 2009 Streams/Wetlands Stream 1 is a southeast to northwest flowing perennial tributary of Beaverdam Creek. This stream is 2-6 feet wide at the ordinary high water mark (OHWM), 3-8 feet wide at top of bank JOB), and incised 2-4 feet. Stream 1 has a substrate comprised of silt, sand, cobble, and bedrock. Stream 2 is a southeast to northwest flowing perennial tributary of Stream 1. This stream is 2-4 feet wide at the OHWM, 2-5 feet wide at top of bank JOB), and incised 1-2 feet. Stream 2 has a substrate comprised of silt, sand, cobble, and bedrock. Stream 3 is a south to north flowing intermittent tributary of Stream 1. This stream is 2-4 feet wide at the OHWM, 2-5 feet wide at top of bank JOB), and incised 1-2 feet. Stream 3 has a substrate comprised of silt, sand, gravel, cobble, and bedrock. Stream 4 is a south to north flowing perennial tributary of Stream 1. This stream loses its OHWM immediately downslope of the existing road crossing and flows underground to Stream 1. The undisturbed portion of Stream 4 is 1-2 feet wide at the OHWM, 2-3 feet wide at top of bank JOB), incised approximately one foot, and has a substrate comprised of loam, sand, and cobble. Upslope of this stream is a wetland swale. 10. Describe the overall project in detail, including the type of equipment to be used: The cumulative work in United States Army Corps of Engineers (USACE) jurisdiction, involving road access improvements and stormwater management infrastructure, is essential and necessary to support the proposed residential subdivision. The pre-existing gravel access roads on the property were modified and expanded to a Right-of-Way (ROW) width of 45-feet (see attached Proposed Conditions map), as a means of updating the proposed development's road system to current Buncombe County standards. Approximately 12,000-feet of two-lane roadways have been or will be constructed/updated to allow for 13.5-foot paved lanes. A 0.54-acre stormwater management pond (Area C) was constructed in intermittent Stream 3 to satisfy local storage capacity requirements for the proposed project. No in-stream water quality treatments would occur as a result of the storm water management design. All treatments would be located in upland locations through the use of forebays and appropriate best management practice (BMP) applications. According to Section 4.9.1 of the 2007 Wilmington District Regional Conditions, in-stream stormwater management facilities constructed under the auspices of Nationwide Permit (NWP) 29 are only prohibited in streams exhibiting perennial flow regimes. Therefore, the stormwater pond constructed on intermittent Stream 3 is permissible under current USACE- Wilmington District rules and guidelines. Please refer to the Impact Justification section of this document for detailed avoidance/minimization measures employed during the planning stages of the stormwater management plan. The previously mentioned work was done primarily with mechanical equipment, utilizing manual labor where necessary. Erosionlsedimentation control devices and techniques have been and will continue to be used in accordance with local rules and regulations, in an effort to minimize ancillary disturbance to downslope USACE jurisdictional areas. The site has been divided into 112 lots with a common area acreage totaling 3.73-acres. Explain the purpose of the proposed work: The existing road improvements and storm water management infrastructure are necessary to support the operation of the proposed single-family residential development, which would satisfy the growing demand/need for affordable housing in suburban Asheville. Page 3 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. USACE Action ID: 200800794 DWQ Project # 08-0399 The original joint application, dated February 27, 2008, was officially returned to the applicant by the DWQ on April 4, 2008. Subsequent to this action, a Cease and Desist Order (Order), dated May 22, 2008, was delivered to the applicant. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to Indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The site plan includes eight areas within USACE jurisdiction (see attached Proposed Conditions map) that have been (or are proposed to be) spanned, crossed, or encroached upon to maximize upland utilization of the property. Due to avoidance/minimization efforts employed by the project sponsor, only five of the eight areas (Areas A, C, D, E, and F) require USACE/DWQ coordination, and the details of these areas are provided in the paragraphs below. Please note that rip-rap armoring was previously placed in the proximity of the impact areas, specifically in Areas A, C, D, E, F, and G. All of the rip-rap armoring will be removed by hand to help prevent additional disturbance to the streams and to decrease overall aquatic impacts associated with the project. Area A (pipe A) consists of a pre-existing 37.12 foot (36-inch diameter) culvert pipe/road crossing on Stream 1. As a practicable means of widening the ROW at this location, the culvert was retrofitted with concrete headwall structures on both ends to minimize unnecessary disturbance to Stream 1. As a result, a total of 2.4 feet of headwall impact to Stream 1 is calculated at this crossing. Page 4 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22. 2009 Approximately 25-feet of rip-rap bank armoring was placed along the side slopes of the crossing and in the streambed near the headwalls. The rip-rap will be removed by hand. Area B (pipe B) consists of a pre-existing 16.16 foot culvert pipe/road crossing on Stream 1. No additional impacts are calculated at this crossing. Area C (pipe C) previously contained a 50.20 foot culvert pipe/road crossing on Stream 3. Cumulative impacts in this area include a man-made stormwater detention pond with an associated outlet control structure (OCS) and pipe. An embankment was constructed across the channel that has filled/impounded 92.2 feet of the stream and the OCS/pipe outfall accounts for 41.2 additional feet of impact. In an effort to reduce the impoundment impacts, the existing 32 linear feet of rip-rap in Stream 3 (immediately upslope of the pond) will be removed by hand and 20 linear feet of the previously excavated stream would be restored and shifted forward (downslope) through the replacement of fill. Following this, 32-feet of rip-rap would be placed inside the pond (downslope of the restored area) for stabilization and erosion protection. As a result of the proposed restoration activities, 72.2-feet of impoundment impacts are now calculated. Area D (pipe D) consists of a pre-existing 32.35 foot (36-inch diameter) culvert pipe/road crossing on Stream 1. Similar to Area A, this road crossing was retrofitted with concrete headwall structures on both ends. As a result, a total of 3.2-feet of headwall impact to Stream 1 is calculated at this crossing. A total of approximately 18-feet of rip-rap bank was placed on both sides (upstream/downstream) of the culvert. This rip-rap will be removed by hand. Area E (pipe E) contains a 61.9 foot culvert pipe/road crossing (including concrete headwalls) on Stream 3. A total of 61.9-feet of impact is calculated. Approximately 55 feet of rip-rap was placed on both sides (upstream/downstream) of the culvert, which will be removed by hand. Area F (pipe F) consists of a 107 foot culvert pipe/road crossing on Stream 4. A total of approximately 20-feet of rip-rap was placed on both sides (upslope/downslope) of the culvert, which will be removed by hand. In summary, after restoration is performed, the impacts to USACE jurisdiction associated with this project will occur at Areas A, C, D, E, and F and will involve disturbance to 113 linear feet of perennial stream and 175 linear feet of intermittent stream. All of the subject culverts were constructed according to Wilmington District Regional Condition 3.6 guidelines, which state that "culverts 48 inches in diameter or less shall be buried or placed on the stream bed as practicable and appropriate to maintain aquatic passage, and every effort shall be made to maintain the existing channel slope." 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) ype of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year F(yes/no) (yes/no) Distance to Nearest Stream (linear feet Area of Impact (acres) i Page 5 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22. 2009 Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0.02 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Average Impact Area Impact Perennial or Stream Length of Number Stream Name Type of Impact Intermittent? Width (linear Impact (indicate Before feet) (acres) on maps Im acct Stream 1, an Area A unnamed tributary Fill, concrete Perennial 3-6 feet 2 4 0 0002 of Beaverdam headwalls . . Creek Stream 3, an Area C unnamed tributary Impound Intermittent 2-4 feet 72.2 0.006 of Stream 1 Stream 3, an Outlet control Area C unnamed tributary structure/pipe Intermittent 2-4 feet 41.2 0.003 of Stream 1 Stream 1, an Area D unnamed tributary Fill, concrete Perennial 3-6 feet 3 2 0 0003 of Beaverdam headwalls . . Creek Stream 3, an Road crossing Area E unnamed tributary including concrete Intermittent 2-4 feet 61.9 0.004 of Stream 1 headwalls Stream 4, an Road Area F unnamed tributary crossing/culvert pipe with concrete Perennial 2-4 feet 107 0.007 of Stream 1 headwalls Tota l Stream Impact (by length and acreage) 288 0.02 Page 6 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Area Impact Name of Waterbody Type of Waterbody of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, Impact (indicate on bay, ocean, etc.) (acres) ma Total Open Water Impact (acres) 0 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.02 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.02 Total Stream Impact (linear feet): 288 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. N/A 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ® stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw- down valve or spillway, etc.): Embankment, installation of outlet control structure and Dipe outfall. Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Attenuation of storm flows to satisfy local stormwater requirements. Current land use in the vicinity of the pond: Residential Size of watershed draining to pond: +/- 25 acres Expected pond surface area: 0.5 acres Page 7 of 12 Pre-Construction Notification, NWP 29 Bartram"s Walk. USACE Action 10 200800794 Buncombe County, North Carolina January 22, 2009 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. As previously discussed, the demand for residential housing (such as the proposed) is high in Buncombe County, and the project team's plan would meet this demand. During the initial planning stages of the project, the applicant sought first to update the site to Buncombe County road standards and DWQ stormwater management standards through complete avoidance of all USACE jurisdictional areas. However, the site is bisected by a perennial stream and associated tributaries, which effectively isolates one side of the property from the other. Due to the location of these features in relation to the overall project layout and the inherent need to access otherwise landlocked portions of the property, the project team made a commitment to achieving the project goals in such a way that would minimize total aquatic disturbances to the extent practicable. As a result of these efforts, a plan was devised that would utilize bridge structures to avoid stream impacts at two locations and promote/expand the existing road system to maximize upland utilization of the property (all the while minimizing the amount of stream/wetland impacts). Through this utilitarian approach, primary and ancillary aquatic impacts are cumulatively reduced. Given the need for adequate storm water management (storage capacity), the project team considered several options/alternatives in order to achieve the most practicable solution in light of environmental concerns, cost, logistics, and existing technology. Several layouts were considered that would place all four of the anticipated stormwater ponds in upland areas. However, due to the topography of the site (average slope of 36.5%), the limited availability of land, and impervious surface stipulations associated with the preferred layout, it was necessary to utilize the natural lay of the land to construct stormwater Pond #1A in Area C. The implementation of this stormwater facility in the uplands to the west of Stream 3 would have resulted in the loss of a residential lot, thus rendering this alternative not practicable in terms of cost. Placing the pond to the east of Stream 3 would have resulted in additional excavation and earthwork disturbance to bottomland floodplain. The construction of the pond in Stream 3 required a simple embankment that impacted a relatively small amount of intermittent stream that was already in a somewhat degraded condition. Furthermore, no in-stream water quality treatments would occur in this pond. All treatments would be located outside of USACE jurisdiction through the use of appropriate best management practice (BMP) applications. Site plans with alternative lot and infrastructure alignments were considered, but discarded due primarily to equal or greater environmental impacts, undesirable roadway line of sight, and/or geotechnical constraints. The replacement of pre-existing culverts with bridges/Con-spans was also considered, however, the extensive costs associated with these structures could not be absorbed by the project. Thus, this alternative was deemed not economically feasible and was rejected. Through exhaustive planning efforts, the project team devised a plan which most practicably balances minimization of environmental impacts with economic viability. The current layout is the most suitable alternative when considering costs, logistics, and existing technology in light of the overall project purpose. Access to the project site is accomplished from Bassett Road (via Beaverdam Road) to the North and Town Mountain Road to the south. Utilities would be placed along road corridors as much as possible to avoid future linear impacts and the stormwater management component of the project would entail compliance with local water quality and quantity standards. Page 8 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County. North Carolina January 22, 2009 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The applicant proposes to compensate the loss of 113 linear feet of perennial stream through payment to the NCEEP and on-site stream and riparian buffer preservation. According to the Wilmington District Stream Mitigation Guidelines, impacts to "good quality" perennial streams require a 2:1 ratio for mitigation credit calculation. Stream preservation (at a factor of 5 times the 113 foot impact length) is suitable to generate up to half of the required compensatory mitigation. Therefore, the applicant proposes to preserve 565 linear feet of perennial Stream 1 (with associated 30 foot buffers) and purchase 113 stream credits from the NCEEP. Please see the attached Compensatory Mitigation Plan map for location of the proposed preservation activities. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http:/Awww.nceep.net/panes/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 113 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0 Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): N/A Page 9 of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213.0233 (Neese), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 26 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify? Yes[:] No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 2 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Page 10 of 12 Pre-Construction Notification, NWP 29 Bertram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 The site is 156.47-acres in size and the preferred site layout would result in approximately 16.98-acres (10.8% of total area) of impervious surface. The stormwater management plan includes four detention ponds within the site limits that would attenuate storm flows such that the post-developed peak rate of runoff would not exceed the pre-developed peak rate of runoff for all storm events from the two-year, 24- hour event up to and including the 50-year, 24-hour storm event. The stormwater management plan utilizes outfall structures and does not contain piping systems, therefore Buncombe County does not require stormwater pond profiles to be submitted. The project engineer is coordinating with Buncombe County for approval on a water quality management plan for this project. Water quality features required by the County and North Carolina will be accomplished with four (4) forebays. The forebays would treat the first 1.5-inches of rainfall by containing the water for up to 72-hours to allow for the settlement of turbid water. Each of the forebays would be placed at the natural release point of stormwater from conveyance systems. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. This project would connect to the local public sewer system. X111. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ®No ? Is this an after-the-fact permit application? Yes ® No ? XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at htto://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: A series of forebays have been created to prevent downstream water quality impacts from occurring. Additionally, other sediment arresting devices will be utilized during construction such as silt screen, hay bales, seed impregnated jute fabric, construction mats, etc. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). An in-office review of the U.S. Fish and Wildlife Service (USFWS) list of federally protected species that may occur in Buncombe County was initially performed to determine the possibility of federally protected species occurring on this site. Federally listed threatened and endangered animal and plant species that were documented as potentially occurring in Buncombe County include: Page I I of 12 Pre-Construction Notification, NWP 29 Bartram's Walk, USACE Action ID 200800794 Buncombe County, North Carolina January 22, 2009 Carolina northern flying squirrel (Glaucomys sabrinus coloratus): Typical habitat is the ecotone between coniferous and mature northern hardwood forests with widely spaced, mature trees at elevations above 4,000-feet. While habitat onsite consists of mature undeveloped forest, the site's elevation ranges between 2,500-feet and 3,100-feet. Because the elevation of the project does not exceed 4,000-feet, the proposed project is not likely to have an impact on this species. Gray bat (Myotis grisescens): Typical habitat is caves. Winter hibernation caves are typically vertical caves with cool, stable temperatures. Summer caves are warmer with domed ceilings. Neither appropriate habitat nor specimens were observed onsite or within the surrounding area during a site reconnaissance. Due to lack of habitat, the proposed project would have no impact on this species. Spreading avens (Geum radiatum): Typical habitat is high-elevation cliffs, outcrops, grassy balds, and steep slopes in full sun. Adjacent forests are mostly red spruce and Fraser fir. Substrate is shallow, acidic soil in cracks and crevices of igneous, metamorphic and metasedimentary rocks. Neither appropriate habitat nor specimens were observed onsite during the project reconnaissance. Due to lack of habitat, the proposed project would have no impact on this species. Rock gnome lichen (Gymnoderma lineare): Typical habitat is areas of high humidity, either at high elevations or in deep river gorges at lower elevation. It is primarily limited to vertical rock faces where seepage water from soils above the cliffs flows at very wet times. Most populations occur above an elevation of 5,000-feet. The site's elevation ranges from 2,500-feet to 3,100-feet and neither appropriate habitat nor specimens were observed onsite during a site reconnaissance. Due to lack of habitat, the proposed project would have no impact on this species. Also, the Buncombe County listings in the National Register of Historic Places (updated October 5, 2007) were reviewed to ascertain the presence of historic properties within the project area. Of the 104 historic features located within Buncombe County, none are located inside the project area or within one mile of the project area. Therefore, no impacts to any listed historic sites would occur. Should cultural resources be discovered during construction of this project, the USACE would be contacted, as required for compliance with Condition 18 of the NWP. ' Applicant/Age (Agent's signature is valid on Signature Date an authorization letter from the applicant is provided.) Page 12 of 12 Base Map: Provided by Vaughn & Melton Prepared: Limits of USACE Jurisdiction N December 8, 2008 Existina Conditions BY: W E Bartram's Walk REGISTER- NELSON Buncombe County, North Carolina 500 S Environmental Consultants for Beaverdam Land Conservancy, LLC Feet 3949 Jadeco Road, McDonough, GA 30253 Office: 678-432-2636 Fax: 678-432-2464 X lOmniGunsukwVManmrFfaWakIPCN1RewsoolMapsUJSACE m0 Pond #4, Pond #4, inlet .1 Area A: pre-existing Pipe A (37.12-feet) and added headwalisr(2.4-fee total 2.4-feet of impact t Stream 1, 25-feet of rip-r to be removed. Area B: pre!existir Pipe B, no additioi Ingress/egress off of Beaverdam Road impact to Stream 3.- j `' Area C: stormwater detention pond (#1A), pre-existing Pipe C (50.2-feet), remove 32.4-feet- of rip-rap and restore 20-feet _ of channel, total 72.2-feet of impoundment impact to Stream 3 (reduced from 92.2-feet) ? Pond #1A?inlet Area E: Pipe E and headwalls for road crossing, total 61.94et of impact to Stream 3, 55-feet of rip-rap to be removed. Area F: Pipe F for road crossing, 107-feet of impact to Stream 4,' 20-feet of rip-rap to be removed. Ingress/egress off of Town Mountain Road Legend C3 Site Boundary Detention Ponds - --- Perennial Stream - • • - Intermittent Stream Wetland Swale Pond #1A; outfall Proposed Lot Lines 8 Road Corridors and #1E inlets ' Area D: pre-existing Pipe D (32.35-feet) and added Pond #1E, outfall headwalls (3.2-feet), total ...? -? ? 3.2-feet of impact to ? I Stream 1. rea G: bridge,no impact Stream 1,rip-rap to be removed from stream. Pond #ICI inlet Pond #11C, outfall Area H: proposed bridge, no impact to Stream 1. *Please note that no disturbance to Mountain streams/wetlands would occur inside 4,0 Joao' the proposed residential lots. Base Map: Provided by Vaughn & Melton Prepared: Proposed Conditions N December 8, 2008 By: W E Bartram's Walk REGISTER NELSON Buncombe County, North Carolina 510 S Environmental Consultants for 3949 Jodeco Road, McDonough, GA 30253 Beaverdam Land Conservancy, LLC Feet Office: 678-432-2636 Fax: 678-432-2464 x?on,r.consun.Vka?d.maw?ikwcNkRa,.tw?Mal?? W,cpo6 d Condt*ns "d 0 0 + M O 0 N O O r O Prepared: Profile View of January 2009 : By' Stream Restoration Note: REGISTER -.', NELSON Bartram's Walk Unequal vertical and Buncombe Count North Ca li horizont l l _.... y, ro na a sca es Environmental Consultants for 3949 Jodeco Road, McDonough, GA 30253 Beaverdam Land Conservancy, LLC Office: 678-432-2636 Fax: 678-432-2464 X:10mnlCorwAirtgkBar4arW3WalklPCM RavisetlUlapel5rreamResloraGOnPmfila mxtl 0 z N ?? l! / 1 I ? I I z U? ? Cl ? _ W ? _ a ? r = O?w N c + / N o ? rza mga 'J' 1'?- ' ? f 2 N X W II EKrEND EXI?71NG 57RE BE I? SLOP?'FOR O'LF IN70 EXI6TI?tG . _ p I I Op a / / o NN 2? z m F and u O O ? O O tom- CO ? t!7 N N N N O ? 9 Acres Prepared: Proposed Mitioation Plan January 14, 2009 By: REGISTER ,,i? NELSON_ Environmental Consultants 3949 Jodeco Road, McDonough, GA 30253 Office: 678-432-2636 Fax: 678-432-2464 Bartram's Walk Buncombe County, North Carolina 530 for I--1 Beaverdam Land Conservancy, LLC Feet N W E S X \OmnComuling{BBlIlanl6WaikWCNRevisedWepsI Pmpoead Whgalan Plan mxd Base Map: Provided by Vaughn & Melton APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section 1V of the JD Form Instructional Guidebook. SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): B. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wimington District, Bartram's Walk, Stream 4 C. PROJECT LOCATION AND BACKGROUND INFORMATION: Bartram's Walk State:North Carolina County/parish/borough: Buncombe County City: Asheville Center coordinates of site (]at/long in degree decimal format): La, t. 35.631916° N, Long. 82.525004° (W. Universal Transverse Mercator: 362039.14 N, 3944035.38 W, UTM Zone 17 Name of nearest waterbody: Stream 1, a tributary of Beaverdam Creek Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: French Broad River Name of watershed or Hydrologic Unit Code (HUC): 06010105 Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. Check if other sites (e.g., offsite mitigation sites. disposal sites. etc...) are associated with this action and are recorded on a different JD form. D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Office (Desk) Determination. Date: 10 Field Determination. Date(s): April, July, & Oct. 'O8 SECTION II: SUMMARY OF FINDINGS A. RNA SECTION 10 DETERMINATION OF JURISDICTION. There Km no "navigable waters of the U.S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area. [Required] Waters subject to the ebb and flow of the tide. Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. Explain: B. CWA SECTION 404 DETERMINATION OF JURISDICTION. There Kiv "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required) 1. Waters of the U.S. a. Indicate presence of waters of U.S. in review area (check all that apply):' TNWs, including territorial seas Wetlands adjacent to TNWs Relatively permanent waters2 (RPWs) that flow directly or indirectly into TNWs Non-RPWs that flow directly or indirectly into TNWs Wetlands directly abutting RPWs that flow directly or indirectly into TNWs Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs impoundments of jurisdictional waters Isolated (interstate or intrastate) waters, including isolated wetlands b. identify (estimate) size of waters of the U.S. In the review area: Non-wetland waters: 150 linear feet: range from 2-3 width (ft) and/or 0.001 acres. Wetlands: 0.02 acres. c. Limits (boundaries) of jurisdiction based on: ?9$7 Delineation Manual Elevation of established OHWM (if known): 2. Non-regulated waters/wetlands (check if applicable) :3 [] Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain: Boxes checked below shall be supported by completing the appropriate sections in Section 111 below. ' For purposes of this Porn, an RPW is defined as a tributary that is not a TNW and that typically flows _year-round or has continuous Ilo+N' at least "seasonally" (e.g., typically 3 months). ' Supporting documentation is presented in Section 111. F. SECTION III: CWA ANALYSIS A. TNWs AND WETLANDS ADJACENT TO TNWs The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section IIl.A.1 and Section III.D.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections III.A.1 and and Section II1.D.1.; otherwise, see Section IILB below. 1. TNW Identify TNW: Summarize rationale supporting determination: Wetland adjacent to TNW Summarize rationale supporting conclusion that wetland is "adjacent": B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY): This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine whether or not the standards for jurisdiction established under Rapanos have been met. The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are "relatively permanent waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous now at least seasonally (e.g., typically 3 months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to Section III.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section III.D.4. A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA regions will include in the record any available information that documents the existence of a significant nexus between a relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant nexus finding is not required as a matter of law. If the waterbody° is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request Is the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section Il1.B.1 for the tributary, Section Il1,B.2 for any onsite wetlands, and Section III.B.3 for all wetlands adjacent to that tributary, both onsite and offsite. The determination whether a significant nexus exists is determined in Section III.C below. 1. Characteristics of non-TNWs that flow directly or indirectly into TNW (i) General Area Conditions: Watershed size: ht wtfst Drainage area Vick List Average annual rainfall: inches Average annual snowfall: inches (ii) Physical Characteristics: (a) Relationship with TNW: ? Tributary flows directly into TNW. ? Tributary flows through Plot-, . tributaries before entering TNW. Project waters are ck 40 river miles from TNW. Project waters are IekList river miles from RPW. Project waters are Iclt List aerial (straight) miles from TNW. Project waters are 0"IList aerial (.straight) miles from RPW. Proiect waters cross or serve as state boundaries. Explain: NIA. Identify flow route to TNW`: Tributary stream order, if known: Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the and West. 5 Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b. which then flows into TNW. (b) General Tributary Characteristics (check all that apply): Tributary is: ? Natural ? Artificial (man-made). Explain: ? Manipulated (man-altered). Explain: impoundment has been built into the stream. Tributary properties with respect to top of bank (estimate): Average width: feet Average depth: feet Average side slopes: Pick List. Primary tributary substrate composition (check all that apply): ? Silts ? Sands ? Concrete ? Cobbles ? Gravel ? Muck ? Bedrock ? Vegetation. Type/% cover: ? Other. Explain: Tributary condition/stability (e.g., highly eroding, sloughing banks]. Explain: Presence of run/riffle/pool complexes. Explain: Tributary geometry: OWL* Tributary gradient (approximate average slope): S % (c) Elow: Tributary provides for: Pick List Estimate average number of flow events in review arealyear: pick List Describe flow regime: Other information on duration and volume: Surface flow is: Pick LW. Characteristics: Subsurface flow: PickList. Explain findings: ? Dye (or other) test performed: Tributary has (check all that apply): ? Bed and banks ? OHWM6 (check all indicators that apply): ? clear, natural line impressed on the bank ? ? changes in the character of soil ? ? shelving ? ? vegetation matted down, bent, or absent ? ? leaf litter disturbed or washed away ? ? sediment deposition ? ? water staining ? ? other (list): the presence of litter and debris destruction of terrestrial vegetation the presence of wrack line sediment sorting scour multiple observed or predicted flow events abrupt change in plant community ? Discontinuous OH WM.' Explain: If factors other than the OHWM were used to detenn [] High Tide Line indicated by: [] ? oil or scum line along shore objects ? fine shell or debris deposits (Foreshore) ? physical markings/characteristics ? tidal gauges ? other (list): ine lateral extent of CWA jurisdiction (check all that apply): Mean High Water Mark indicated by: ? survey to available datum; ? physical markings; ? vegetation lines/changes in vegetation types. (iii) Chemical Characteristics: Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed ebaracteristics, etc.). Explain: Identify specific pollutants, if known: 6A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where the OHWM has been removed by development or agricultural practices). Where there is a break in the OIIWM that is unrelated to the waterbodv's flow regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break. 'Ibid. (iv) Biological Characteristics. Channel supports (check all that apply): ? Riparian corridor. Characteristics (type, average width): ? Wetland fringe. Characteristics: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: non-tolorent aquatic indicators. ? Aquatic/wildlife diversity. Explain findings: 2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW (i) Physical Characteristics: (a) General Wetland Characteristics: Properties: Wetland size: acres Wetland type. Explain: Wetland quality. Explain: Project wetlands cross or serve as state boundaries. Explain: (b) General Flow Relationship with Non-TNW: Flow is: )Pick List. Explain: Surface flow is: kidt'Lut Characteristics: Subsurface flow: Pick Ust. Explain findings: ? Dye (or other) test performed: (c) Wetland Adjacency Determination with Non-TNW: ? Directly abutting ? Not directly abutting ? Discrete wetland hydrologic connection. Explain: ? Ecological connection. Explain: ? Separated by berm/barrier. Explain: (d) Proximity (Relationship) to TNW Project wetlands are PIcl< gist river miles from TNW. Project waters are kick List aerial (straight) miles from TNW. Flow is from: Fick] st. Estimate approximate location of wetland as within the kick List floodplain. (ii) Chemical Characteristics: Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed characteristics, etc.). Explain: Identify specific pollutants, if known: (iii) Biological Characteristics. Wetland supports (check all that apply): ? Riparian buffer. Characteristics (type, average width): ? Vegetation type/percent cover. Explain: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: 3. Characteristics of all wetlands adjacent to the tributary (if any) All wetland(s) being considered in the cumulative analysis: dick List Approximately ( ) acres in total are being considered in the cumulative analysis. For each wetland, specify the following: Directly abuts? (Y/N1 1) Size (in acres) Directly abuts? (Y/N) Size (in acres) Summarize overall biological, chemical and physical functions being- performed: C. SIGNIFICANT NEXUS DETERMINATION A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a tributary and the TNW). Similarly, the fact an adjacent wetland lies within or outside of a noodplain is not solely determinative of significant nexus. Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in the Instructional Guidebook. Factors to consider include, for example: • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW? • Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW? • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that support downstream foodwebs? • Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or biological integrity of the TNW? Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below: 1. Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section III.D: 2. Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section 111.13: 3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section 111.1): D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT APPLY): 1. TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area: TNWs: linear feet width (ft), Or, acres. Wetlands adjacent to TNWs: acres. 2. RPWs that flow directly or indirectly into TNWs. 1Z Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is perennial: Pemnial determination is based on field observations of flow in a dry year. Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g.. typically three months each year) are jurisdictional. Data supporting this conclusion is provided at Section 111.8. Provide rationale indicating that tributary flows seasonally: Provide estimates for jurisdictional waters in the review area (check all that apply): Tributary waters: linear feet width (ft). B Other non-wetland waters: acres. Identify type(s) of waters: Non-RPWss that now directly or indirectly into TNWs. ? Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a TNW is jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional waters within the review area (check all that apply): ? Tributary waters: linear feet width (ft). ? Other non-wetland waters: acres. Identify type(s) of waters: Wetlands directly abutting an RPW that flow directly or indirectly into TNWs. ® Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands. ? Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Immediately upslope with a surface connection. Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is seasonal in Section III.B and rationale in Section I I I.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Provide acreage estimates for jurisdictional wetlands in the review area: acres. Wetlands adjacent to but not directly abutting an RPW that now directly or indirectly into TNWs. Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this conclusion is provided at Section III.C. Provide acreage estimates for jurisdictional wetlands in the review area: acres. Wetlands adjacent to non-RPWs that now directly or indirectly into TNWs. ? Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional wetlands in the review area: acres. Impoundments of jurisdictional waters.9 As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional. Demonstrate that impoundment was created from "waters of the U.S.." or Demonstrate that water meets the criteria for one of the categories presented above (1-6), or Demonstrate that water is isolated with a nexus to commerce (see E below). E. ISOLATED [INTERSTATE OR INTRA-STATE1 WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK ALL THAT APPLY):" which are or could be used by interstate or foreign travelers for recreational or other purposes. from which fish or shellfish are or could be taken and sold in interstate or foreign commerce. which are or could be used for industrial purposes by industries in interstate commerce. Interstate isolated waters. Explain: Other factors. Explain: Identify water body and summarize rationale supporting determination: sSee Footnote 4 3. 9 To complete the analysis refer to the key in Section 111.13.6 of the Instructional Guidebook. 10 Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Fallowing Rapanos. Provide estimates for jurisdictional waters in the review area (check all that apply): ? Tributary waters: linear feet width (ft). ? Other non-wetland waters: acme. Identify type(s) of waters: ? Wetlands: acres. F. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY): ? If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland Delineation Manual and/or appropriate Regional Supplements. ? Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce. ? Prior to the Jan 2001 Supreme Court decision in "SIVANCC," the review area would have been regulated based solely on the "Migratory Bird Rule" (MBR). ? Waters do not meet the "Significant Nexus standard, where such a finding is required for jurisdiction. Explain: ? Other: (explain, if not covered above): Provide acreage estimates for non jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional judgment (check all that apply): ? Non-wetland waters (i.e., rivers, streams): linear feet width (ft). Lakes/ponds: acres. ?? Other non-wetland waters: acres. List type of aquatic resource: Wetlands: acres. Provide acreage estimates for non-jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction (check all that apply): Non-wetland waters (i.e., rivers, streams): linear feet, width (ft). Lakes/ponds: acres. Other non-wetland waters: acres. List type of aquatic resource: Wetlands: acres. SECTION IV: DATA SOURCES. A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: . Data sheets prepared/submitted by or on behalf of the applicant/consultant. ? Office concurs with data sheets/delineation report. ? Office does not concur with data sheets/delineation report. Data sheets prepared by the Corps: M Corps navigable waters' study: ? U.S. Geological Survey Hydrologic Atlas: ? USGS NHD data. ? USGS 8 and 12 digit HUC maps. U.S. Geological Survey map(s). Cite scale & quad name: (Weaverville & Asheville) 7.5 Quadrangle, 1:24,000 scale. USDA Natural Resources Conservation Service Soil Survey. Citation: . National wetlands inventory map(s). Cite name: (Wcaver0le & Asheville). State/Local wetland inventory map(s): FEMA/FIRM maps: 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) Photographs: ? Aerial (Name & Date): or ? Other (Name & Date): Previous detennination(s). File no. and date of response letter: Applicable/supporting case law: Applicable/supporting scientific literature: Other information (please specify): COE field determination. B. ADDITIONAL COMMENTS TO SUPPORT JD: { Permit No, (ro be provkhd by DWQ) Df WA7F9 P-1A QG AS D STORMWATER MANAGEMENT PERMIT APPLICATION FORM O ~ 401 CERTIFICATION APPLICATION FORM T DRY EXTENDED DETENTION BASIN SUPPLEMENT . This TOtm must be Md oW, P?+W and submfted, The Required Items Checldfst (Part III) must be printed, tided out and submkfed along with a# the requbed hrformWon. 5Re characteristics Drainage area Impervious area % Impervious Design rainfafl depth Peak Flow CW ulatdons 1-yr, 24-hr rainfall depth Rational C, pre- development Rational C, post-development Rainfall Intensk. 1-n 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pmftt 1-yr, 24-hr peak control Morage Vohane: Non-SA Waters Minimum required volume Provided volume Sediment storage volume provided Stange volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff volume Post-development 1-yr, 24-hr runoff volume Minimum required volume Provided volume Sediment storage volume provided Basin Design Parameters Drawdown time SHWT elevation Basin bottom elevation Storage elevation Basin side slopes Tap elevation freeboard provided Basin Bottom Dimensions Basin length Basin width Length to width ratio 3,195,126A0 . fig 527,512`00! {(? 0.17 3_ Z5 in 325 ° In 55A0 (unwess) 62.00. (unjilim) „0.14 infir -13,43 ft'Isec 2045 fe/sec _ 7.0? ft lsec 8411059`00 - fe 187,274.04 f 46,819!00 {e 400' ; ft 000 fe no ` - fte ^-?--000 f 0.00 ` ft 0.00 . ft < 3;00 , `days -' 2_349.00_ :dmsl }:00 fmsl 2356.59 fmsl 3.0.. ` 2364.00_ fmsl 2:38 ft .172.00 ft -135 .00 ft OK OK OK OK OK OK OK Too deep, maximum depth of 10-feet allowed OK Increase length to width ratio to at least 1.5:1 Form SW401-Dry Extended Detantkm Basin4tev.3 Parts 1.6 It. Design Summery, Page 1 of 2 Additional Information Total runoff volume captured by basin Forebay Provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build-out? Is a sediment depth indicator included? Does the basin include a drain? Farm SW401-Dry Ezrended Detention Basin-Rev.s Permit No. (to be provrHad by DWO) 73 35 actin Forebay is required n (Y or N) Need to a recorded drainage easement y (Y or N) OK Y (Y or N) OK y (Y or N) OK ., f !n? Parts t. & II. Design Summery, Page 2 or 2 Permit No. (to be provided by DWO) ?pp WATFA ` .w STORMWATER MANAGEMENT PERMIT APPLICATION FORM ?? O T 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be god out printed and strbmllted. The Required Hems Checklist (Part Ht) must be printed, Mod out and &&? *W along wHh aN the required informift. Project name tr;i'welt Collect person Tan parlttard< Phone number 1W88.7370/850.294-2501 Date 3/1312009 Drainage area number Sui 1C Site Characteristics x, Drainage area 692;604.00; ! f? Impervious area 120;226.00 f¢ % tmper i ous 0.17 Design rainfall depth 3.25 , in Peak Flow Calculations 1-yr, 24-hr rainfall depth 125 in Rational C, pre-development 55.00 „(units) Rational C, post-development 6200 : (unieess) Rainfall intensity. 1 -yr, 24-hr storm - < 0.14, : iNhr Pre-development 1-yr. 24-hr peals flow -13.43 felsec Post-development 1-yr, 24-hr peak flow 6.25 f lsec PnOlost 1-yr, 24-hr peak control -7.18 ftshoc Storage Volume: Non-SA Waters Minimum required volume h, 1-1j06&00 Provided volume , `15;09700 - f? OK Sediment storage volume provided 3,775.00 fns OK Storage Volume: SA Waters 1,5' runoff volume - o te Pre-development 1-yr, 24-hr runoff volume 0 00 le Post-development 1-yr, 24-hr runoff volume -0.00 fns Minimum required volume , - -G,00 Provided volume 0.00 fns OK Sediment storage volume provided 0.00 Its OK Basin Design Parameters Drawdown time 0.00 days OK SHWT elevation -2448'00 f nal Basin bottom elevation 2450.00 fmsl OK Storage elevation 2457.53 fmsi Basin side slopes 10' :1 OK Top elevation 2459:00 WI OK Freeboard provided 1:47 it OK Basin. Bottom Dimensions Basin length 73.00 ` $ Basin width 30.00 fl Length to width ratio 2;40 a OK Fort SW401-Dry Extended Detention Besln-Rev.3 Parts 1.6 II. Design Summary, Pape 1 of 2 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build-out? Is a sediment depth indicator included? Does the basin include a drain? l Form SW401-Dry Extended Detention Bas"ev.3 15,90 ao-In n (Y or N) n (Y or N) Y (Y or N) Y (Y or N) Y (Y or N) Permft No. go be Provided by DWG) Forebay is required Need to a recorded drainage easement OK OK OK Parts 1. & II. Design Summary. Pape 2 oil Permit No. (to be pnoWded by DINO) ?pF WALeg STORMWATER MANAGEMENT PERMIT APPLICATION FORM > i WDM 401 CERTIFICATION APPLICATION FORM p Y DRY EXTENDED DETENTION BASIN SUPPLEMENT , This form must be Idled out, priMMed and mbmffted. The Requhed Items Checkdst (Part 111) must be Prirded, frilled ouf and submdted along wkh a8 the required kiformatIon. Project name Bar6ahis`Walc- -? Contact person FomDar?ellAtan; Newrnar Phone number 77140.79701850-294-2501 ........ , . Date 311rA9 Drainage area number Ban.1E Site Characile West Drainage area q *;DO f1 Impervious area 150,718:00 ff % Impervious 0.20 Design rainfall depth 3.25 ' in Peak Flow Calculations 1-yr, 24-hr rainfall depth in Rational C, pre-development 55:00 (unltless) Rational C, post-development 64.00 Rainfall intens* l-yr, 244ir storm 0.14 in/hr Pre-development 1 yr, 2444 peak flow 4W felsec Post-development 1-yr, 24-hr peak flow 10.89 'f&80 Pre/Post 1-yr, 24-hr peak control -2.44 felsec Storage Volume: Non-SA Waters Mmimum required volume 048.00 Provided volume 133,076.00 le OK Sediment storage volume provided 33;269.00 fe OK Storage Vohime: SA Waters 1.5' runoff volume _0:00 fe Pre-development 1-yr, 24-hr runoff volume "?00 fta Post-development 1-yr, 24-hr runoff volume O;pO ft1 Wmimum required volume -----0.00 fe Provided volume 0:00 {e OK Sediment storage volume provided 0:00 fts OK Basin Design Parameters Drawdown lime 4.00 days OK SHWT elevation 2351;00 hsl Basin bottom elevation 2353.00 tmsl OK Storage elevation 2356.69 frrisi Basin side slopes 3.0 ` ? OK Top elevation .Freeboard provided 2364.00 `fmsl Too deep, maximum depth of 10-feet allowed 7.31 ft OK Basin Bottom Dimensions Basin length 78;00 ft Basin width 55.00 ft Length to width ratio 1:38 :1 Increase length to width ratio to at least 1.5:1 Form SW401-Dry Extended Detention Sasin-Rev.3 Pegs i. d II. Design Summery, Page 1 or2 Additional Informatlon Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture al runoff at ultimate build-out? Is a sediment depth indicator induded? Does the basin include a drain? Form SW401-Dry Extended Detention Bash-Rev.3 17M ao-In n (Y or N) n (Y or N) Y (Y or N) y (Y or N) y (Y or N) r Permit No. fro be provkbd by OWQ) Forebay Is required Need to a recorded drainage easement OK OK OK Parts 1.8 II. Design Summary, Page 2 of 2 NcDENa STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT . This form must be Mod out, printed and submitted, The Required Items Check tst (Part 111) must be printed, titled out and submitted along with as the required htirmadon. Project name Bartrem's Wink Contact person Tam.Newrnan - Phone number 7704*737OMSO-2W2501 . Date 3i13I1p0g Drainage area number Btisin 3 Site Characteristics Drainage area 175.5471)0 Impervious area 35,284.00 % Impervious 0.20 Design rainfall depth 3:25- in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.25, in Rational C, pre-development _ 55.00 (unitises) Rational C, post development 84000 (unMess) Rainfall inlens4: l-yr, 24-hr storm 0.14 knihr Pwdevelopment 1-yr, 24-hr peak flow 0.87 fe/sec Post-development 1-yr, 24-hr peak flow 3;21. PrelPost 1-yr, 24-hr peak control Z34 Storage Volume: Non-SA Waters Minimum required volume ' 6,512:00 ft' Provided volume 10 078DI) ft' OK Sediment storage volume provided 5000.00_ f? OK Storage Volume: SA Waters 1.5' runoff volume f Pre-development 1-yr, 24-hr runoff volume 'x:00' fig Post-development 1-yr, 24-hr runoff volume -777?007 ! le Minimum required volume -0.00 f Provided volume 0.00 fe OK Sediment storage volume provided 0:00 fl3 OK Basin Design Parameters Drawdown time 0 days OK SHWT elevation 2503:00 find Basin bottom elevation 2505-00- L ` hal OK Storage elevation 2507:62 fmsl Basin side slopes 3.0 :1 OK Top elevation 2510.00 final OK Freeboard provided 138 A OK Basin Bottom Dimensions Basin length 986:00, ft Basin width 27.00 it Length to width ratio 1:4:30 :1 OK Penult No. 00 be provided by DINO) 119E W AT?q G 0 Q -C Form SW401-Dry Extended Detention easm-Rev.3 Paris I.3 II. Deoipn Summary. Pepe 1 of 2 Additional krbnnatlon Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate bu4d•out? Is a sediment depth indicator included? Does the basin include a drain? 1 Form SW401-Dry Extended Detention Beain-Rev,3 *,.OS sic-In (Y or N) n (Y or N) Y (Y or N) n (Y or N) Y (Y or N) Permit No. fro be provided by DWO) Forebay Is not required Need to a recorded drainage easement OK A segment depth indicator must be included OK Parts I. & II, Deargn Summary, Page 2 of 2 Permit No. (to be Pmvlrrsd by DWO) ?pF WAlEA G AV 3- WA W-DEHR STORMWATER MANAGEMENT PERMIT APPLICATION FORM ? 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT . This form must be tii/ed out, printed and subm4ted. The Requfnsd Items Checklist (Part /it) must be printed, ad out and submfft W abV with aN the required NiformaBon. Project name Contact parsers Phone number Date Dr 7Oh Dhniiiftrc Nauman P "Q6-7370,00-2M-2501, - 3l13)2009 Dings area number Basin 4 Site Characteristics I Bi ll, Drainage area 412;513;00 fe Impervious area :82;328;00 i % Impervious 0.20 Design rainfall depth =8.25' - in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3:25 in Rational C, pre-development 55A0 (unldess) Rational C, post-development 64.00 (units) Rainfall intensity: l-yr, 24-hr si rm r 0.14. - , irAr Pre-devekipment 1-yr, 24-hr peek flow . 152 i fe/sec Post-devekipment 1-yr, 24-hr peak flow 6;01, Pre/Post 1-yr, 24-hr peak control 4.49 fl Storage Volume: Non-SA Waters Minimum required volume 15,188:00, ff' Provided volume 24,431`.00` fe OK Sediment storage volume provided 8;1109.00 f? OK Storage Volume: SA Waters 1.5" runoff volume 0.00- Pre-development 1-r, 24-hr runoff volume p0 f? Post-development 1-yr, 24-hr runoff volume 0.00 ft" Minimum required volum e fe Provided volume OOQ OK Sediment storage volume provided 0;00 (? OK Basin Design Parameters Drewdown 6me 3,0& days OK SHWT elevation 2277.50 _ fmsl Basin bottom elevation 2279.50' fmsl OK Storage elevation 87:09 2287. fool Basin side slopes 10 :1 OK Top elevation 2289.00 fmsl OK freeboard provided 1.91 it OK Basin Bottom Dlmensions Basin length Basin width 54.00 it Length to width ratio 13.00 3.00 00 Q 4-15 :11 OK Forte SW401-Dry Extended Detention Basin-Rev.3 Parts I. ti rl, Deelgn Summary, Pepe 1 art Permit No. go be provided by DWQ) Additional Information Total runoff volume captured by basin .9.47 ac4n Forebay is not required Forebay provided ri . (Yor N) Is basin In a recorded drainage easement? n , (Y or N) Need to a recorded drainage easement Does basin capture all runoff at ultimate bulkkut? y (Y or N) OK Is a sediment depth Indicator Included? _y_ (Y or N) OK Does the basin include a drain? y (Y or N) OK Forth SW409-Dry Extended petentlon Basin-Rev.3 Parts I. & 11. Deslpn Summery, Pape 2 or 2 Maintenance Agreement - WHEREAS, the Property Owner recognizes that the wet or extended detention facility or facilities (hereinafter referred to as "the facility" or "facilities") must be maintained for the development called, located in Land Lot(s) ,District(s) , of Buncombe County, North Carolina; and, WHEREAS, the Property Owner is the owner of real pro • articularly described on the attached Exhibit A (hereinafter referted to as "th erty"), and, WHEREAS, Buncombe County (hereinafter referre as my") and the Property Owner, or its administrators, executors, success e , or ass that the f health, safety and welfare of the citizens of the Coun t the faciIi a constructed and maintained on the property, and, WH EREAS, the Development Regulations re or faciliti as shown on the approved development plans and specifications be co ted and maintained by the Property Owner, its administrators, executors; su sots, heirs, or NOW, THEREFORE, h 'conside foregoing es, the mutual covenants contained herein, and the following terms con a parti ereto agree as follows: SE 1. The facility or f be constru d by the P perty Owner in accordance with the plans and specifi for velbpment. N ECTIO The P Owner, cutors, successors, heirs or assigns shall maintain ilitie oil worl g condition acceptable to the County and in accor with the sc of 1o aintenance activities agreed hereto and attached as Exh' -SECTION 3. - The Pr Owner, administrators, executors, successors, heirs or assigns hereby grants permission Co ; its authorized agents and employees, to enter upon the property and to inspect the henever the County deems necessary. Whenever possible, the County shall provide ce prior to entry. The Property Owner shall execute an access easement in favor of Buncombe County to allow the County to inspect, observe, maintain, and repair the ! I facility as deemed necessary. A fully executed original easement is attached to this Agreement as Exhibit C and by reference made a part hereof. SECTION 4. In the event the Property Owner, its administrators, executors, successors, heirs or assigns fails to maintain the facility or facilities as shown on the approved plans and specifications in good working order acceptable to the County and in accordance with the maintenance schedule incorporated in this Agreement, the County, with due notice, may enter the property and take i whatever steps it deems necessary to return the facility or facilities to good working order. This provision shall not be construed to allow the County to erect any structure of a permanent nature on the property. It is expressly understood and agreed that the County is under no obligation to maintain or repair the facility or facilities and in no event shall this Agreement be construed to impose any such obligation on the County. '&? SECTION 5. In the event the County, pursuant to the Agreement, p rk of any nature, or expends any funds in the performance of said work for labor, of ent, supplies, materials, and the like, the Property Owner shall reimb a unty, o 1 forfeit any ! required bond upon demand within thirty (30) days of eipt ereof for all sts incurred by the County hereunder. If not paid within the pres time 'od, the Coun ure alien against the real property in the amount of such cca? acti escribed in on are in i addition to and not in lieu of any and all legal remedie a County as result of the Property Owner's failure to maintain the facility or facili ON 6. It is the intent of this agreement to roper main . of the facility or facilities by the Property Owner; provided, eve , 's Agre ent shall not be deemed to create or effect any additional liability of any ged to result from or caused by storm water runoff. _ SECTI 7 Sediment accum n re g from the operation of the facility or facilities will be catered'for. The Pro ommodation for the removal and disposal of all amurn ents. sal va ovided onsite in a reserved area(s) or will be remov m the si red s3•shall be sufficient to accommodate for a minimum of two SECTION 8. The Owner I provide the County with a bond or a letter of credit providing for the mainte the f ' or facilities pursuant to the County's Development Regulations concerning Mainte eements. e SECTION 9. The Property Owner shall use the standard BMP Operation and Maintenance Inspection Report attached to this agreement as Exhibit D and by this reference made a part hereof for the purpose of a minimal annual inspection of the facility or facilities by a qualified inspector. 1 1 a SECTION 10. The Property Owner, its administrators, executors, successors, heirs and assigns hereby indemnifies and holds harmless the County and its authorized agents and employees for any and all damages, accidents, casualties, occurrences or claims which might arise or be asserted against the County from the construction, presence, existence or maintenance of the facility or facilities by the Property Owner or the County. In the event a claim is asserted against the County, its authorized agents or employees, the County shall promptly notify the Property Owner and the Property Owner shall defend at its own expense any suit based on such claim. If any judgement or claims against the County, its authorized agents or employees shall be wed, the Property Owner shall pay for all costs and expenses in connection herewith. SECTION 11. This Agreement shall be recorded among the deed reow of erk of Superior Court . of Buncombe County and shall constitute a covenant the 1 shall be binding on the Property Owner, its administrators, executors, , ass s and any successors in interest. SECTION This Agreement may be enforced by proceedings or in equity by or against the parties hereto and their respective succesW in interest. Invalidation of any one of the other provisions and all other provisior all in no way effect any effect. a MAINTENANCE AGREEMENT SO AGREED this day of -020 PROPERTY OWNER LIMITED LIABILITY CORPORATION Name of LLC:„ Printed or Typed Name BY: Attest: Signature Signature of Wi Printed or Typed Name d o Typed N e Title: e: (Seal) Managing Person ,. , Notary B CO ORTH OLINA. By. l Chief E ate " emen Attachments: Exh' it A (Plat and Legal Description) Exhibit B (Maintenance and Inspection Schedule) Exhibit C (Access Easement) Exhibit D (Standard BUT Operation and Maintenance Inspection Report) 1 , i i i i i 1 1 1 MAINTENANCE AGREEMENT SO AGREED this day of 20 PROPERTY OWNER INDIVIDUAL OR PROPERTY OWNED JOINTLY BY SEVERAL INDIVIDUALS By: Signature of Owner Attest: Signature (Seal) . Notary Public ?IUNTY, NORTH CAROLINA. LC .s.. By: 7 1 I I 7 Attachments: Exhibit A (Plat and Legal Description) Exhibit B (Maintenance and Inspection Schedule) Exhibit C (Access Easement) Exhibit D (Standard BMP Operation and Maintenance Inspection Report) Attachment A Maintenance Plans for Stormwater Detention Ponds I 1. The proposed detention pond is designed to function as a detention pond for controlling on-site runoff and as a sediment basin to reduce the amount of sediment traveling downstream Curb and gutter will be used to channel onsite water to the ( detention/sediment-basin. Final elevations are as shown on the attached as-built plans. = 2. All grasses will be mowed twice each year. The grass should be mowed in early summer and again in early fall to prevent seeds of annual weeds from maturing. ' Trees and shrubs will not be permitted to grow on the dam or in the emergency spillway. 3. Replanting and overseeding. If vegetation covers less than 40% of the soil surface, lime, fertilize, and seed in accordance with current recommendations £or new seeding. If vegetation covers more that 40% but less than 70% of the soil surface, lime, fertilize and overseed in accordance with current recommendations. 4. Removing trash and sediment. Trash and litter will be removed as needed to prevent obstruction to the flow of water, prevent degradation of downstream properties, to maintain the integrity of ft structure and to provide an attractive appearance. 5. Removing sediment. Accumulated sediments (including clay, silt, sand gravel etc.) , , will be removed before the pond loses 10% of the designed storage capacity. It will be removed from conveyance channels before it impairs the structural integrity of the channels. b. Sediment disposal. Sediment disposal should be in accordance with current procedures for disposal of sediment and sludge. 7. Repairing slides, slumps,; and eroded areas. Slopes which have been impaired by slides, slumps, and erosion.will be repaired within 30 days. Burrowing and digging by rodents and other ani nals will be controlled and damaged areas will be repaired within 30 days. 1 8. Repairing and other d=ptaents. Pipes, headwalls, etc. will be maintained, repaired and/or replaced as needed to maintain the integrity of the structure. 9. Maintenance inspections. Once each year, a representative of the owner(s) and a representative of the County will jointly inspect all stormwater management structures; appropriate action will be taken to ensure proper maintenance. All maintenance costs will be borne by the owner(s). 10. All sediment from the including any deposits of material that accumulate on or around the parking area shall be properly disposed through collection and disposal at a facility, such as a landfill, designated for the disposal of such material. EXHIBIT `B' MAINTENANCE AND INSPECTION SCHEDULE MM - MUDMAT : This item shall be inspected during construction only and this feature will be removed upon permenant bed construction. RECP - ROLLED EROSION. CONTROL PRODUCTS These items will be place on c and fi es within the development and should be o a iliza nee this development is handed o to the Home Own sociation. However, the folio ' tenan schedule sho observed during construction: • Inspect the RE east weekly and after each cant rain t+ Repair immediately. • checked f grass coverage and a an ould be ed until grass coverage is 9 o or RR- OUTLET ST. RO1 is a device and should be • -, Tie RR at least weekly and after each Vx0h :.significant rain fall event until permanent vegetation been established. Repair immediately. t er permanent vegetation has been established, these outlets protections should be inspected every 12 months. PROTECTION This is a temporary protection device and should be removed upon stabilization of the soil within the development. • Inspect the Doughnut at least weekly and after each significant rain fall event. Repair immediately. ' ROCK PIPE INLET PROTECTION This is a temporary protection device and should be removed upon stabilization of the soil within the development, • Inspect Rock pipe inlet protection at least weekly and after each significant rain fall event. Repair immediately. TEMPORARY SEDIMENT TRAP This is a temporary protection-device should be removed upon stabilization of the soil within the nt. • Inspect Rock pi t pro at least weekly and after eac t rain ent. Remove silt and re trap to its original ' ons once it has ated u I/2 its volum th of Rip Rap- PERMANENT SEDIMENT BASIN This is ape rman control de d should be maintained at all • Insp B a eekly and after each signifi t rain f vent until permanent vegetation Rhas bee stablished. Remove silt and restore basin to its on imensions once it has accumulated 1/1 it plume. • ?> anent vegetation has been established, -these outlets protections should be inspected every . months utilizing the inspection report. a temporary protection device and should be removed upon ation of the soil within the development. • Inspect Silt Fence protection at least weekly and after each significant rain fall event. Remove silt once it has accumulated up to 1/1 its depth of fencing height. I EXHIBIT `C' PERMANENT WATER QUALM BMW AND ACCESS EASEMENT AGREEMENT i 7 i i 1 i i STATE OF NORTH CAROLINA COUNTY OF BUNCOMBE THIS EASEMENT granted this day of as of the first part, Y a p subdivision of hereinafter refe o as Grantee. th of ONE DOL ($1.00) in an m considerafion of the nance Agreement between m and to that portion of the and identified on the between the property owner hereinafter referred to as Grantor, and BUNCOMB the State of North Carolina, as party of the seco av WM4ESSETH THAT: Grantor, for and in consider hand paid at and before the sealing and delivery of this agreements and covenants contained in is document and Grantor and Grantee, hereby grants unto tee an ea property shown on Exhibit "A" to=jhq greet' plat attached hereto as Exhibit "1". ' The purpose of this easem' allow Gran its age for maintenance activities to the Water Quality Be ent Practice MP) facil , and to prevent development of the property within ement wing issuan of the Certificate of Occupancy or in the case of a residen . su ion, pproval of th Plat, without written permission from the Buncombe County PI This ment is required by the provisions of the Maintenance t exe by _ the Grantor and Grantee. a y r` PERMANENT WATER QUALITY BMP AND ACCESS EASEMENT AGREEMENT SO AGREED this day of , 20 PROPERTY OWNER INDIVIDUAL OR PROPERTY OWNED JOINTLY BY SEVERAL INDIVIDUALS By: Signature of Owner Printed or Typed'Name By: Signature of Owner Printed or Typed Name By: Signature of Owner r, or Typed Typed Name Attest: Witness or Typed Name Printed or Notary Public Name of Witness 1 (Pat of-Easement) l EXIT `D' BMP Facility Operation and Maintenance Inspection Report for Pond Facilities Inspector Name Community Inspection Date Address Type of BMP Watershed Tax Map or Beyond Toe d. Emergency ay 6. Pond, Too & Chimney Drains Clear & Fund 7. Seeps/Leaks on Downstream Face. 1 r r i l 3 i ITEM INSPECTED CHECKED MAINTENANCE OBSERVATIONS & REMARKS Yes No R d. Not Re d. 8. Pond Drain Valve a. Operational/Exercised b. Chained and Locked 9. Outfall Channels Functioning 10, Other (Specify) Agi. C. Permanent Pool • Wet Ponds 1. Undesirable Vegetative Growth 2. Floating or Floetable Debris Removal Requited 3. Visible Pollution > 4. Shoreline Problems 5. Other (Specify) D. Dry Pool Areas - Dry Pond t r? 1. Vegetation Adequate 2. Undesirable Vegetative a 3. Undesirable W wth 4. Low Flow Channels C Obstructions 5 t Spots 6, . S entxnd/nrTf. "` . E. Condition o I9 into 1. Rip Rep Fain 2. Slope Invert Erosio 3. Storm Drain Pipes 4. Endwalis/Headwails S. Other (Specify) ITEM INSPECTED CHECKED MAINTENANCE OBSERVATIONS & REMARKS Yes No Regd. Not Rcqd. F. Other 1. Encroachments on Pond or Easermt Area (Be Specific) 2. Complaints from Local Residents ' N/A N/A (Describe on Back) 3. Aesthetics a. Crass Mowing Regd. b. Graffiti Removal Reqd. c. Other 4. Public Hazards (Be F,4C Specific) lowk 5. Maintenance Access r 1. Inspector's Remar w ' 4 2. Overall Condi • Fac' (Check One) Acceptable Unacceptable 3. I hereby certify under penalty of perjury that I have performed the inspections and trade a good faith effort to identify the items that need maintenance. I further certify that failure to inspect or misrepresent the need for maintenance could result in my liability for personal or property damage. Signed: Date: Inspector Operation and Maintenance Inspection Report for Filtration Facility (Adapted from Watershed Management Institute, Inc.) Inspector Name ProjectLocation Inspection Date Watershed As-built Plans available? Z Inspection Items v Z 1. Debris removal Ad'ecent area clear of debris Inlets and outlets clear of debris Filtration facHi free of debris 2. Vegetation Adjacent Brea stabilized GrasB molded 'y An evidence of erosion 3. Oil and grease An 'evidence of filter clo 4. Water retention where required Water holding chambers at normal pool No evidence of IS?kW 5. Sediment deposition Filtration chamber clean of sediments Water chambers not more than y full of T ?- sediments I 6. Structural components - An evidence of structural deterioration Grates in od condition Any evidence of spalling or cracking of structure.( arts 11 7. Outlets/overflow spillway Good condition no need for repair) i An evidence of erosion" I 8. Overall function of facility An evidence of flow b assin facili J An noticeable odors outside of facility M M M M M M M M A A A A A A A Comments 1 b o `? r o zbz? Inspection Items U z Comments 9. Pump (Where applicable) Catalog cuts and wiring diagram for A 2uinp available Waterproof conduits for wiring appear to A f be intact Panel box is well marked A Any evidence of pump failure (excess A _ water in pump well, etc) C Inspection Frequency. Key A=Annual, M=Monthly, S=After major storm Necessary Action: If any of the items above where answered Yes for "Maintenance Needed", a time frame needs to be established for repair or correction. . No action necessary. Continue routine inspections. Correct noted facility deficiencies by (date) - Facility repairs were previously indicated and completed. Site reinspection is necessary to verify corrections or improvements. Site reinspection completed on (date) Site reinspection was satisfactory. Next routine inspection is scheduled for approximately (date): Inspectors Signature Operation and Maintenance Inspection Report for Infiltration Trenches. (Adapted from Watershed Management Institute, Inc.) Inspector Name Project Location Inspection Date Watershed As-built Plans available? b O U h O O U % ? I i U z w nspect on Items . Comments 1. Debris removal Trench surface clear of debris . M Inlets clear of debris M Inflow pipes clear of debris M Overflows illvm clear of debris :.. M 2. Sediment traps, forebays, or pretreatment swales Obvious] tra in sediment 'A Greater than 50% of original storage A volume remaining 3. Vegetation Mowin done when necessary - Fertilized per s f I Von M An evidence of erosion _ M Contributing a area stabilized M 4. Dewatering Trench dewaters between storms M 5. Sediment removal of trench _ An evidence of sedimentation in trench - A Does sediment accumulation currently A r uire.removal 6. Inlets Good condition .A An evidence of erosion "A 7. Outlets/overflow spillway . Good condition no need for repair) A An evidence of on A 8. Aggregate repairs Surface of a e ate clean A Top layer of stone in need of A re lacement Trench in need of rehabilitation A C- z U z o U Inspection Items ? Comments 9. Vegetated surface Evidence of erosion present M Perforated inlet functioning adequately M Does water stand on v etated surface M Does .Mod vegetative cover exist M 10. Overall function of facility Any evidence of flow bypassing facility S l 1 7 7 1 Inspection Frequency Key A=Annual, M=Monthly, S=After major storm Necessary Action: r If any of the items above where answered Yes for "Maintenance Needed", a time frame needs to be established for repair or correction. No action necessary. Continue routine inspections. Correct noted facility. deficiencies by (date) Facility repairs were previously indicated and completed. Site reinspection is necessary to verify corrections or improvements. Site reinspection completed on (date) Site reinspection was satisfactory. . Next routine inspection is scheduled for approximately (date): Inspectors Signature i i 7 a Operation and Maintenance Inspection Report for Enhanced Swales I Grass Channels 1 Filter Strips (Adapted from Watershed Management Institute, Inc.) Inspector Name Project Location Inspection Date Watershed As-built Plans available? u Z U Inspection Items Comments 1. Debris removal Facility and adjacent area clear of debris M Inlets and outlets clear of debris M An dum in of and wastes into facili M Has litter ranches, etc, been removed M 2. Vegetation' .; Adjacent area stabilized M Grass mowed M Plant height not less than design water M depth Fertilized er s ecifications M An evidence of erosion M Is plant composition according to M approved plans Any unauthorized or inappropriate a . M lantin • An dead or diseased lants M Any evidence of plant stress fro M. inad uate watering - An evidence of deficient stakes or wires M 3. Oil and grease An evidence of filter clom?g M 4. Dewatering Facility dewaters between storms M 5. Check dams/energy dissipators/sumps An evidence of sedimentation buildu A S Are sumps greater than•50% full of A,S sediment Any evidence of erosion at downstream A,S toe of drop structures 'rC O U ? ,C?? O O U I U ? , ?' U V! U Inspection Items U Z w Comments 6.. Sediment deposition Swale clean of sediments A Sediments should not be > than 200A of A ' Swale design depth 7. Outlets/overflow spillway Good condition no need for repair) S An evidence of ciosion A An evidence of blockages S 8. Integrity of facility Has facility been blocked or filled A inwropriawy 9. Bioretention Planting Soil An evidence of planting soil erosion A 10. Organic Layer Mulch covers entire area (No voids) and A to s ified thickness Mulch is in good condition r A mspecuon r.requency Key A=Annual, M=Monthly, S=After major storm Necessary Action: If any of the items above where answered Yes for "Maintenance Needed", a time frame. needs to . be established for repair or correction. No action necessary. Continut4outine inspections. Correct noted facility deficiencies by (date) Facility-repairs were previously indicated and completed. Site reinspection is necessary to verify corrections or improvements. Site reinspection completed on (date) Site reinspection was satisfactory. Next routine inspection is scheduled for approximately (date):. Inspectors Signature (Company Letterhead) BAD 18-Month Certification Form Project Name Buncombe Co. Permit # BMP Identifier (as stated on original as-built): BMP Facility Type: Based on an 18-month As-Built survey condu< that no changes have occurred to the Best Ma'. would affect either the volume. or the outlet str Water Management Report was sub ttlu therefore conclude that the BM0facili development regulations, is functioninexceed the required v N%r e. see tabl Date (date) we (comp erby certify aft at s (BM) ,which the original As-built Storm uncombe County. We ;e with mbe County's that the volume meets or Volume Typ De Volume 18-Month Field Surveyed Volume ., ww uauty ? (V a Below w Ch n Orifice Total Xne ume olu 00-year ndof 1 Attached to this fo new 18-month record survey (topography/plan view) of-the 3P BMP facility along with a detail drawing of the outlet control structure for review. Note: 1 Form Per BMP Facility Engineer Stamp Here { 1 (A-030AV'2, Hydrology & Water Quality Study For Bartram's Walk Buncombe County, North Carolina ICI IAI n" I ?? pQ; •F?SS/ .2. p 47 CI S j6Z'r-07 January 31, 2007 Revised: May 3, 2007 Revised : April 1, 2008 Prepared by: 0269 Fax: 770-486-8398 omni@omnicons.com Omni Consulting Services 665 Highway 74 South Suite 125 Peachtree City, Georgia 3 'Ph: 770-486-7370 I. Site Location The proposed development for Bartram's Walk Subdivision is located off the southern side of Wolfe Cove Road and extending southward to Town Mountain Road in the township of Beaverdam in Buncombe County, North Carolina. II. Existing Conditions The overall site is approximately 156 acres in size and is currently wooded with a small pasture located within the center of the property. For our study we will model this site as entirely forested. The site is divided into 7 drainage basins for which the runoff will be modeled. The majority of the site drains into an existing creek located on site. III. Proposed Development The proposed development consists of 87 new lots and their associated improvements. IV. Proposed Rnnoff Control and Description For this development, we will accommodate the additional runoff created by using multiple detention & water quality ponds for the development. The entire design storage for the development will utilize the 1 yr-24 hour storm event. This storm will be contained within the pond as well as all water quality draw down volume. All basins will release at less than the pre- developed rate so as not to adversely affect any downstream property. Furthermore, each lot will be required to install an underground metering tank to hold and release the additional runoff from each house and its associated impervious areas. This will be in addition to the proposed ponds. We will also utilize all grassed swales throughout the project with small water quality holding basins to-filter the particulates from the runoff prior to discharging into the detention ponds. V. Methodology Both the developed and pre-developed runoff flows have been calculated using the SCS Method. Runoff intensities were derived from the North Carolina 1-year 1-day precipitation map. The time of concentration was computed using the Lag Method. Inlet and Outlet control calculations were made using software by Hydroflow Hydrographs. This software also generated all reservoir routing calculations and hydrographs. VI. Analysis A. Basin 1 1. Existing Conditions • Total Area =173.55 acres • Overall CN = 55 CN = 55 (wooded; good cover) =173.55 ac. • Tc = 44.6 twin (Lag Method - Hydrograph #1) Flow Length = 3994' Slope =18.00% 2. Bypass Conditions • Total Area = 51.43 acres • Overall CN = 59' CN = 55 (wooded; good cover) = 29.72 ac. (offsite) CN = 98 (Impervious) = 20% = 4.34 ac CN = 55 (wooded; good cover) = 80% =17.37 ac. (onsite) • Tc = 40.3 min (Lag Method - Hydrograph #2) Flow Length= 3994' Slope =18.00% 3. Developed Conditions (Sub-Basin 1-A) • Total Area = 73.35 acres • Overall CN = 62 CN = 55 (wooded; good cover) =12.78 ac. (offsite) CN = 98 (Impervious) = 20% =12.11 ac CN = 55 (wooded; good cover) = 801/6 = 48.46 ac. (onsite) • Tc = 34.2 tr(Lag Method - Hydrograph #3) - Flow Length = 3518' Slope = 17.6% 4. Developed Conditions (Sub-Basin 1-C) • Total Area =15.90 acres • Overall CN = 62 CN = 55 (wooded; good cover) = 2.08 ac. (offsite) CN = 98 (Impervious) = 20% = 2.76 ac CN = 55 (wooded; good cover) = 80% =11.06 ac. (onsite) • Tc = 22.4 min (Lag Method - Hydrograph #5) Flow Length = 2508' Slope = 25.0% 5. Developed Conditions (Sub-Basin 1-D) • Total Area = 8.40 acres • Overall CN = 64 CN = 98 (Impervious) = 2011/a =1.68 ac CN = 55 (wooded; good cover) = 80% = 6.72 ac. • Tc =11.0 min (Lag Method - Hydrograph #7) Flow Length =1143' Slope = 25.55% 6. Developed Conditions (Sub-Basin 1-E) • Total Area =17.32 acres • Overall CN = 64 CN = 98 (Impervious) = 200/a = 3.46 ac CN = 55 (wooded; good cover) = 801/o =13.86 ac. (onsite) • Tc =14.9 min (Lag Method - Hydrograph #8) Flow Length =1450' Slope = 20.14% y 7. Developed Conditions (Sub-Basin 1-F) • Total Area = 2.52 acres • Overall CN ?, 64 CN = 98 (Impervious) = 20% = 0.50 ac CN = 55 (wooded; good cover) = 80% = 2.02 ac. • Tc = 6.8 min (Lag Method - Hydrograph #10) Flow Length = 659' Slope = 27.31-9/0 B. Basin 3 1. Existing Conditions Total Area = 4.54 acres • Overall CN = 55 CN = 55 (wooded; good cover) = 4.54 ac. • Tc = 8.9 min (Lag Method - Hydrograph #12) Flow Length = 605' Slope = 21.98% 2. Bypass Conditions • Total Area = 0.39 acres • Overall CN = 64 CN = 98 (Impervious) = 20% = 0.078 ac. CN = 55 (wooded; good cover) = 80% = 0.312 ac. • Tc =1.7 min (Lag Method - Hydrograph #13) Flow Length =127' Slope = 32.28% s 3. Developed Condid ions • Total Area = 4.03 acres • Overall CN 64 CN = 98 (Impervious) = 20% = 0.81 ac. CN = 55 (wooded; good cover) = 80% = 3.22 ac. • Tc = 9.10 min (Lag Method - Hydrograph #14) Flow Lengtli'= 717' Slope = 17.4'%0 C. Basin 4 1. Existing Conditions •' Total Area =11.06 acres • Overall CN = 55 CN = 55 (wooded; good cover) =11.06 ac. • Tc =16.6 min (Lag Method - Hydrograph #17) Flow Length =1310' Slope = 21.76% 2. Bypass Conditions • Total Area =1.59 acres • Overall CN = 60 CN = 98 (Impervious) =10.4% = 0.17 ac. CN = 55 (wooded; good cover) = 89.6% =1.42 ac. • Tc = 5.1 min (Lag Method - Hydrograph #18) Flow Length = 301' Slope =17.28% 3. Developed Conditions • Total Area = 9.47 acres • Overall CN =. 64 CN = 98 (Impervious) = 20% =,1.89 ac. CN = 55 (wooded; good cover) = 80% = 7.58 ac. • Tc =13.7 min (Lag Method - Hydrograph #19) Flow Length =1308' Slope = 20.4%. D. Basin 2 1. Existing Conditions • Total Area= 3.11 acres • Overall CN 55 CN = 55 (wooded; good cover) = 3.11 ac. • Tc = 5.0 min (Lag Method - Hydrograph #22) Flow Length = 320' Slope = 25.0% 2. Developed Conditions • Total Area = 2.50 acres • Overall CN = 57 CN = 98 (Impervious) = 20% = 0.11 ac. CN = 55 (wooded; good cover) = 80% = 2.39 ac. • Tc = 4.8 min (Lag Method - Hydrograph #23) Flow Length = 320' Slope = 25.0% ti S E. Basin 5 1. Existing Conditions • Total Area =1.87 acres • Overall CN = 55 CN = 55 (wooded; good cover) = 3.11 ac. • Tc = 5.2 mi (Lag Method - Hydrograph #24) Flow Length k.370' Slope = 29.7% 2. Developed Conditions • Total Area =1.87 acres • Overall CN = 64 CN = 98 (Impervious) = 20% = 0.37 ac. CN = 55 (wooded; good cover) = 80% =1.50 ac. • Tc = 4.1 min (Lag Method - Hydrograph #25) Flow Length = 370' Slope = 29.7% F. Basin 6 1. Existing Conditions • Total Area = 2.50 acres • Overall CN = 55 CN = 55 (wooded; good cover) = 2.50 ac. • Tc = 5.6 min (Lag Method - Hydrograph #26) Flow Length = 380' Slope = 26.3% 2. Developed Conditions • Total Area = 2.50 acres • Overall CN = 64 CN = 98 (Impervious) = 20% = 0.50 ac. CN = 55 (wooded; good cover) = 80% = 2.00 ac. • Tc = 4.5 min (Lag Method - Hydrograph #27) Flow Length = 380' Slope = 26.3% G. Basin 7 1. Existing Conditions • Total Area = 4.26 acres • Overall CN = 55 CN =-55 (wooded; good cover) = 4.26 ac. • Tc = 7.2 min' (Lag Method - Hydrograph #28) Flow Length =..500' Slope = 25.0% 2. Developed Conditions • Total Area = 2.97 acres • Overall CN = 64 CN = 98 (Impervious) = 20% = 0.59 ac. CN = 55 (wooded, good cover) = 80% = 2.38 ac. • Tc = 5.7 min (Lag Method - Hydrograph #29) Flow Length = 500' Slope = 25.0% 1 Flow Summa Basin Storm Year Pre- Developed Flows cfs Basin Post- Developed Flows cfs Allowable Flow (cfs) Bypass Flows (cfs) Routed Flow (?) Total Developed Flow cfs 1 ` 7 13.43 NIA 13.43 8.615 N/A 13.02 (1-A) 1 NIA 20.45 NIA N/A 2.13 (1-C) 1 NIA 6.25 NIA N/A 0.64 (1-D) 1 NIA 6.22 NIA N/A N/A (1-E) 1 WA 10.99 N/A N/A 0.96 (1-F) 1 NIA 2.15 NIA WA NIA 2 t 1 0.76 1.03 0.76 NIA N/A 1.03 3 1 0.87 3.21 0.87 0.57 0.46 0.62 4. 1 1.52 6.01 1.52 0.97 1.05 1.33 5 1 0.46 1.90 0.46 WA WA 1.90 6 1 0.61 - 2.53 0.61 N/A N/A 2.53 7 L 7f 1 0.90 2.83 0.90 N/A N/A 2.83 *Bas in 1 was divi ded intn five c»h-hnc;nc *** See Attached H dro a hs for Calculations *** HYDROGRAPHS AND POND SUMMARIES Hydrograph Return Period Recap HydraflowHydrographsby lntelisolvev9.2 Hyd. Hydrograph Inflow Peak Outflow (do) Hydrograph No. type (origin) Hyd(s) i-Yr 2-Yr 3 Yr 5-Yr 10-Yr 25-Yr 50 Yr 100•Yr description 1 SCS Runoff 13.43 - -- -- --- ----- ---- - -- Basin 1(Pre-0eveloped) 2 SCS Runoff - 8.615 Basin 1(Bypass) 3 SCS Runoff 20.45 Basin A 4 Reservoir 3 2.127 - -- Basin A (Routed) 5 SCS Runoff -- 6.252 Basin C 6 Reservoir 5 0.643 ---- --- -- ---- ---- Basin C (Routed) 7 SCS Runoff 6.220 Basin D 8 SCS Runoff - 10.99 --- - -- -, Basin E 9 Reservoir 8 0.964 - - .? - Basin E (Routed) 10 SCS Runoff -- 2.147 Basin F 11 Combine 2, 4, 6, 7, 9,lMD2 Total Developed Flow (Basin 1) 12 SM Runoff - 0.871 -- ---- -- Basin 3 (Pre-Developed) 13 SCS Runoff ---- 0.408 ---- --- -- ---? - - ?. Basin 3 (Bypass) 14 SCS Runoff 3.205 r-? - - -- Basin 3 (Developed) 15 Reservoir 14 0.573 -- Basin 3 (Routed) 16 Combine 13.15 0.623 - Total Developed Flow (Basin 3) 17 SCS Runoff - 1.524 - Basin 4 (Pre-Developed) .18 SCS Runoff 0.972 - -- - - Basin 4 (Bypass) 19 SCS Runoff - 6.007 Basin 4 (Developed) 20 Reservoir 19 1.052 Basin 4 (Routed) 21 Combine 18,20 1.330 - -- -- - - Total Developed Flow (Basin 4) 22 SCS Runoff - 0.764 -.. -- - Basin 2 (Pre-Developed) 23 SCS Runoff - 1.033 ,- - ?. Basin 2 (Developed) 2,4 SCS Runoff 0.459 - - -- ..? - Basin 5 (Pre-Developed) 25 SCS Runoff - 1.895 - -- Basin 5 (Developed) 26 SCS Runoff -- 0.614 Basin 6 (Pre-Developed) 27 SCS Runoff .- 2.533 Basin 6 (Developed) 28 SCS Runoff - 0.903 - Basin 7 (Pre-Developed) 29 SCS Runoff - 2.828 - Basin 7 (Developed) Proj . file: hydrore v3-la-n o-water -quality. gpw Frid ay, Ma r 13, 2009 Hydrograph Summary Report HydraflowHydrographsbylntellsolvev9.2 Hyd. No. Hydrograph type (origin) Peak flow (cls) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (tt) Total strip used (CUR) Hydrograph description 1 SCS Runoff 13.43 1 756 167,359 - - - Basin 1 (Pre-Developed) 2 SCS Runoff 8.615 1 743 73,328 - - - Basin 1 (Bypass) 3 SCS Runoff 20.45 1 738 133,806 - - - Basin A 4 Reservoir 2.127 1 983 133,739 3 2356.59 61,059 Basin A (Routed) 5 SCS Runoff 6.252 1 729 29,284 - - - Basin C 6 Reservoir 0.643 1 873 29,282 5 2457.53 11,063 Basin C (Routed) 7 SCS Runoff 6.220 1 722 18,084 - - - Basin D 8 SCS Runoff 10.99 1 724 36,633 - - - Basin E 9 Reservoir 0.964 1 825 36,455 8 2356.69 32,048 Basin E (Routed) 10 SCS Runoff 2.147 1 719 5,197 -- - Basin F 11 Combine 13.02 1 743 296,084 2, 4, 6, 7, ),10 - -- Total Developed Flow (Basin 1) 12 SCS Runoff 0.871 1 723 4,378 - ---- - Basin 3 (Pre-Developed) 13 SCS Runoff 0.408 1 716 773 - --- -- Basin 3 (Bypass) 14 SCS Runoff 3.205 1 720 8,524 ---- ---- -- Basin 3 (Developed) 15 Reservoir 0.573 1 744 8,517 14 2507.62 6,512 Basin 3 (Routed) 16 Combine 0.623 1 736 9,291 13,15 - - Total Developed Flow (Basin 3) 17 SCS Runoff 1.524 1 728 10,799 - - - Basin 4 (Pre-Developed) 18 SCS Runoff 0.972 1 719 2,547 - -- - Basin 4 (Bypass) 19 SCS Runoff 6.007 1 724 20,029 - - -- Basin 4 (Developed) 20 Reservoir 1.052 1 757 20,019 19 2287.09 15,188 Basin 4 (Routed) 21 Combine 1.330 1 720 22,566 18,20 - - Total Developed Flow (Basin 4) 22 SCS Runoff 0.764 1 720 3,093 - - - Basin 2 (Pre-Developed) 23 SCS Runoff 1.033 1 719 2,963 - - - Basin 2 (Developed) 24 SCS Runoff 0.459 1 720 1,860 - - - Basin 5 (Pre-Developed) 25 SCS Runoff 1.895 1 717 3,955 - - - Basin 5 (Developed) 26 SCS Runoff 0.614 1 720 2,486 -- - Basin 6 (Pre-Developed) 27 SCS Runoff 2.533 1 717 5,288 - - - Basin 6 (Developed) 28 SCS Runoff 0.903 1 721 4,005 - - - Basin 7 (Pre-Developed) 29 SCS Runoff 2.828 1 718 6,478 --- - - Basin 7 (Developed) hydrorev3-1a-no-water-quality.gpw Retum Period: 1 Year Friday, Mar 13, 2009 Pond Report Hydraflow Hydrographs by Intelisolve Y9.2 Friday, Mar 13, 2009 Pond No. 9 - Pond A Pond Data Contours - User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 2351.00 ft Stage / Storage Table Stage (R) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 2351.00 10 0 0 1.00 2352.00 10,123 5,067 5,067 3.00 2354.00 11,981 22,104 27,171 4.00 2355.00 12,719 12,350 39,521 5.00 2356.00 13,481 13,100 52,621 7.00 2358.00 15,075 28,556 81,177 9.00 2350.00 16,766 31,841 113,018 11.00 2362.00 18,535 35,301 148,319 13.00 2364.00 20,420 38,955 187,274 14.00 2365.00 21,407 20,914 208,187 Culvert l Orifice Structures Weir Structures [A] [g] [C] [PrfRsr] [A] [B] [C] [Ol Rise (In) = 36.00 6.00 0.00 0.00 Crest Lon (R) = 0.00 0.00 0.00 0.00 Span (in) = 36.00 6.00 0.00 0.00 Crest El. (it) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 2351.00 2351.00 0.00 0.00 Weir Type = - - - - Length (ft) = 130.00 0.50 0.00 0.00 multi-stage = No No No No Slope (%) = 1.00 1.00 0.00 n/a N Value = .013 .013 .000 n/a ?' .. Orifice Coeff. = 0.60 0.60 0.00 0.00 ExHLOn/hr) = 0.000 (by Contour) Mum-stage = We Yes No No TW Elev. (R) = 0.00 NWe: CulverVOt fice mdMm are analyzed under Inlet Cc) end outlet (oc) cw W. Weir rieera dwdwd for aiBoe opMwm pc) and wbme wce W. Stage / Storage / Discharge Table < Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exflf User Total ft tuft ft cfs cfa cis cis ofs cfs cfs cis cfs cis cfs 0.00 0 2351.00 0.00 0.00 - - - - - - 0.10 507 2351.10 0.031C 0.031C 0.20 1,013 2351.20 0.111C 0.11 IC - - - - - - 0.30 1,520 2351.30 0.231C 0.221C -- °?., -- - - - - 0.40 2,027 2351.40 0.371C 0.361C - -- - - - - 0.50 2,533 2351.50 0.501C 0.471C 0.60 3,040 2351.60 0.551C 0.551C = - - - - - 0.70 3,547 2351.70 0.621C 0.621C - = - - - - - 0.80 4,053 2351.80 0.681C 0.681C - - - - - - 0.90 4,560 2351.90 0.74 IC 0.73 IC - - - - - - 1.00 5,067 2352.00 0.811C 0.781C - - - - - - 1.20 7,277 2352.20 0.881C 0.881C - - - - - - 1.40 9,487 2352.40 0.971C 0.971C - - - - - - 1.60 11,698 2352.60 1.051C 1.05 IC - - - - - - 1.80 13,908 2352.80 1.131C 1.13 IC - - - - - - 2.00 16,119 2353.00 1.221C 1.201C - - - - - - 2.20 18,329 2353.20 1.321C 1.271C - - - - - - 2.40 20,539 2353.40 1.331C 1.331C - - - - - - 2.60 22,750 2353.60 1.421C 1.391C - - - - - -.- 2.80 24,960 2353.60 1.53 IC 1.451C - - - - - -.- 3.00 27,171 2354.00 1.5310 1.511C - - - - - - 3.10 28,406 2354.10 1.541C 1.541C 3.20 29,641 2354.20 1.641C 1.571C - - - - - - 3.30 30,876 2354.30 1.641C 1.59 IC 3.40 32,111 2354.40 1.641C 1.621C 3.50 33,346 2354.50 1.65 IC 1.651C - -- - - - - 3.60 34,581 2354.60 1.671C 1.671C - - - - - - 3.70 35,816 2354..70 1.76 IC 1.701C - 3.80 37,051 2354.80 1.761C 1.721C - -- - - - - 3.90 38,286 2354.90 1.761C 1.751C - 4.00 39,521 2355.00 1.771C 1.771C - - - - - - 4.10 40,831 2355.10 1.8910 1.8010 - - - 0.000 0.028 --- 0.106 --- 0.220 0.358 - 0.473 - - 0.552 -- - 0.616 0.676 -- - 0.732 -- 0.782 0.881 0.968 1.050 1.128 -- - 1.199 1.266 1.332 -- 1.395 - - 1.452 - 1.513 - - 1.540 1.566 1.594 - 1.622 -- -- 1.649 1.672 1.724 - - 1.750 1.774 -- - 1.796 Continues on next page... Pond A Stage / Storage / Discharge Table Stage Storage Elevation Civ A CIv B Clv C PrlRsr Wr A Wr B Wr C Wr D Exfll User Total lt cult It Cfs Cis ds Cis Cfs Cis Cis cfs cfs ds cis 4.20 42,141 2355.20 1.891C 1.821C - - - - - - - - 1.821 4.30 43,451 2355.30 1.891C 1.851C - - - - - - - - 1.845 4.40 44,761 2355.40 1.89 IC 1.87 IC - - - - - - - -» 1.869 4.50 46,071 2355.50 1.891C 1.891C - - - - - - - - 1.893 4.60 47,381 2355.60 1.911C 1.911C - - - - - - - -- 1.914 4.70 48,691 2355.70 2.021C 1.941C - - - - - - 1 936 4.80 50,001 2355.80 2.021C 1.961C - - - . - --- - - .,- 1.959 4.90 51,311 2355.90 2.021C 1.981C - - - - - - - -- 1.981 5.00 52,621 2356.00 2.021C 2.00 IC - - - - - 2.003 5.20 55,476 2356.20 2.051C 2.041C - 2 045 5.40 58,332 2356.40 2.16 IC 2.09 IC - - - . - - - ,- - 2 087 5.60 61,187 2356.60 2.161C 2.131C - . 2 129 5.80 64,043 2356.80 2.171C 2.171C - - - . - - - - - 2 170 6.00 66,899 2357.00 2.301C 2.211C - . 208 2 6.20 69,754 2357.20 2.301C 2.25 IC - . 248 2 6.40 72,610 2357.40 2.301C 2.291C - --- - . - - - - - 2 287 6.60 75,465 2357.60 2.321C 2.321C - - - . - - - - - 2 324 6.80 78,321 2357.80 ' 2.451C 2.361C - - - . - - - - - 2 361 7.00 81,177 2358.00 2.451C 2.401C - - - . -» - - - - 2 398 7.20 84,361 2358.20 2.451C 2.441C - . 2 435 7.40. 87,545 2358.40 2.47 IC 2.471C - . 2 470 7.60 90,729 2358.60 2.611C 2.50 IC - - - . - - ... - ,_ 2 504 .7.80 93,913 2358.80 2.61 IC 2.54 IC --- - - . - - - - 2 540 8.00 97,097 2359.00 2.61 IC 2.571C --- - - . - -- - - - 2.575 8.20 100,281 2359.20 2.611C 2.611C - - - - - -- - - 2 609 8.40 103,465 2359.40 2.641C 2.641C - - - . - - - - - 2 641 8.60 106,649 2359.60 2.771C 2.671C - - - . -- - - - - 2 674 8.80 109,833 2359.80 2.771C 2.711C - - - . - - - - - 2 707 9.00 113,018 2360.00 2.77 IC 2.74 IC, - . 2 740 9.20 116,548 2360.20 2.77 IC 2.77 IC '- ., - - . - - - .- - 2 772 9.40 120,078 2360.40 2.801C 2.801C . 2 802 9.60 123,608 2360.60 2.941C 2.831C - - - . - --- - - - 2 833 9.80 127,138 2360.80 2.941C 2.861C . 2 864 10.00 130,668 2361.00 2.941C 2.901C - - - . - - - - -,. 2 895 10.20 134,198 2361.20 2.94 IC 2.931C --- - - . - - - - 2 926 10.40 137,728 2361.40 2.961C 2.961C -- - - . - - - - - 2 955 10.60 141,258 2361.60 3.111C 2.981C . 2 984 10.80 144,788 2361.80 3.111C 3.011C -- - - . - - - - 3 013 11.00 148,319 2362.00 3.111C 3.04 IC . 3 043 11.20 152,214 2362.20 3.111C 3.071C - - - . - - - - - 3 072 11.40 156,110 2362.40 3.11 IC 3.101C . 3 101 11.60 160,005 2362.60 3.131C 3.131C - - - . - - - - - 3 129 11.80 163,901 2382.80 3.161C 3.16 IC - ` - - . - - - - 3 156 12.00 167,796 2363.00 3.301C 3.18 IC -- " ' - - . - - - 3 184 12.20 171,692 2363.20 3.301C 3.211C - - - . - - - - 3 212 12.40 175,587 2363.40 3.30 IC 3.24 IC--__ - - . - - - 3 239 12.60 179,483 2363.60 3.301C 3.271C - . 3 267 12.80 183,378 2363.80 3.30 IC 3.29 IC - - - . - - - 3 294 13.00 187,274 2364.00 3.321C 3.321C - - - . - - - 3 320 13.10 189,365 2384.10 3.33 IC 3.33 IC - . 3 333 13.20 191,456 2364.20 3.481C 3.351C - -- -- . - - - - 3 345 13.30 193,548 2364.30 3.481C 3.361C - - . - - - 3 359 13.40 195.639 2364.40 3.481C 3.371C - . - 3 372 13.50 197,730 2364.50 3.481C 3.391C - - - . - - - 3 385 13.60 199,822 2364.60 3.481C 3.401C - - - . - - 3 398 - - 13.70 201,913 2364.70 3.481C 3.411C - - - . - - - 411 3 13.80 204,004 2364.80 3.481C 3.421C -- - - . - - 3 425 13.90 206,096 2364.90 3.481C 3 441C - . 14.00 208,187 2365.00 3.481C . 3 451C - 3.438 . 3.450 ...End s Pond Report Hydraflow Hydrographs by Inteiisolve v9.2 Friday, Mar 13, 2009 Pond No. 3 - Pond C Pond Data Contours - User-defined contour areas. Average end area method used for volume calculailm. Begining Elevation = 2450.00 ft Stage I Storage Table Stage (it) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 2450.00 354 0 0 2.00 2452.00 952 1,306 1,306 4.00 24500 11565 2,517 3,823 6.00 2456.00 2,077 3,642 7,465 8.00 2458.00 2,619 4,696 12,161 10.00 2460.00 3,253 5,672 18,033 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 3.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span pn) = 18.00 3.00 0.00 0.00 Crest El. (R) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir CoeH. = 3.33 3.33 3.33 3.33 Invert El. (R) = 2449.00 2450.00 0.00 0.00 Weir Type = - - - - Length (ft) = 60.00 0.50 0.00 0.00 Multi-stage = No No No No slope (%) = 11.67 1.00 0.00 n/a N-Value = .024 .013 .013 We Orifice Coeff. = 0.60 0.60 0.60 0.60 Exnl.(IW = 0.000 (by Contour) Muld-stage = rda Yes No No TW Elev. (ft) = 0.00 Nde: CuNerUOABce oMms are analYzed under Inlet (le) and outlet (oe) control. Weir risers checked for od0oe cond flans (k) and mkmergww (s). Stage / Storage ! Discharge Table Stage Storage Elevation CIV A Clv B CIv C PrtRsr Wr A Wr B Wr C Wr D Exfll User Total ft cult ft GIs Cfe cfs afs Cfa cis cis cfs dfs cis cfs 0.00 0 2450.00 0.00 0 00 0.20 131 2450.20 4.28 le . 0 06 Ic -- .- 0,000 ' 0.40 261 2450.40 4.28Ic . - - - 0 121c - - 0.054 - - 0.60 392 2450.60 4.28 is . - - - 0 16 is - - 0.124 - - 0.80 522 2450.80 4.28 is . - - - 19 Ic - - 0 - 0.163 1.00 653 2451.00 4.281c . - - - 0.22 IC - - - - - 0194 - 0 221 1.20 784 2451.20 4.28 is 0.24 Ic - b - - - - . 0 245 - ' 1.40 914 2451.40 4.28 is 0.27 1s - ^;, - - - - . _ _ 0 267 '- 1.60 1,045 2451.60 4.28 is 0.29 is - - - . 1.80 1,175 2451.80 4.281c - 0.31Ic 0.287 2.00 1,306 2452.00 4.281c 0.32 IC - - - .0.306 - - - 2.20 1,558 2452.20 4.28 Ic - - - 0.34 is -- = .- .. - 0.324 - 2.40 1,809 2452.40 4.28 is . - 0 36 Ic - - - 0.340 _ 2.60 2,061 2452.60 4.28 Ic . - - - 0.37 le - - - - - 0.356 2.80 2,313 2452.80 4.281c - - 0 39Ic -- - 0.372 - - 3.00 2,565 2453.00 4.281c . - - - 0.40 is - - - 0.387 3.20 2,816 2453.20 4.28 le - - 0 41 is 0.401 3.40 3,068 2453.40 4.281c . 0 431c 0.414 3.60 3,320 2453.60 4.28Ic . - 0 441C - - 0.428 - - - 3.80 3,571 2453.80 4.28 Ic . - - 0 45 is - - - 0.441 4.00 3,823 2454.00 4.28 is . - - 0.47 Ic 0.453 4.20 4,187 2454.20 4.281c 0.481c - - - - 0.465 4.40 4,551 2454.40 4.281c - 0.49 is 0.477 4.60 4,916 2454.60 4.28 Ic 0.50 is 0.489 4.80 5,280 2454.80 4.28Ic 0 51 is 0.500 5.00 5,644 2455.00 4.28 Ic . 0.52 Ic - - 0.511 5.20 1 6,008 2455.20 428 Ic - - '0 53 is - - 0.522 - 5.40 6,372 2455.40 4.281c . - - 0.54Ic - - - - 0.532 - - - 5.60 6,737 2455.60 4.28 Ic - 0.55 Ic - - 0.543 ' 5.80 7,101 2455.80 4.28 Ic - 0.56 IC - - - _ _ 0.59 6.00 7,465 2456.00 4.281c - 0.57Ic - - 0.563 6.20 7,935 2456.20 4.281c - - 0.581c - - - - 0.573 6.40 8,404 2456.40 4.281c - 0.591c - - - - 0.582 6.60 8,874 2456.60 4.28Ic - - 0.60Ic - - - - 0.592 - - - 6.80 9,343 2456.80 4.281c - 0.6110 - - - 0.601 - 7.00 9,813 2457.00 4.28 is - 0.62 is - - 0.611 0.620 Continues on next page- Pond C Stage / Storage 1 Discharge Table Stage Storage Elevation Clv A ft cult ft efs 7.20 10,283 2457.20 4.28 is 7.40 10,752 2457.40 4.281c 7.60 11,222 2457.60 4.281c 7.80 11,691 2457.80 4.28.1c 8.00 12,161 2458.00 4.281c 8.20 12,748 2458.20 4.281c 8.40 13,335 2458.40 4.281c 8.60 13,923 2458.60 4.28 fc 8.80 14,510 2458.80 4.28 is 9.00 15,097 2459,00 4.281c 9.20 15,664 2459.20 4.281c 9.40 16,271 2459.40 4.28 is 9.60 16,859 2459.60 4.28 is 9.80 17,446 2459.80 4.28Ic 10.00 18,033 2460.00 " 4.281c ...End Clv 8 Clv C PrMw Wr A Wr B Wr C Wr D Exfll User Total Cfs Cft Cfs Cfs Cfs eft Cfs Cfs ofs cis 0.631c - - - - - - - - 0.629 0.64Ic - - - - - - - -- 0.637 0.65 is - - - - - - - - 0.646 0.65 IC - - - - - - - - 0.655 0.66 IC - - - - - - - - 0.663 0.67Ic - - - - - - - -- 0.672 0.68Ic - - - - - - - - 0.680 0.69 is - - - - - - - - 0.688 0.701c - - - - - - - - 0.696 0.70 is - - - 0.704 0.71Ic - - - - - - -- -- 0.712 0.72 is - - - - - - - - 0.720 0.73Ic 0.727 0.7410 - --- •- --- - --- - - 0.735 0.741c 0.743 t Pond Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Nlar 13, 2009 Pond No. 4 - Pond E Pond Data Contours - User-defined contour areas. Average and area method used for volume calculation. 8egining Elevation = 2353.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 2353.00 10 0 0 1.00 2354.00 9,175 4,593 4,593 2.00 2355.00 9,798 9,487 14,079 3.00 2356.00 10,516 10,157 24,236 5.00 2358.00 11,997 22,513 46,749 7.00 2360.00 13,556 25,553 72,302 9.00 2362.00 15,175 28,731 101 033 11.00 2364.00 16,868 32,043 , 133 076 12.00 2365.00 17,869 17,389 , 150,445 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [Al [Bl [C] [D] Rise (in) = 18.00 6.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span can) = 18.00 6.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 2353.00 2355.40 0.00 0.00 Weir Type = - - - - Length (ft) = 50.00 0.50 0.00 0.00 Multl-stage = No No No No Slope (%) = 2.00 1.00 0.00 Ma N Value = .024 .013 .013 n/a . ONftce Coetf, = 0.60 0.60 0.60 0.00' Exfil.pn/hr) = 0.000 (by Contour) Muld-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Nob: Cul"rWritice outflows are analyzed under inlet pc) and outlet (ac) control. Weir risers dredwd for oriHoe conditions pc) and submwWce (a). Stage i Storage / Discharge Table Stage Storage Elevation Chr A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft cuft ft cis cfs Cfs cfs do 1:118 cis cfa cis cis cis 0.00 0 2353.00 0.00 0 00 - - 0.10 459 2353.10 040 . 0 00 - - - - - 0.000 0.20 919 235320 0.00 . 0 00 - - - _ -. - 0.000 0.30 1,378 2353.30 0.00 . , 0 00 - -- - - 0.000 0.40 1,837 2353.40 0.00 . 0 00 - ? - - - _ 0.000 0.50 2,296 2353.50 0.00 . s 0 00 --- . - - - 0.000 0.60 2,756 2353.60 0.00 . 0.00 - .- ~' _ 0.000 0.70 3,215 2353.70 0.00 0.00 - = - - -- - - .0.000 0.80 3,674 2353.80 0.00 0 00 - - - _ - - - r 0.000 0.90 4,133 2353.90 0.00 . 0 00 - - 0.000 -1.00 4,593 2354.00 0.00 . 0.00 - -- - - - - O .D00 1.10 5,541 2354.10 0.00 OM - - 0.000 120 6,490 2354.20 0.00 0 00 -- - - - - w 0.000 1.30 7,438 2354.30 0.00 . 0 00 - - - - ? - 0.000 1.40 8,387 2354.40 0.00 . 0 00 - - _ _ _ _ 0.000 1.50 9,336 2354.50 0.00 . 0.00 - - --- -? - - 0.000 1.60 10,284 2354.60 0.00 0.00 .-. 0.000 1.70 11,233 2354.70 0.00 0 00 -- - 0.000 1.80 12.182 2354.80 0.00 . 0 00 - - 0 000 1.90 13,130 2354.90 0.00 . 0.00 - - - - - 0.000 2.00 14,079 2355.00 0.00 0.00 - - - - 0.000 2.10 15,095 2355.10 0.00 0 00 --- - - - - -' - -- 0.000 2.20 16,110 2355.20 0.00 . 0.00 -- - _- - - - - - 0.000 2.30 i 17,126 2355.30 0.00 0.00 - - - - - 0.000 2.40 18,142 2355.40 0.00 0.00 - - - - 0.000 2.50 19,158 2355.50 0.03 IC 0.031C - - - - w ' - 0.000 2.60 20,173 2355.60 0.121C 0.11 IC -- _. - - - w 0.030 2.70 21,189 2355.70 0.231C 0.23 IC - - -- - - 0.114 2.80 22,205 2355.80 0.36 IC 0.36 IC - - - - -- - -' - 0.230 2.90 23,220 2355.90 0.491C 0.47 IC - - - - - - 0.363 3.00 24,236 2356.00 0.56 IC 0.561C - 0.473 3.20 26,487 2356.20 0.72 IC 0.70 IC 0.559 3.40 28,739 2356.40 0.84 IC 0.821C 0.700 0.818 Continues on next page... Pond E Stage I Storage / Discharge Table stage ft storage Elevation Clv A Ov B Clv C PrfRsr Wr A Wr B Wr C Wr D EMI User Total CUR ft Cfa cfs efs Cfs ofs Cfa cfs aft Cfa C% Cfa 3.60 30,990 2356.60 0.931C 0.921C - - - 3.80 33,241 2356.80 1.021C - 1.011C - - - 0.921 r 4.00 35,493 2357.00 1.111C - 1.101C - - - 1.013 W - 4.20 37,744 2357.20 121 IC - 1.181C - - - - 1.098 4.40 •39,995 2357.40 1.261C - 1.251C - - - 1.176 - - 4.60 42,246 2357.60 1.321C - 1.321C - - - 1.250 4.80 44,498 2357.80 1.421C - 1.391C - - - - 1.320 5.00 46,749 2358.00 1.481C - 1.45 IC - - - 1.386 5.20 49,304 2358.20 1.531C - 1.511C - - - 1.449 _' 5.40 51,860 2358.40 1.591C - 1.571C - - ». 1509 - -_ - - 5.60 54,415 2358.60 1.651C - 1.621C - - - 1.567 r - - - 5.80 56,970 2358.80 1.711C - 1.681C - - -- 1.623 - - - - 6.00 59,526 2359.00 1.771C - 1.731C - - - 1.677 6.20 82,081 2359.20 1.78 IC - 1.78 IC - 1.730 6.40 64.636 2359.40 1.841C 1.831C - - - 1781 - - - 6.60 67,191 2359.60 1.901C - 1.8810 - -- - 1.830 - - - 6.80 69,747 2359.80 1.971C - 1.931C - - --. 1.878 - - 7.00 72,302 2360.00 1.971C 1.971C - - - - - - - 1925 7.20 75,175 2360.20 2.031C 2.021C - - - - - - - 1.971 7.40 78,048 2360.40 2.101C - 2.061C - - - - - - - 2.016 7.60. 80,921 2360.60 2.101C 2.101C - - - - r 2060 7.80 83,794 2360.80 2.161C - 2.1510 - - - - _. 2.103 8.00 86,668 2361.00 2.231C - 2.191C - 2.145 8.20 89,541 2361.20 2.231C 2231C - 2.186 8.40 92,414 2361.40 2.301C 2.271C - - 2.187 8.80 95,287 2361.60 2.311C 2.311C - - - T - - 2267 8.80 98,160 2381.80 2.37 IC - 2.341C - - - 2.67 - - - 9.00 101,033 2362.00 2.381C -- - - 2.381C -- 2.344 - - - 9.20 104,237 2362.20 2.44 IC 2.42 IC - -- - 2.382 - - 9.40 107,442 2362.40 2.46 IC ; _ - 2.46 IC 2.419 9.60 110,646 2362.60 2.51 IC 2A9 IC --- - Z456 9.80 113,850 2362.80 2.531C - - 2.531C - - 2.492 - - - - 10.00 117,055 2363.00 2.581C - 2.561C - - - 2.527 10.20 120,259 2363.20 2.601C - 2.601C - - - - 2.563 - - Y - 10.40 123,463 2363.40 2.66 IC 2.63 IC - - - 2.597 - - - 10.60 126,667 2363.60 2.67 IC - 7-671C - - - 2.631 - - ' 10.80 129,872 2363.80 2.731C 2.7010 _• - '" - 2.665 - - 11.00 133,076 2364.00 2.731C 2.731C - _ 2.698 11.10 134,813 2364.10 2.76 IC 2.75 IC - - - 2.731 11.20 136,550 2364.20 2.801C 2.761C - - - - '- ^ 2.748 11.30 138,287 2364.30 2.801C 2.781C - - - - 2.764 11.40 140,023 2364.40 2.8010 2,801C - 2.780 11.50 141,760 2364.50 2.81 IC 2.81 IC - " - ` -' - 2.796 11.60 143,497 2364.60 2.88 IC - - 2.83 IC - - - - 2.812 11.70 145,234 2364.70 2.881C 2.841C - - "- '- - 2.828 11.80 146,971 2364.80 2.881C 2.861C - - - - - 2.844 11.90 148,708 2384.90 2.88 IC 2.86 IC - - - ?? ` -' - - 2.859 12.00 150,445 2365.00 2.89 IC 2.89 IC - - -' ?` - -- 2.875 '- - - - 2.690 ...End Pond Report Hydraflow Hydrographs by Interlsolve V9.2 Friday, Mar 13, 2009 Pond No. 8 - Pond 3 Pond Data Contours - User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 2505.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (stall) Incr. Storage (tuft) Total storage (cuff) 0.00 2505.00 10 0 0 1.00 2506.00 1,320 665 665 3.00 2508.00 5,901 7,221 7 886 5.00 2510.00 13,177 19,078 , 26,964 Culvert / Orifice Structures Weir Structures [A] [B] . [C] [Prfitsr] [A] [B] [C] ID] Rise (In) = 18.00 6.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0 00 Span (in) = 18.00 6.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 . 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 2505.00 2507.00 0.00 0.00 Weir Type = - Length (it) = 30.00 0.50 0.00 0.00 Mulls-Stage = No No No No slope (%) = 3.33 1.00 0.00 n/a N -Value = .024 .013 .000 n/a Orifice Coeff. = 0.60 0.60 0.00 0.00 Ehfil.(Inlhr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Cutwrt/Ortfice outflows are analy ed under Inlet tic) and outlet (cc) control. Weir risers checked for odflce conditne Qc) and submergence (s), Stage 1 Storage / Discharge Table -. , Stage ft Storage Elevation Clv A Clv B Chf C PrlRsr Wr A Wr B Wr C Wr D Exfil User Total tuft ft ifs afs afs cis efs ifs cis cfs de cfs cfs 0.00 0 2505.00 0.00 0.00 - 0.10 67 2505.10 0.00 0.00 - 0.000 0.20 133 2505.20 0.00 0.00 - • - - - 0.000 - 0.30 200 2505.30 0.00 0.00 - - 0.000 0.40 266 2505.40 0.00 0.00 - - - - 0.000 - - 0.50 333 2505.50 0.00 0.00 - - ... - 0.000 - `- 0.60 399 2505.60 0.00 0.00 - - - - _ 0,000 - - - 0.70 466 2505.70 0.00 0.00 - - - - 0.000 - - - 0.80 532 2505.80 0.00 0.00 - ^ - __ 0.000 0.90 599 2505.90 0.00 0.00 -- . -• - - - - - ... - - 0.000 1.00 665 2506.00 0.00 0.00 -- -- .-» - 0.000 - - - 1.20 1,387 2506.20 0.00 0.00 - -- - - 0.000 - - 1.40 2,109 2506.40 0.00 0.00 --? - - ._ - 0.000 1.60 2,831 2508.60 0.00 0.00 - - --- - - - - 0.000 - - - 1.80 3,553 2506.80 0.00 0.00 - - -- - 0.000 - 2.00 4,276 2507.00 0.00 0.00 - - - - 0.000 - - - 2.20 4,998 2507.20 0.12 IC 0.111C - - - - - - 0.000 2.40 5,720 2507.40 0.36 IC 0.361C - - .. - - ' - 0.114 -? - 2.60 6,442 2507.60 0.581C 0.561C - - - _ - - _ 0.363 - 2.80 7,164 2507.80 0.721C 0.701C - - - - 0.559 - -- - 3.00 7,886 2508.00 0.841C 0.82 IC - - - - 0.701 - - 3.20 9,794 2508.20 0.931C 0.92 IC -- - - - - 0.819 - - - 3.40 11,702 2508.40 1.02 IC 1.011C - - 0.921 3.60 13,609 2508.60 1.111C 1.10Ic - - - - - 1.014 - - - 3.80 15,517 2508.80 1.211C 1.181C - - - - - -- 1.098 - - - 4.00 17,425 2509.00 1.261C 1.25 IC - - - - - 1.177 - - - 4.20 19,333 2509.20 1.32 IC 1.32 IC - - - - - 1.250 - - - 4.40 21,241 2509.40 1A2 IC 1.391C - - - 1.320 - - 4.60 + 23,148 2509.60 1.481C 1.45 IC - - - 1386 - - 4.80 25,056 2509.80 1.531C 1.511C - - - - - 1.449 - - - 5.00 26,964 2510.00 1.591C 1.57 IC - - - - - - 1.509 '" - - - -- 1.566 Pond Report Hydrafiow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Pond No. 9 - Pond 4 Pond Data Contours - User-defined contour areas. Average and area method used for volume calculation. Begining Elevation = 2279.50 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 2279.50 10 0.50 2260.00 508 2.50 2282.00 1,116 4.50 2284.00 2,018 5.50 2285.00 3,378 6.50 2286.00 3,208 8.50 2288.00 4,687 10.50 2290.00 6,627 0 130 1,624 3,134 2,698 3,293 7,895 11,314 0 130 1,754 4,858 7,586 10,879 18,774 30,088 Culvert I Orifice Structures Weir Structures [A] [B] [C] IPrfRsr] [A] [g] [C) ID] Rise (in) = 18.00 6.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 18.00 6.00 0.00 0.00 Crest El. (it) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 2283.00 2285.60 0.00 0.00 Weir Type = - - Length (it) = 55.00 0.50 0.00 0.00 Multi-stage = No No No No Slope (%) 1 1.82 1.00 0.00 n/a N-Value = .024 .013 .000 n/a Orifice Coeff. = 0.60 0.60 0.00 0.00 " Exfll.(In/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No ? ? TW Elev. (it) = 0.00 Note: Cuhre WIfice 8XIonm we analyzed uroder INet 0c) and outlet Jac) eontmf Weir mama dfecked f fi Stage I Storage I Discharge Table . or of ce conditions 0c) and submergence (s? Stage ft Storage Elevation Civ A Clv B Civ C PrMsr Wr A Wr B Wr C Wr D Exfll User Total cuff ft cfs ds cfs Cis cfs cfs cfs cfs cia cfs cfs 0.00 0 2279.50 0.00 0.00 - - 0.05 13 2279.55 0.00 - 0.00 - - - -- 0.000 - - 0.10 26 2279.60 0.00 0.00 - - - W 0.000 0.15 39 2279.65 0.00 - 0.00 - - - 0.000 - - 0.20 52 2279.70 0.00 - 0.00 - 0.000 '- 0.25 65 2279.75 0.00 0.00 - -• - - - 0.000 0.30 78 2279.80 0.00 0.00 -. ' '' - 0.000 - - - - - 0.35 91 2279,85 0.00 - 0.00 - - - 0.000 - - - - - 0.40 104 2279.90 0.00 - - 0,00 -?-- 0.000 - ` - 0.45 117 2279.95 0.00 ? 0 00 - - - _ .0.000 0.50 130 2280.00 0.00 . - 0.00 - - 0.000 - - - - .0.70 292 2280.20 0.00 0.00 - - - - 0.000 0.90 454 2280.40 0.00 - 0.00 - -- - 0,000 - - - - 1.10 617 2280.60 0.00 - 0.00 - - 0.000 - Y 1.30 779 2280.80 0.00 - 0.00 - - 0.000 ` 1.50 942 2281.00 0.00 - 0.00 - - _ _ _ - 0,DDO 1.70 1,104 2281.20 0.00 - 0.00 - - - - 0.000 1.90 1,266 2281.40 0.00 - 0.00 - - 0.000 - - 2,10 1,429 2281.60 0.00 - 0.00 - - 0.000 - - - - '- 2.30 1,591 2281.80 0.00 - 0.00 - - - 0.000 -- - - - - 2.50 1,754 2282.00 0.00 - 0.00 - - 0.000 - - - 2.70 2,067 2282.20 0.00 - 0.00 0,000 2.90 2,380 2282.40 0.00 0.00 0.000 3.10 2,694 2282.60 0.00 0.00 -- -- 0.000 - - - - - 3.30 3,007 2282.80 0.00 - 0.00 - 0.000 - - 3.50 3,321 2283.00 0.00 0.00 - - - 0.000 - 3.70 3,634 2283,20 0.00 0.00 - 0.000 3.90 3,947 2283.40 0.00 0.00 - 0.000 4.10 4,261 2283.60 0.00 0.00 - - 0.000 - - 4.30 4,574 2283.80 0.00 - 0.00 - - 0.000 4.50 4,888 2284;00 0.00 0.00 - -- 0.000 - - - 4.60 5,157 2284.10 0.00 - 0.00 - 0.000 4.70 5,427 2284.20 0.00 0.00 - -- 0.000 - - - 4.80 5,697 2284.30 0.00 - 0.00 - 0.000 0.000 Continues on next page... Pond 4 Stage / Storage I Discharge Table Stage Storage Elevation Ov A ft Cott ft Cfa 4.90 5,967 2284.40 0.00 5.00 6,236 2284.50 0.00 5.10 6,506 2284.60 0.00 5.20 6,778 2264.70 0.00. 5.30 7,046 2284.80 0.00 5.40 7,316 2284.90 0.00 5.50 7,586 2285.00 0.00 5.60 7,915 2285.10 0.00 5.70 8,244 2285.20 0.00 5.80 8,573 2285.30 0.00 5.90 8,903 2285.40 0.00 6.00 9,232 2285.50 0.00 6.10 9,561 2285.60 0.00 6.20 9,891 2285.70 0.031C 6.30 10,220 2285.80 0.12 IC 6.40 10,549 2285.90 0.231C 6.50 10,879 2286.00 0.36 IC 6.70 11,668 2286.20 0.561C 6.90 12,458 2286.40 0.721C 7.10 13,247 2286.60 0.841C 7.30 14,037 2286.80 0.93 IC 7.50' 14,826 2287.00 1,02 IC 7.70 15,616 2287.20 1.11 IC 7.90 16,405 2287.40 1.211C 8.10 17,195 2287.60 1.261C 8.30 17,984 2287.80 1.321C 8.50 18,774 2288.00 1.421C 8.70 19,905 2288.20 1.481C 8.90 21,036 2288.40 1.531C 9.10 22,168 2288.60 1.59 IC 9.30 23,299 2288.80 1.65 le 9.50 24,431 2289.00 1.711C 9.70 25,562 2289.20 1.771C 9.90 26,693 2289.40 1.781C 10.10 27,825 2289.60 1.841C 10.30 28,956 2289.80 1.901C 10.50 30,088 2290.00 1.971C ...End Clv B Ctv C Pr(Rar Wr A Wr B Wr C Wr D Exfll User Total Cfa Cfs Cie Cfe Cfs Cfs Cfs Cre Cfa Cfa 0.00 - - - - - - - - 0.000 0.00 -- -- - - - - - - 0.000 0.00 - - - - - -- - -- 0.000 0.00 - - - - 0.000 0100 - - - - 0.000 0.00 - - - - 0.000 0.00 - - -- - - -- - - 0.000 0.00 - - - - - - - - 0.000 0.00 - - - 0.000 0.00 - - - 0.000 0.00 - - - 0.000 0.00 - - - - - - - - 0.000 0.00 - -- -- - - - - - 0.000 0.03 IC -- - - - - - - - 0.030 0.11 IC - 0.114 0.231C --- - - - - - - -.- 0.230 0.361C - 0.362 0.561C - 0.558 0.701C -- - - - - - - -- 0.700 012 IC -- - - - - - -- - 0.818 0.92 IC - 0.921 1.011C - 1.013 1.101C - - - - - -- -- - - 1.098 1.181C - 1.176 1.251C - - - - - - -- -- 1.250 1.32 IC - -- - - - - - - 1.320 1.39 IC -- - - -- _ - • - - 1.386 1.451C - 1.449 1.511C - 1.509 1.57 IC '?-, - .- - _ .- -- _ 1.567 1.62 IC - _, - - - - - _ - 1.623 1.681C - 1.677 1.731C - 1.730 1.781C -- --- - - - - - - 1,781 1.831C --- 1.830 1.881C - 1.878 1.93 IC - 1.925 m ;u g ?c„ o O z z XN coo 11 0 gc z go x ? -i m m D in -171 I O C r m 0 0. z X O r X C 0 i C T N m v 0 m o < n W m X a cn 0 0 0 cp N Oo M9: C NO PZm O? a, I? II ?^1 004 K) C ?n .D Im (4) --1 m D? v= D? nn r I m WIT] o r- f N _ o o O& ,T1o :9o N * > m rn rq0 !3 .• ? 4 ? 62 ?1 C O il o . m -i m ODTcnzco) ?vX?m2z o? 0 ;0 X -2.0 l -nm M)C D gO0DA Zng CO E -I a n 0- cc ?D ?3?CA q ! >w Sm= mNZ X O m -v---??? Zk C G) c O Z -? u Z ? o 0 v -1n< m - o CO m. m x o -o W ;uo? a;D:* $ m n= CO) n;0 CD ?Z rj) G) -o NAX-' o? n,O1 $o m? O G) co 0 ? Z q ? -40 "c myna "cot v Oz zx -i? 1?2 4" O ? o ;2:9 8? a ^ m m O v ?m m "n O m p^` N rn o>-nmM?m o pow Z o cm° --I 0 - )KMLn O m zoo)- -u o m9El ?- C -n D oz 0 Co "'vzizDk ('? ------- --- ao --? z x m -? :*>-a z m ?xz 0 m $ o jo< m o?N ?mm o,. x -n;uo N m x o? m ?1 m. 822 O - m fA "' fA z W (!J G'1 f ?O (D 0 q). wl com:c O ?co3 00 mmOv m? z=x m? v<m < CD Z o?N NOn -wz- @c oz C_ gZ zX oo?m wm? z? 0 .. ? -q "o •r? v co m 1 m m M. m v m -i o r m m m CO) v a a C m N 0 rn ODnin7ocn c z o --i m --? Q ?°xzmz r Wmtr->?D ._..I O?m°Ov Q ?O0 1 caz -q - ?c m ? C "n n I K 0 Cl) MZODO C co Z x l7 ?-- zo ? -? Z c c T C N ;u rn m pry a ?v? O al m -o co o -1 m 0 ;u 0 r p -? n< m 0 0? ANC ?N w Uom m < Ws; ;o o O O° Ooo -n 9) a O?? c) -' RCN) u ;u ?? w MO .? p ow oo 5 O ch D?g m X O°o m oo mn= w Z n m co n N CO ? z 8 NO 1 O m?i cx rn c? o°O m=9 r?- v?--i mE O Z Z=X M G) ??N t?_n0 ?'n "mn "-2.0 0? DD v= D 1 0 ;u 0 z ? M 0 n o CD?: M m? C 0q z? p z =1 _ o m -6 a v W mm n ?o M 0 m c r m _ N : n ? I Q a? O> -ncn;ocn cz0-am-A z DV?v mT T r- m -q C) O O v m0 xnzT= p r mom ?on v 00>!q --? \ 4% Gn Z -- D m n G) c- 0 C 0 =ZODao m o ? - _ 2.z O ? C - -I z T Z G) 0 c m 0 m z m 0 O 0 nr ' o mno m m ?- 9 Or- l< a c .° ? N O cn oo O m< -q z rn o 3N o g o X 011.0 O X 09 o ll - O N CA _C 0 • a po K) 4 m m o 0 o2 cn v n -n m? CD Ln Z I o Wo I[- i i i a i ZI -i T V co 0q ?cx o ? m x Z G ??N ° z 0 C r *,, ooO w? 0 °o0 wO O 0D ZX n8 mm -n r r - m v M3:Cr) H o CNO-o -0 m o z -1 m , a OI i N o ? 0 r C C7 --I C m v m n m GO- N ? n o? Im I .p. C' -L{ ? 0 a) r C O 0 < 'U C O m O 0)m c ;a n . O Or- ? OO NC ? Ln O O O n o KN m ? p o0 m . ° o n O 0 4 mp CYI II ,Z_1 o m 0 GO PO O0 o m m CA o K3 K) v 0 4 PD 4?, m >CA n0? zm v D OD -nCo;a Co cz0-1m-i ra ? zmz ??r-v;u v mr?-qD 0 00 xnz-u=41? DmmmX 110004 T zi)z-Dm (1) -n ,P c -i 0 X?0;? =m-D 03 mzz OX 03 ZX Z c 9 c co D O O -1 n < m mmm m m? ?0 D ;0* mn= CO ?z co 0 m BASIN 1 HYDROGRAPHS Hydrograph Report HydraBow Hydrographs by Intellsolve v9.2 Friday, Mar 13, 2009 Hyd. No. 1 Basin 1 (Pre-Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 173.550 ac 18.0% LAG 3.25 in 24:hrs Peak discharge = 13.43 cfs Time to peak = 12.60 hrs Hyd. volume = 167,359 cuft Curve number = 55 Hydraulic length = 3994 ft Time of conc. (Tc) = 44.6 min Distribution = Type 11 Shape factor = 484 Hydrograph Discharge Table Time =- Outflow (hrs cfs) 12.43 12.76 12.45 12.89 12.47 13.00 12.48 13.10 y 12.50 13.19 -% 12.52 13.26 12.53 13.32 12.55 13.37 12.57 13.40 12.58 13.42 12.60 13.43 << 12.62 13.42 12.63 13.40 12.65 13.37 12.67 13.33 12.68 13.27 12.70 13.21 --- 12.72 13.13 - 12.73 13.04 12.75 12.94 12.77 12.83 ...End I Prlyded vskm 95.00% or Op,l Hydrograph Report Hydraflow Hydrographs by Intellsdve v9.2 Hyd. No. 2 Basin 1 (Bypass) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 51.430 ac Basin Slope = 18.0% Tc method = LAG Total precip. = 3.25 in Storm duration = 24 hrs Hydrograph Discharge Table Time '-- Outflow (hrs cfs) 12.32 8.366 12.33 8.499 12.35 8.578 12.37 8.612 12.38 8.615 << 12.40 8.602 12.42 8.581 12.43 8.552 12.45 8.515 12.47 8.471 12.48 8.418 12.50 8.357 12.52 8.288 12.53 8.211 ...End Friday, Mar 13, 2009 Peak discharge = 8.615 cfs Time to peak = 12.38 hrs Hyd. volume = 73,328 cuft Curve number = 59 Hydraulic length = 3994 ft Time of conc. (Tc) = 40.3 min Distribution = Type II Shape factor = 484 ( ftnbd veWee >= 96.00% or Op.) SUB BASIN 1-A HYDROGRAPHS Hydrograph Report Hydraflow Hydrographs by lntellsolve v9.2 Hyd. No. 3 Basin A Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 73.350 ac = 17.6% = LAG = 3.25 in = 24 hrs Friday, Mar 13, 2009 Peak discharge = 20.45 cfs Time to peak = 12.30 hrs Hyd. volume = 133,806 cuft Curve number = 62 Hydraulic length = 3518 ft Time of conc. (Tc) = 34.2 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time-- Outflow (hrs cfs) 12.25 19.92 12.27 20.24 12.28 20.41 12.30 20.45 « 12.32 20.38 12.33 20.23 12.35 20.04 12.37 19.84 12.38 19.61 ...End 3:1 ! (Printed values x 95.00% or Qp.) t Hydrograph Report Hydmaflow Hydrographs by intalisolve v92 Friday, Mar 13, 2009 Hyd. No. 4 Basin A (Routed) Hydrograph type = Reservoir Stone frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 - Basin A Max. Elevation = 2356.59 ft Peak discharge Time to peak Hyd. volume Reservoir name Max. Storage = 2.127 cfs = 16.38 hrs = 133,739 cuft = Pond A = 61,059 cuft Storage Indication method used. Hydrograph D ischarge Table tMMMV UOS 95.00% of Qp') Time Inflow Elevation Clv A CIv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cfs afa cfs cfs cfs cfs 13.75 4.076 2356.09 2.031 2.021 - -- - - ----- - --- 2.021 13.77 4.047 2356.09 2.032 2.023 - - -- - -- - - 2.023 13.78 4.018 2356.10 2.033 2.025 -- --- - ---- -- --- - 2.025 13.80 3.989 2356.11 2.034 2.026 - --- - - -- - -- 2.026 13.82 3.961 2356.12 2.035 2.028 --- - ---- - -- ---- - 2.028 13.83 3.933 2356.13 2.036 2.030 - -- - - --- - --- 2.030 13.85 3.905 2356.14 2.037 2.031 --- - - - --- - - 2.031 13.87 3.878 2356.14 2.038 2.033.---.- -- -- - - 2.033 13.88 3.851 2356.15 2.039 2.035 ---= - -- -- - --- - 2.035 13.90 3.825 2356.16 2.040 2.036 2.036 13.92 3.798 2356.17 2.041 2.038 2.038 13.93 3.772 2356.17 2.042 2.039 - - - ---- - - - 2.039 13.95 3.746 2356.18 2.043 2.041 - - - - - ---- - 2.041 13.97 3.720 2356.19 2.044 2.042 2.042 13.98 3.695 2356.19 2.044 2.044 ----- - -- ---- - - -- 2.044 14.00 3.669 2356.20 2.046 2.045 --- - ---- -- --- -- - 2.045 14.02 3.644 2356.21 2.050 2.047 -L -- --- -- -- -- -- 2.047 14.03 3.619 2356.22 2.053 2.048 -?:; - ----- ----- - - - 2.048 14.05 3.594 2356.22 2.057 2.049 - -- --- - - - --- 2.049 14.07 3.569 2356.23 2.061 2.051 -- -- --- ----- - - - 2.051 14.08 1545 2356.23 2.064 2.052 - - -- - - -- --- - 2.052 14.10 3.521 2356.24 2.068 2.053 ---- = - ---- -- ---- --- -- 2.053 14.12 3.497 2356.25 2.071 2.055 - -- - - ---- ---- - - 2.055 14.13 3.474 2356.25 2.075 2.056 - - - --- - ---- - 2.056 14.15 3.451 2356.26 2.078 2.057 - -- -- -- - - - 2.057 14.17 3.428 2356.26 2.081 2.058 ---- -- ---- -- - --- -- 2.058 14.18 3.405 2356.27 2.084 2.060 -- -- -- 2.060 14.20 3.383 2356.28 2.088 2.061 - 2.061 14.22 3.362 2356.28 2.091 2.062 - --- - - ----- -- - 2.062 14.23 3.341 2356.29 2.094 2.063 2.063 14.25 3.320 2356.29 2.097 2.064 --- - - ---- --- --- - 2.064 14.27 3.300 2356.30 2.100 2.065 -- --- - --- ---- -- - 2.065 14.28 3.280 2356.30 2.103 2.066 ---- -- -- -- --- - -- --- 2.066 14.30 3.261 2356.31 2.106 2.067 2.067 14.32 3.243 2356.31 2.108 2.068 - --- - ---- ----- - ---- 2.068 14.33 3.225 2356.32 2.111 2.070 2.069 14.35 3.208 2356.32 2.114 2.070 -- --- -- - ---- -,- ----- 2.070 14.37 3.191 2356.33 2.117 2.072 ---- - --- ---- ---- - -- ----- 2.071 14.38 3.175 2356.33 2.119 2.072 - -- ---- -- - -- -- 2.072 14.40 3.159 2356.34 2.122 2.073 - --- - ---- -- ---- --- 2.073 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hm) ds ft ds ds ds ds cis Cfs ds Cfs efs ds 14.42 3.144 2356.34 2.124 2.074 2.074 14.43 3.130 2356.34 2.127 2.075 - - -- - - -- ---- 2.075 14.45 3.116 2356.35 2.129 2.076 - ---- - - ---- -- - 2.076 14.47 3.102 2356.35 2.132 2.077 - --- -- - -- - - 2.077 14.48 3.089 2356.36 2.134 2.078 2.078 14.50 3.076 2356.36 2.137 2.079 - -- --- ---- -- --- - 2.079 14.52 3.064 2356.37 2.139 2.080 - --- -- - - - --- 2.080 14.53 3.052 2356.37 2.141 2.081 -- - - ---- -- ---- - 2.081 14.55 3.041 2356.37 „ 2.144 2.082 -- -- ---- - ----- - - 2,082 14.57 3.029 2356.38 2.146 2.082 2.082 14.58 3.019 2356.38 2.148 2.083 - -- - - --- --- -- 2.083 14.60 3.008 2356.39 2.150 2.084 - --- - - - -- -- 2.084 14.62 2.998 2356.39 2.152 2.085 -- -- ---- - -- -- - 2.085 14.63 , 2.988 2356.39 2.155 2.086 -- - --- - -- ---- --- 2.086 14.65 2.979 2356.40 2.157 2.086 - --- - - -- -- - 2.086 14.67 2.969 2356.40 2.158 2.087 2.087 14.68 2.960 2356.41 2.158 2.088 2.088 14.70 2.952 2356.41 2.158 2.089 - --- - --- ---- - -- 2.089 14.72 2.943 2356.41 2.158 2.090 --- ---- ---- - - - ----- 2.090 14.73 2.935 2356.42 2.158 2.090 --- --- - - ----- --- -- 2.090 14.75 2,926 2356.42 2.158 2.091 y _ ; --- - --_ --- --- - 2.091 14.77 2.918 2356.42 2.158 2.092 -- ---- - - -- ---- - 2.092 14.78 2.910 2356.43 2.158 2.093 --- - - - --- --- - 2.093 14.80 2.902 2356.43 2.158 2.093 -- --- - ---- ---- - - 2.093 14.82 2.895 2356.43 2,158 2.094 2.094 14.83 2.887 2356.44 2.158 2.095 --- -- --- --- -- ----- - 2.095 14.85 2.880 2356.44 2.158 2.095 2.095 14.87 2.872 2356.44 2.158 2.096 2.096 14.88 2.865 2356.45 2,158 2.097 2.097 14.90 2.857 2356.45 2.158 2.097 ---- - - --- - ---- -- 2.097 14.92 2.850 2356.45 2.158 2.098 - - - -- - - - 2.098 14.93 2.842 2356.46 2.158 2.099 --= ., - - ---- --- - - 2.099 14.95 2.835 2356.46 2.158 2.099 ----- - --- -- -- - - 2.099 14.97 2.827 2356.46 2.158 2.100 - 2.100 14.98 2.820 2356.47 2.158 2.101 _ 2.101 15.00 2.812 2356.47 2.158 2.101 ----- - - --- -- -- - 2.101 15.02 2.805 2356.47 2.158 2.102 2.102 15.03 2.797 2356.47 2.158 2.103 2.103 15.05 2.789 2356.48 2.158 2.103 - ---- -- -- - --- 2.103 15.07 2.782 2356.48 2.158 2.104 - -- ----- - --- -- -- 2.104 15.08 2.774 2356AB 2.158 2.104 2.104 15.10 2.766 2356.49 2.158 2.105 --- - ---- - --- - -- 2.105 15.12 2.759 2356.49 2.158 2.106 2.106 15.13 2.751 2356.49 2.158 2.106 2.106 15.15 2.743 2356.49 2.158 2.107 2.107 15.17 2.735 2356.50 2.158 2.107 2.107 15.18 ` 2.727 2356.50 2.158 2.108 -- - --- - --- -- - 2.108 15.20 2.719 2356.50 2.158 2.108 2.108 15.22 2.712 2356.50 2.158 2.109 2.109 15.23 2.704 2356.51 2.158 2.109 2.110 15.25 2.696 2356.51 2.158 2,110 2.110 15.27 2.688 2356.51 2.158 2.111 2.111 15.28 2.680 2356.51 2.158 2.111 2.111 15.30 2.672 2356.52 2.158 2.112 ---- -- ---- ---- - =- - ---- 2.112 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C PfRsr Wr A Wr B Wr C Wr D ExfII Outflow (hrs) cfs ft cfs cfs cfs cis cfs cfs cis cfs cfs cfs 15.32 2.664 2356.52 2.158 2.112 - -- --- - - --- ---- 2.112 15.33 2.656 2356.52 2.158 2.113 - - -- --- - - --- 2.113 15.35 2.647 2356.52 2.158 2.113 -- - - ---- ---- - - 2.113 15.37 2.639 2356.53 2.158 2.113 --- -- - - --- - - 2.114 15.38 2.631 2356.53 2.158 2.114 -- - -- -- - -- --- 2.114 15.40 2.623 2356.53 2.158 2.114 - - -- - - -- --- 2.114 15.42 2.615 2356.53 2.158 2.115 --- - --- - --- - - 2.115 15.43 2.607 2356.53 2.158 2.115 -- ----- - - --- - -- 2.115 15.45 2.598 2356.54., 2.158 2.116 - -- -- ---- - -- - 2.196 15.47 2.590 2356.54 2.158 2.116 - - -- - --- - - 2.116 15.48 2.582 2356.54 2.158 2.117 -- - ---- -- -- - - 2.117 15.50 2.573 2356.54 2.158 2.117 -- -- - -- -- - - 2.117 15.52 2.565 2356.54 2.156 2.117 - ---- -- -- - -- ---- 2,117 15.53 , 2.557 2356.55 2.158 2.118 2.118 15.55 2.548 2356.55 2.158 2.118 --- - --- -- -- - 2.118 15.57 2.540 2356.55 2.158 2.119 2.119 15.58 2.531 2356.55 2.158 2.119 -- - ---- ---- ---- -- -- 2.119 15.60 2.523 2356.55 2.158 2.119 - - - ---- --- ---- -- 2.119 15.62 2.515 2356.55 2.158 2.120 - --- - - -- - ---- 2.120 15.63 2.506 2356.56 2.158 2.120 --- -- --- -- --- - - 2.120 15.65 2.498 2356.56 2.158 2.120 r - --- -- - ---- -- 2.120 15.67 2.489 2356.56 2.158 2.121 =-: - - - - -- - 2.121 15.68 2.480 2356.56 2.158 2.121 2,121 15.70 2.472 2356.56 2.158 2.121 -- ---- ---- - --- -- - 2.121 15.72 2,463 2356.56 2.158 2.122 --- -- -- -- -- - -- 2.122 15.73 2.455 2356.57 2.158 2.122 - --- --- - - --- ---- 2.122 15.75 2.446 2356.57 2,158 2.122 ----- - --- - ---- - ---- 2.122 15.77 2.437 2356.57 2.158 2.123 --- --- -- --- --- -- - - 2.122 15.78 2.429 2356.57 2.158 2.123 2.123 15.80 2.420 2356.57 2.158 2.123 -- - -- ---- - --- -- 2.123 15.82 2,411 2356.57 2.158 2.123 --- - - - -- - ---- 2.123 15.83 2.402 2356.57 2.158 2.124 ----"" :. --- - - - --- -- --- 2,124 15.85 2.394 2356.57 2.158 2.124 2.124 15.87 2.385 2356.58 2.158 2.124-- 2.124 15.88 2.376 2356.58 2.158 2.124 -- - -- -- - - - 2.124 15.90 2.367 2356.58 2.158 2.124 - --- ---- - -- --- - 2.124 15.92 2.358 2356.58 2.158 2.125 - --- - -- ---- -- -- 2.125 15.93 2.349 2356.58 2.158 2.125 - -- -- - - - - 2.125 15.95 2.340 2356.58 2.158 2.125 --- -- - ---- - - 2.125 15.97 2.331 2356.58 2.158 2.125 2.125 15.98 2.322 2356.58 2.158 2.125 ---- --- -- -- -- -- -- 2.125 16.00 2.314 2356.58 2.158 2.126 - ---- -- -- - - -- 2.126 16.02 2.305 2356.58 2.158 2.126 --- -- -- - --- - - 2.126 16.03 2.296 2356.58 2.158 2.126 --- -- -_ - _? - - 2.126 16.05 2.287 2356.59 2.158 2.126 2.126 16.07 2.278 2356.59 2.158 2.126 - - --- - -- ---- --- 2.126 16.08 2.269 2356.59 2.158 2.126 --- -- - - -- - - 2.126 16.10 2.260 2356.59 2.158 2.127 2.126 16.12 2.251 2356.59 2.158 2.127 --- ---- --- -- -- --- --- 2.127 16.13 2.242 2356.59 2.158 2.127 --- - -- --- -- -- - 2.127 16.15 2.234 2356.59 2.158 2.127 2.127 16.17 2.225 2356.59 2.158 2.127 2.127 16.18 2.216 2356.59 2.158 2.127 - --- ----- -- -- - --- 2.127 16.20 2.208 2356.59 2.158 2.127 2.127 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cis ft cfs cfs cfs cfs cis cfs cfs cfs cfs cis 16.22 2.200 2356.59 2.158 2.127 2.127 16.23 2.192 2356.59 2.158 2.127 2.127 16.25 2.184 2356.59 2.158 2.127 ---- - - - - --- -- 2.127 16.27 2.176 2356.59 2.158 2.127 --- - ----- -- -- --- - 2.127 16.28 2.168 2356.59 2.158 2.127 -- - - ----- -- -- -- 2.127 16.30 2.161 2356.59 2.158 2.127 --- - - --- - -, --- 2.127 16.32 2.154 2356.59 2.158 2.127 2.127 16.33 2.147 2356.59 2.158 2.127 2.127 16.35 2.140 2356.59,, 2.158 2.127 - --- -- ---- - --- - 2.127 16.37 2.133 2356.59 2.158 2.127 2.127 16.38 2.127 2356.59 << 2.158 2.127 2.127 << 16.40 2.121 2356.59 2.158 2.127 --- --- - --- ----- - - 2.127 16.42 2.115 2356.59 2.158 2.127 2.127 16.43 2.109 2356.59 2.158 2.127 --- - - -- ----- - -- 2.127 16.45 2.104 2356.59 2.158 2.127 2.127 16.47 2.098 2356.59 2.158 2.127 2.127 16.48 2.093 2356.59 2.158 2.127 2.127 16.50 2.088 2356.59 2.158 2.127 ---- - -- -- - - ---- 2.127 16.52 2.083 2356.59 2.158 2.127 - ---- - -- - - - 2.127 16.53 2.079 2356.59 2.158 2.127 - - -- - --- --- -- 2.127 16.55 2.074 2356.59 2.158 2.127 s - - - -- - - 2 127 16.57 2.070 2356.59 2.158 .. 2.127 --r ---- -- --- . -- ---- --- 2.127 16.58 2.066 2356.59 2.158 2.127 - - - -- --- - - 2.127 16.60 2.061 2356.59 2.158 2.127 - - ---- - --- -- -- 2.127 16.62 2.057 2356.59 2.158 2.127 2.127 16.63 2.054 2356.59 2.158 2.127 2.127 16.65 2.050 2356.59 2.158 2.127 ---- -- --- --- - --- -- - 2.127 16.67 2.046 2356.59 2.158 2.127 -- - ---- -- - -- --- 2.127 16.68 2.043 2356.59 2.158 2.127 - - - --- - ---- -- 2.127 16.70 2.039 2356.59 2.156 2.127 2.127 16.72 2.036 2356.59 2.158 2.127 2.127 16.73 2.033 2356.59 2.158 2.126 -.4"..- 2.126 16.75 2.029 2356.59 2.158 2.126 2.126 16.77 2.026 2356.59 2.158 2.126 2.126 16.78 2.023 2356.59 2.158 2.126 _ 2.126 16.80 2.020 2356.59 2.158 2.126 -- -- --- -- - -- - 2.126 16.82 2.017 2356.58 2.158 2.126 --- -- -- - -- -- ---- 2.126 16.83 2.014 2356.58 2.158 2.126 - - - - --_ ?- -- 2.126 16.85 2.011 2356.58 2.158 2.126 2.126 16.87 2.008 2356.58 2.158 2.126 -- -- -- - - - -- 2.126 16.88 2.006 2356.58 2.156 2.126 2.126 16.90 2.003 2356.58 2.158 2.125 2.125 16.92 2.000 2356.58 2.158 2.125 -- - - --- --- -- - 2.125 16.93 1.997 2356.58 2.158 2.125 - --- -- ---- - - - 2.125 16.95 1.994 2356.58 2.158 2.125 2.125 16.97 1.991 2356.56 2.158 2.125 2.125 16.98 1 1.988 2356.58 2.158 2.125 2.125 17.00 1.985 2356.58 2.158 2.125 2.125 17.02 1.983 2356.58 2.158 2.125 2,125 17.03 1.980 2356.58 2.158 2.125 2.125 17.05 1.977 2356.58 2.158 2.124 2.124 17.07 1.974 2356.58 2.158 2.124 --- 2.124 17.08 1.971 2356.58 2.158 2.124 - 2.124 17.10 1.968 2356.58 2.158 2.124 - 2.124 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft CfS cis cis CfS CfS cfs CfS CfS cis CfS 17.12 1.965 2356.57 2.158 2.124 -- -- ---- - - - - 2.124 17.13 1.962 2356.57 2.158 2.124 -- ---- - --- - - ---- 2.124 17.15 1.959 2356.57 2.158 2.124 - -- -- ---- - - - 2.124 17.17 1.956 2356.57 2.158 2.123 ----- - - - - - - 2.123 17.18 1.953 2356.57 2.158 2.123 - ---- -- - - - - 2.123 17.20 1.950 2356.57 2.158 2.123 - -- -- --- - - - 2.123 17.22 1.947 2356.57 2.158 2.123 2.123 17.23 1.945 2356.57 2.158 2.123 - - --- -- - - - 2.123 17.25 1.942 2356.57 , 2.158 2.123 - --- -- - -- --- ---- 2.123 17.27 1.939 2356.57 2.158 2.122 -- - -- --- - -- -- 2,122 17.28 1.936 2356.57 2.158 2.122 2.122 17.30 1.933 2356.57 2.158 2.122 - - -- --- - ----- -- 2.122 17.32 1.930 2356.57 2.158 2,122 - - -- -- - - - 2.122 17.33 1.927 2356.56 2.158 2.122 2.122 17.35 1.924 2356.56 2.158 2.122 --- --- -- - - -- --- 2.122 17.37 1.921 2356.56 2.158 2.121 2.121 17.38 1.918 2356.56 2.158 2.121 -- --- -- - --- ---- - 2.121 17.40 1.915 2356.56 2.158 2.121 -- -- ---- -- - - -- 2.121 17.42 1.912 2356.56 2.158 2.121 ---- - -- -- --- - -- 2.121 17.43 1.909 2356.56 2.158 2.121 -- -- -- --- - - --- 2.121 17.45 1.905 2356.56 2.158 2.121 ?. -- - ----- -- -- - 2.121 17.47 1.902 2356.56 2.158 2.120 -?-:; ----- - - -- --- - 2.120 17.48 1.899 2356.56 2.158 2.120 2.120 17.50 1.896 2356.56 2.158 2.120 2.120 17.52 1.893 2356.56 2.158 2.120 - - ----- -- - - - 2.120 17.53 1.890 2356.55 2158 2.120 2,120 17.55 1.887 2356.55 2.158 2.119 2.119 17.57 1.884 2356.55 2.158 2.119 -- -- - ---- ----- --- --- 2.119 17.58 1.881 2356.55 2.158 2.119 - - -- - - -- - 2,119 17.60 1.878 2356.55 2.158 2.119 - - - - --- -- - 2.119 17.62 1.875 2356.55 2.158 2.118 ---- -- -- - --- - --- 2.118 17.63 1.872 2356.55 2.158 2.118 --=`,z, -- -- -_ - -- - 2.118 17.65 1.869 2356.55 2.158 2.118 - - - ---- - --- -- 2.118 17.67 1.866 2356.55 2.158 2.118-.- -- -- - -- -- - 2.118 17.68 1.862 2356.55 2.158 2.118 -2.118 17.70 1.859 2356.54 2.158 2.117 -- -- -- -- --- - -- 2.117 17.72 1.856 2356.54 2.158 2.117 2.117 17.73 1.853 2356.54 2.158 2.117 2.117 17.75 1.850 2356.54 2.158 2.117 2.117 17.77 1.847 2356.54 2.158 2.116 2.116 17.78 1.844 2356.54 2,158 2.116 - - - __- ,_ -_ .-_ 2,116 17.80 1.840 2356.54 2.158 2.116 - - -- - - - -- -- 2.116 17.82 1.837 2356.54 2.158 2.116 - - --- - - - - 2.116 17.83 1.834 2356.53 2.158 2.115 ---- - --- --- -- --- - 2,115 17.85 1.831 2356.53 2.158 2.115 2.115 17.87 1.828 2356.53 2.158 2.115 - - --- -- - --- - 2.115 17.88 1.825 2356.53 2.158 2.115 2.115 17.90 1.821 2356.53 2.158 2.114 2.114 17.92 1.818 2356.53 2.158 2.114 2.114 17.93 1.815 2356.53 2.158 2.114 2.114 17.95 1.812 2356.53 2.156 2.114 2.114 17.97 1.809 2356.53 2.158 2.113 --- -- - ----- --- - - 2.113 17.98 1.805 2356.52 2.158 2.113 -- - -- -- - --- -- 2.113 18.00 1.802 2356.52 2.158 2.113 2.113 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A CIv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cis ft cis cis cis Cis cis cfs cis cfs Cfs Cis 18.02 1.799 2356.52 2.158 2.113 --- - - - --- --- - 2.113 18.03 1.796 2356.52 2.158 2.112 --- -- - -- -- - --- 2.112 18.05 1.793 2356.52 2.158 2.112 ----- -- -- -- --- -- - 2.112 18.07 1.789 2356.52 2.158 2.112 - -- ---- --- - --- -- 2.112 18.08 1.786 2356.52 2.158 2.111 --- - - - ---- - ---- 2.111 18.10 1.783 2356.51 2.158 2.111 --- - ----- - -- --- - 2.111 18.12 1.780 2356.51 2.158 2.111 ---- --- ---- --- - ---- - 2.111 18.13 1.776 2356.51 2.158 2.111 --- - - --- -- --- ---- 2.111 18.15 1,773 2356.51 - 2.158 2.110 - -- -- -- - - -- 2.110 18.17 1.770 2356.51 2.158 2.110 - - - - --- -- - 2.110 18.18 1.767 2356.51 2.158 2.110 -- - - -- -- - - 2.110 18.20 1.763 2356.51 2.158 2.109 - -- - - --- - - 2.109 18.22 1.760 2356.50 2.158 2.109 -- -- -- - - - -- 2.109 18.23 1.757 2356.50 2.158 2.109 --- - ---- - ---- -- -- 2.109 18.25 1.753 2356.50 2.158 2.108 - - --- -- --- ---- 2.108 18.27 1.750 2356.50 2.158 2.108 2.108 18.28 1.747 2356.50 2.158 2.108 ---- - - - - - - 2.108 18.30 1.744 2356.50 2.158 2.107 -- -- --- --- -- - - 2.107 18.32 1.740 2356.50 2.158 2.107 - --- -- ---- - -- - 2.107 18.33 1.737 2356.49 2.158 2.107 - - --- --- - -- --- 2.107 18.35 1.734 2356.49 2.158 2.106 -- - - - --- --- - 2.106 18.37 1.730 2356.49 2.158 2.106 2.106 18.38 1.727 2356.49 2.158 2.106 --- ---- -- --- --- - - 2.106 18.40 1.724 2356.49 2.158 2.105 - -- --- - - -- -- 2.105 18.42 1.720 2356.49 2.158 2.105 - - ---- - - ----- -- 2.105 18.43 1.717 2356.48 2.158 2.105 -- - -- --- - -- --- 2.105 18.45 1.714 2356.48 2.158 2.104 -- -- ---- - - - ---- 2.104 18.47 1.710 2356.48 2.158 2.104 -- ---- - -- - -- - 2.104 18.48 1.707 2356.48 2.158 2.104 -- -- ---- - - - -- 2.104 18.50 1.704 2356.48 2.158 2.103 -- ---- - - -- - -- 2.103 18.52 1.700 2356.48 2.158 2.103 - -- - ---- -- - - 2.103 18.53 1.697 2356.47 2.158 2.103 -= ; . - - -- -- - -- 2.103 18.55 1.694 2356.47 2.158 2.102 2.102 18.57 1.690 2356,47 2.158 2.102 -` 2.102 18.58 1.687 2356.47 2.158 2.102 - -- - ----- - - --- 2.102 18.60 1.683 2356.47 2.158 2.101 - -- - - ---- ---- --- 2.101 18.62 1.680 2356.47 2.158 2.101 -- -- - ---- -- -- --- 2.101 18.63 1.677 2356.46 2.158 2.100 ---- --- - - -- --- --- 2.100 18.65 1.673 2356.46 2.158 2.100 - --- -- -- -- --- 2.100 18.67 1.670 2356.46 2.158 2.100 ---- - - - - --- -- 2.100 18.68 1.666 2356.46 2.158 2.099 2.099 18.70 1.663 2356.46 2.158 2.099 -- -- --- - -- -- - 2.099 18.72 1.660 2356.45 2.158 2.098 - -- -- -- - -- -- 2.098 18.73 1.656 2356.45 2.158 2.098 --- 2.098 18.75 1.653 2356.45 2.158 2.098 - - -- --- -- ---- - 2.098 18.77 1.649 2356.45 2.158 2.097 --- ---- - -- -- -- - - 2.097 18.78 1.646 2356.45 2.158 2.097 --- -- - - --- --- ---- 2.097 18.80 1.642 2356.45 2.158 2.096 - --- --- ----- ---- ---- ---- 2.096 18.82 1.639 2356.44 2.158 2.096 - ---- --- - -- ---- --- 2.096 18.83 1.636 2356.44 2.158 2.096 --- - -- --- ---- --- -- 2.096 18.85 1.632 2356.44 2.158 2.095 2.095 18.87 1.629 2356.44 2.158 2.095 ---- --- -- - --- --- - 2.095 18.88 1.625 2356.44 2.158 2.094 ---- --- ---- ----- -- ----- --- 2.094 18.90 1.622 2356.43 2.158 2.094 ---- ---- --- ----- - --- ---- 2.094 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cis ft cis cfs cfs cfs cis cis cis cis cfs cis 18.92 1.618 2356.43 2.158 2.094 - ---- ---- --- - «--- -- 2.094 18.93 1.615 2356.43 2.158 2.093 -- ---- -- - - --- - 2.093 18.95 1.611 2356.43 2.158 2.093 2.093 18.97 1.608 2356.43 2.158 2.092 --- --- - -- - - -- 2.092 18.98 1.604 2356.42 2.158 2.092 - -- -- --- -- -- -- 2.092 19.00 1.601 2356.42 2.158 2.091 2.091 19.02 1.597 2356.42 2.158 2.091 - - -- ---- -- -- -- 2.091 19.03 1.594 2356.42 2.158 2.091 2.091 19.05 1.590 2356.42- 2.158 2.090 -- --- ---- ---- --- ---- - 2.090 19.07 1.587 2356.41 2.158 2.090 - --- - - - - -- 2.090 19.08 1.583 2356.41 2.158 2.089 -- -- ---- - - - -- 2.089 19.10 1.580 2356.41 2.158 2.089 2.089 19.12 1.576 2356.41 2.158 2.088 --- --- - --- - «- - 2.088 19.13 1.573 2356.40 2.158 2.088 - - - --- ---- - 2.088 19.15 1.569 2356.40 2.158 2.087 2.087 19.17 1.566 2356.40 2.158 2.087 2.087 19.18 1.562 2356.40 2.157 2.087 - - ---- -- - - ----- 2.086 19.20 1.559 2356.40 2.156 2.086 - ----- --- - - --- ---- 2.086 19.22 1.555 2356.39 2.154 2.086 -- -- -- - ---- --- - 2.086 19.23 1.551 2356.39 2.153 2.085 «- ----- - --- - -- - 2.085 19.25 1.548 2356.39 2.152 2.085 =. ---- --- - --- - ---- 2.085 19.27 1.544 2356.39 2.151 s 2.084 -- ---- - ---- - - - 2.084 19.28 1.541 2356.38 2.149 2.084 - - - - - --- -- 2.084 19.30 1.537 2356.38 2.148 2.083 -- --- - ---- --- --- -- 2.083 19.32 1.534 2356.38 2.147 2.083 -- - --- - -- - - 2.083 19.33 1.530 2356.38 2.145 2.082 -- -- - --- --- -- ---- 2.082 19.35 1.527 2356.38 2.144 2.082 2.082 19.37 1.523 2356.37 2.143 2.081 - --- --- ---- - -- -- 2.081 19.38 1.519 2356.37 2.141 2.081 2.081 19.40 1.516 2356.37 2.140 2.080 - - ----- - -- -- - 2.080 19.42 1.512 2356.37 2.139 2.080 - ---- --- - - - - 2.080 19.43 1.509 2356.36 2.137 2.079 -=?,:. -- - --- - --- 2.079 19.45 1.505 2356.36 2.136 2.079 2.079 19.47 1.501 2356.36 2.135 2.078 - -?_ - -- ~ ---- --- --- - 2078 19.48 1.498 2356.36 2.133 2.078 --- __ --- -- _ - -- -- --- 2.078 19.50 1.494 2356.35 2.132 2.077 -- -- ----- - -- - - 2.077 19.52 1.491 2356.35 2.130 2.077 2.077 19.53 1.487 2356.35 2.129 2.076 2.076 19.55 1.483 2356.35 2.128 2.076 - - -- - -- -- --- 2.076 19.57 1.480 2356.34 2.126 2.075 - -- --- - -- - -- 2.075 19.58 1.476 2356.34 2.125 2.075 - ---- - - -- ---- --- 2.075 19.60 1.472 2356.34 2.123 2.074 ----- -- --- - -- ---- -- 2.074 19.62 1.469 2356.34 2.122 2.074 2.074 19.63 1.465 2356.33 2.121 2.073 2.073 19.65 1.461 2356.33 2.119 2.072 --- ---- --- -- -- - --- 2.072 19.67 1.458 2356.33 2.118 2.072 - - -- -- -- 2.072 19.68 1 1.454 2356.33 2.116 2.071 - - --- ---- --- - - 2.071 19.70 1.451 2356.32 2.115 2.071 ---- -- - - -- ----- - 2.071 19.72 1.447 2356.32 2.113 2.070 -_- _«- --- --- ---- --.- --- 2.070 19.73 1.443 2356.32 2.112 2.070 - --- ---- -- -- -- ----- 2.070 19.75 1.440 2356.32 2.110 2.069 2.069 19.77 1.436 2356.31 2.109 2.069 -- ---- --- --- -- -- - 2.069 19.78 1.432 2356.31 2.107 2.068 ----- -- ---- - --- ----- ---- 2.068 19.80 1.428 2356.31 2.106 2.067 2.067 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs Cfs efs cfs Cfs cfs cis Cfs cis cis 19.82 1.425 2356.30 2.104 2.067 - - - -- --- ---- --- 2.067 19.83 1.421 2356.30 2.103 2.066 ---- --- - - --- - 2.066 19.85 1.417 2356.30 2.101 2.066 -- -- - ---- --- --- - 2.066 19.87 1.414 2356.30 2.100 2.065 --- --- - -- ---- - - 2.065 19.88 1.410 2356.29 2.098 2.065 - - - - - - - 2.065 19.90 1.406 2356.29 2.096 2.064 - - - - - -- - 2,064 19.92 1.403 2356.29 2.095 2.063 --- - - --- - - - 2.063 19.93 1.399 2356.29 2.093 2.063 -- --- -- - -- -- - 2.063 19.95 1.395 2356.28 , , 2.092 2.062 --- --- - -- -- -- - 2.062 19.97 1.391 2356.28 2.090 2.062 - -- --- -- ----- - - 2.062 19.98 1.388 2356.28 2.089 2.061 ---- - - - --- -- - 2.061 20.00 1.384 2356.27 2.087 2.060 - - - - - -- - 2.060 20.02 1.380 2356.27 2.085 2.060 -- - ---- - - ---- - 2.060 20.03 1.377 2356.27 2.084 2.059 --- - - -- -- - - 2.059 20.05 1.373 2356.27 2.082 2.059 ---- -- -- --- - -- - 2.059 20.07 1.369 2356.26 2.080 2.058 2.058 20.08 1.366 2356.26 2.079 2.057 - - -- - -- - - 2.057 20.10 1.362 2356.26 2.077 2.057 --- --- ---- -- - - - 2.057 20.12 1.358 2356.25 2.076 2.056 --- -- - -- -- - - 2.056 20.13 1.355 2356.25 2.074 2.056 - -- - ---- - - - 2.056 20.15 1.351 2356.25 2.072 2.055. x.- - - ---- - --- - 2.055 20.17 1.348 2356.25 2.070 , 2.054 S ; - - - -- -- - 2.054 20.18 1.344 2356.24 2.069 2.054 ---- - - - -- - --- 2.054 20.20 1.341 2356.24 2.067 2.053 --- -- - -- ---- --- - 2.053 20.22 1.338 2356.24 2.066 2.053 - - --- --- - - - 2.052 20.23 1.334 2356.23 2.064 2.052 ----< - -.._ _- -_ ?. - 2.052 20.25 1.331 2356.23 2.062 2.051 -- - - - -- - -- 2.051 20.27 1.328 2356.23 2.060 2.051 2.051 20.28 1.325 2356.22 2.059 2.050 -- --- ---- -- -- - ---- 2.050 20.30 1.322 2356.22 2.057 2.049 --- --- --- --- - -- --- 2.049 20.32 1.320 2356.22 2.055 2.049 - --- -- -- - - - 2.049 20.33 1.317 2356.22 2.054 2.048 -= - -- - -- --- -_-- 2.048 20.35 1.314 2356.21 2.052 2.047 -- - - - - - - 2.047 20.37 1.312 2356.21 2.050 2.047 ---, 2.047 20.38 1.310 2356.21 2.048 2.046 - 2.046 20.40 1.307 2356.20 2.046 2.045 - - -- - - --- - 2.045 20.42 1.305 2356.20 2.045 2.045 - - - ----- -- - - 2.045 20.43 1.303 2356.20 2.045 2.044 ---- --- ----- - -- - - 2.044 20.45 1.301 2356.19 2.044 2.043 --- -- --- - ---- -- 2.043 20.47 1.300 2356.19 2.044 2.043 - --- -- --- - -- - 2.043 20.48 1.298 2356.19 2.043 2.042 - ---- ---- - - -- -- 2.042 20.50 1.296 2356.18 2.043 2.042 2.042 20.52 1.295 2356.18 2.043 2.041 - ----- - - - - --- 2.041 20.53 1.293 2356.18 2.042 2.040 ---- ----- -- -- --- - - 2.040 20.55 1.292 2356.17 2.042 2.040 -- -- --- ---- - -- - 2.040 20.57 1.290 2356.17 2.042 2.039 -- - -- -- - -- ---- 2.039 20.58 11.289 2356.17 2.041 2.038 -- - - - -- ---- - 2.038 20.60 1.288 2356.17 2.041 2.038 2.038 20.62 1.287 2356.16 2.040 2.037 2.037 20.63 1.286 2356.16 2.040 2.036 2.036 20.65 1.285 2356.16 2.040 2.036 - - - -- -- ----- - 2.036 20.67 1.284 2356.15 2.039 2.035 --- ---- - -- -- -- ---- 2.035 20.68 1.283 2356.15 2.039 2.034 --- --- - - - ---- - 2.034 20.70 1.282 2356.15 2.039 2.034 2.034 Continues on next page... Basin A (Routed) Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B CN C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cis cfs cfs cfs cfs cfs 20.72 1.281 2356.14 2.038 2.033 - - - --- --- - --- 2.033 20.73 1.281 2356.14 2.038 2.032 - 2.032 20.75 1.280 2356.14 2.037 2.032 2.032 20.77 1.279 2356.13 2,037 2.031 - - -- - -- - ---- 2.031 20.78 1.279 2356.13 2.037 2.030 2.030 20.80 1.278 2356.13 2.036 2.030 2,030 20.82 1.277 2356.12 2.036 2.029 --- - - -- ---- - -- 2.029 20.83 1.277 2356.12 2.035 2.028 2.028 20.85 1.276 2356.12 2.035 2.028 2,028 20.87 1.276 2356.11 2.035 2.027 - 2.027 20.88 1.275 2356.11 2.034 2.027 - 2.027 20.90 1.275 2356.11 2.034 2.026 -- --- - - --- ---- - 2.026 20.92 1.274 2356.11 2.034 2.025 2.025 20.93 1.274 2356.10 2.033 2.025' 2.025 20.95 1.273 2356.10 2.033 2.024 2.024 20.97 1.272 2356.10 2.032 2.023 ----- : =-- - ----- -- - --- 2.023 20.98 1.272 2356.09 2.032 2.023 2.023 21.00 1.271 2356,09 2.032 2.022 - -- - - - - -- 2.022 21.02 1.271 2356.09 2.031 2.021 2.021 ...End a r. SUB BASIN 1-C HYDROGRAPHS a Hydrograph Report Hydraflow Hydrographs by InWsoNa v9.2 Friday, Mar 13, 2009 Hyd. No. 5 Basin C Hydrograph type = SCS Runoff Peak discharge = 6.252 cfs Storm frequency = 1 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 29,284 cult Drainage area = 15.900 ac Curve number = 62 Basin Slope = 25.0% Hydraulic length = 2508 ft Tc method = LAG Time of conc. (Tc) = 21.9 min Total precip. = 3.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time.- Outflow (hrs cfs) 12.12 6.123 12.13 6.226 12.15 6.252 << 12.17 6.202 12.18 6.092 12.20 5.941 ...End ( Printed values - 95.00% of Op.) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 6 Basin C (Routed) Hydrograph type = Reservoir Peak discharge = 0.643 cfs Storm frequency = 1 yrs Time to peak = 14.55 hrs Time interval = 1 min Hyd. volume = 29,282 cuft Inflow hyd. No. = 5 - Basin C Reservoir name = Pond C Max. Elevation = 2457.53 ft Max. Storage = 11,063 cuft Storage Indication method used. Hydrograph Discharge Table cPdnbdVWUGS 3-•95.00%of Op.) Time Inflow Elevation CIv A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) ds ft ds efs ds ds ds ds efs cis ds efs 12.80. 1.401 2456.82 4.281 0.612 ---- 0 612 12.82 1.377 2456.84 4.281 0.613 - . 0 613 12.83 1.355 2456.86 4.281 0.613 . - 0 613 12.85 1.334 2456.88 4.281 0.614 -- -- -- . -- - ?_ 0 614 12.87 1.315 2456.90 4.281 0.615 . 615 0 12.88 1.296 2456.92 4.281 0.616 . 0 616 12.90 1.279 2456.93 4.281 0.617 -- --- _- . _- - _? _- 0 617 12.92 1.264 2456.95 4.281 0.617"' =-- --- -- . _.._ .-_ - 0 - 617 12.93 1.248 2456.97 4.281 0.618 -_- --- -- - . -? _ ._ - 0 618 12.95 1.234 2456.98 4.281 0.619 ----- --._ -? . - - ____ 0 619 12.97 1.221 2457.00 4.281 0.620 . 0 620 12.98 1.208 2457.01 4.281 0.620 -- ---- - . ?_ _.._ 0 620 13.00 1.196 2457.03 4.281 0.621 . 0 621 13.02 1.184 2457.04 4.281 0.622 . 0 622 13.03 1.172 2457.06 4.281 0.622 . 0 622 13.05 1.161 2457.07 4.281 0.623 . - 0 623 13.07 1.150 2457.08 4.281 0.623 -?- - - . - -_. - 0 623 13.08 1.139 2457.10 4.281 0 624 - ----- . 13.10 1.128 2457.11 4.281 . 0 625 -- - - 0.624 - - - 13.12 1.117 2457.12 4.281 . - -_ 0 625 - „-- 0.625 13.13 1.106 2457.14 4.281 . 0 626 0.625 13.15 1.096 2457.15 4.281 . 0 626 ---- -= - 0.626 - r 13.17 1.085 2457.16 4.281 -_-_ . 0 627 --- ---- - _- ____ ____ 0.626 13.18 1.075 2457.17 4.281 . - 0 627 --- - -- - ?_ - - 0.627 13.20 1.065 2457.18 4.281 . -_ 0 628 ,_ _- 0.627 13.22 1.056 2457.19 4.281 . 0 628 0.628 13.23 1.046 2457.21 4.281 . 0 629 ----- - ____ - 0.628 13.25 1.037 2457.22 4.281 . ?_ 0 629 ?_ - 0.629 13.27 1.028 2457.23 4.281 . 0.630 - - - - 0.629 13.28 1.020 2457.24 4.281 0 630 --- --- - - - - 0.630 13.30 1.012 2457.25 4.281 . - 0 631 ?_ 0.630 13.32 1.004 2457.26 4.281 . 0 631 0.631 13.33 0.996 2457.26 4.281 . 0 631 0.631 13.35 0.988 2457.27 4.281 . 0 632 ---- ---- - - 0.631 13.37 0.981 2457.28 4.281 __-_ . 0 632 - - _? 0.632 - -' 13.38 0.973 2457.29 4.281 . -» 0.633 --- - - ____ - 0.632 13.40 0.966 2457.30 4.281 ?. 0.633 - 0.633 13.42 0.959 2457.31 4.281 0 633 0,633 13.43 0.952 2457.32 4.281 . 0 634 0.633 13.45 0.945 2457.33 4.281 . 0.634 0.634 0.634 Continues on next page... Basin C (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft ds cfs cfs cfs cfs ds cfs eft cfs cfs 13.47 0.938 2457.33 4.281 0.634 ---- --- -- --- -- .?_ ____ 0.634 13.48 0.932 2457.34 4.281 0,635 0.635 13.50 0.925 2457.35 4.281 0.635 --- -- ----- ,---- --- ---- ---_- 0.635 13.52 0.919 2457.36 4.281 0.635 0.635 13.53 0.912 2457.36 4.281 0.636 0.636 13.55 0.905 2457.37 4.281 0.636 -- - - ---- -- - - 0.636 13.57 0.899 2457.38 4.281 0.636 ----- --- ---- -- -- - - 0.636 13.58 0.892 2457.36 4.281 0.637 - ---- -- -- --- ---- -- 0.637 13.60 0.886 2457.39, 4.281 0.637 - - 0.637 13.62 0.880 2457.40 4.281 0.637 --- - -- --- -- --- -- 0.637 13.63 0.873 2457.40 4.281 0.637 0.637 13.65 0.867 2457.41 4.281 0.638 0.638 13.67 0.860 2457.41 4.281 0.638 --- --- - -- --- -- - 0.638 13.68 0.854 2457.42 4.281 0.638 0.638 13.70 0.848 2457.42 4.281 0.638 - - --- ---- - --- 0.638 13.72 0.842 2457.43 4.281 0.639 0.639 13.73 0.836 2457.44 4.281 0.639 -- --- - -- --- - - 0.639 13.75 0.830 2457.44 4.281 0.639 0.639 13.77 0.825 2457.44 4.281 0.639 - - -- -- - - ----- 0.639 13.78 0.819 2457.45 4.261 0.640 0,640 13.80 0.813 2457.45 4.281 0.640,-.-- 0,640 13.82 0.808 2457.46 4.281 0.640 :; - - - -_ - - - 0.640 13.83 0.802 2457.46 4.281 0.640 0.640 13.85 0.797 2457.47 4.281 0.640 0.640 13.87 0.792 2457.47 4.281 0.640 - --- -- - - -- -- 0.640 13.88 0.786 2457.47 4.281 0.641 0.641 13.90 0.781 2457.48 4.281 0.641 - 0.641 13.92 0.776 2457.48 4.281 0.641 - 0.641 13.93 0.771 2457.48 4.281 0,641 -- ---- ----- ---- ---- -- - 0 641 13.95 0.765 2457.49 4.281 0.641 - . 0.641 13.97 0.760 2457.49 4.281 0.641 -4. --- ----- -- --- -- -- 0.641 13.98 0.755 2457.49 4.281 0.641 0.641 14.00 0.750 2457.50 4.281 0.642 0.642 14.02 0.745 2457.50 4.281 0.642-- -. - _-- _- _?. -_ - -0.642 14.03 0.740 2457.50 4.281 0.642 - 0 642 14.05 0.735 2457.50 4.281 0.642 ---- -- - -- . - _? ____ _- 0 642 14.07 0.730 2457.51 4.281 0.642 -- -- - . ---- - - - 0.642 14.08 0.725 2457.51 4.281 0.642 0 642 14.10 0.720 2457.51 4.281 0.642 . 0 642 14.12 0.715 2457.51 4281 0.642 -- - -- . -- -- -- -- 0 642 14.13 0.711 2457.52 4.281 0.642 . 0 642 14.15 0.706 2457.52 4.281 0.642 . 0 642 14.17 0.702 2457.52 4.281 0.643 . 0 643 14.18 0.698 2457.52 4.281 0.643 . 0 643 14.20 0.694 2457.52 4.281 0.643 . 643 0 14.22 0.690 2457.52 4.281 0.643 . 0 643 14.23 0.686 2457.52 4.281 0.643 --- -- - -- . -- - - --- - 0 643 14.25 0.683 2457.52 4.281 0,643 - - -- . - -- --- -- 0 643 14.27 0.680 2457.53 4.281 0.643 . 643 0 14.28 0.677 2457.53 4.281 0.643 ----- ----- --- - . -- - - 0 643 14.30 0.674 2457.53 4.281 0.643 - - . 0 643 14.32 0.671 2457.53 4.281 0.643 --- - . 0 643 14.33 0,668 2457.53 4.281 0.643 --- -- -- . -_ _.__ - -, 0 643 14.35 0.666 2457.53 4.281 0.643 . 0.643 Continues on next page... Basin C (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B CN C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) Cfs ft CfS CfS CfS cis cis cfs CfS cis ds CfS 14.37 0.664 2457.53 4:281 0.643 - -- ---- ---- --- ---- - 0.643 14.38 0.661 2457.53 4.281 0.643 --- - - ---- --- --- --- 0.643 14.40 0.659 2457.53 4,281 0.643 -- - -- -- - ---- -- 0.643 14.42 0.657 2457.53 4.281 0.643 ---- ----- -- - - ---- - 0.643 14.43 0.655 2457.53 4.281 0.643 -- ----- - -- -- -- - 0,643 14.45 0.653 2457.53 4.281 0.643 - -- --- --- -- - ---- 0.643 14.47 0.652 2457.53 4.281 0.643 --- ---- - --- - -- - 0.643 14.48 0.650 2457.53 4.281 0.643 --- --- --- - ---- -- -- 0.643 14.50 0.648 2457.53„ 4.281 0.643 - - ---- --- -- --- -- 0.643 14.52 0.647 2457.53 4.281 0.643 - ---- ---- - --- --- -- 0.643 14.53 0.645 2457.53 4.281 0.643 0.643 14.55 0.644 2457.53 << 4.281 0.643 0.643 « 14.57 0.642 2457.53 4,281 0.643 - - ---- -- --- - - --- 0.643 14.58 0.640 2457,53 4.281 0.643 ---- - --- - ----- - - 0,643 14.60' 0.639 2457.53 4.281 0.643 0,643 14.62 0.637 2457,53 4.281 0.643 0.643 14:63 0.636 2457.53 4.281 0.643 --- ---- - --- -- --- - 0.643 14.65 0.634 2457.53 4.281 0.643 0.643 14.67 0.633 2457.53 4.281 0.643 - -- - -- - ----- - 0.643 14.68 0.631 2457.53 4.281 0.643 - 0.643 14.70 0.629 2457.53 4.281 0.641 - --- - --- ---- --- - 0.643 14.72 0.628 2457.53 4.281 0.643 t_; - --- -- -- - 0.643 14.73 0.626 2457.53 4.281 0.643 --- ----- -- -- - -- -- - -- 0.643 14.75 0.624 2457.53 4.281 0.643 - - -- ---- - --- - 0.643 14.77 0.623 2457.53 4.281 0.643 - --- - --- -- - -- --- 0,643 14.78 0.621 2457.53 4.281 0.643 - - - --- ----- --- - -- 0.643 14.80 0.620 2457.53 4.281 0.643 - --- --- --- -- ----- - 0.643 14.82 0.618 2457.53 4.281 0.643 0.643 14.83 0.616 2457.53 4.281 0.643 0.643 14.85 0.615 2457.53 4.281 0.643 ---- - -- - - ---- - 0.643 14.87 0.613 2457.53 4.281 0,643 - --- --- -- --- -- -- 0.643 14.88 0.611 2457.52 4.281 0.643 =' - ---- ---- ---- - r? - 0.643 14.90 0.610 2457.52 4.281 0.643 ---- - -- -- -- -- --_ 0,643 14.92 0.608 2457.52 4.281 0.643-- = - -- ----- - --- -- - -0.643 14.93 0.606 2457.52 4.281 0.643 - - - - --- -- - - 0.643 14.95 0.605 2457.52 4.281 0.643 0.643 14.97 0,603 2457.52 4.281 0.643 --- - ---- ---- ?-- --- - 0.643 14.98 0.601 2457.52 4.281 0.643 0.643 15.00 0.599 2457.52 4.281 0.643 --- -- --- - ---- ---- 0.643 15.02 0.598 2457.52 4.281 0.642 -- ----- ---- --- ----- - - 0.642 15.03 0.596 2457.52 4.281 0.642 0.642 15.05 0.594 2457.51 4.281 0.642 0,642 15.07 0.593 2457.51 4281 0.642 -- ---- --- -- -- - - 0.642 15.08 0.591 2457.51 4.281 0.642 0.642 15.10 0.589 2457.51 4.281 0.642 0,642 15.12 0.587 2457.51 4.281 0.642 0.642 15.13 0.586 2457.51 4.281 0.642 0 642 15.15 0.584 2457.51 4.281 0.642 , 0,642 15.17 0.582 2457.51 4.281 0.642 0,642 15.18 0.580 2457.50 4.281 0.642 ---- -- - - -- ---- ---- 0.642 15.20 0.578 2457.50 4.281 0.642 0.642 15.22 0.577 2457.50 4.281 0.642 0.642 15.23 0.575 2457.50 4.281 0.642 0.642 15.25 0.573 2457.50 4.281 0.642 - - ---- --- ---- -- --- 0.642 Continues on next page... Basin C (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs eft cfs cfs cfs cfs cis cfs 15.27 0.571 2457.50 4.281 0.642 -- ---- --_ -_ _- ___, - 0 642 15.28 0.569 2457.49 4.281 0.641 . 0 641 15.30 0.568 2457.49 4.281 0.641 . 0 641 15.32 0.566 2457.49 4.281 0.641 . 0 641 15.33 0.564 2457.49 4.281 0.641 . 0 641 15.35 0.562 2457.49 4.281 0.641 . 0 641 15.37 0.560 2457.48 4.281 0.641 - . -- - - ____ - .? 0 641 15.38 0.559 2457.48 4.281 0.641 . 0 641 15.40 0.557 2457.48 4.281 0.641 . 641 0 15.42 0.555 2457.48 4.281 0.641 . 0 641 15.43 0.553 2457.47 4.281 0.641 . 0 641 15.45 0.551 2457.47 4.281 0.641 - . - -- - _. _, _- 0 641 15.47 0.549 2457.47 4.281 0.640 --- . 0 640 15.48 ' 0.547 2457.47 4.281 0.640 - . --- -- - - - 0 640 15.50 0.546 2457.47 4.281 0.640 ---- . 0 640 15.52 0.544 2457.46 4.281 0.640 . 0 640 15.53 0.542 2457.46 4.281 0.640 . 0 640 15.55 0.540 2457.46 4.281 0.649 . 0 640 15.57 0.538 2457.46 4.281 0.640 . 0 640 15.58 0.536 2457.45 4.281 0.640 . 0 640 15.60 0.534 2457.45 4.281 0.640: . 0 640 15.62 0.532 2457.45 4.281 0.639 ?-_;- . -- -- ---- -- _- - 0 639 15.63 0.530 2457.44 4.281 0.639 . 0 639 15.65 0.528 2457.44 4.281 0.639 . -- -- - 0 639 ? 15.67 0.527 2457.44 4.281 0.639 . 0 639 15.68 0.525 2457.44 4.281 0.639 . 0 639 15.70 0.523 2457.43 4.281 0.639 . 0 639 15.72 0.521 2457.43 4.281 0.639 . - 0 639 15.73 0.519 2457.43 4.281 0.639 --- . --_ - - -? - 0 639 - 15.75 0.517 2457.42 4.281 0.638 -- . ---- ---- -_-- - w 0 638 15.77 0.515 2457.42 4.281 0.638 . - 0 638 15.78 0.513 2457.42 4.281 0.638 - -= , ; . --- -.- _ - ____ 0 638 15.80 0.511 2457.41 4.281 0 638 . 15.82 0.509 2457.41 4281 . 0 638 0.638 15.83 0.507 2457.41 4.281 . 0 638 0.638 15.85 0.505 2457.40 4.281 . 0 638 0.638 15.87 0.503 2457.40 4.281 . 0 637 0.638 15.88 0.501 2457.40 4.281 . 0 637 - --- 0.637 ? - --- -- 15.90 0.499 2457.39 4.281 . 0 637 .- -- .__ 0.637 15.92 0.497 2457.39 4281 . 0 637 0.637 15.93 0.495 2457.39 4.281 . 0 637 0.637 15.95 0.493 2457.38 4.281 . 637 0 0.637 15.97 0.491 2457.38 4.281 . 0.636 0.637 15.98 0.489 2457.38 4.281 0.636 0.636 16.00 0.487 2457.37 4.281 0 636 0.636 16.02 0.485 2457.37 4.281 . 0 636 0.636 16.03 0.483 2457.36 4.281 . 0 636 0.636 16.05 0.481 2457.36 4.281 . 0 636 0.636 16.07 0.479 2457.36 4.281 . 0 635 -- - 0.636 - 16.08 0.477 2457.35 4.281 . 0 635 -- 0.635 16.10 0.475 2457.35 4.281 . 0 635 0.635 16.12 0.474 2457.34 4.281 . 0.635 0.635 16.13 0.472 2457.34 4.281 0 635 - - - - 0.635 --- . 16.15 0.470 2457.34 4.281 . 0.635 - - -. ,_ 0.635 0.635 Continues on next page... Basin C (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A CIv S Clv C PfRsr Wr A Wr S Wr C Wr D Exfil Outflow (hrs) cfs ft CfS efs cfs CfS efs CfS cfs CfS cfs efs 16.17 0.468 2457.33 4:281 0.634 --- - - -- --- - ---- 0.634 16.18 0.467 2457.33 4.281 0.634 -- - - -- ---- - --- 0.634 16.20 0,465 2457.32 4.281 0.634 0,634 16.22 0.464 2457.32 4.281 0.634 0.634 16.23 0.462 2457.31 4.281 0.634 0.634 16.25 0.461 2457.31 4.281 0.633 - 0.633 16.27 0.459 2457.31 4.281 0.633 -- ---- --- -- - -- ---- --- 0.633 16.28 0.458 2457.30 4.281 0.633 -- - -- --- -- -- -- 0.633 16,30 0.457 2457.30„ 4.281 0.633 0.633 16.32 0.456 2457.29 4.281 0.633 0.633 16.33 0.455 2457.29 4,281 0.632 0.632 16.35 0.454 2457.28 4.281 0.632 --- --- --- -- ----- - - 0.632 16.37 0.453 2457,28 4.281 0.632 0.632 16.38 0.452 2457.27 4.281 0.632 0.632 16.40' 0.451 2457.27 4.281 0.632 --- -- - -- - -- ---- 0.632 16.42 0.451 2457.26 4.281 0.631 0.631 16.43 0.450 2457.26 4.281 0.631 --- - - -- -- -- --- 0.631 16.45 0.449 2457.26 4.281 0.631 - ---- ---- - -- -- - 0.631 16.47 0.449 2457.25 4.281 0.63'1 ----- -- - ---- --- -- --- 0 631 16.48 0.448 2457.25 4.281 0,631 --- -- --- . ----- - -- -- 0 631 16.50 0.447 2457.24 4.281 0.630:„ . 0.630 16.52 0.447 2457.24 4.281 0.630 s' ---- _--_ - 0 630 16.53 0.446 2457.23 4.281 0.630 . 0 630 16.55 0.445 2457.23 4.281 0.630 ---- - - . -- -- -- --- 0 630 16.57 0,445 2457.22 4.281 0.630 . 0 630 16.58 0.444 2457.22 4.281 0.629 . 0 629 16.60 0.443 2457.21 4.281 0.629 ---- --- --- . ----- -- -- --- 0 629 16.62 0.443 2457.21 4.281 0.629 -- -- --- . -- -- -- - 0 629 16.63 0.442 2457.20 4.281 0,629 . 0 629 16.65 0.442 2457.20 4.281 0.629 . 0 629 16.67 0.441 2457.19 4.281 0.628 -- -- . -- --- -- - 0 628 16.68 0.440 2457.19 4.281 0.628 . 0 628 16.70 0.440 2457.18 4.281 0.628 . 0 628 16.72 0.439 2457.18 4.281 0.628._, 4_= . -0 628 16.73 0.439 2457.18 4.281 0.627 _ . 0 627 16.75 0.438 2457.17 4.281 0.627 . 0 627 16.77 0.437 2457.17 4.281 0.627 . 0 627 16.78 0.437 2457.16 4.281 0.627 . 0 627 16.80 0.436 2457.16 4.281 0.627 -- -- . - -- - - 0 627 16.82 0.435 2457.15 4.281 0.626 . 0 626 16.83 0.435 2457.15 4.281 0.626 --- --- - . - - -- - -- 0 626 16.85 0.434 2457.14 4.281 0.626 , 0 626 16.87 0.434 2457.14 4.281 0.626 . 0 626 16.88 0.433 2457.13 4.281 0.625 . 0 625 16.90 0.432 2457.13 4.281 0.625 . 0 625 16.92 0.432 2457.12 4.281 0.625 . 0 625 16,93 0.431 2457.12 4.281 0.625 ---- --- ---- . - 0 625 16.95 0.430 2457.11 4.281 0.625 . 0 625 16.97 0.430 2457.11 4.281 0.624 . 0 624 16.98 0.429 2457.10 4.281 0.624 . 0 624 17.00 0.428 2457.10 4.281 0.624 . 0 624 17.02 0.428 2457.09 4.281 0.624 . 0 624 17.03 0.427 2457.09 4.281 0.623 . 0 623 17.05 0.426 2457.08 4.281 0.623 . 0.623 Continues on next page... Basin C (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Mar Wr A Wr B Wr C Wr D Exfil Outflow (hm) cis ft CfS CfS CfS cfs dis cis cfs afs CfS CfS 17.07 0.426 2457.08 4.281 0.623 0.623 17.08 0.425 2457.07 4.281 0.623 -- --- -- ---- ---- -- -- 0,623 17.10 0.425 2457.07 4.281 0.623 0,623 17.12 0.424 2457.06 4.281 0.622 - -- -- - ---- - - 0,622 17.13 0.423 2457.06 4.281 0.622 - - - --- ---- - - 0.622 17.15 0.423 2457.05 4.281 0.622 0.622 17.17 0.422 2457.05 4.281 0.622 -- - -- -- - - - 0.622 17.18 0.421 2457.04 4.281 0.621 --- - -- - --- -- - 0.621 17.20 0.421 2457.04-, 4.281 0.621 --- -- - ---- -- - - 0.621 17.22 0.420 2457.03 4.281 0.621 0.621 17.23 0.419 2457.03 4.281 0.621 - - -- ---- - --- --- 0.621 17.25 0.419 2457.02 4.281 0.621 -- - ---- - --- -- -- 0.621 17.27 0.418 2457.02 4.281 0.620 - - - -- - -_- - 0.620 17.28, 0.417 2457.01 4.281 0.620 - --- - - - - - 0.620 17.30 0.417 2457.00 4.281 0.620 ---- - - --- -- - - 0.620 17.32 0.416 2457.00 4.281 0.620 - 0.620 17.33 OA15 2456.99 4.281 0.619 --- - -- --- - ---- -- 0.619 17.35 0.415 2456.99 4.281 0.619 --- -- - ---- ---- - -- 0.619 17.37 0.414 2456.98 4.281 0.619 0.619 17.38 0.413 2456.98 4.281 0.619 -- ----- - --- ---- -- - 0.619 17,40 0.413 2456.97 4.281 0.618'- ,: -- - -_ __-- --__ -_ 0 618 17.42 0.412 2456.97 4.281 0.618 -= - --- --- - . --- -- 0.618 17.43 0.411 2456.96 4.281 0.618 - - - - 0.618 17.45 0.411 2456.96 4.281 0.618 -- - - _--- - - - 0.618 17.47 0.410 2456.95 4.281 0.617 - ----- -- --- --- - - 0.617 17.48 0.409 2456.95 4.281 0.617 0.617 17.50 0.409 2456.94 4.281 0.617 --- ---- -.- --- --- `- -- 0.617 17.52 0.408 2456.94 4.281 0.617 0.617 17.53 0.407 2456.93 4.281 0.616 0.616 17.55 0.407 2456.93 4.281 0.616 0.616 17.57 0.406 2456.92 4.281 0.616 --= -- --- - - --- - 0.616 17.58 0.405 2456.92 4.281 0.616 --=-t•: - - --- -- ---- - - - 0.616 17.60 0.404 2456.91 4.281 0.616 - --- --- --- ----- -- --- 0.616 17.62 0.404 2456.90 4.281 0.615----- - - - -- - - .0.615 17.63 0.403 2456.90 4.281 0.615 ---- - 0.615 17.65 0.402 2456.89 4.281 0.615 - --- - - --- -- - 0 615 17.67 0.402 2456.89 4.281 0.615 . 0 615 17.68 0.401 2456.88 4.281 0.614 . 0.614 17.70 0.400 2456.88 4281 0.614 0.614 17,72 0.400 2456.87 4.281 0.614 --- ---- -- --- --- --- - 0 614 17.73 0.399 2456.87 4.281 0.614 --- -- - - - . - ---- 0 614 17.75 0.398 2456.86 4.281 0.613 . 0.613 17.77 0.398 2456.86 4.281 0.613 - --- --- - -- ---- -- 0.613 17.78 0,397 2456.85 4.281 0.613 0 613 17.80 0.396 2456.84 4.281 0.613 . 0 613 17.82 0.395 2456.84 4.281 0.612 . 0 612 17.83 0.395 2456.83 4.281 0.612 . 0 612 17.85 0.394 2456.83 4.281 0.612 ----- - - - --- . -- --- 0 612 17.87 0.393 2456.82 4.281 0.612 - . 0 612 17.88 0.393 2456.82 4.281 0.611 . 0 611 17.90 0,392 2456.81 4.281 0.611 ---- --- _-. -- _- . r._ _.... 0.611 ...End SUB BASIN 1-D HYDROGRAPHS Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.2 Friday, Mar 13, 2009 Hyd. No. 7 Basin D Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 8.400 ac = 25.6% = LAG = 3.25 in = 24 hrs Peak discharge = 6.220 cfs Time to peak = 12.03 hrs Hyd. volume = 18,084 cult Curve number = 64 Hydraulic length = 1143 ft Time of conc. (Tc) = 11.0 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time - Outflow (hrs cfs) 12.00 5.945 12.02 6.202 12.03 6.220 << 12.05 6.080 ...End ( PfIMOd values ae 95.00% of Op.) SUB BASIN 1-E HYDROGRAPHS Hydrograph Report Hydratlow Hydrographs by Intelis0hre V9.2 Friday. Mar 13, 2009 Hyd. No. 8 Basin E Hydrograph type = SCS Runoff Peak discharge = 10.99 cfs Storm frequency = 1 yrs Time to peak = 12,07 hrs Time interval = 1 min Hyd. volume = 36,633 cuft Drainage area = 17.320 ac Curve number = 64 Basin Slope = 20.1 % Hydraulic length = 1450 ft Tc method = LAG Time of conc. (Tc) = 14.9 min Total precip. = 3.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time - OUtfloW (hrs cfs) 12.03 10.56 12.05 10.93 12.07 10.99 << 12.08 10.84 12.10 10.49 ...End a ( Pdrued values - 9600% or Op.) Hydrograph Report Hydratiow Hydrographs by Intellsolve v9.2 Friday, Mar 13, 2009 Hyd. No. 9 Basin E (Routed) Hydrograph type = Reservoir Peak discharge = 0.964 cfs Storm frequency = 1 yrs Time to peak = 13.75 hrs Time interval = 1 min Hyd. volume = 36,455 tuft Inflow hyd. No. = 8 - Basin E Reservoir name = Pond E Max. Elevation = 2356.69 ft Max. Storage = 32,048 cuft Storage Indication method used. Wet pond routing start elevation = 2355.40 ft. Hydrograph Dischargelable ( Printed velum - 95.00% of Op.) Time Inflow Elevation Civ A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs eft cfs Cft cfs Cft cfs cfs cfs 12.70. 1.702 2356.59 0.922 0.916 - --- ---- ---- --- --- - 0.916 12.72 1.672 2356.60 0.924 0.918 - -- -- --- --- --- - 0.918 12.73 1.644 2356.60 0.925 0.920 ---` ---- ---- --- ---- -- -- 0.920 12.75 1.620 2356.60 0.927 0.922 ---- ----- --- ---- --- --- ---- 0.922 12.77 1.598 2356.61 0.929 0.924 -- - - - - - - 0.924 12.78 1.578 2356.61 0.930 0.926 --- --- -- --- --- - ---- 0.926 12.80 1.559 2356.61 0.932 0.927 ---- - ---- -- - - --- 0.927 12.82 1.543 2356.62 0.933 0.929 .: , - - - -- -- --- 0.929 12.83 1.527 2356.62 0.935 0.930 -=-' --- ---- -- --- - ---- 0.930 12.85 1.512 2356.62 0.936 0.932 - -- ---- - - --- -- 0.932 12.87 1.498 2356.63 0.938 0.933 - - - - - - -- 0.933 12.88 1.485 2356.63 0.939 0.934 -- ---- ----- - -- - - 0.934 12.90 1.471 2356.63 0.940 0.936 - - -- --- -- --- - 0.936 12.92 1.458 2356.64 0.941 0.937 -- - - - --- --- - 0.937 12.93 1.444 2356.64 0.943 0,938 ---- ---- ---- -- ---- ---- --- 0.938 12.95 1.430 2356.64 0.944 0.940 - ---- ---- - -- - --- 0.940 12.97 1.416 2356.64 0.945 0.941 --: - -- - - -- 0.941 12.98 1.402 2356.65 0.946 0.942 -79 ----- ----- ---- --- - ---- 0.942 13.00 1.387 2356.65 0.947 0.943 ----' ---- --- --- --- --- - 0.943 13.02 1.373 2356.65 0.948 0.944 ---- --- ---- --- ---- -- 0.944 13.03 1.359 2356.65 0.949 0.945'- ---- --- - - --- - - 0.945 13.05 1.344 2356.66 0.950 0.946 - 0.946 13.07 1.330 2356.66 0.951 0.947 - - - -- ----- - - 0.947 18.08 1.316 2356.66 0.952 0.948 -- - - - --- - - 0.948 13.10 1.303 2356.66 0.953 0.949 ----- --- - --- -- - -- 0.949 13.12 1.290 2356.66 0.954 0.950 - - - - - -- --- 0.950 13.13 1.277 2356.66 0.954 0.951 - - -- - - ---- - 0.951 13.15 1.265 2356.67 0.955 0.951 -- --- --- -- - - ---- 0.951 13.17 9.253 2356.67 0.956 0.952 -- - - --- --- ---- 0.952 13.18 1.242 2356.67 0.957 0.953 --- ---- - --- - - -- 0.953 .13.20 1.232 2356.67 0.957 0.954 -- ---- --- - --- -- -- 0.954 13.22 1.222 2356.67 0.958 0.954 - --- --- ---- - - ---- 0.954 1323 1.212 2356.67 0.959 0.955 ---- - - ----- --- --- - 0.955 13.25 1.203 2356.68 0.959 0.955 0,955 13.27 1.194 2356.68 0.960 0.956 ---- - ---- -- - --- - 0.956 13.28 1.185 2356.68 0.960 0.957 -- --- - - -- ---- --- 0.957 13.30 1.177 2356.68 0.961 0.957 ---- ---- -- ----- --- - - 0.957 13.32 1.168 2356.68 0.961 0.958 - -- --- --- - -- --- 0.958 13.33 1.160 2356.68 0.962 0.958 ---- - - - -- --- - 0.958 13.35 1.152 2356.68 0.962 0.959 -- ----- -- ---- -- - - 0.959 Continues on next page... Basin E (Routed) Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs efs cfs cfs cis cfs aft cfs cfs eft 13.37 1.144 2356.68 0.963 0.959 --- --- -- - --- --- - 0.959 13.38 1.136 2356.68 0.963 0.960 ----- ---- - -- - --- ---- 0.960 13.40 1.128 2356.69 0.964 0.960 -- ---- -- -- -- -- -- 0.960 13.42 1.120 2356.69 0.964 0.960 - -- ---- ---- --- -- -- 0.960 13.43 1.112 2356.69 0.964 0.961 ---- ---- --- -- ----- ---- 0.961 13.45 1.104 2356.69 0.965 0.961 - --- -- ----- -- - - 0.961 13.47 1.096 2356.69 0.965 0.962 -- --- - -- - --- ----- 0.962 13.48 1.088 2356.69 0.966 0.962 - --- ---- - ----- - - 0.962 13.50 1.080 2356.69 0.966 0.962 -- --- - --- --- --- - 0.962 13.52 1.072 2356.69 0.966 0.962 -- -- --- --- -- -- - 0.962 13.53 1.063 2356.69 0.966 0.963 -- ---- - - -- -- --- 0.963 13.55 1.055 2356.69 0.966 0.963 ---- -- - --- --- --- -- 0.963 13.57 1.047 2356.69 0.967 0.963 --- --- -- -- --- ---- -- 0.963 13.58 1.039 2356.69 0.967 0.963 - - - --- --- - - 0.963 13.60 ' 1.031 2356.69 0.967 0.964 --- --- ----- -- -- --- ---- 0.964 13.62 1.023 2356.69 0.967 0.964 ----. '- -- --- --- --- - -- 0.964 13.63 1.015 2356.69 0.967 0.964 --- ---- --- -- --- --- --- 0.964 13.65 1.008 2356.69 0.967 0.964 - ---- ---- -- -- - ----- 0.964 13.67 1.001 2356.69 0.968 0.964 0.964 13.68 0.994 2356.69 0.968 0.964 -- --- ---- - --- --- 0.964 13.70 0.987 2356.69 0.968 0.964 -- -- - -- - ---- 0.964 13.72 0.980 2356.69 0.968 - 0.964 -=x --- ---- - - --- ---- 0.964 13.73 0.973 2356.69 0.968 0.964 -- ---- - --- ---- -- --- 0.964 13.75 0.966 2356.69 << 0.968 0.964 - -- - ---- --- -- -- 0.964 « 13.77 0.960 2356.69 0.968 0.964 ---- --- -- --- --- ---- -- 0.964 13.78 0.954 2356.69 0.968 0.964 --- - ---- -- - --- -- 0.964 13.80 0.947 2356.69 0.968 0.964 - ---- --- ---- ---- - - 0.964 13.82 0.941 2356.69 0.968 0.964 ---- 0.964 13.83 0.935 2356.69 0.968 0.964 - - - -- ---- --- --- 0.964 13.85 0.929 2356.69 0.968 0.964 -- ----- ---- --- ---- ---- -- 0.964 13.87 0.923 2356.69 0.967 0.964 --- ---- ---- -- --- ----- ---- 0.964 13.88 0.917 2356.69 0.967 0.964 = - --- -- ---- - - 0.964 13.90 0.910 2356.69 0.967 0.964 --- ----- - - --- --- --- 0.964 13.92 0.904 2356.69 0.967 0.964-,,..?i 0.964 13.93 0.898 2356.69 0.967 0.963 0.963 13.95 0.892 2356.69 0.967 0.963 - -- ---- --- ----- --- ---- 0.963 13.97 0.886 2356.69 0.967 0.963 --- - - - --- --- - --- 0.963 13.98 0.879 2356.69 0.966 0.963 ----- - -- ---- --- --- -- 0.963 14.00 0.873 2356.69 0.966 0.963 -- --- --- ---- - -- 0.963 14.02 0.867 2356.69 0.966 0.962 ---- --- -- - ---- -- ----- 0.962 14.03 0.860 2356.69 0.966 0.962 0.962 14.05 0.854 2356.69 0.966 0.962 0,962 14.07 0.848 2356.69 0.965 0.962 -- ---- --- --- --- -- ---- 0.962 14.08 0.842 2356.69 0.965 0.961 - - ---- --- -- -- ---- 0.961 14.10 0.837 2356.69 0.965 0.961 -- ---- --- --- ---- ---- --- 0.961 14.12 0.831 2356.69 0.964 0.961 --- - -- --- ----- - --- 0.961 14.13 1 0.826 2356.69 0.964 0.960 0.960 14.15 0.822 2356.69 0.964 0.960 0.960 14.17 0.817 2356.68 0.963 0.960 -- --- --- -- - -- -- 0.960 14.18 0.813 2356.68 0.963 0.959 --- ----- - ---- ---- - - 0.959 14.20 0.809 2356.68 0.963 0.959 -- -- ----- -- ---- ---- - 0.959 14.22 0.806 2356.68 0.962 0.959 0.959 14.23 0.803 2356.68 0.962 0.958 --- - ---- ---- --- - - 0.958 14.25 0.800 2356.68 0.962 0.958 0.958 Continues on next page... Basin E (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cis ft cfs cis cis cis cis cfs dfs cis cfs cis 14.27 0.797 2356.68 0:961 0.958 - -- -- -- -- -- ---- 0.958 14.28 0.795 2356.68 0.961 0.957 -- --- ---- -=-- --- -- ----- 0.957 14.30 0.793 2356.68 0.960 0.957 -- - --- - --- -- - 0.957 14.32 0.790 2356.68 0.960 0.956 - --- -- -- --- --- - 0.956 14.33 0.788 2356.68 0.960 0.956 0.956 14.35 0.786 2356.68 0.959 0.955 --- --- - - -- --- - 0.955 14.37 0.784 2356.67 0.959 0.955 --- ---- - ----- -- -- --- 0.955 14.38 0.782 2356.67 0.958 0.955 - - - - -- -- --- 0.955 14.40 0.780 2356.67. 0.958 0.954 -- - - - - --- -- 0.954 14.42 0.779 2356.67 0.958 0.954 -- ---- --- ---- --- - -- 0.954 14.43 0.777 2356.67 0.957 0.953 - -- ---- - - - -- 0.953 14.45 0.775 2356.67 0.957 0.953 --- - - - -- ----- - 0.953 14.47 0.773 2356.67 0.956 0.952 --- ---- --- --- -- -- - 0.952 14.48 0.771 2356.67 0.956 0.952 -- ---- -- ---- --- -- - 0.952 14.50 0.769 2356.67 0.955 0.952 - - --- - - - -- 0.952 14.52 0.767 2356.67 0.955 0.951 ---. `--- ---- --- - ---- --- 0.951 14.53 0.765 2356.67 0.955 0.951 -- -- ---- ----- ---- ---- -- 0.951 14.55 0.763 2356.66 0.954 0.950 --- - --- - - -- ----- 0.950 14.57 0.761 2356.66 0.954 0.950 - -- - - - - - 0.950 14.58 0.759 2356.66 0.953 0.949 - - - ----- - ---- ----- 0.949 14.60 0.757 2356.66 0.953 0.9491 ----- --- --- -- ----- -- ---- 0.949 14.62 0.755 2356.66 0.952 0.948 t,, -- - -- ---- -- -- 0.948 14.63 0.753 2356.66 0.952 0.948 -- -- -- - - --- - 0.948 14.65 0.751 2356.66 0.951 0.947 - - -- - - -- -- 0.947 14.67 0.749 2356.66 0.951 0.947 ----- ---- ---- ---- -- --- ----- 0.947 14.68 0.747 2356.66 0.950 0.946 -- - ---- -- - --- -- 0.946 14.70 0.745 2356.65 0.950 0.946 - - --- -- -- --- -- 0.946 14.72 0.743 2356.65 0.950 0.945 - ---- --- - -- --- - 0.945 14.73 0.741 2356.65. 0.949 0.945 ---- --- - -- - - --- 0.945 14.75 0.739 2356.65 0.949 0.944 ---- - --- -- --- --- -- 0.944 14.77 0.737 2356.65 0.948 0.944 ----- ---- ---- ---- ---- --- ----- 0.944 14.78 0.735 2356.65 0.948 0.943 = . --- --- - - - -- 0.943 14.80 0.733 2356.65 0.947 0.943 -- --- --- ----- --- --- ---- 0.943 14.82 0.731 2356.65 0.946 0.942-- -. , 0.942 14.83 0.728 2356.65 0.946 0.942 - 0.942 14.85 0.726 2356.64 0.945 0.941 -- ---- ---- --- -- ---- --- 0.941 14.87 0.724 2356.64 0.945 0.941 - - - - - - - 0.941 14.88 0.722 2356.64 0.945 0.940 - 0.940 14.90 0.720 2356.64 0.944 0.940 ---- - - --- - ---- -- 0.940 14.92 0.718 2356.64 0.943 0.939 - - - ----- -- - ---- 0.939 14.93 0.716 2356.64 0.943 0.939 --- -- - --- -- - - 0.939 14.95 0.714 2356.64 0.942 0.938 0.938 14.97 0.712 2356.64 0.942 0.937 ---- ----- ----- ---- --- -- -- 0.937 14.98 0.709 2356.64 0.941 0.937 - -- -- --- ---- - -- 0.937 15.00 0.707 2356.63 0.941 0.936 --- - ---- ---- -- ---- -- 0.936 15.02 0.705 2356.63 0.940 0.936 - -- -- - --- --- - 0.936 15.03 ` 0.703 2356.63 0.940 0.935 -- --- --- -- ---- ---- ---- 0.935 15.05 0.701 2356.63 0.939 0.935 ---- -- --- ---- -- ---- ---- 0.935 15.07 0.699 2356.63 0.938 0.934 ----- --- ---- - --- - - 0.934 15.08 0.696 2356.63 0.938 0.934 0.934 15.10 0.694 2356.63 0.937 0.933 - -- --- ----- -- --- -- 0.933 15.12 0.692 2356.63 0.937 0.932 - --- - -- -- ---- - 0.932 15.13 0.690 2356.62 0.936 0.932 ---- -- --- --- -- --- --- 0.932 15.15. 0.688 2356.62 0.936 0.931 - --- --- ---- ---- --- -- 0.931 Continues on next page... Basin E (Routed) Hydrograph Discharge Table Time Inflow Elevation CIv A CIv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft afs cfs cfs cis cfs cfs cfs cfs cfs cfs 15.17 0.686 2356.62 0.935 0.931 - -- - - --- ---- - 0.931 15.18 0.683 2356.62 0.934 0.930 - -- - -- -- - - 0.930 15.20 0.681 2356.62 0.934 0.929 - --- --- --- ---- --- --- 0.929 15.22 0.679 2356.62 0.933 0.929 - - -- - ----- ---- -- 0.929 15.23 0.677 2356.62 0.933 0.928 - --- --- -- -- --- - 0.928 15.25 0.674 2356.62 0.932 0.928 - 0.927 15.27 0.672 2356.61 0.931 0.927 - - -- - ---- -- --- 0.927 15.28 0.670 2356.61 0.931 0.926 - 0.926 15.30 0.668 2356.61, 0.930 0.926 - --- --- -- -- ----- ---- 0.926 15.32 0.665 2356.61 0.930 0.925 ---- ---- -- -- -- - --- 0.925 15.33 0.663 2356.61 0.929 0.924 - -- -- ----- ---- ---- --- 0.924 15.35 0.661 2356.61 0.928 0.924 --- --- ---- ---- ----- ----- ---- 0.924 15.37 0.659 2356.61 0.928 0.923 0.923 15.38 0.656 2356.60 0.927 0.922 ---- ----- ----- ----- --- - --- 0.922 15.40 0.654 2356.60 0.926 0.922 ---- --- ---- --- - --- -- 0.922 15.42 0.652 2356.60 0.926 0.921 0.921 15.43 0.650 2356.60 0.925 0.920 ---- ---- --- --- - - -- 0.920 15.45 0.647 2356.60 0.925 0.920 --- -- - -- -- ---- - -- 0.920 15.47 0.645 2356.60 0.924 0.919 --- ---- --- - --- ---- -- 0.919 15.48 0.643 2356.60 0.923 0.918 - -- - --- ----- -- ---- 0.918 15.50 0.640 2356.59 0.923 0.917 r - --- -- -- -- -- -- 0.917 15.52 0.638 2356.59 0.922 0.917 r; ----- --- --- ---- --- --- 0.917 ...End SUB BASIN 1-F HYDROGRAPHS Hydrograph Report Hydraflow Hydrographs by IntellsoW v9.2 Friday, Mar 13, 2009 Hyd. No. 10 Basin F Hydrograph type = SCS Runoff Peak discharge = 2.147 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 5,197 cuft Drainage area = 2.520 ac Curve number = 64 Basin Slope = 27.3% Hydraulic length = 659 ft Tc method = LAG Time of conc. (Tc) = 6.8 min Total precip. = 3.25 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time - Outflow (hrs cfs) 11.98 2.147 << 12.00 2.132 ...End ( Printed vskm a= 96.00% or Op.) t BASIN 1 TOTAL DEVELOPED FLOW t_ Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 11 Total Developed Flow (Basin 1) Hydrograph type Storm frequency Time interval Inflow hyds. = Combine 1 yrs 1 min 2, 4, 6, 7, 9, 10 Peak discharge = 13.02 cfs Time to peak = 12.38 hrs Hyd. volume = 296,084 cuft Contrib. drain. areE= 62.350 ac Hydrograph Discharge Table ( Pdr&d ,ak= " 95.E arp) Time Hyd. 2 + Hyd. 4 + Hyd. 6 + Hyd. 7 + Hyd. 9 + Hyd. 10 = Outflow (hrs) (cfs) (S) (Cfs) (S) (cfs) (cfs) (Cfs) 12.30 8.179 1.203 0.537 1.398 0.820 0.383 12.52 12.32 8.366 1.237 0.544 1.374 0.827 0.376 12.72 12.33- 8.499 1.272 0.550 1.349 0.834 0.368 12.87 12.35 8.578 1.305 0.556 1.323 0.839 0.360 12.96 12.37 8.612 1.338 0.562 1:297 0.845 0.353 13.01 12.38 8.615 << 1.370 0.567 1.270 0.850 0.344 13.02 << 12.40 8.602 1.400 0.572: 1.243 0.855 0.336 13.01 12.42 8.581 1.428 0.575 1.215 0.860 0.328 12.99 12.43 8.552 1.456 0.578 1.187 0.864 0.319 12.96 12.45 8.515 1.484 0.581 r 1.158 0.869 0.311 12.92 12.47 8.471 1.511 0.583 1.129 0.873 0.302 12.87 12.48 8.418 1.534 0.586 1.100 0.877 0.293 12.81 12.50 8.357 1.554 0.588 1.070 0.881 0.284 12.73 12.52 8.288 1.575 0.590 1.039 0.885 0.275 12.65 12.53 8.211 1.596 0.591 1.009 0.889 0.267 12.56 12.55 8.127 1.616 0.593 0.980 0.892 0.258 12.47 ...End BASIN 2 HYDROGRAPHS Hydrograph Report Hydratlow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 22 Basin 2 (Pre-Developed) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 3.110 ac = 25.0% = LAG = 3.25 in = 24 hrs Peak discharge = 0.764 cfs Time to peak = 12.00 hrs Hyd. volume = 3,093 cuft Curve number = 55 Hydraulic length = 320 ft Time of conc. (Tc) = 5.0 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.00 0.764 << 12.02 0.758 ...End M fA ( Printed values - 95.00% at Cp.) Hydrograph Report Hydraflow Hydroprephs by Intellsdve v9.2 Hyd. No. 23 Basin 2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.500 ac Basin Slope = 25.0% Tic method = LAG Total precip. = 3.25 in Storm duration = 24 hrs Friday, Mar 13,20D9 Peak discharge = 1.033 cfs Time to peak = 11.98 hrs Hyd. volume = 2,963 tuft Curve number = 57 Hydraulic length = 320 ft Time of conc. (Tc) = 4.8 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.97 1.029 11.98 1.033 << ...End w t? ( Printed values s- 95M% of Op.) l BASIN 3 HYDROGRAPHS -i Hydrograph Report Hydraflow Hydrographs by Intensoive v9.2 Friday. Mar 13, 2009 Hyd. No. 12 Basin 3 (Pre-Developed) Hydrograph type = SCS Runoff Peak discharge = 0.871 cfs Storm frequency = 1 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 4,378 cuft Drainage area = 4.540 ac Curve number = 55 Basin Slope = 22.0% Hydraulic length = 605 ft Tc method = LAG Time of conc. (Tc) = 8.9 min Total precip. = 3.25 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table INnW wAm >=95•00% &Qpj Time - Outflow (hrs cfs) 12.03 0.864 12.05 0.871 12.07 0.844 ...End a k Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 13 Basin 3 (Bypass) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tic method Total precip. Storm duration = SCS Runoff = 1 yrs 1 min = 0.390 ac = 32.3% LAG = 3.25 in = 24 hrs Peak discharge = 0.408 cis Time to peak = 11.93 hrs Hyd. volume = 773 cuft Curve number = 64 Hydraulic length = 127 ft Time of conc. (Tc) = 1.7 min Distribution = Type I) Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cis) 11.93 0.408 << ...End ( Printed values >- B&M of Op.) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 94 Basin 3 (Developed) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 4.030 ac = 17.4% = LAG = 3.25 in = 24 hrs Peak discharge = 3.205 cfs Time to peak = 12.00 hrs Hyd. volume = 8,524 cuft Curve number = 64 Hydraulic length = 717 ft Time of conc. (Tc) = 9.1 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time - Outflow (hrs cfs) 11.98 3.056 12.00 3.205 << 12.02 3.201 12.03 3.095 ...End ( PrIled values - 95.00% d op.) Hydrograph Report Hydraflow Hydrographs by Intetisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 15 Basin 3 (Routed) Hydrograph type = Reservoir Peak discharge = 0.573 cfs Storm frequency = 1 yrs Time to peak = 12.40 hrs Time interval = 1 min Hyd. volume = 8,517 cuft Inflow hyd. No. = 14 - Basin 3 (Developed) Reservoir name = Pond 3 Max. Elevation = 2507.62 ft Max. Storage = 6,512 cuft Storage Indication method used. Wet pond routing start elevation = 2507.00 ft. Hydrograph Dlscharge"Ta ble (f,rftd wWas 06.00% of Op.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfll Outflow (hm) ds ft Cfs ds ds Cfs Cfs Cfs ds ds Cfs ds 12.17 1.016 2507.59 0.574 0.552 0.552 12.18 0.884 2507.60 0.582 0.558 --- - ---- - ---- --- --« -- 0,558 12.20 0.788 2507.60 0.585 0.562 --- - - --- -- -- 0,561 12.22 0.728 2507.61 0.587 0.564 -- «- --- --_ -«- - - 0.564 12.23 0.695 2507.61 0.589 0.566 0.566 12.25 0.678 2507.61 0.590 0.567 --- - - - -_ -«- «-- 0.567 12.27 0.667 2507.61 0.592 0.568 ---- ---- -- ---- --« -_ 0,568 12.28 0.656 2507.62 0.593 0.5693 =,-- ---- -- --- - .-- _- 0.569 12.30 0.644 2507.62 0.594 0.570= - -- - - - -- 0.570 12.32 0.632 2507.62 0.595 0.571 0.571 12.33 0.620 2507.62 0.595 0.572 0.572 12.35 0.608 2507.62 0.596 0.572 - - - -- - -- --- ----- 0.572 12.37 0.595 2507.62 0.596 0.572 0.573 12.38 0:582 2507.62 0.596 0.573 --- -- - -- - --- - 0.573 12.40 0.569 2507.62 << 0.596 0.573 ---- ---- --- --- -- --- - 0.573 « 12.42 0.556 2507.62 0.596 0.573 -- --- - - -- -- -«- 0.573 12.43 0.542 2507.62 0.596 0.572 0.572 12.45 0.528 2507.62 0.595 0.572 0.572 12.47 0.514 2507.62 0.595 0.571 - ---- -- --- --. - -« 0.571 12.48 0.500 2507.62 0.594 0.571 0.571 12.50 0.485 2507.62 0.593 0.576"=--aF -- -- -- 0.570 12.52, 0.471 2507.61 0.592 0.569 ----- = - --- _---- ---. -- --- 0.569 12.53 0.457 2507.61 0.591 0.567 ---- --- --- -- - -- - 0.567 12.55 0.443 2507.61 0.590 0.566 --- ---- - -- -«-- - - - 0.566 12.57 0.430 2507.61 0.588 0.564 0,564 12.58 0.418 2507.61 0.586 0.563 ---- - --- ---- -- ---- --- 0.563 12.60 0.408 2507.60 0.585 0.561 0.561 12.62 0.398 2507.60 0.583 0.559 - --- «_- -- -- -- -_ 0.559 12.63 0.391 2507.60 0.580 0.557 -- --- - ---- -- - - 0.557 12.65 0.384 2507.60 0.577 0.554 0.554 12.67 0.378 2507.59 0.574 0.551 --- -- -- --- -- -- ---- 0.551 12.68 0.373 2507.59 0.571 0.548 0.848 12.70 0.369 2507.59 0.567 0.545 0.545 1 ...End Hydrograph Report Hydraflow Hydmgmphs by Inteilsoive v9.2 Hyd. No. 16 Total Developed Flow (Basin 3) Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 13, 15 Friday, Mar 13, 2009 Peak discharge = 0.623 cfs Time to peak = 12.27 hrs Hyd. volume = 9,291 cuft Contrib. drain. area= 0.390 ac Hydrograph Discharge Table Time Hyd. 13 + Hyd. i5= (hm) WS) (cfs) 12.13 0.064 0.530 12.15 0.063 0.542 12.17" 0.062 0.552 12.18 0.061 0.558 12.20 0.060 0.561 12.22 0.059 0.564 12.23 0.057 0.566 " 12.25 0.056 0.567 12.27 0.055 0.568 12.28 0.054 0.569 12.30 0.053 0.570 12.32 0.052 0.571 12.33 0.051 0.572 12.35 0.049 0.572 12.37 0.048 0.573 12.38 0.047 0.573 12.40 0.045 0.573 << 12.42 0.044 0.573 12.43 0.043 0.572 12.45 0.041 0.572 12.47 0.040 0.571 12.48 0.039 0.571 12.50 0.037 0.570 12.52 0.036 0.569 12.53 0.035 0.567 12.55 0.035 0.566 12.57 0.034 0.564 12.58 0.034 0.563 12.60 0.034 0.561 12.62 0.033 0.559 ...End (P tW values - 95.00% of OP.) Outflow (cis) 0.593 0.605 0.613 0.619 0.621 0.622 0.623 0.623 0.623 << 0.623 0.623 0.623 0.622 0.621 0.621 0.619 0.618 0.617 0.615 0.613 0.611 0.609 0.607 0.605 0.602 0.600 0.599 0.597 0.595 0.593 BASIN 4 HYDROGRAPHS Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.2 Friday, Mar 13, 2008 Hyd. No. 17 Basin 4 (Pre-Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 11.060 ac 21.8% LAG 3.25 in 24 hrs Peak discharge = 1.524 cfs Time to peak = 12.13 hrs Hyd. volume = 10,799 cuft Curve number = 55 Hydraulic length = 1310 It Time of conc. (Tc) = 16.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.10 1.489 12.12 1.522 12.13 1.524 << 12.15 1.506 12.17 1.478 ...End .y ( Prlnled vdues # 95.00% of Op.) Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.2 Hyd. No. 18 Basin 4 (Bypass) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.590 ac Basin Slope = 17.3% Tc method = LAG Total precip. = 3.25 in Storm duration = 24 hrs Hydrograph Discharge Table Time.- Outflow (hrs cfs) 11.97 0.939 11.98 0.972 << 12.00 0.951 ...End a Friday, Mar 13, 2009 Peak discharge = 0.972 cfs Time to peak = 11.98 hrs Hyd. volume = 2,547 tuft Curve number = 60 Hydraulic length = 301 ft Time of conc. (Tc) = 5.1 min Distribution = Type II Shape factor = 484 (PMW values 98AD% or op) I Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.2 Friday, Mar 13, 2009 Hyd. No. 19 Basin 4 (Developed) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 9.470 ac = 20.4% = LAG = 3.25 in 24- hrs Peak discharge = 6.007 cfs Time to peak = 12.07 hrs Hyd. volume = 20,029 cuft Curve number = 64 Hydraulic length = 1308 ft Time of conc. (Tc) = 13.7 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time Outflow (hrs cfs) 12.03 5.774 12.05 5.974 12.07 6.007 << 12.08 5.927 12.10 5.735 ...End ( Printed values " 95,0096 or Op.) Hydrograph Report Hydraflow Hydrographs by lntelisolve v9.2 Friday, Mar 13.2009 Hyd. No. 20 Basin 4 (Routed) Hydrograph type = Reservoir Peak discharge = 1.052 cfs Storm frequency = 1 yrs Time to peak = 12.62 hrs Time interval = 1 min Hyd. volume = 20,019 cuff Inflow hyd. No. = 19 - Basin 4 (Developed) Reservoir name = Pond 4 Max. Elevation = 2287.09 ft Max. Storage = 15,188 cuft Storage Indication method used. Wet pond routing start elevation = 2285.80 ft. Hydrograph D ischarge Table (Pdr dvOuss >= 05.00% of Op.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hm) cis ft cfs cfs cfS cfS cfs cfs efs ds cfs cfs 12.28 2.116 2286.99 1.009 1.006 - --- --- -- - -- - -- 1.006 12.30 1.906 2287.00 1.016 1.013 - ?--- -- -- ---- --- - 1.013 12.32 1.753 2287.01 1.021 1.019 - ---- - --- --- --- - 1.019 12.33 1.637 2287.02 1.026 1.023 -- ----- --- - --- -- - 1.023 12.35 1.558 2287.03 1.030 1.027 -- -- ---- -- - ----- --- 1.027 12.37 1.507 2287.04 1.034 1.030 ---- --- ---- - ---- - ----- 1.030 12.38 1.472 2287.05 1.037 1.033. 1.033 12.40 1.443 2287.05 1.040 1.036 =° -=. - --- ----- -- ---- _--- 1.036 12.42 1.414 2287.06 1.043 1.038 - = - -- -_ - - ____ 1.038 12.43 1.384 2287.06 1.046 1.040 1,040 12.45 1.354 2287.07 1.048 1.042 ---- ---- - -- --- --- -- 1.042 12.47 1.323 2287.07 1.050 1.044 1.044 12.48 1.291 2287.08 1.052 1.046 ---' ----- --_- - ----- --- -- 1.046 12.50 1.259 2287.08 1.054 1.048 -- -- -- ---- --=- - -- 1.048 12.52 1.227 2287.08 1.055 1.049 - 1.049 12.53 1.194 2287.09 1.056 1.050 - ---- --- - -- --- --- 1.050 12.55 1.162 2287.09 1.057 1.051 -=- --- ---- -- -- -_-- - 1.051 12.57 1.130 2287.09 1.058 1.051 1.051 12.58 1.100 2287.09 1.058 1.052 ---- --- -- ---- -- -_^ -- 1.052 12.60 1.070 2287.09 1.0588 1.052 -- ---- ---- ---- - ---- --- 1.052 12.62 1.042 2287.09 << 1.058 1.052 == 1.052 << 12.63 1.015 2287.09 1.058 1.052 - - - -- -- -- -- - 1.052 12.65 0.991 2287.09 1.058 1.051 ---- - --- --- --- ---- -- 1.051 12.67 0.969 2287.09 1.057 1.051 - --- - --- --- -- --- 1.051 12.68 0.949 2287.09 1.057 1.050 --- - ---- -- - -- -- 1.050 12.70 0.930 2287.09 1.056 1.050 - ---- --- - -- -- - 1.050 12.72 0.914 2287.08 1.055 1.049 1.049 12.73 0.899 2287.08 1.054 1.046 1 048 12.75 0.886 2287.08 1.053 1.047 . 1.047 12.77 0.874 2287.08 1.052 1.046 1.046 12.78 0.863 2287.08 1.051 1.045 - -- - -- ---- ---- - 1.045 12.80 0.853 2287.07 1.049 1.044 1,044 12.82 0.843 2287.07 1.048 1.042 --- - --- --- -- --- 1 042 12.83 0.835 2287.07 1.046 1.041 - . 1.041 12.85 0.827 2287.06 1.045 1.040 - 1.040 12.87 0.819 2287.06 1.043 1.038 - 038 1 12.88 0.812 2287.06 1.042 1.037 . 037 1 12.90 0.804 2287.05 1.040 1.035 . 1 035 12.92 0.797 2287.05 1.038 1.034 . 1 034 12.93 0.789 2287.05 1.037 1.032 . 1.032 Continues on next page... Basin 4 (Routed) Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C PfRsr Wr A Wr B Wr C Wr D Exffl Outflow (hrs) cfs ft cfs cfs Cfs cfs cfs CfS cfs cfs cfs cfs 12.95 0.782 2287.04 1.035 1.031 ---- - - - ----- - --- 1.031 12.97 0.774 2287.04 1.033 1.029 ---- --- --- -- - -- -- 1.029 12.98 0.766 2287.03 1.031 1.027 1.027 13.00 0.759 2287.03 1.029 1.026 - - - - ---- ---- - 1.026 13.02 0.751 2287.03 1.027 1.024 - ----- ---- -- - -- - ---- 1.024 13.03 0.743 2287.02 1.025 1.022 ---- - - ---- - -- -- 1.022 13.05 0.735 2287.02 1.023 1.020 ----- ---- -- -- --- --- ---- 1.020 13.07 0.727 2287.01 1.021 1.019 ---- --- -- -- -- - - 1.019 13.08 0.720 2287.01 1.019 1.017 --- --- -- --- - -- - 1.017 13.10 0.712 2287.00 1.017 1.015 -- --- --- ----- - - - 1.015 13.12 0.705 2287.00 1.015 1.013 --- - -- - ----- --- - 1.013 13.13 0.698 2286.99 1.013 1.011 ---- ---- - -- --- - --- 1.011 13.15 0.692 2286.99 1.011 1.008 --- -- ---- --- - - ---- 1.008 13.17 0.685 2286.99 1.008 1.006 - -- ---- - -- --- --- 1.006 13.18 0.679 2286.98 1.006 1.004 ---- ---- --- --- ----- --- -- 1.004 13.20 0.674 2286.98 1.004 1.002 1.002 ...End t? Hydrograph Report Hydreflow Hydrogra{hs by Intallsolve v9.2 Friday, Mar 13, 2009 Hyd. No. 21 Total Developed Flow (Basin 4) Hydrograph type = Combine Peak discharge = 1.330 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 22,566 cuft Inflow hyds. = 18, 20 Contrib. drain. area= 1.590 ac Hydrograph Discharge Table Time Hyd. 18 + Hyd. 20 = (hm) (cfs) We) 12.00 0.951 0.379 12.02 0.874 0.450 12.03 0.758 0.527 ...End (Nnted valum 05.00% of Qp,) Outflow (cfs) 1.330 << 1.324 1.285 ..v i BASIN 5 HYDROGRAPHS y t Y w J ry Hydrograph Report Hydraflow Hydrographs by Intellaolve v9.2 Friday, Mar 13, 2009 Hyd. No. 24 Basin 5 (Pre-Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 1.870 ac 29.7% LAG 3.25 in 24 *s Peak discharge = 0.459 cfs Time to peak = 12.00 hrs Hyd. volume = 1,860 cuft Curve number = 55 Hydraulic length = 370 ft Time of conc. (Tc) = 5.2 min Distribution = Type it Shape factor = 484 Hydrograph Discharge Table Time - Outflow (hrs ds) 12.00 0.459 << 12.02 0.456 .End ( Minted values >- KIDD% of Op.) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Friday, Mar 13, 2009 Hyd. No. 25 Basin 5 (Developed) Hydrograph type = SCS Runoff Peak discharge = 1.895 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3 955 cuft Drainage area = 1.870 ac Curve number = , 64 Basin Slope = 29.7% Hydraulic length = 370 ft Tc method = LAG Time of conc. (Tc) = 4.1 min Total precip. = 3.25 in Distribution = Type II Storm duration = 24: hrs Shape factor = 484 Hydrograph Discharge Table cFMnfedvWuns-95.W%ofOpj Time - Outflow (hrs cfs) r 11.95 1.895 << 11.97 1.859 ...End !'R 1 BASIN 6 HYDROGRAPHS J 1 Hydrograph Report Hydraflow Hydropraphs by Intellsdve v92 Friday, Mar 13, 2009 Hyd. No. 26 Basin 6 (Pre-Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 2.500 ac 26.3% LAG 3.25 in 24,,hrs Peak discharge = 0.614 cis Time to peak = 12.00 hrs Hyd. volume = 2,486 cuft Curve number = 55 Hydraulic length = 380 ft Time of conc. (Tc) = 5.6 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.00 0.614 << 12.02 0.610 .End ( Printed values - 95.00% or op.) t Hydrograph Report Hydraflow Hydrographa by IntermdVe V9.2 Friday, Mar 13, 2009 Hyd. No. 27 Basin 6 (Developed) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 2.500 ac = 26.3 % = LAG = 3.25 in = 24 hrs Peak discharge = 2.533 cis Time to peak = 11.95 hrs Hyd. volume = 5,288 cuft Curve number = 64 Hydraulic length = 380 ft Time of conc. (Tc) = 4.5 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.95 2.533 11.97 2.486 ...End (Printed values - 06.00% of Op.) BASIN 7 E"RQGRAPHS s ,w Hydrograph Report Hydraflow Hydrographs by Inteiisolve v9.2 Hyd. No. 28 Basin 7 (Pre-Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.260 ac Basin Slope = 25.0% Tc method = LAG Total precip. = 3.25 in Storm duration = 24 ,hrs Friday, Mar 13, 2009 Peak discharge = 0.903 cfs Time to peak = 12.02 hrs Hyd. volume = 4,005 cuft Curve number = 55 Hydraulic length = 500 ft Time of conc. (Tc) = 7.2 min Distribution = Type II Shape factor = 484 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.02 0.903 << 12.03 0.899 ...End ( PrWed values >= 95.00% or Op.) Hydrograph Report Hydraflow Hydra®raphs by lntelisolve v9.2 Friday. Mar 13, 2009 Hyd. No. 29 Basin 7 (Developed) Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 2.970 ac = 25.0% = LAG = 3.25 in = 24.,hrs Hydrograph Discharge Table Time - Outflow (hrs cfs) 11.97 2.828 << 11.98 2.823 ...End Peak discharge = 2.828 cfs Time to peak = 11.97 hrs Hyd. volume = 6,478 cuft Curve number = 64 Hydraulic length = 500 ft Time of conc. (Tc) = 5.7 min Distribution = Type 11 Shape factor = 484 ( Printed values 7•.95.00% of op.) x APPENDIX r Page .1 of 1 bttD://www.erh.noaa.L-ov/er/ho/hvd/grat)hicq/24botirl.gif I/'fin/)nm CN CHARTS N a r Table 2.1.5-1 Runoff Curve Numbers Cover descriotfon Curve numbers for Cover type and Average percent ? hydrologic soil groups hydrologic Condition impervious area A B C D Cultivated land: without conservation treatment 72 81 88 91 with conservation treatment 62 71 78 81 Pasture or range land; poor conditlon 68 79 86 89 good condition 39 61 74 80 Meadow: good condition 30 58 71 78 Wood or forest land: thin stand, poor cover 45 6 77 83 good cover 25 55 70 77 Open s ace lawns p ( ,parks, golf courses, cemeteries, etc.) a Poor condition (grass cover a50%) 68 79 86 89 Fair condition (grass cover 50% to 75%) 49 69 79 84 Good condition (grass cover a 75%) '39 61 74 80 Impervious areas: Paved parking lots, roofs, dn.Veways, etc. (excluding right-of-way) 98 98 98 98 Streets and roads: Paved; curbs and storm drains (excluding right-of-way) Paved; open ditches (including right-of-way) 98 83 98 89 98 98 Gravel (including right-of-way) 76 85 92 89 93 91 Dirt (including right-of-way) 72 82 87 89 Urban districts: Commercial and business 85% Industrial 89 92 94 95 72% 81 88 91 93 Residential districts by averagaAot size: -" 1/8 acre or less (town houses) 65% 77 85 90 92 114 acre 38% 1/3 acre 30% 61 57 75 83 87 1 I acre /2 acre 25% 54 72 70 81 80 86 85 2 acres 200 12 /0 51 46 68 65 79 77 84 82 Developing urban areas and Newly graded areas (pervious areas only, no vegetation) 77 86 91 94 1 Average runoff condition, and la = 0.25 2 The average percent impervious area shown was used to develop the composite CNs. follows: impervious areas are directly connected to the drainage system Impervious ah: Other assumptions are h as , areas are considered equivalent to open space in good hydrologic condition. SCS method has an adjustment to reduce the effect as ave a C If the impervious area N of H. and pervious is not connected, the . 3 CNs shown are equivalent to those of pas lure. Composite CNs maybe computed for other combi cover type. nations of open space 2.1-22 Volume 2 (Technical Handbook) 1? A &- r Table 2,1.5-1 Runoff Curve Numbers' Cover description Curve numbers for hydrologic sot! arouas Cover type and Average percent 2 hydrologic condition impervious area A B C D J I ?i Cultivated land: without conservation treatment 72 81 88 91 with conservation treatment 62 71 78 81 Pasture or range land: poor condition 68 79 86 good condition 39 61 74 89 80 O? Meadow: good condition Wood or forest l d 30 58 71 18 an : thin stand, poor cover 45 66 77 83 good cover _ 25 55 70 77 Open space (lawns, parks, golf courses, cemeteries, etc.) 3 Poor condition (grass cover <60%) 68 79 86 89 Fair condition (grass cover 50% to 75%) 49 69 79 84 Good condition (grass cover > 75%) 39 61 74 80 ?`oL Impervious areas: Paved parking lots, roofs, drf'?eways etc. , (excluding right-of-way) 98 9 Streets and roads: 8 98 98 Paved; curbs and storm drains (excluding right-of-way) Paved; open ditches (including right-of-way) 98 83 98 98 98 Gravel (including right-of-way) 76 89 85 92 89 93 Dirt (including right-of-way) 72 82 87 91 Urban districts: 89 Commercial and business 85% Industrial 89 92 94 95 72% 81 88 91 93 Residential districts by averag4jo,tsize: - 118 acre or less (town houses) _ 65% 77 86 90 1/4 acre 38% 1/3 acre . 61 75 83 92 87 30% 1/2 acre 25% 57 54 72 70 81 86 1 acre 20% .. 2 acres 51 68 80 79 85 84 12% 46 65 77 82 Developing urban areas and Newly graded areas (pervious areas only, no vegetation) 77 86 91 94 f Average runoff condition, and la = 0.25 1 \C 6q ? 2 The average percent impervious area shown was used ?IJ . are as follows: impervious areas are directly connected to the drainage system, impervious areasOhave as CN areas a t7 re considered equivalent to open space in good hydrologic condition. If t SCS method has an adjustment to reduce the effect he impervious area is of 98, an not conn d pervious ecd, the . 3 CNs shown are equivalent to those of pasture. Composite CNs may be computed for other combinations of open space cover type.. 2.1-22 0-ec.,c)l0 Sl?q'71 flier r?!QIiO!1C'rf ltni r+•i0751??_l{ - .. Volume 2 (Technical Handbook) WATER QUALITY CALCULATIONS i i i i i a i i 1 i jUa W Q oZW w W ? w 6 0 ?? LL w o w u? a Z U (D?? o .. W a _ ?o LL a U¦ N? 00000 00000 _J 0000 00000 00000 ? J 0000 , 0000 00000 00000 00000 _ Z 00000 00000 00000 e 0 00 o 00000 00000 fA l.... m Q O o - ?J ` a LU= a CL [3 tuune? U I- > CL U cn LLJ L 0 W 0 IZ ?jV.waWU Wz6E2 ? OCcl w ULW U 12Z mo D -3 0 coo (j)??m D LL Do Zw W(qJ WZ Q? ?N ? iw? w w fn U. U- C9?0 ~ in 8 i a Z ? N ? Determine Water Quality Volume of Basin 1-A Given: Total Area of Basin = 73.35 Total Area Onsite Pond Basin = 60.57 Acres Total Area of Impervious = 20% =12.11 Acres 1. Determine I: I=12.11/60.57 I = 0.20 2. Determine Rv: Rv = 0.05 + (I) x 0.009 Rv = 0.05 + (20.0) x 0.009 = 0.23 .3. Determine WQr: WQr =1.2" (Rv) WQr =1.2" (0.23) = 0.276" 4. Determine WQv: WQv = WQr/12 x A WQv = (0.276/12) x (60.57 ac) x (43,5(0s.f./ac) = 60,684 c.f. => 61,187 c.f provided Orifice Equation for 48 Hour Drawdown: Given: t =172,800 sec WQv = 61,187 c.f. R = 2.50 in/2 = 1.25 in ti 1. Determine H H = Elevation of Water Quality Vo- =-Elevation of Pond Bottom - R H = 2356.60 - 2351.00 -1.25 in x (1 ft / 1-2in) = 5.496 2. Determine Area of Orifice: A = (WQv/t) / [0.6 x (64.4 x H/2)"] A = (61,187 c.f. /172,800 sec) / [0.6 x (64.4 x 5.496/2)0"] A = (0.354) / (7.98) = 0.0444 3. Check Area of 2.50 in Orifice: A=3.14xR? A = 3.14 x (2.50 in/2 x 1 in/12 ft)z = 0.0341 0.0341 < 0.0444 Use 2.50" Orifice Determine Water Quality Volume of Basin 1-E Given: Total Area of Basin =17.32 Total Area Onsite Pond Basin =17.32 Acres Total Area of Impervious = 20% = 3.46 Acres 1. Determine I: I=3.46/17.32 I = 0.20 2. Determine Rv: Rv = 0.05 + (1) x 0.009 Rv = 0.05 + (20.0) x 0.009 = 0.23 3. Determine WQr: WQr =1.2" (Rv) WQr =1.2" (0.23) = 0.276" 4. Determine WQv: WQv = WQr/12 x A WQv = (0.276/12) x (17.32 ac) x (43,5tps.f./ac) =17,352.56 c.f. => 18,142 c.f. provided Orifice Equation for 48 Hour Drawdown: Given: t =172,800 sec WQv =18,142 c.f. R =1.50 in/2 = 0.75 in 1. Determine H H = Elevation of Water Quality VT=-Elevation of Pond Bottom - R H = 2355.40 - 2353.00 - 0.75 in x (1 ft / 1-2in) = 2.34 2. Determine Area of Orifice: A = (WQv/t) / [0.6 x (64.4 x H/2f 51 A = (18,142 c.f. /172,800 sec) / [0.6 x (64.4 x 2.34/2)0s] A = (0.105) / (5.21) = 0.0202 3. Check Area of 1.5 in Orifice: A=3.14xRx A = 3.14 x (1.50 in/2 x 1 in/12 ft) = 0.0123 0.0123 < 0.0202 Use 1.50" Orifice Determine Water Quality Volume of Basin 3 Given: Total Area of Basin = 4.03 Total Area Onsite Pond Basin = 4.03 Acres Total Area of Impervious = 20% = 0.81 Acres 1. Determine I: I = 0.81 / 4.03 I = 0.20 2. Determine Rv: Rv = 0.05 + (1) x 0.009 Rv = 0.05 + (20.0) x 0.009 = 0.23 3. Determine WQr: WQr =1.2" (Rv) ' WQr =1.2" (0.23) = 0.276" 4. Determine WQv: WQv = WQr/12 x A WQv = (0.276/12) x (4.03 ac) x (43 (b-.f./ac) = 4,037.58 c.f. > 4,276 c.f. provided Orifice Equation for 48 Hour Drawdown: Given: t =172,800 sec WQv = 4,276 c.f. R = 0.50 in/2 = 0.25 in 1. Determine H H = Elevation of Water Quality Vol: -elevation of Pond Bottom - R H = 2507.00 - 2505.00 - 0.25 in x (1 ft / l2in) =1.979 2. Determine Area of Orifice: A = (WQv/t) / [0.6 x (64.4 x 1-1/2)0.5] A = (4,276 c.f. /172,800 sec) / [0.6 x (64.4 x 1.979/2)0.5] A = (0.025) / (4.79) = 0.0052 3. Check Area of 0.5 in Orifice: A=3.14xR2 A = 3.14 x (0.50 in/2 x 1 in/12 ft)2 = 0.0014 0.0014 < 0.0052 Use 0.50" Orifice Determine Water Quality Volume of Basin 4 Given: Total Area of Basin = 9.47 Total Area Onsite Pond Basin = 9.47 Acres Total Area of Impervious = 20% =1.89 Acres 1. Determine I: I=1.89/9.47 I = 0.20 2. Determine Rv: Rv=0.05+(1) x0.009 Rv = 0.05 + (20.0) x 0.009 = 0.23 3. Determine WQr: WQr =1.2" (Rv) ' WQr =1.2" (0.23) = 0.276" 4. Determine WQv: WQv = WQr/12 x A WQv = (0.276/12) x (9.47 ac) x (43,56&f./ac) = 9,487.8 c.f. => 9,561 c.f provided Orifice Equation for 48 Hour Drawdown: Given: t =172,800 sec WQv = 9,561 c.f. R =1.00 in/2 = 0.50 in 1. Determine H . H = Elevation of Water Quality Vor--Elevation of Pond Bottom - R H = 2285.60 - 2279.50 - 0.50 in x (I R / 12in) = 6.06 2. Determine Area of Orifice: A = (WQv/t) / [0.6 x (64.4 x H/2)0.5] A = (9,561 c.f. /172,800 sec) / [0.6 x (64.4 x 6.06/2)°'SJ A = (0.055) / (8.38) = 0.0066 3. Check Area of 1.0 in Orifice: A=3.14xR2 A = 3.14 x (1.00 in/2 x 1 in/12 ft) = 0.0055 0.0055 < 0.0066 Use 1.00" Orifice