Loading...
HomeMy WebLinkAboutWQ0000020_Comments_20131101�F WQOOU00;1-0 .AIL. NCDENR North Carolina Department of Environment and Natural Resources ,. Division of Water Resources Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary October 23, 2013 RE EI E IDENPOK John R. Toepfer, P.E. NODI 0-12013 Duke Energy Progress 410 S. Wilmington Street/PEB14 d�1eUIfBr�rO$eCtiOn Section, Raleigh, NC 27601 RE: Response to comments from Duke Energy Progress dated September 6, 2013 concerning the Asheville Airport Engineered Fill Project — Area III Development Dear Mr. Toepfer:. The Asheville Regional Office of the Division of Water Resources (DWR) acknowledges receiving a response to our review comments dated August 6, 2013. We have provided additional questions and comments, in the bulleted paragraphs below. Please note that some comments include requirements applicable to all structural fill areas at this site: , CCP leachate in Area Wand possibly Area III is/will be pumped and hauled by VLS of South Carolina to their industrial wastewater treatment plant located in Mauldin, SC. DWR is requesting a letter from VLS of South Carolina specifically agreeing to accept the CCP leachate and verification that they are authorized to operate an industrial wastewater treatment facility. Please provide a total volume of CCP leachate•that has been pumped and hauled to date. • The Metropolitan Sewerage District (MSD) of Buncome County recently issued an industrial discharge permit to allow the CCP leachate to be discharged to their public sewer system from both Area 1V and Area III. Please provide a letter from MSD specifically agreeing to accept the CCP leachate and a copy of the industrial discharge authorization. • In order for DWR to monitor the condition of the ash post -emplacement, please provide all -existing and future records pertaining to leachate water quality assessment, discharge and disposal for all CCP fill areas. Please identify whether the leachate is discharged to MSD (i.e., flow volume) or any pump and haul contractor. This data can bE WATER QUALITY REGIONAL OPERATIONS SECTION North Carolina Division of Water Quality —Asheville Regional Office 2090 U.S. Highway 70, Swannanoa, N.C. 28778 Phone (828) FAX (828) 299-7043 Internet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer Duke Energy Progress - Asheville October 23, 2013 Page 3 of 3 4. A quality assurance plan for groundwater monitoring. r • According to 15A NCAC 02T.1204, you are responsible for providing a site plan that includes the location of all wells (including usage and construction details if available), streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, and other surface drainage features within 500 ft. of the CCPs use boundary. DWR requested the relocation of monitoring wells MW3, MW4, and MW6. The new locations for MW3 and MW6 are acceptable. The addition and location of MW7 is also acceptable. It is understood that site conditions prevent the movement of MW4. The current location of MW4 is acceptable. Please contact me if you have any questions regarding our review comments. I can be reached at (828) 296-4681 or brett.laverty@ncdenr.gov. Sincerely, Ash Jon-l'isga`''�'arrd—"DWMVJIFaSg-. - t Laverty er Qualit 1 -Regional Operations Section Tonal Office