Loading...
HomeMy WebLinkAboutBraeburn - Braeburn - BMP and Storm Drain Calc Package - 2-27-18 (CURRENT) Table of Contents 1. Project Narrative & Summary 2. Location & USGS Map 3. Soils Map & Information 4. FEMA Flood Insurance Map 5. Storm Drainage Calculations A. Storm System A Tabulation Report & Profiles B. Storm System B Tabulation Report & Profiles C. Storm System C Tabulation Report & Profiles D. Storm System D Tabulation Report & Profiles E. Storm System E Tabulation Report & Profiles F. Storm System F Tabulation Report & Profiles G. Storm System G Tabulation Report & Profiles H. Inlet Capacity Chart / Spread Calculations 6. Wet Ponds A. Wet Pond 1 Pre-Development B. Wet Pond 1 Post-Development C. Wet Pond 2 Pre-Development D. Wet Pond 2 Post-Development E. Wet Pond 3 Pre-Development F. Wet Pond 3 Post-Development G. Wet Pond 4 Pre-Development H. Wet Pond 4 Post-Development I. Summary 7. Impervious Area Calculations 8. Drainage Map 9. Appendix A. Wetlands Reports 1. Project Narrative & Summary PROJECT NARRATIVE The project, “Braeburn” is a proposed single-family residential development located at 4408 Faith Church Road in the town of Indian Trail, Union County, North Carolina. This existing site is being developed as a single-family community with public streets and infrastructure. This package details the storm drainage system, water quality and quantity BMP, and Phase 3 erosion control calculations for the project. For Phase 1 and Phase 2 erosion control measures and calculations, see “Overall Early Erosion Control and Grading Calculation Package” by ESP Associates, dated February 19, 2018. The project site is located in Zone X and Zone AE per FIRM Map for Union County, North Carolina –Map Numbers 3710541900J and 37410542900J, both with an effective date of October 16, 2008. The overall existing site a combination of woods and open fields. The site primarily drains southeast towards a tributary of North Fork Crooked Creek located at the southeast end of the site. North Fork Crooked Creek borders the northeast side of the site. Wetlands exist near the creeks bordering the site; however, none are proposed to be disturbed with the proposed development. The proposed storm drainage networks for the project drain to four (4) separate proposed wet pond BMP’s. The wet ponds are sized to control the flow for the 1, 2, 10, 25, and 50 year flows, in accordance with the NCDEQ BMP Manual and the Town of Indian Trail Post-Construction Stormwater Ordinance. Due to the proposed wet pond BMP detention systems, the proposed project is not anticipated to have negative impacts on downstream or adjacent properties. 2. Location & USGS Map Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI,Esri China (Hong Kong), Esri (Thailand), MapmyIndia, © OpenStreetMap contributors, and the GISUser Community SITE I LOCATION MAPBRAEBURN - PHASE 5 & 6INDIAN TRAIL, NC 1 " = 1,000 ' Copyright:© 2013 National Geographic Society, i-cubed SITE I USGS MAPBRAEBURN - PHASE 5 &6INDIAN TRAIL, NC 1 " = 1,000 ' 3. Soils Map & Information Hydrologic Soil Group—Union County, North Carolina (Bonterra - Phase 5 & 6 - Soils Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/29/2017 Page 1 of 4388330038834003883500388360038837003883800388390038840003884100388420038843003884400388330038834003883500388360038837003883800388390038840003884100388420038843003884400534600534700534800534900535000535100535200535300535400535500535600535700535800535900536000536100536200536300 534600 534700 534800 534900 535000 535100 535200 535300 535400 535500 535600 535700 535800 535900 536000 536100 536200 536300 35° 6' 8'' N 80° 37' 13'' W35° 6' 8'' N80° 36' 2'' W35° 5' 30'' N 80° 37' 13'' W35° 5' 30'' N 80° 36' 2'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 350 700 1400 2100 Feet 0 100 200 400 600 Meters Map Scale: 1:8,220 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 16, Sep 20, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2015—Feb 8, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Union County, North Carolina (Bonterra - Phase 5 & 6 - Soils Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/29/2017 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ChA Chewacla silt loam, 0 to 2 percent slopes, frequently flooded B/D 32.4 18.9% CmB Cid channery silt loam, 1 to 5 percent slopes D 33.8 19.7% ScA Secrest-Cid complex, 0 to 3 percent slopes C 100.3 58.4% TaB Tarrus gravelly silt loam, 2 to 8 percent slopes B 5.2 3.0% Totals for Area of Interest 171.6 100.0% Hydrologic Soil Group—Union County, North Carolina Bonterra - Phase 5 & 6 - Soils Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/29/2017 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Union County, North Carolina Bonterra - Phase 5 & 6 - Soils Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/29/2017 Page 4 of 4 4. FEMA Flood Insurance Maps . Storm Drainage Calculations A. Storm System A Tabulation Report & Profiles B. Storm System B Tabulation Report & Profiles C. Storm System C Tabulation Report & Profiles D. Storm System D Tabulation Report & Profiles E. Storm System E Tabulation Report & Profiles F. Storm System F Tabulation Report & Profiles G. Storm System G Tabulation Report & Profiles H. Inlet Capacity Chart / Spread Calculations PROJECT: BraeburnDESIGNED BY:_____ JAC DATE: 2/27/2018MAXIMUM ALLOWABLE SPREAD FOR VALLEYLOCATION: Town on Indian Trail, NCCHECKED BY: _____ MRR DATE:CURB AND GUTTER = 7' RAINFALL INTENSITY 4.00 IN/HRREFERENCE: "Town of Indian Trail - Land Development Standards" INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSDCB#A3 0.55 0.60 SAG-DOUBLE 1.32 1.64 0.00% 2.08% N/A N/A 6.54 0.14 0.00 N/ADCB#A4 0.59 0.60 SAG-DOUBLE 1.42 1.54 0.00% 2.08% N/A N/A 6.26 0.13 0.00 N/ADCB#A9 0.54 0.60 SAG-DOUBLE 1.30 1.30 0.00% 2.08% N/A N/A 5.61 0.12 0.00 N/ACB#A10 0.23 0.60 SAG-SINGLE 0.55 0.55 0.00% 2.08% N/A N/A 4.01 0.08 0.00 N/ACB#A16 0.41 0.60 ON GRADE 0.98 0.98 1.43% 2.08% 24.0 0.86 6.54 0.14 0.12 DCB#A4CB#A17 0.16 0.60 ON GRADE 0.38 0.38 1.43% 2.08% 24.0 0.48 4.59 0.10 0.00 CB#A16CB#A18 0.07 0.60 ON GRADE 0.17 0.17 1.43% 2.08% 24.0 0.29 3.37 0.07 0.00 CB#A17CB#A19 0.07 0.60 ON GRADE 0.17 0.17 1.43% 2.08% 24.0 0.29 3.37 0.07 0.00 CB#A18CB#A20 0.37 0.60 ON GRADE 0.89 0.89 1.43% 2.08% 24.0 0.81 6.29 0.13 0.08 CB#A32CB#A21 0.13 0.60 ON GRADE 0.31 0.31 1.00% 2.08% 21.0 0.41 4.54 0.09 0.00 DCB#A4CB#A22 0.21 0.60 ON GRADE 0.50 0.56 1.00% 2.08% 21.0 0.59 5.65 0.12 0.00 CB#A21CB#A23 0.33 0.60 ON GRADE 0.79 0.79 1.00% 2.08% 21.0 0.74 6.44 0.13 0.05 CB#A22CB#A28 0.28 0.60 ON GRADE 0.67 0.70 1.27% 2.08% 23.0 0.70 5.90 0.12 0.01 DCB#A9CB#A29 0.32 0.60 ON GRADE 0.77 0.77 1.27% 2.08% 23.0 0.74 6.09 0.13 0.03 CB#A28CB#A30 0.40 0.60 ON GRADE 0.96 1.12 1.43% 2.08% 24.0 0.93 6.86 0.14 0.18 DCB#A3CB#A31 0.41 0.60 ON GRADE 0.98 0.98 1.00% 2.08% 21.0 0.84 6.99 0.15 0.14 DCB#A3CB#A32 0.41 0.60 ON GRADE 0.98 1.06 1.43% 2.08% 24.0 0.91 6.73 0.14 0.16 CB#A30CB#A33 0.13 0.60 ON GRADE 0.31 0.31 1.27% 2.08% 23.0 0.42 4.35 0.09 0.00 DCB#B6610-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHARTSURFACE 'Q' SLOPEINLET TYPE INLETDRAINAGE AREAINLET 'C'STORM SYSTEM ATo Inlet #BYPASS Q PROJECT: BraeburnDESIGNED BY:_____ JAC DATE: 2/27/2018MAXIMUM ALLOWABLE SPREAD FOR VALLEYLOCATION: Town on Indian Trail, NCCHECKED BY: _____ MRR DATE:CURB AND GUTTER = 7' RAINFALL INTENSITY 4.00 IN/HRREFERENCE: "Town of Indian Trail - Land Development Standards"10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHART INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSDCB#B3 0.61 0.60 SAG-DOUBLE 1.46 1.46 0.00% 2.08% N/A N/A 6.06 0.13 0.00 N/ADCB#B4 0.71 0.60 SAG-DOUBLE 1.70 1.70 0.00% 2.08% N/A N/A 6.70 0.14 0.00 N/ACB#B5 0.04 0.60 ON GRADE 0.10 0.10 3.27% 2.08% 32.0 0.21 2.34 0.05 0.00 DCB#B4CB#B6 0.01 0.60 ON GRADE 0.02 0.02 1.00% 2.08% 21.0 0.08 1.74 0.04 0.00 CB#B7CB#B7 0.10 0.60 SAG-SINGLE 0.24 0.24 0.00% 2.08% N/A N/A 2.30 0.05 0.00 N/ACB#B8 0.05 0.60 ON GRADE 0.12 0.13 1.00% 2.08% 21.0 0.23 3.24 0.07 0.00 CB#B7CB#B9 0.28 0.60 ON GRADE 0.67 0.67 1.00% 2.08% 21.0 0.67 6.06 0.13 0.01 CB#B8CB#B10 0.34 0.60 ON GRADE 0.82 0.89 1.00% 2.08% 21.0 0.79 6.73 0.14 0.10 CB#B11CB#B11 0.05 0.60 ON GRADE 0.12 0.22 1.00% 2.08% 21.0 0.33 3.96 0.08 0.00 CB#B12CB#B12 0.32 0.60 SAG-SINGLE 0.77 0.77 0.00% 2.08% N/A N/A 5.00 0.10 0.00 N/ACB#B14 0.41 0.60 SAG-SINGLE 0.98 1.05 0.00% 2.08% N/A N/A 6.15 0.13 0.00 N/ADCB#B15 0.56 0.60 SAG-DOUBLE 1.34 1.36 0.00% 2.08% N/A N/A 5.77 0.12 0.00 N/ACB#B17 0.35 0.60 SAG-SINGLE 0.84 0.84 0.00% 2.08% N/A N/A 5.31 0.11 0.00 N/ADCB#B18 0.54 0.60 SAG-DOUBLE 1.30 1.30 0.00% 2.08% N/A N/A 5.58 0.12 0.00 N/ACB#B19 0.07 0.60 ON GRADE 0.17 0.21 2.00% 2.08% 27.0 0.33 3.42 0.07 0.00 DCB#B18CB#B20 0.35 0.60 ON GRADE 0.84 0.84 1.51% 2.08% 25.0 0.80 6.10 0.13 0.04 CB#B19CB#B21 0.33 0.60 ON GRADE 0.79 0.79 1.51% 2.08% 25.0 0.77 5.97 0.12 0.02 CB#B71CB#B25 0.25 0.60 ON GRADE 0.60 0.60 1.00% 2.08% 21.0 0.62 5.81 0.12 0.00 CB#B9CB#B26 0.19 0.60 ON GRADE 0.46 0.46 1.00% 2.08% 21.0 0.52 5.24 0.11 0.00 CB#B25CB#B27 0.34 0.60 ON GRADE 0.82 0.82 1.00% 2.08% 21.0 0.75 6.52 0.14 0.06 CB#B73DCB#B28 0.67 0.60 SAG-DOUBLE 1.61 1.61 0.00% 2.08% N/A N/A 6.45 0.13 0.00 N/ADCB#B35 0.27 0.60 SAG-DOUBLE 0.65 0.65 0.00% 2.08% N/A N/A 3.52 0.07 0.00 N/ADCB#B36 0.59 0.60 SAG-DOUBLE 1.42 1.42 0.00% 2.08% N/A N/A 5.92 0.12 0.00 N/ACB#B41 0.30 0.60 ON GRADE 0.72 0.77 1.97% 2.08% 27.0 0.76 5.63 0.12 0.02 DCB#B15CB#B42 0.36 0.60 ON GRADE 0.86 0.86 1.97% 2.08% 27.0 0.81 5.86 0.12 0.05 CB#B41CB#B43 0.51 0.60 ON GRADE 1.22 1.22 1.97% 2.08% 27.0 1.01 6.68 0.14 0.22 CB#B67CB#B54 0.40 0.60 ON GRADE 0.96 0.96 1.00% 2.08% 21.0 0.83 6.93 0.14 0.13 CB#B55CB#B55 0.31 0.60 SAG-SINGLE 0.74 0.87 0.00% 2.08% N/A N/A 5.44 0.11 0.00 N/ADCB#B56 0.46 0.60 SAG-DOUBLE 1.10 1.18 0.00% 2.08% N/A N/A 5.25 0.11 0.00 N/ACB#B57 0.31 0.60 ON GRADE 0.74 0.74 1.00% 2.08% 21.0 0.71 6.30 0.13 0.03 DCB#B56CB#B58 0.19 0.60 ON GRADE 0.46 0.46 1.00% 2.08% 21.0 0.52 5.24 0.11 0.00 CB#B57CB#B59 0.13 0.60 ON GRADE 0.31 0.31 1.00% 2.08% 21.0 0.41 4.54 0.09 0.00 CB#B58CB#B60 0.14 0.60 ON GRADE 0.34 0.34 1.04% 2.08% 21.0 0.43 4.64 0.10 0.00 CB#B59CB#B61 0.22 0.60 ON GRADE 0.53 0.53 1.04% 2.08% 21.0 0.57 5.50 0.11 0.00 CB#B83CB#B64 0.17 0.60 ON GRADE 0.41 0.41 2.00% 2.08% 27.0 0.50 4.41 0.09 0.00 DCB#B18CB#B65 0.36 0.60 SAG-SINGLE 0.86 0.86 0.00% 2.08% N/A N/A 5.41 0.11 0.00 N/ADCB#B66 0.54 0.60 SAG-DOUBLE 1.30 1.30 0.00% 2.08% N/A N/A 5.58 0.12 0.00 N/ACB#B67 0.28 0.60 ON GRADE 0.67 0.89 1.97% 2.08% 27.0 0.82 5.93 0.12 0.06 CB#B14CB#B68 0.13 0.60 ON GRADE 0.31 0.31 2.00% 2.08% 27.0 0.43 3.99 0.08 0.00 CB#B17DCB#B69 0.56 0.60 SAG-DOUBLE 1.34 1.34 0.00% 2.08% N/A N/A 5.72 0.12 0.00 N/ACB#B70 0.24 0.60 ON GRADE 0.58 0.59 1.51% 2.08% 25.0 0.64 5.33 0.11 0.00 DCB#B28CB#B71 0.31 0.60 ON GRADE 0.74 0.76 1.51% 2.08% 25.0 0.75 5.89 0.12 0.01 CB#B70CB#B72 0.11 0.60 ON GRADE 0.26 0.26 1.51% 2.08% 25.0 0.39 3.95 0.08 0.00 DCB#B15CB#B73 0.32 0.60 ON GRADE 0.77 0.83 1.00% 2.08% 21.0 0.76 6.57 0.14 0.07 CB#B10DCB#B79 0.27 0.80 SAG-DOUBLE 0.86 0.86 0.00% 2.08% N/A N/A 4.26 0.09 0.00 N/ACB#B80 0.22 0.60 ON GRADE 0.53 0.53 1.33% 2.08% 23.0 0.57 5.25 0.11 0.00 CB#B55CB#B81 0.32 0.60 ON GRADE 0.77 0.77 1.33% 2.08% 23.0 0.72 6.04 0.13 0.04 DCB#B56CB#B83 0.18 0.60 ON GRADE 0.43 0.43 1.04% 2.08% 21.0 0.50 5.10 0.11 0.00 DCB#B35STORM SYSTEM BDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet # PROJECT: BraeburnDESIGNED BY:_____ JAC DATE: 2/27/2018MAXIMUM ALLOWABLE SPREAD FOR VALLEYLOCATION: Town on Indian Trail, NCCHECKED BY: _____ MRR DATE:CURB AND GUTTER = 7' RAINFALL INTENSITY 4.00 IN/HRREFERENCE: "Town of Indian Trail - Land Development Standards"10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHART INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSDCB#C3 0.70 0.60 SAG-DOUBLE 1.68 1.68 0.00% 2.08% N/A N/A 6.64 0.14 0.00 N/ACB#C4 0.21 0.60 ON GRADE 0.50 0.50 2.00% 2.08% 27.0 0.58 4.78 0.10 0.00 DCB#C3CB#C5 0.03 0.60 ON GRADE 0.07 0.07 2.00% 2.08% 27.0 0.17 2.30 0.05 0.00 CB#C4CB#C6 0.17 0.60 ON GRADE 0.41 0.41 2.00% 2.08% 27.0 0.50 4.41 0.09 0.00 CB#C15CB#C15 0.21 0.60 ON GRADE 0.50 0.50 2.00% 2.08% 27.0 0.58 4.78 0.10 0.00 DCB#C3 INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSCB#D50.17 0.60 ON GRADE 0.41 0.64 1.16% 2.08% 22.0 0.65 5.79 0.12 0.00 DCB#D21CB#D60.07 0.60 ON GRADE 0.17 0.17 1.16% 2.08% 22.0 0.28 3.50 0.07 0.00 CB#D22CB#D70.08 0.60 ON GRADE 0.19 0.19 1.16% 2.08% 22.0 0.30 3.68 0.08 0.00 CB#D6CB#D90.55 0.60 SAG-DOUBLE 1.32 1.49 0.00% 2.08% N/A N/A 6.14 0.13 0.00 N/ACB#D10 0.12 0.60 ON GRADE 0.29 0.67 1.39% 2.08% 24.0 0.69 5.69 0.12 0.00 CB#D9CB#D11 0.30 0.60 ON GRADE 0.72 0.97 1.98% 2.08% 27.0 0.87 6.13 0.13 0.10 CB#D10CB#D12 0.72 0.42 ON GRADE 1.21 1.35 1.98% 2.08% 27.0 1.07 6.92 0.14 0.28 CB#D10CB#D13 0.44 0.60 ON GRADE 1.06 1.06 1.98% 2.08% 27.0 0.92 6.32 0.13 0.14 CB#D12 Portion of overall 0.90 AC drainage area to be caught within future Amenity Area.CB#D14 0.30 0.60 ON GRADE 0.72 0.72 1.98% 2.08% 27.0 0.72 5.47 0.11 0.00 CB#D13CB#D15 0.18 0.60 ON GRADE 0.43 0.43 1.98% 2.08% 27.0 0.52 4.52 0.09 0.00 CB#D14 Portion of overall 1.31 AC drainage area to be caught within future Amenity Area.CB#D16 0.05 0.60 ON GRADE 0.12 0.12 1.98% 2.08% 27.0 0.24 2.79 0.06 0.00 CB#D15CB#D17 0.10 0.60 ON GRADE 0.24 0.24 1.98% 2.08% 27.0 0.36 3.62 0.08 0.00 CB#D16CB#D18 0.08 0.60 ON GRADE 0.19 0.19 1.15% 2.08% 22.0 0.30 3.69 0.08 0.00 CB#D17CB#D19 0.09 0.60 ON GRADE 0.22 0.22 1.15% 2.08% 22.0 0.33 3.86 0.08 0.00 CB#D18CB#D20 0.25 0.60 ON GRADE 0.60 0.60 1.15% 2.08% 22.0 0.62 5.66 0.12 0.00 CB#D64DCB#D21 0.62 0.60 SAG-DOUBLE 1.49 1.49 0.00% 2.08% N/A N/A 6.12 0.13 0.00 N/ACB#D22 0.35 0.60 SAG-SINGLE 0.84 0.88 0.00% 2.08% N/A N/A 5.49 0.11 0.00 N/ACB#D28 0.33 0.60 ON GRADE 0.79 0.79 1.00% 2.08% 21.0 0.74 6.44 0.13 0.05 CB#D22CB#D29 0.17 0.60 ON GRADE 0.41 0.41 1.00% 2.08% 21.0 0.49 5.03 0.10 0.00 CB#D28CB#D30 0.45 0.60 SAG-SINGLE 1.08 1.08 0.00% 2.08% N/A N/A 6.28 0.13 0.00 N/ACB#D31 0.25 0.60 ON GRADE 0.60 0.60 1.00% 2.08% 21.0 0.62 5.81 0.12 0.00 CB#D30CB#D32 0.23 0.60 ON GRADE 0.55 0.55 1.00% 2.08% 21.0 0.59 5.63 0.12 0.00 CB#D61CB#D39 0.41 0.60 ON GRADE 0.98 1.06 1.16% 2.08% 22.0 0.88 6.99 0.15 0.17 CB#D9CB#D40 0.35 0.60 ON GRADE 0.84 0.84 1.16% 2.08% 22.0 0.77 6.41 0.13 0.07 CB#D39CB#D41 0.04 0.60 ON GRADE 0.10 0.10 1.16% 2.08% 22.0 0.20 2.84 0.06 0.00 CB#D40CB#D42 0.15 0.60 ON GRADE 0.36 0.36 2.31% 2.08% 29.0 0.48 4.10 0.09 0.00 CB#D41CB#D43 0.15 0.60 ON GRADE 0.36 0.36 2.31% 2.08% 29.0 0.48 4.10 0.09 0.00 DCB#B4CB#D49 0.18 0.60 ON GRADE 0.43 0.46 1.00% 2.08% 21.0 0.52 5.25 0.11 0.00 DCB#D21CB#D50 0.04 0.60 ON GRADE 0.10 0.10 1.00% 2.08% 21.0 0.20 2.92 0.06 0.00 CB#D22CB#D51 0.03 0.60 ON GRADE 0.07 0.07 1.00% 2.08% 21.0 0.16 2.62 0.05 0.00 CB#D52CB#D52 0.30 0.60 SAG-SINGLE 0.72 0.82 0.00% 2.08% N/A N/A 5.21 0.11 0.00 N/ACB#D53 0.40 0.60 SAG-SINGLE 0.96 1.06 0.00% 2.08% N/A N/A 6.18 0.13 0.00 N/ACB#D54 0.37 0.60 ON GRADE 0.89 0.89 1.00% 2.08% 21.0 0.79 6.73 0.14 0.10 CB#D53CB#D55 0.37 0.60 ON GRADE 0.89 0.89 1.00% 2.08% 21.0 0.79 6.73 0.14 0.10 CB#D52CB#D58 0.24 0.60 ON GRADE 0.58 0.58 1.39% 2.08% 24.0 0.62 5.38 0.11 0.00 CB#D10CB#D59 0.35 0.60 ON GRADE 0.84 0.84 1.39% 2.08% 24.0 0.79 6.19 0.13 0.05 CB#D65CB#D60 0.30 0.60 ON GRADE 0.72 0.72 1.00% 2.08% 21.0 0.69 6.22 0.13 0.03 CB#D49CB#D61 0.50 0.60 SAG-SINGLE 1.20 1.20 0.00% 2.08% N/A N/A 6.73 0.14 0.00 N/ACB#D62 0.54 0.60 ON GRADE 1.30 1.30 1.98% 2.08% 27.0 1.04 6.82 0.14 0.25 CB#D11CB#D63 0.33 0.60 ON GRADE 0.79 0.79 1.16% 2.08% 22.0 0.74 6.27 0.13 0.05 CB#D68CB#D64 0.23 0.60 ON GRADE 0.55 0.55 1.15% 2.08% 22.0 0.59 5.48 0.11 0.00 CB#B27CB#D65 0.26 0.60 ON GRADE 0.62 0.68 1.39% 2.08% 24.0 0.69 5.71 0.12 0.00 CB#D67CB#D66 0.32 0.60 ON GRADE 0.77 0.77 1.00% 2.08% 21.0 0.72 6.37 0.13 0.04 CB#D22CB#D67 0.53 0.60 SAG-SINGLE 1.27 1.27 0.00% 2.08% N/A N/A 7.00 0.15 0.00 N/ACB#D68 0.37 0.60 ON GRADE 0.89 0.94 1.16% 2.08% 22.0 0.82 6.69 0.14 0.12 CB#D69CB#D69 0.44 0.60 ON GRADE 1.06 1.18 1.16% 2.08% 22.0 0.94 7.27 0.15 0.23 CB#D5CB#D70 0.17 0.60 ON GRADE 0.41 0.41 1.00% 2.08% 21.0 0.49 5.03 0.10 0.00 CB#D66STORM SYSTEM DDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet #STORM SYSTEM CDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet # PROJECT: BraeburnDESIGNED BY:_____ JAC DATE: 2/27/2018MAXIMUM ALLOWABLE SPREAD FOR VALLEYLOCATION: Town on Indian Trail, NCCHECKED BY: _____ MRR DATE:CURB AND GUTTER = 7' RAINFALL INTENSITY 4.00 IN/HRREFERENCE: "Town of Indian Trail - Land Development Standards"10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHART INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSDCB#E3 0.48 0.60 SAG-DOUBLE 1.15 1.35 0.00% 2.08% N/A N/A 5.73 0.12 0.00 N/ACB#E4 0.46 0.60 SAG-SINGLE 1.10 1.23 0.00% 2.08% N/A N/A 6.83 0.14 0.00 N/ACB#E6 0.43 0.60 SAG-SINGLE 1.03 1.03 0.00% 2.08% N/A N/A 6.09 0.13 0.00 N/ACB#E7 0.47 0.60 SAG-SINGLE 1.13 1.13 0.00% 2.08% N/A N/A 6.46 0.13 0.00 N/ACB#E17 0.30 0.60 ON GRADE 0.72 0.72 1.00% 2.08% 21.0 0.69 6.22 0.13 0.03 CB#E4CB#E18 0.19 0.60 ON GRADE 0.46 0.46 1.00% 2.08% 21.0 0.52 5.24 0.11 0.00 CB#E17CB#E19 0.37 0.60 ON GRADE 0.89 0.89 1.00% 2.08% 21.0 0.79 6.73 0.14 0.10 CB#E33CB#E20 0.37 0.60 ON GRADE 0.89 0.89 1.00% 2.08% 21.0 0.79 6.73 0.14 0.10 CB#E4CB#E21 0.15 0.60 ON GRADE 0.36 0.36 1.00% 2.08% 21.0 0.45 4.80 0.10 0.00 CB#E20CB#E22 0.14 0.60 ON GRADE 0.34 0.34 1.00% 2.08% 21.0 0.43 4.67 0.10 0.00 CB#E21CB#E23 0.28 0.60 ON GRADE 0.67 0.67 1.00% 2.08% 21.0 0.67 6.06 0.13 0.01 CB#E34CB#E26 0.10 0.60 ON GRADE 0.24 0.24 1.28% 2.08% 23.0 0.35 3.93 0.08 0.00 CB#E27CB#E27 0.31 0.60 SAG-SINGLE 0.74 0.77 0.00% 2.08% N/A N/A 5.01 0.10 0.00 N/ADCB#E28 0.65 0.60 SAG-DOUBLE 1.56 1.56 0.00% 2.08% N/A N/A 6.32 0.13 0.00 N/ACB#E32 0.39 0.60 ON GRADE 0.94 0.96 1.00% 2.08% 21.0 0.83 6.94 0.14 0.13 DCB#E3CB#E33 0.30 0.60 ON GRADE 0.72 0.82 1.00% 2.08% 21.0 0.75 6.52 0.14 0.06 DCB#E3CB#E34 0.30 0.60 ON GRADE 0.72 0.73 1.00% 2.08% 21.0 0.70 6.24 0.13 0.03 CB#E32 INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSDCB#F3 0.40 0.60 SAG-DOUBLE 0.96 1.26 0.00% 2.08% N/A N/A 5.49 0.11 0.00 N/ADCB#F4 0.42 0.60 SAG-DOUBLE 1.01 1.07 0.00% 2.08% N/A N/A 4.90 0.10 0.00 N/ADCB#F8 0.53 0.60 SAG-DOUBLE 1.27 1.38 0.00% 2.08% N/A N/A 5.82 0.12 0.00 N/ADCB#F9 0.62 0.60 SAG-DOUBLE 1.49 1.55 0.00% 2.08% N/A N/A 6.30 0.13 0.00 N/ACB#F10 0.05 0.60 ON GRADE 0.12 0.22 1.00% 2.08% 21.0 0.33 3.98 0.08 0.00 DCB#F9CB#F11 0.40 0.60 ON GRADE 0.96 0.96 2.00% 2.08% 27.0 0.86 6.08 0.13 0.10 CB#F10CB#F12 0.30 0.60 ON GRADE 0.72 0.72 2.00% 2.08% 27.0 0.72 5.46 0.11 0.00 CB#F11CB#F13 0.13 0.60 ON GRADE 0.31 0.31 2.00% 2.08% 27.0 0.43 3.99 0.08 0.00 CB#D58CB#F14 0.24 0.60 ON GRADE 0.58 0.58 2.00% 2.08% 27.0 0.63 5.02 0.10 0.00 CB#F13CB#F15 0.11 0.60 ON GRADE 0.26 0.26 2.00% 2.08% 27.0 0.38 3.75 0.08 0.00 CB#F14CB#F16 0.05 0.60 ON GRADE 0.12 0.12 2.00% 2.08% 27.0 0.23 2.79 0.06 0.00 CB#F15CB#F17 0.07 0.60 ON GRADE 0.17 0.17 2.00% 2.08% 27.0 0.29 3.16 0.07 0.00 CB#D20CB#F18 0.16 0.60 ON GRADE 0.38 0.38 2.00% 2.08% 27.0 0.49 4.31 0.09 0.00 CB#F46CB#F25 0.09 0.60 ON GRADE 0.22 0.22 1.71% 2.08% 26.0 0.34 3.58 0.07 0.00 DCB#F4CB#F26 0.23 0.60 ON GRADE 0.55 0.55 1.71% 2.08% 26.0 0.62 5.09 0.11 0.00 CB#F25CB#F27 0.25 0.60 ON GRADE 0.60 0.66 1.71% 2.08% 26.0 0.69 5.44 0.11 0.00 CB#F48CB#F28 0.37 0.60 ON GRADE 0.89 0.89 1.71% 2.08% 26.0 0.83 6.08 0.13 0.06 CB#F27CB#F29 0.29 0.60 ON GRADE 0.70 0.70 1.71% 2.08% 26.0 0.71 5.55 0.12 0.00 CB#F28CB#F30 0.29 0.60 ON GRADE 0.70 0.70 1.71% 2.08% 26.0 0.71 5.55 0.12 0.00 CB#F29CB#F31 0.46 0.60 ON GRADE 1.10 1.10 1.71% 2.08% 26.0 0.95 6.60 0.14 0.15 CB#F35CB#F34 0.16 0.60 ON GRADE 0.38 0.38 2.00% 2.08% 27.0 0.49 4.31 0.09 0.00 CB#G8CB#F35 0.20 0.60 ON GRADE 0.48 0.63 1.71% 2.08% 26.0 0.67 5.36 0.11 0.00 CB#F44CB#F40 0.18 0.60 ON GRADE 0.43 0.43 1.71% 2.08% 26.0 0.53 4.64 0.10 0.00 CB#F26CB#F41 0.35 0.60 ON GRADE 0.84 0.84 1.25% 2.08% 23.0 0.78 6.32 0.13 0.06 DCB#F4CB#F42 0.36 0.60 ON GRADE 0.86 0.86 1.25% 2.08% 23.0 0.80 6.39 0.13 0.07 DCB#F3CB#F43 0.40 0.60 ON GRADE 0.96 0.96 2.07% 2.08% 27.0 0.85 6.04 0.13 0.11 DCB#F8CB#F44 0.36 0.60 ON GRADE 0.86 0.86 2.07% 2.08% 27.0 0.80 5.81 0.12 0.07 DCB#F9CB#F45 0.27 0.60 ON GRADE 0.65 0.65 2.00% 2.08% 27.0 0.67 5.25 0.11 0.00 CB#F12CB#F46 0.34 0.60 ON GRADE 0.82 0.82 2.00% 2.08% 27.0 0.78 5.72 0.12 0.04 CB#F47CB#F47 0.40 0.60 SAG-SINGLE 0.96 1.00 0.00% 2.08% N/A N/A 5.95 0.12 0.00 N/ACB#F48 0.53 0.60 ON GRADE 1.27 1.27 1.71% 2.08% 26.0 1.04 6.96 0.14 0.23 DCB#F3STORM SYSTEM FDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet #STORM SYSTEM EDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet # PROJECT: BraeburnDESIGNED BY:_____ JAC DATE: 2/27/2018MAXIMUM ALLOWABLE SPREAD FOR VALLEYLOCATION: Town on Indian Trail, NCCHECKED BY: _____ MRR DATE:CURB AND GUTTER = 7' RAINFALL INTENSITY 4.00 IN/HRREFERENCE: "Town of Indian Trail - Land Development Standards"10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHART INLET #SUB. TOTALLONG. TRANS.KQ CAP SPREADDEPTHREMARKSCB#G30.04 0.60 ON GRADE 0.10 0.10 2.29% 2.08% 29.0 0.21 2.50 0.05 0.00 CB#G4CB#G40.09 0.60 ON GRADE 0.22 0.22 2.29% 2.08% 29.0 0.35 3.39 0.07 0.00 N/ACB#G50.12 0.60 ON GRADE 0.29 0.29 2.00% 2.08% 27.0 0.41 3.87 0.08 0.00 N/ACB#G60.34 0.60 ON GRADE 0.82 0.83 2.00% 2.08% 27.0 0.79 5.76 0.12 0.04 N/ACB#G70.06 0.60 ON GRADE 0.14 0.39 2.20% 2.08% 28.0 0.50 4.28 0.09 0.00 N/ACB#G80.54 0.60 ON GRADE 1.30 1.30 2.20% 2.08% 28.0 1.05 6.69 0.14 0.25 CB#G7CB#G12 0.29 0.60 ON GRADE 0.70 0.70 1.00% 2.08% 21.0 0.68 6.14 0.13 0.02 CB#G6CB#G13 0.30 0.60 ON GRADE 0.72 0.72 1.00% 2.08% 21.0 0.69 6.22 0.13 0.03 CB#E27CB#G14 0.14 0.60 ON GRADE 0.34 0.34 2.29% 2.08% 29.0 0.46 4.00 0.08 0.00 N/ACB#G15 0.22 0.60 ON GRADE 0.53 0.53 2.29% 2.08% 29.0 0.61 4.74 0.10 0.00 CB#G3CB#G16 0.28 0.60 ON GRADE 0.67 0.67 2.29% 2.08% 29.0 0.71 5.19 0.11 0.00 CB#G14CB#G18 0.34 0.60 ON GRADE 0.82 0.82 2.20% 2.08% 28.0 0.78 5.62 0.12 0.03 N/ASTORM SYSTEM GDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLET BYPASS QTo Inlet # . Wet Ponds A. Wet Pond 1 Pre-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.29 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.08 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.37 Min = 22.2 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 Compute r 0.04 0.50 0.013 Compute Tt 0.29 +0.00 Woods-Light Grass-Short 0.4 0.15 100 30 3.12 3.12 0.0360 0.02 Unpaved 3600 V 0.005 0.040 0.012 0.50 5.53 130 1718 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID 12/8/2017 12/8/2017 SEGMENT ID A CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 1 Pre-Dev TOC P2^0.5 s^0.4 SEGMENT ID B C 367 361 0.0400 0.0166 3.227 2.08 Compute Tt 0.03 +0.05 1.10 6.28 Open Channel Pipe 0.05 3.14 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 1 Pre-Dev TOC Braeburn - Pond 1 - TOC Calcs Pre-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B B B C C C C D D D D * Use only one CN source per line Totals =13.073 911.77 CN (weighted)total product = 911.768 = 69.7 Use CN=70 total area 13.0733 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 3.21 6.50 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Woods, Good condition (TaB) Open space, Good condition (grass cover > 75%) Dirt Roads (including right-of-way) Paved areas, streets, roofs, driveways, etc (excl.ROW) 0.00061 (CmB) Woods, Good condition (CmB) CAL 55 Pond 1 CN Pre-Development 1.626 89.45 Braeburn Indian Trail, Union County, NC MRR Paved areas, streets, roofs, driveways, etc (excl.ROW) 0.00(TaB) 0.220 18.07 77 (TaB) (ScA) 82 6.50 Woods, Good condition 70 NCDENR BMP Design Manual, July 2007 0.772 59.44 2 4.20 1.46 2.710.02898 0.12 0.96 0.001 0.012 (ScA) Open space, Good condition (grass cover > 75%) 74(ScA) 98 682.28 0.000 0.00 52.230.600 0.066 9.747 (CmB) Dirt Roads (including right-of-way) 87 Dirt Roads (including right-of-way) 89 (ScA) (CmB) Open space, Good condition (grass cover > 75%) 80 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 1 CN Pre-Development Braeburn - Pond 1 - CN Calcs Pre-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 5.416 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 23,855 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 9.643 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 37,760 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 25.71 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 91,236 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 36.11 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 126,334 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 44.36 cfs Storm frequency = 50 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 154,089 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 1 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 49.98 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 173,133 cuft Drainage area = 13.070 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.20 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 1 PRE-DEV Hyd. No. 1 -- 100 Year Hyd No. 1 B. Wet Pond 1 Post-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.24 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.01 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.03 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.28 Min = 16.8 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 Compute r 0.50 0.50 0.005 Compute Tt 0.15 +0.09 Grass-Short Woods-Light 0.15 0.4 60 40 3.12 3.12 0.0100 0.095 Unpaved 3600 V 0.005 0.012 0.012 5.53 5.53 558 1733 Compute Tt 0.03 +0.00 Unpaved 3600 V SEGMENT ID 12/8/2017 12/8/2017 SEGMENT ID A B CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 1 Post-Dev TOC P2^0.5 s^0.4 SEGMENT ID B C 115 32 0.0608 0.0140 3.978 1.91 Compute Tt 0.01 +0.00 6.28 6.28 Pipe Pipe 3.14 3.14 D ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 1 Post-Dev TOC Braeburn - Pond 1 - TOC Calcs Post-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B C D * Use only one CN source per line Totals =13.074 1168.81 CN (weighted)total product = 1168.81 = 89.4 Use CN=89 total area 13.074 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 5.22 8.95 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 2 4.20 3.01 Commercial and business 947.88(ScA) 0.694 63.89(CmB) () 92 CAL 85 Pond 1 Post-Development CN 1.848 157.04 Braeburn Indian Trail, Union County, NC MRR Residential, 1/8 acre or less (town houses) (TaB) Residential, 1/8 acre or less (town houses) Residential, 1/8 acre or less (town houses) Residential, 1/4 acre 10.53290 () Paved Roads; open ditches (including ROW) () ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 1 Post-Development CN Braeburn - Pond 1 - CN Calcs Post-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 23.13 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 72,347 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 30.34 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 95,298 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 53.06 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 169,885 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 66.02 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 213,650 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 75.70 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 246,775 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 50 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 1 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 82.13 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 268,962 cuft Drainage area = 13.070 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.80 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) POND 1 POST-DEV Hyd. No. 2 -- 100 Year Hyd No. 2 Basin ID:Required Designer Input=Project Name:Project # :Designer:Date: 02/19/18Rev 1:5.44 ac236,878.58 sf7.64 ac332,623.94 sf0.00 ac13.07 ac 569,502.52 sfPerform Water Balance Calcs.41.59%1.00-inI =41.59%Rv = 0.42V(design) =0.46-ac-ft20,138.82-cfVmp =49,058.17-cfDesign Rainfall is 1 InchDrainage Area is 13.07 AcresTotal Impervious Area:Total Pervious Area:Percent BUA:WQv = (1 x 0.42 x 13.07)/12Calculate The Design VolumeDesign Rainfall:Total Area:Determine the Runoff Coefficient (Rv) for the 1-in rainfallRv = 0.05 + 0.9 x (I)WQv = Design Rainfall x Rv x Onsite Drainage Area Rv is 0.43C. LudwigWet Detention Basin WorksheetWet Pond #1BraeburnFM26.420Basin Drainage Area SummaryCalculate The Required Main Pool VolumeDetermine the Water Quality Volume (WQv)Total Future Impervious Area: V(forebay) = 20% of Vmp =9,811.63-cf611.00-ft610.50-ftRequired Permanent Pool Volume:58,869.80-cfForebay Crest Elevation =609.50-ftElev. Forebay Area Main Bay Area Total Area Forebay Incr. Vol. Forebay Accumulated Vol.Main Bay Incr. Vol.Main Bay Accumulated Vol.Total Accumulated Vol.605.002,438.06 sf 19,321.74 sf21,759.80 sf 0.00-cf0.00-cf0.00-cf0.00-cf0.00-cf606.003,247.64 sf 21,418.06 sf24,665.70 sf 2,842.85-cf 2,842.85-cf 20,369.90-cf 20,369.90-cf23,212.75-cf607.004,164.37 sf 23,577.81 sf27,742.18 sf 3,706.01-cf 6,548.86-cf 22,497.94-cf 42,867.84-cf49,416.69-cf608.005,186.94 sf 25,797.50 sf30,984.44 sf 4,675.66-cf 11,224.51-cf 24,687.66-cf 67,555.49-cf78,780.00-cf609.006,315.36 sf 28,077.13 sf34,392.49 sf 5,751.15-cf 16,975.66-cf 26,937.32-cf 94,492.81-cf111,468.47-cf609.506,919.27 sf 29,239.57 sf36,158.84 sf 3,308.66-cf 20,284.32-cf 14,329.18-cf 108,821.98-cf129,106.30-cf610.00.00 sf 38,305.46 sf38,305.46 sf 0.00-cf 20,284.32-cf 16,886.26-cf 125,708.24-cf145,992.56-cf610.50.00 sf 39,641.35 sf39,641.35 sf 0.00-cf 20,284.32-cf 19,486.70-cf 145,194.94-cf165,479.26-cf611.00.00 sf 44,195.71 sf44,195.71 sf 1.00-cf 20,285.32-cf 20,959.27-cf 166,154.21-cf186,439.52-cf% Forebay =18.64%Required PPE = 607.39-ftProposed PPE =611.00-ftElev. Incr. Vol. Accumul. Vol.611.00 0.00 cf186,439.52 cf611.5023,275.68 cf209,715.20 cf612.0024,814.50 cf234,529.70 cf613.0051,816.00 cf286,345.70 cf614.0054,774.50 cf341,120.20 cf615.0057,789.50 cf398,909.70 cf616.0060,861.00 cf459,770.70 cf616.5031,598.75 cf491,369.45 cf617.0032,387.94 cf523,757.39 cf618.0067,175.20 cf590,932.59 cfBasin Permanent Pool Stage/Storage53,281.00 sf56,268.00 sf59,311.00 sf62,411.00 sf63,984.00 sf48,907.00 sf50,351.00 sfBasin Detention Stage/Storage Above Permanent Pool ElevationContour Area44,195.71 sf65,567.74 sf68,782.66 sfAssumed Elev. Of Permanent Pool:Elevation at Bottom of Littoral Shelf:Calculate the Permanent Pool Elevation from Proposed Contours with ForebayCalculate The Required Forebay Volume PPE = 611.00-ftP.P. Perimeter = 926.58-ftVpp = 186,439.52-cfApp = 44,195.71-sfBottom of Shelf Elev = 610.50-ftA(bottom of shelf) = 39,641.35-sfV(shelf) = 1,158.23-cfDavg = 4.67-ftCalculate the Average Depth of the Pond 1-year, 24-hour Storm Pre-Development Runoff Volume =23,855.00-cf(See Hydraflow Hydrographs)1-year, 24-hour Storm Post-Development Runoff Volume =72,347.00-cf(See Hydraflow Hydrographs)Difference =48,492.00-cfVpp = 186,439.52-cf1-year, 24-hour Storm Volume in Wet Pond #1 = 234,931.52-cf1-year, 24-hour Storm Elevation in Wet Pond #1 = 612.01-ftC = 0.6A = 7.07 in2g = 32.2 ft/secH = 0.50 ftOrifice Diameter = 3inQout = 0.17 cfsDrawdown Time = 3.35 daysDetermine The Orifice Size of the Riser Structureܥܣ2݃ܪ଴.ହൌܳ Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Pond No. 2 - Wet Pond 1 Start at PPE Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 611.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 611.00 44,196 0 0 0.50 611.50 48,907 23,263 23,263 1.00 612.00 50,351 24,811 48,075 2.00 613.00 53,281 51,804 99,879 3.00 614.00 53,268 53,269 153,148 4.00 615.00 59,311 56,257 209,405 5.00 616.00 62,411 60,848 270,253 5.50 616.50 63,984 31,595 301,848 6.00 617.00 65,568 32,384 334,232 7.00 618.00 68,783 67,162 401,394 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 36.00 3.00 12.00 0.00 Span (in)= 36.00 3.00 36.00 0.00 No. Barrels = 1 130 Invert El. (ft)= 611.00 611.00 612.50 0.00 Length (ft)= 58.50 0.50 0.50 0.00 Slope (%)= 1.71 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 16.00 20.00 0.00 0.00 Crest El. (ft)= 615.00 616.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 611.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 23,263 611.50 0.15 ic 0.14 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.143 1.00 48,075 612.00 0.23 ic 0.22 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.216 2.00 99,879 613.00 11.12 ic 0.20 ic 10.83 ic --- 0.00 0.00 --- --- --- --- 11.04 3.00 153,148 614.00 32.70 ic 0.18 ic 32.52 ic --- 0.00 0.00 --- --- --- --- 32.70 4.00 209,405 615.00 42.19 oc 0.23 ic 41.96 ic --- 0.00 0.00 --- --- --- --- 42.19 5.00 270,253 616.00 60.97 ic 0.13 ic 23.34 ic --- 37.51 s 0.00 --- --- --- --- 60.97 5.50 301,848 616.50 66.61 ic 0.10 ic 17.78 ic --- 48.74 s 23.55 --- --- --- --- 90.16 6.00 334,232 617.00 71.32 ic 0.08 ic 14.25 ic --- 56.98 s 66.60 --- --- --- --- 137.91 7.00 401,394 618.00 79.41 ic 0.06 ic 10.14 ic --- 69.17 s 188.37 --- --- --- --- 267.73 Starmount Cove Unit wt. of concrete (pcf) =150 lb/ft3 Unit wt. of H2O =62.4 lb/ft3 TOP OF RISER ELEV. =615.00 ft INV. OUT OF RISER ELEV. = 605.00 ft INT. WIDTH OF RISER =48 in INT. LENGTH OF RISER =48 in WALL THICK. OF RISER =6 in BASE THICK. OF RISER =6 in VOL. OF RISER =262.5 ft3 BUOYANT FORCE =16380.0 lbs Vol. of Riser x Unit wt. of H2O VOL. CONC. IN RISER =102.5 ft3 SINKING FORCE OF RISER =8979 lbs Vol. of Conc. x (Unit wt. of Conc. ‐ Unit wt. of H 2O) CONC. PAD THICKNESS =24 in CONC. PAD WIDTH/LENGTH =8 ft VOL. OF CONC. PAD =128.00 ft3 L x W x H / Pad Thickness SINKING FORCE OF PAD =11212.8 lbs Vol. of Pad x (Unit wt. of Conc. ‐ Unit wt. of H 2O) TOTAL SINKING FORCE =20191.8 lbs   F.S. = 1.23 OK F.S. MUST BE GREATER THAN 1.10 CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #1 CS #1 Factor of safety = SINKING FORCE BUOYANT FORCE Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 0.247 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 56,715 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 612.27 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 61,866 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 1 Year Hyd No. 3 Hyd No. 2 Total storage used = 61,866 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 0.660 cfs Storm frequency = 2 yrs Time to peak = 18.27 hrs Time interval = 2 min Hyd. volume = 73,603 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 612.54 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 76,082 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 2 Year Hyd No. 3 Hyd No. 2 Total storage used = 76,082 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 9.504 cfs Storm frequency = 10 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 147,829 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 612.95 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 97,296 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 10 Year Hyd No. 3 Hyd No. 2 Total storage used = 97,296 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 20.59 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 191,451 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 613.26 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 113,857 cuft Storage Indication method used. 0 6 12 18 24 30 36 42 48 54 60 66 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 25 Year Hyd No. 3 Hyd No. 2 Total storage used = 113,857 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 26.72 cfs Storm frequency = 50 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 224,484 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 613.50 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 126,475 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 50 Year Hyd No. 3 Hyd No. 2 Total storage used = 126,475 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 1 PPV Hydrograph type = Reservoir Peak discharge = 28.91 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 246,618 cuft Inflow hyd. No. = 2 - POND 1 POST-DEV Max. Elevation = 613.68 ft Reservoir name = Wet Pond 1 Start at PPE Max. Storage = 135,816 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) WET POND 1 PPV Hyd. No. 3 -- 100 Year Hyd No. 3 Hyd No. 2 Total storage used = 135,816 cuft C. Wet Pond 2 Pre-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.37 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.18 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.55 Min = 33.0 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.06 +0.12 6.28 6.28 Pipe Pipe 3.14 3.14 510 902 0.0217 0.0180 2.377 2.16 P2^0.5 s^0.4 SEGMENT ID B C 12/8/2017 12/8/2017 SEGMENT ID A CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 2 TOC PRE-DEV Unpaved 3600 V 0.005 0.012 0.012 5.53 5.53 931 1718 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID Compute Tt 0.37 +0.00 Woods-Light Pavement 0.4 0.011 100 25 3.12 3.12 0.0190 0.02 NCDENR BMP Design Manual, July 2007 Compute r 0.50 0.50 0.005 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 2 TOC PRE-DEV Braeburn - Pond 2 - TOC Calcs Pre-Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B B B C C C C D D D D * Use only one CN source per line Totals =20.366 1428.87 CN (weighted)total product = 1428.87 = 70.2 Use CN=70 total area 20.3658 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 3.21 6.50 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 0.000 NCDENR BMP Design Manual, July 2007 0.055 4.88 2 4.20 1.46 0.000.00098Paved areas, streets, roofs, driveways, etc (excl.ROW) 0.00(ScA) 1.598 123.08 89 (CmB) (CmB) 77 0.0080 CAL 55 Pond 2 CN Pre-Development 0.758 41.71 Braeburn Indian Trail, Union County, NC MRR Woods, Good condition (TaB) Paved areas, streets, roofs, driveways, etc (excl.ROW) Woods, Good condition Open space, Good condition (grass cover > 75%) 0.00098 (CmB) Dirt Roads (including right-of-way) (CmB) 0.00(TaB) Dirt Roads (including right-of-way) 82 0.043 3.50(TaB) Open space, Good condition (grass cover > 75%) 61 0.000 1245.56(ScA) Open space, Good condition (grass cover > 75%) 74 0.008 0.60(ScA) Woods, Good condition 70 17.794 9.54(ScA) Dirt Roads (including right-of-way) 87 0.110 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 2 CN Pre-Development Braeburn - Pond 2 - CN Calcs Pre-Development 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 6.543 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 36,983 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 11.68 cfs Storm frequency = 2 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 58,541 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 31.70 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 141,446 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 44.67 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 195,859 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 54.85 cfs Storm frequency = 50 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 238,889 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 2 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 61.79 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 268,413 cuft Drainage area = 20.370 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 33.00 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POND 2 PRE-DEV Hyd. No. 1 -- 100 Year Hyd No. 1 D. Wet Pond 2 Post-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.12 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.00 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.05 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.17 Min = 10.2 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.00 +0.00 6.28 6.28 Pipe Pipe 3.14 3.14 D 10 199 0.0075 0.0048 1.760 1.12 P2^0.5 s^0.4 SEGMENT ID C 12/8/2017 12/8/2017 SEGMENT ID A B CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 2 TOC Post-Dev Paved 3600 V 0.005 0.012 0.012 5.53 5.53 944 1718 Compute Tt 0.05 +0.00 Unpaved 3600 V SEGMENT ID Compute Tt 0.11 +0.01 Grass-Short Pavement 0.15 0.011 75 25 3.12 3.12 0.0306 0.02 NCDENR BMP Design Manual, July 2007 Compute r 0.50 0.50 0.005 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 2 TOC Post-Dev Braeburn - Pond 2 - TOC Calcs Post-Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B C D * Use only one CN source per line Totals =20.366 1832.22 CN (weighted)total product = 1832.22 = 90.0 Use CN=90 total area 20.3658 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 5.33 9.08 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Residential, 1/8 acre or less (town houses) (TaB) Residential, 1/8 acre or less (town houses) Residential, 1/8 acre or less (town houses) Residential, 1/4 acre 17.91290 () Paved Roads; open ditches (including ROW) () CAL 85 Pond 2 Post-Development CN 0.801 68.08 Braeburn Indian Trail, Union County, NC MRR Commercial and business 1612.04(ScA) 1.653 152.10(CmB) () 92 NCDENR BMP Design Manual, July 2007 2 4.20 3.11 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 2 Post-Development CN Braeburn - Pond 2 - CN Calcs Post-Development 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 46.88 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 122,202 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 60.80 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 159,723 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 104.25 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 280,895 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 128.93 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 351,709 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 147.34 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 405,228 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 50 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 2 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 159.58 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 441,049 cuft Drainage area = 20.370 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.20 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POND 2 POST-DEV Hyd. No. 2 -- 100 Year Hyd No. 2 Basin ID:Required Designer Input=Project Name:Project # :Designer:Date: 02/19/18Rev 1:9.75 ac424,688.94 sf10.62 ac462,444.96 sf0.00 ac20.37 ac 887,133.90 sfPerform Water Balance Calcs.47.87%1.00-inI = 47.87%Rv = 0.48V(design) = 0.82-ac-ft35,548.06-cfVmp =86,595.08-cfC. LudwigWet Detention Basin WorksheetWet Pond #2BraeburnFM26.420Basin Drainage Area SummaryCalculate The Required Main Pool VolumeTotal Future Impervious Area:Total Impervious Area:Total Pervious Area:Percent BUA:Determine the Runoff Coefficient (Rv) for the 1-in rainfallRv = 0.05 + 0.9 x (I)Calculate The Design VolumeDesign Rainfall:Total Area:Design Rainfall is InchDrainage Area is 20.37 AcresWQv = (1 x 0.48 x 62.6)/12Determine the Water Quality Volume (WQv)WQv = Design Rainfall x Rv x Onsite Drainage Area Rv is 0.48 V(forebay) = 20% of Vmp =17,319.02-cf600.00-ft599.00-ftRequired Permanent Pool Volume:103,914.09-cfForebay Crest Elevation =598.50-ftElev. Forebay Area 1 Forebay Area 2 Main Bay Area Total Area Forebay Incr. Vol.Forebay Accumulated Vol.Main Bay Incr. Vol.Main Bay Accumulated Vol.Total Accumulated Vol.594.00 261.27 831.54 sf15,414.18 sf16,506.99 sf 0.00-cf0.00-cf0.00-cf0.00-cf0.00-cf595.00 686.84 1,217.53 sf 17,232.44 sf19,136.81 sf 1,498.59-cf 1,498.59-cf 16,323.31-cf 16,323.31-cf17,821.90-cf596.00 1198.36 1,668.03 sf 19,120.03 sf21,986.42 sf 2,385.38-cf 3,883.97-cf 18,176.24-cf 34,499.55-cf38,383.52-cf597.00 1797.63 2,183.03 sf 21,077.04 sf25,057.70 sf 3,423.53-cf 7,307.50-cf 20,098.54-cf 54,598.08-cf61,905.58-cf598.00 2477.63 2,762.52 sf 23,103.44 sf28,343.59 sf 4,610.41-cf 11,917.90-cf 22,090.24-cf 76,688.32-cf88,606.22-cf598.50 2842.88 3,076.46 sf 24,142.69 sf30,062.03 sf 2,789.87-cf 14,707.77-cf 11,811.53-cf 88,499.85-cf103,207.63-cf599.0032,104.74 sf32,104.74 sf 0.00-cf0.00-cf 14,061.86-cf 102,561.71-cf102,561.71-cf599.5036,834.82 sf36,834.82 sf 0.00-cf0.00-cf 17,234.89-cf 119,796.60-cf119,796.60-cf600.0041,721.87 sf41,721.87 sf 0.00-cf0.00-cf 19,639.17-cf 139,435.77-cf139,435.77-cf% Forebay =16.62%Required PPE = 599.10-ftProposed PPE =600.00-ftElev. Incr. Vol. Accumul. Vol.600.00 0.00 cf119,796.60 cf601.0043,225.71 cf163,022.31 cf602.0046,261.66 cf209,283.96 cf603.0049,354.15 cf258,638.11 cf604.0052,503.19 cf311,141.30 cf605.0055,708.76 cf366,850.06 cf606.0058,970.88 cf425,820.93 cf606.5030,724.69 cf456,545.62 cfBasin Permanent Pool Stage/Storage50,914.53 sf54,091.84 sf57,325.68 sf60,616.07 sf62,282.67 sf44,729.54 sf47,793.77 sfBasin Detention Stage/Storage Above Permanent Pool ElevationContour Area41,721.87 sfAssumed Elev. Of Permanent Pool:Elevation at Bottom of Littoral Shelf:Calculate the Permanent Pool Elevation from Proposed Contours with ForebayCalculate The Required Forebay Volume PPE = 600.00-ftP.P. Perimeter = 993.13-ftVpp = 139,435.77-cfApp = 41,721.87-sfBottom of Shelf Elev = 599.00-ftA(bottom of shelf) = 32,104.74-sfV(shelf) = 4,965.65-cfDavg = 4.19-ftCalculate the Average Depth of the Pond 1-year, 24-hour Storm Pre-Development Runoff Volume =36,983.00-cf(See Hydraflow Hydrographs)1-year, 24-hour Storm Post-Development Runoff Volume =122,202.00-cf(See Hydraflow Hydrographs)Difference =85,219.00-cfVpp = 139,435.77-cf1-year, 24-hour Storm Volume in Wet Pond #1 = 224,654.77-cf1-year, 24-hour Storm Elevation in Wet Pond #1 = 602.31-ftC = 0.6A = 7.07 in2g = 32.2 ft/secH = 1.16 ftOrifice Diameter = 3inQout = 0.25 cfsDrawdown Time = 3.88 daysOKDetermine The Orifice Size of the Riser Structureܥܣ2݃ܪ଴.ହൌܳ Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Pond No. 1 - WET POND 2 ABOVE PPE Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 600.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 600.00 41,722 0 0 1.50 601.00 44,730 64,819 64,819 2.50 602.00 47,794 46,249 111,068 3.50 603.00 50,915 49,341 160,409 4.50 604.00 54,092 52,490 212,899 5.50 605.00 57,326 55,695 268,594 6.50 606.00 60,616 58,957 327,551 7.00 606.50 62,283 30,721 358,272 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 27.00 3.00 12.00 0.00 Span (in)= 42.00 3.00 36.00 0.00 No. Barrels = 1 130 Invert El. (ft)= 600.00 600.00 602.50 0.00 Length (ft)= 93.00 0.50 0.50 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 20.00 20.00 0.00 0.00 Crest El. (ft)= 603.50 604.50 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 600.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 1.50 64,819 601.00 0.22 ic 0.22 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.221 2.50 111,068 602.00 0.32 ic 0.32 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.324 3.50 160,409 603.00 11.17 ic 0.34 ic 10.83 ic --- 0.00 0.00 --- --- --- --- 11.17 4.50 212,899 604.00 54.86 oc 0.17 ic 31.14 ic --- 23.55 0.00 --- --- --- --- 54.86 5.50 268,594 605.00 73.28 ic 0.09 ic 16.24 ic --- 56.94 s 23.55 --- --- --- --- 96.82 6.50 327,551 606.00 83.21 ic 0.06 ic 10.53 ic --- 72.57 s 122.35 --- --- --- --- 205.51 7.00 358,272 606.50 87.56 ic 0.05 ic 8.95 ic --- 78.55 s 188.37 --- --- --- --- 275.92 Starmount Cove Unit wt. of concrete (pcf) =150 lb/ft3 Unit wt. of H2O =62.4 lb/ft3 TOP OF RISER ELEV. =603.50 ft INV. OUT OF RISER ELEV. = 594.00 ft INT. WIDTH OF RISER =60 in INT. LENGTH OF RISER =60 in WALL THICK. OF RISER =6 in BASE THICK. OF RISER =6 in VOL. OF RISER =360.0 ft3 BUOYANT FORCE =22464.0 lbs Vol. of Riser x Unit wt. of H2O VOL. CONC. IN RISER =122.5 ft3 SINKING FORCE OF RISER = 10731 lbs Vol. of Conc. x (Unit wt. of Conc. ‐ Unit wt. of H 2O) CONC. PAD THICKNESS =36 in CONC. PAD WIDTH/LENGTH =8 ft VOL. OF CONC. PAD =192.00 ft3 L x W x H / Pad Thickness SINKING FORCE OF PAD =16819.2 lbs Vol. of Pad x (Unit wt. of Conc. ‐ Unit wt. of H 2O) TOTAL SINKING FORCE =27550.2 lbs   F.S. = 1.23 OK F.S. MUST BE GREATER THAN 1.10 CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #2 CS #2 Factor of safety = SINKING FORCE BUOYANT FORCE Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 0.319 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 80,428 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 601.95 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 108,655 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 1 Year Hyd No. 3 Hyd No. 2 Total storage used = 108,655 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 0.735 cfs Storm frequency = 2 yrs Time to peak = 21.97 hrs Time interval = 2 min Hyd. volume = 98,080 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 602.54 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 137,631 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 2 Year Hyd No. 3 Hyd No. 2 Total storage used = 137,631 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 13.77 cfs Storm frequency = 10 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 218,657 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 603.08 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 164,416 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 10 Year Hyd No. 3 Hyd No. 2 Total storage used = 164,416 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 35.79 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 289,280 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 603.60 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 191,775 cuft Storage Indication method used. 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 25 Year Hyd No. 3 Hyd No. 2 Total storage used = 191,775 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 53.35 cfs Storm frequency = 50 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 342,718 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 603.96 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 210,646 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 50 Year Hyd No. 3 Hyd No. 2 Total storage used = 210,646 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 2 ROUTED Hydrograph type = Reservoir Peak discharge = 60.21 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 378,489 cuft Inflow hyd. No. = 2 - POND 2 POST-DEV Max. Elevation = 604.21 ft Reservoir name = WET POND 2 ABOVE PPE Max. Storage = 224,173 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) WET POND 2 ROUTED Hyd. No. 3 -- 100 Year Hyd No. 3 Hyd No. 2 Total storage used = 224,173 cuft E. Wet Pond 3 Pre-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.25 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.04 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.29 Min = 17.4 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.04 +0.00 6.28 6.28 Pipe Pipe 3.14 3.14 361 199 0.0200 0.0048 2.282 1.12 P2^0.5 s^0.4 SEGMENT ID C 12/8/2017 12/8/2017 SEGMENT ID A B CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 3 TOC Pre-Dev Unpaved 3600 V 0.005 0.012 0.012 5.53 5.53 606 1718 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID Compute Tt 0.13 +0.12 Woods-Light Grass-Short 0.4 0.15 34 66 3.12 3.12 0.0300 0.018 NCDENR BMP Design Manual, July 2007 Compute r 0.50 0.50 0.005 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 3 TOC Pre-Dev Braeburn - Pond 3 - TOC Calcs Pre-Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B B B C C C C D D D D * Use only one CN source per line Totals =12.290 899.40 CN (weighted)total product = 899.397 = 73.2 Use CN=73 total area 12.2899 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 3.51 6.89 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 (CmB) Dirt Roads (including right-of-way) 87 Dirt Roads (including right-of-way) 89 (ScA) (CmB) Open space, Good condition (grass cover > 75%) 80 98 228.01 8.804 651.46 19.920.229 0.000 3.257(ScA) Open space, Good condition (grass cover > 75%) 74(ScA) NCDENR BMP Design Manual, July 2007 0.000 0.00 2 4.20 1.67 0.000.00098 0.00 0.00 0.000 0.000 Paved areas, streets, roofs, driveways, etc (excl.ROW) 0.00(TaB) 0.000 0.00 77 (TaB) (ScA) 82 0.00 Woods, Good condition 70 CAL 55 Pond 3 CN Pre-Development 0.000 0.00 Braeburn Indian Trail, Union County, NC MRR Woods, Good condition (TaB) Open space, Good condition (grass cover > 75%) Dirt Roads (including right-of-way) Paved areas, streets, roofs, driveways, etc (excl.ROW) 0.00061 (CmB) Woods, Good condition (CmB) ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 3 CN Pre-Development Braeburn - Pond 3 - CN Calcs Pre-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 7.664 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 27,277 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 12.44 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 41,580 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 29.95 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 94,791 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 41.13 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 128,959 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 49.79 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 155,741 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 3 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 55.66 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 174,026 cuft Drainage area = 12.290 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.40 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POND 3 PRE-DEV Hyd. No. 1 -- 100 Year Hyd No. 1 F. Wet Pond 3 Post-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.15 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.01 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.03 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.19 Min = 11.4 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.01 +0.00 6.28 6.28 Pipe Pipe 3.14 3.14 C 74 199 0.0200 0.0048 2.875 1.12 P2^0.5 s^0.4 SEGMENT ID B 12/8/2017 12/8/2017 SEGMENT ID A B CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 3 TOC Post-Dev Paved 3600 V 0.005 0.012 0.012 5.53 5.53 514 1718 Compute Tt 0.03 +0.00 Unpaved 3600 V SEGMENT ID Compute Tt 0.14 +0.01 Grass-Short Pavement 0.15 0.011 80 20 3.12 3.12 0.0200 0.01 NCDENR BMP Design Manual, July 2007 Compute r 0.50 0.50 0.005 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 3 TOC Post-Dev Braeburn - Pond 3 - TOC Calcs Post-Development 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B C D * Use only one CN source per line Totals =12.290 1106.09 CN (weighted)total product = 1106.09 = 90.0 Use CN=90 total area 12.2899 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 5.33 9.08 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Residential, 1/8 acre or less (town houses) (TaB) Residential, 1/8 acre or less (town houses) Residential, 1/8 acre or less (town houses) Residential, 1/4 acre 12.29090 () Paved Roads; open ditches (including ROW) () CAL 85 Pond 3 Post-Development CN 0.000 0.00 Braeburn Indian Trail, Union County, NC MRR Commercial and business 1106.09(ScA) 0.000 0.00(CmB) () 92 NCDENR BMP Design Manual, July 2007 2 4.20 3.11 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 3 Post-Development CN Braeburn - Pond 3 - CN Calcs Post-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 28.29 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 73,729 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 36.68 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 96,367 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 62.90 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 169,474 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 77.79 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 212,199 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 88.90 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 244,490 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 50 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 3 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 96.28 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 266,102 cuft Drainage area = 12.290 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.40 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) POND 3 POST-DEV Hyd. No. 2 -- 100 Year Hyd No. 2 Basin ID:Required Designer Input=Project Name:Project # :Designer:Date: 02/19/18Rev 1:5.11 ac222,492.26 sf7.18 ac312,853.79 sf0.00 ac12.29 ac 535,346.05 sfPerform Water Balance Calcs.41.56%1.00-inI = 41.56%Rv = 0.42V(design) = 0.43-ac-ft18,917.53-cfVmp =46,083.10-cfWet Detention Basin WorksheetWet Pond #3BraeburnFM26.420Design Rainfall is 1 InchDrainage Area is 12.29 AcresC. LudwigBasin Drainage Area SummaryDetermine the Water Quality Volume (WQv)Total Impervious Area:Total Pervious Area:Total Future Impervious Area:Calculate The Design VolumeDesign Rainfall:Total Area:Percent BUA:Determine the Runoff Coefficient (Rv) for the 1-in rainfallRv = 0.05 + 0.9 x (I)WQv = (1 x 0.42 x 12.29)/12Rv is 0.42WQv = Design Rainfall x Rv x Onsite Drainage Area Calculate The Required Main Pool Volume V(forebay) = 20% of Vmp =8,949.35-cf598.00-ft597.50-ftRequired Permanent Pool Volume:53,696.08-cfForebay Crest Elevation =597.00-ftElev. Forebay Area Main Bay Area Total Area Forebay Incr. Vol.Forebay Accumulated Vol.Main Bay Incr. Vol.Main Bay Accumulated Vol.Total Accumulated Vol.591.503,868.88 sf 29,882.93 sf33,751.81 sf 0.00-cf0.00-cf0.00-cf0.00-cf0.00-cf592.004,271.91 sf 30,948.45 sf35,220.36 sf 2,035.20-cf 2,035.20-cf 15,207.85-cf 15,207.85-cf17,243.04-cf593.005,129.87 sf 33,130.42 sf38,260.29 sf 4,700.89-cf 6,736.09-cf 32,039.44-cf 47,247.28-cf53,983.37-cf594.006,056.90 sf 35,380.50 sf41,437.40 sf 5,593.39-cf 12,329.47-cf 34,255.46-cf 81,502.74-cf93,832.21-cf595.007,053.01 sf 37,698.69 sf44,751.70 sf 6,554.96-cf 18,884.43-cf 36,539.60-cf 118,042.34-cf136,926.76-cf596.008,118.19 sf 40,084.98 sf48,203.17 sf 7,585.60-cf 26,470.03-cf 38,891.84-cf 156,934.17-cf183,404.20-cf597.009,252.46 sf 42,539.38 sf51,791.84 sf 8,685.33-cf 35,155.35-cf 41,312.18-cf 198,246.35-cf233,401.70-cf597.50.00 sf 53,908.56 sf53,908.56 sf 0.00-cf 35,155.35-cf 24,111.99-cf 222,358.34-cf257,513.69-cf598.00.00 sf 58,760.76 sf58,760.76 sf 0.00-cf 35,155.35-cf 28,167.33-cf 250,525.67-cf285,681.02-cf% Forebay =17.73%Required PPE = 593.07-ftProposed PPE =598.00-ftElev. Incr. Vol. Accumul. Vol.598.00 0.00 cf285,681.02 cf598.5030,632.74 cf316,313.75 cf599.0032,268.42 cf348,582.18 cf600.0066,858.16 cf415,440.33 cf601.0069,995.71 cf485,436.04 cf602.0073,189.80 cf558,625.84 cf603.0076,440.43 cf635,066.27 cf604.0079,747.62 cf714,813.89 cf605.0083,111.35 cf797,925.24 cf68,412.80 sf71,578.62 sf74,800.98 sf78,079.88 sf81,415.35 sfBasin Detention Stage/Storage Above Permanent Pool ElevationContour Area58,760.76 sf84,807.35 sf63,770.18 sf65,303.51 sfBasin Permanent Pool Stage/StorageAssumed Elev. Of Permanent Pool:Elevation at Bottom of Littoral Shelf:Calculate the Permanent Pool Elevation from Proposed Contours with ForebayCalculate The Required Forebay Volume PPE = 598.00-ftP.P. Perimeter = 986.16-ftVpp = 285,681.02-cfApp = 58,760.76-sfBottom of Shelf Elev = 597.50-ftA(bottom of shelf) = 53,908.56-sfV(shelf) = 1,232.70-cfDavg = 5.28-ftCalculate the Average Depth of the Pond 1-year, 24-hour Storm Pre-Development Runoff Volume =27,277.00-cf(See Hydraflow Hydrographs)1-year, 24-hour Storm Post-Development Runoff Volume =73,729.00-cf(See Hydraflow Hydrographs)Difference =46,452.00-cfVpp = 285,681.02-cf1-year, 24-hour Storm Volume in Wet Pond #1 = 332,133.02-cf1-year, 24-hour Storm Elevation in Wet Pond #1 = 598.75-ftC = 0.6A = 12.57 in2g = 32.2 ft/secH = 0.37 ftOrifice Diameter = 4inQout = 0.26 cfsDrawdown Time = 2.10 daysOKDetermine The Orifice Size of the Riser Structureܥܣ2݃ܪ଴.ହൌܳ Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Pond No. 1 - POND 3 PPE=598 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 598.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 598.00 58,761 0 0 0.50 598.50 63,770 30,621 30,621 1.00 599.00 65,304 32,264 62,886 2.00 600.00 68,413 66,845 129,731 3.00 601.00 71,579 69,983 199,714 4.00 602.00 74,801 73,177 272,890 5.00 603.00 78,080 76,427 349,317 6.00 604.00 81,415 79,734 429,051 7.00 605.00 84,807 83,097 512,148 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 36.00 4.00 12.00 0.00 Span (in)= 36.00 4.00 36.00 0.00 No. Barrels = 1 130 Invert El. (ft)= 598.00 598.00 599.00 0.00 Length (ft)= 50.00 0.50 0.50 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 16.00 20.00 0.00 0.00 Crest El. (ft)= 602.00 603.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 598.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 30,621 598.50 0.26 ic 0.24 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.240 1.00 62,886 599.00 0.37 ic 0.37 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.372 2.00 129,731 600.00 14.27 oc 0.14 ic 13.99 ic --- 0.00 0.00 --- --- --- --- 14.12 3.00 199,714 601.00 20.54 oc 0.20 ic 20.34 ic --- 0.00 0.00 --- --- --- --- 20.54 4.00 272,890 602.00 33.71 oc 0.32 ic 33.38 ic --- 0.00 0.00 --- --- --- --- 33.70 5.00 349,317 603.00 58.64 oc 0.22 ic 22.20 ic --- 36.21 s 0.00 --- --- --- --- 58.63 6.00 429,051 604.00 71.32 ic 0.14 ic 14.24 ic --- 56.94 s 66.60 --- --- --- --- 137.92 7.00 512,148 605.00 79.41 ic 0.10 ic 10.14 ic --- 69.14 s 188.37 --- --- --- --- 267.75 Starmount Cove Unit wt. of concrete (pcf) =150 lb/ft3 Unit wt. of H2O =62.4 lb/ft3 TOP OF RISER ELEV. =602.00 ft INV. OUT OF RISER ELEV. = 591.50 ft INT. WIDTH OF RISER =48 in INT. LENGTH OF RISER =48 in WALL THICK. OF RISER =6 in BASE THICK. OF RISER =6 in VOL. OF RISER =275.0 ft3 BUOYANT FORCE =17160.0 lbs Vol. of Riser x Unit wt. of H2O VOL. CONC. IN RISER =107 ft3 SINKING FORCE OF RISER = 9373.2 lbs Vol. of Conc. x (Unit wt. of Conc. ‐ Unit wt. of H 2O) CONC. PAD THICKNESS =24 in CONC. PAD WIDTH/LENGTH =8 ft VOL. OF CONC. PAD =128.00 ft3 L x W x H / Pad Thickness SINKING FORCE OF PAD =11212.8 lbs Vol. of Pad x (Unit wt. of Conc. ‐ Unit wt. of H 2O) TOTAL SINKING FORCE =20586.0 lbs   F.S. = 1.20 OK F.S. MUST BE GREATER THAN 1.10 CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #3 CS #3 Factor of safety = SINKING FORCE BUOYANT FORCE Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 0.357 cfs Storm frequency = 1 yrs Time to peak = 21.87 hrs Time interval = 2 min Hyd. volume = 64,721 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 598.93 ft Reservoir name = POND 3 PPE=598 Max. Storage = 58,560 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 1 Year Hyd No. 3 Hyd No. 2 Total storage used = 58,560 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 1.105 cfs Storm frequency = 2 yrs Time to peak = 15.03 hrs Time interval = 2 min Hyd. volume = 86,650 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 599.08 ft Reservoir name = POND 3 PPE=598 Max. Storage = 68,065 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 2 Year Hyd No. 3 Hyd No. 2 Total storage used = 68,065 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 8.921 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 159,569 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 599.50 ft Reservoir name = POND 3 PPE=598 Max. Storage = 96,117 cuft Storage Indication method used. 0 8 16 24 32 40 48 56 64 72 80 88 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 10 Year Hyd No. 3 Hyd No. 2 Total storage used = 96,117 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 12.53 cfs Storm frequency = 25 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 202,219 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 599.83 ft Reservoir name = POND 3 PPE=598 Max. Storage = 118,656 cuft Storage Indication method used. 0 8 16 24 32 40 48 56 64 72 80 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 25 Year Hyd No. 3 Hyd No. 2 Total storage used = 118,656 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 14.79 cfs Storm frequency = 50 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 234,461 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 600.09 ft Reservoir name = POND 3 PPE=598 Max. Storage = 135,930 cuft Storage Indication method used. 0 8 16 24 32 40 48 56 64 72 80 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 50 Year Hyd No. 3 Hyd No. 2 Total storage used = 135,930 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 3 PPE=598 Hydrograph type = Reservoir Peak discharge = 16.05 cfs Storm frequency = 100 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 256,045 cuft Inflow hyd. No. = 2 - POND 3 POST-DEV Max. Elevation = 600.26 ft Reservoir name = POND 3 PPE=598 Max. Storage = 147,686 cuft Storage Indication method used. 0 8 16 24 32 40 48 56 64 72 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) WET POND 3 PPE=598 Hyd. No. 3 -- 100 Year Hyd No. 3 Hyd No. 2 Total storage used = 147,686 cuft G. Wet Pond 4 Pre-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.22 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.29 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.51 Min = 30.6 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.12 +0.17 1.10 6.28 Open Channel Pipe 0.05 3.14 911 1192 0.0170 0.0143 2.104 1.93 P2^0.5 s^0.4 SEGMENT ID B C 12/8/2017 12/8/2017 SEGMENT ID A B CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 4 TOC Pre-Dev Unpaved 3600 V 0.005 0.040 0.012 0.50 5.53 130 1718 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID Compute Tt 0.11 +0.11 Grass-Short Grass-Short 0.15 0.15 57 43 3.12 3.12 0.0175 0.0095 NCDENR BMP Design Manual, July 2007 Compute r 0.04 0.50 0.013 ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 4 TOC Pre-Dev Braeburn - Pond 4 - TOC Calcs Pre-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B B B B C C C C D D D D * Use only one CN source per line Totals =62.604 4614.07 CN (weighted)total product = 4614.07 = 73.7 Use CN=74 total area 62.6036 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 3.61 7.03 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Woods, Good condition (TaB) Open space, Good condition (grass cover > 75%) Dirt Roads (including right-of-way) Paved areas, streets, roofs, driveways, etc (excl.ROW) 1.01561 (CmB) Woods, Good condition (CmB) CAL 55 Pond 4 CN Pre-Development 2.470 135.83 Braeburn Indian Trail, Union County, NC MRR Paved areas, streets, roofs, driveways, etc (excl.ROW) 61.90(TaB) 0.256 21.01 77 (TaB) (ScA) 82 0.00 Woods, Good condition 70 NCDENR BMP Design Manual, July 2007 22.597 1739.99 2 4.20 1.74 14.730.15098 25.81 693.50 0.290 8.669 23.398(ScA) Open space, Good condition (grass cover > 75%) 74(ScA)3.377 249.90 30.560.351 0.000 2.98(TaB) Paved areas, streets, roofs, driveways, etc (excl.ROW) 98 0.030 (CmB) Dirt Roads (including right-of-way) 87 Dirt Roads (including right-of-way) 89 (ScA) (CmB) Open space, Good condition (grass cover > 75%) 80 98 1637.84 ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 4 CN Pre-Development Braeburn - Pond 4 - CN Calcs Pre-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 30.13 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 150,414 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 48.64 cfs Storm frequency = 2 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 226,684 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 115.89 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 507,504 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 158.09 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 686,580 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 190.98 cfs Storm frequency = 50 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 826,555 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 1 POND 4 PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 213.29 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 921,975 cuft Drainage area = 62.600 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.60 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POND 4 PRE-DEV Hyd. No. 1 -- 100 Year Hyd No. 1 H. Wet Pond 4 Post-Development ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)……………. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.14 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.05 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.14 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.33 Min = 19.8 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 Compute r 0.95 0.50 0.010 Compute Tt 0.14 +0.00 Grass-Short Grass-Short 0.15 0.15 100 43 3.12 3.12 0.0288 0.0095 Unpaved 3600 V 0.005 0.040 0.012 3.60 5.53 153 2497 Compute Tt 0.01 +0.13 Unpaved 3600 V SEGMENT ID 12/8/2017 12/8/2017 SEGMENT ID A CAL MRR Braeburn Indian Trail, Union County, NC Wet Pond 4 POST-DEV TOC P2^0.5 s^0.4 SEGMENT ID B C 136 170 0.0288 0.0048 2.738 1.12 Compute Tt 0.01 +0.04 12.65 6.28 Open Channel Pipe 12.00 3.14 DE ESP Associates', PA Po Box 7030 Charlotte NC 28241 Wet Pond 4 POST-DEV TOC Braeburn - Pond 4 - TOC Calcs Post-Dev 12/14/2017 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project By Date 2/19/2018 Location Checked Date 2/19/2018 Circle One: Present Developed 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment Tbl. Fig. Fig. of Group and hydrologic condition)2-2 2-3 2-4 Acres CN x area B C D * Use only one CN source per line Totals =62.604 5678.91 CN (weighted)total product = 5678.91 = 90.7 Use CN=91 total area 62.6039 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 10 100 Rainfall , P (24-hour)in 6.50 10.30 Runoff , Q in 5.45 9.20 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 2 4.20 3.21 Commercial and business 2441.38(ScA) 31.706 2916.99(CmB) () 92 CAL 85 Pond 4 Post-Development CN 3.771 320.54 Braeburn Indian Trail, Union County, NC MRR Residential, 1/8 acre or less (town houses) (TaB) Residential, 1/8 acre or less (town houses) Residential, 1/8 acre or less (town houses) Residential, 1/4 acre 27.12690 () Paved Roads; open ditches (including ROW) () ESP Assocates, PA PoBox 7030 Charlotte NC 28241 Pond 4 Post-Development CN Braeburn - Pond 4 - CN Calcs Post-Dev 2/16/2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 121.67 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 382,518 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 156.62 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 496,123 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 265.33 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 860,807 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 4.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 326.99 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,073,130 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 5.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 372.99 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,233,382 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 50 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 2 POND 4 POST-DEV Hydrograph type = SCS Runoff Peak discharge = 403.56 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,340,562 cuft Drainage area = 62.600 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 19.80 min Total precip. = 6.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (hrs) POND 4 POST-DEV Hyd. No. 2 -- 100 Year Hyd No. 2 Basin ID:Required Designer Input=Project Name:Project # :Designer:Date: 02/19/18Rev 1:28.41 ac1,237,519.26 sf34.19 ac1,489,508.22 sf0.00 ac62.60 ac 2,727,027.48 sf45.38%1.00-inI = 45.38%Rv = 0.46V(design) = 2.39-ac-ft104,176.56-cfVmp =253,774.10-cfTotal Impervious Area:Total Pervious Area:C. LudwigBasin Drainage Area SummaryCalculate The Required Main Pool VolumeDetermine the Water Quality Volume (WQv)Total Future Impervious Area:Calculate The Design VolumeDesign Rainfall:Total Area:Wet Detention Basin WorksheetWet Pond #4BraeburnFM26.420Design Rainfall is 1 InchDrainage Area is 62.6 AcresWQv = (1 x 0.46 x 62.6)/12Percent BUA:Determine the Runoff Coefficient (Rv) for the 1-in rainfallRv = 0.05 + 0.9 x (I)WQv = Design Rainfall x Rv x Onsite Drainage Area Rv is 0.46 V(forebay) = 20% of Vmp =50,754.82-cf600.00-ft600.00-ftRequired Permanent Pool Volume:304,528.92-cfForebay Crest Elevation =599.50-ftElev. Forebay Area 1 Forebay Area 2 Main Bay Area Total Area Forebay Incr. Vol.Forebay Accumulated Vol.Main Bay Incr. Vol.Main Bay Accumulated Vol.Total Accumulated Vol.593.00 6597.253,501.00 sf 69,842.64 sf79,940.89 sf 0.00-cf0.00-cf0.00-cf0.00-cf0.00-cf594.00 7614.354,200.00 sf 73,687.32 sf85,501.67 sf 10,956.30-cf 10,956.30-cf 71,764.98-cf 71,764.98-cf82,721.28-cf595.00 8698.694,959.53 sf 77,617.33 sf91,275.55 sf 12,736.29-cf 23,692.59-cf 75,652.33-cf 147,417.31-cf171,109.89-cf596.00 9850.285,778.50 sf 81,632.66 sf97,261.44 sf 14,643.50-cf 38,336.09-cf 79,625.00-cf 227,042.30-cf265,378.39-cf597.00 11069.086,657.28 sf 85,733.31 sf103,459.67 sf 16,677.57-cf 55,013.66-cf 83,682.99-cf 310,725.29-cf365,738.94-cf598.00 12354.667,595.86 sf 89,919.28 sf109,869.80 sf 18,838.44-cf 73,852.10-cf 87,826.30-cf 398,551.58-cf472,403.68-cf599.00 13704.008,594.24 sf 94,190.57 sf116,488.81 sf 21,124.38-cf 94,976.48-cf 92,054.93-cf 490,606.51-cf585,582.98-cf599.50 14402.458,594.24 sf 96,358.16 sf119,354.85 sf 11,323.73-cf 106,300.21-cf 47,637.18-cf 538,243.69-cf644,543.90-cf600.000.00.00 sf 123,918.23 sf123,918.23 sf 0.00-cf 106,300.21-cf 55,069.10-cf 593,312.79-cf699,612.99-cf% Forebay =19.75%Required PPE = 596.41-ftProposed PPE =600.00-ftElev. Incr. Vol. Accumul. Vol.600.00 0.00 cf699,612.99 cf600.5064,123.93 cf763,736.92 cf601.0068,492.70 cf832,229.62 cf602.00144,075.78 cf976,305.39 cf603.00149,468.93 cf1,125,774.32 cf604.00154,918.59 cf1,280,692.91 cf605.00160,424.77 cf1,441,117.68 cf606.00165,987.47 cf1,607,105.14 cf607.00171,607.58 cf1,778,712.72 cf608.00177,284.39 cf1,955,997.11 cf608.5090,786.63 cf2,046,783.74 cf180,136.57 sf183,009.96 sfAssumed Elev. Of Permanent Pool:Elevation at Bottom of Littoral Shelf:Calculate the Permanent Pool Elevation from Proposed Contours with ForebayCalculate The Required Forebay VolumeBasin Permanent Pool Stage/Storage152,179.63 sf157,657.55 sf163,191.99 sf168,782.94 sf174,432.21 sf141,393.33 sf146,758.22 sfBasin Detention Stage/Storage Above Permanent Pool ElevationContour Area123,918.23 sf132,577.47 sf PPE = 600.00-ftP.P. Perimeter = 1,716.10-ftVpp = 699,612.99-cfApp = 123,918.23-sfBottom of Shelf Elev = 600.00-ftA(bottom of shelf) = 123,918.23-sfV(shelf) = 0.00-cfDavg = 5.65-ftCalculate the Average Depth of the Pond 1-year, 24-hour Storm Pre-Development Runoff Volume =150,414.00-cf(See Hydraflow Hydrographs)1-year, 24-hour Storm Post-Development Runoff Volume =382,518.00-cf(See Hydraflow Hydrographs)Difference =232,104.00-cfVpp = 699,612.99-cf1-year, 24-hour Storm Volume in Wet Pond #1 = 931,716.99-cf1-year, 24-hour Storm Elevation in Wet Pond #1 = 601.69-ftC = 0.6A = 28.27 in2g = 32.2 ft/secH = 0.85 ftOrifice Diameter = 6inQout = 0.87 cfsDrawdown Time = 3.09 daysOKDetermine The Orifice Size of the Riser Structureܥܣ2݃ܪ଴.ହൌܳ Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Pond No. 1 - WET POND 4 PPE=600 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 600.00 ft Stage / Storage Table Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 600.00 123,918 0 0 0.50 601.00 132,577 64,105 64,105 1.00 601.00 141,393 68,474 132,579 2.00 602.00 146,758 144,053 276,632 3.00 603.00 152,180 149,446 426,078 4.00 604.00 157,658 154,895 580,973 5.00 605.00 163,192 160,401 741,374 6.00 606.00 168,783 165,963 907,337 7.00 607.00 174,432 171,582 1,078,919 8.00 608.00 180,137 177,259 1,256,178 8.50 608.50 183,010 90,777 1,346,955 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr][A] [B] [C] [D] Rise (in)= 42.00 6.00 12.00 0.00 Span (in)= 42.00 6.00 36.00 0.00 No. Barrels = 1 130 Invert El. (ft)= 600.00 600.00 603.00 0.00 Length (ft)= 117.00 0.50 0.50 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 20.00 20.00 0.00 0.00 Crest El. (ft)= 605.00 606.50 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 600.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 64,105 601.00 0.82 ic 0.79 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.789 1.00 132,579 601.00 0.91 ic 0.77 ic 0.00 --- 0.00 0.00 --- --- --- --- 0.775 2.00 276,632 602.00 1.20 ic 1.20 ic 0.00 --- 0.00 0.00 --- --- --- --- 1.204 3.00 426,078 603.00 1.53 ic 1.52 ic 0.00 --- 0.00 0.00 --- --- --- --- 1.519 4.00 580,973 604.00 31.86 oc 1.16 ic 30.64 ic --- 0.00 0.00 --- --- --- --- 31.80 5.00 741,374 605.00 48.77 oc 1.04 ic 47.73 ic --- 0.00 0.00 --- --- --- --- 48.77 6.00 907,337 606.00 84.66 oc 0.64 ic 29.30 ic --- 54.71 s 0.00 --- --- --- --- 84.65 7.00 1,078,919 607.00 103.31 oc 0.39 ic 17.98 ic --- 84.93 s 23.55 --- --- --- --- 126.85 8.00 1,256,178 608.00 115.01 ic 0.27 ic 12.60 ic --- 102.10 s 122.35 --- --- --- --- 237.33 8.50 1,346,955 608.50 119.78 ic 0.24 ic 10.91 ic --- 108.58 s 188.37 --- --- --- --- 308.10 Starmount Cove Unit wt. of concrete (pcf) =150 lb/ft3 Unit wt. of H2O =62.4 lb/ft3 TOP OF RISER ELEV. =605.00 ft INV. OUT OF RISER ELEV. = 593.00 ft INT. WIDTH OF RISER =60 in INT. LENGTH OF RISER =60 in WALL THICK. OF RISER =6 in BASE THICK. OF RISER =6 in VOL. OF RISER =450.0 ft3 BUOYANT FORCE =28080.0 lbs Vol. of Riser x Unit wt. of H2O VOL. CONC. IN RISER =150 ft3 SINKING FORCE OF RISER = 13140 lbs Vol. of Conc. x (Unit wt. of Conc. ‐ Unit wt. of H 2O) CONC. PAD THICKNESS =42 in CONC. PAD WIDTH/LENGTH =8 ft VOL. OF CONC. PAD =224.00 ft3 L x W x H / Pad Thickness SINKING FORCE OF PAD =19622.4 lbs Vol. of Pad x (Unit wt. of Conc. ‐ Unit wt. of H 2O) TOTAL SINKING FORCE =32762.4 lbs   F.S. = 1.17 OK F.S. MUST BE GREATER THAN 1.10 CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND #4 CS #4 Factor of safety = SINKING FORCE BUOYANT FORCE Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 1.315 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 316,258 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 602.33 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 325,924 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 1 Year Hyd No. 3 Hyd No. 2 Total storage used = 325,924 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 1.698 cfs Storm frequency = 2 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 364,853 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 603.02 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 428,978 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 2 Year Hyd No. 3 Hyd No. 2 Total storage used = 428,978 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 21.94 cfs Storm frequency = 10 yrs Time to peak = 12.93 hrs Time interval = 2 min Hyd. volume = 721,938 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 603.77 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 544,982 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 10 Year Hyd No. 3 Hyd No. 2 Total storage used = 544,982 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 41.20 cfs Storm frequency = 25 yrs Time to peak = 12.60 hrs Time interval = 2 min Hyd. volume = 933,156 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 604.40 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 645,654 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 25 Year Hyd No. 3 Hyd No. 2 Total storage used = 645,654 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 48.41 cfs Storm frequency = 50 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 1,092,750 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 604.97 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 736,590 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 400.00 400.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 50 Year Hyd No. 3 Hyd No. 2 Total storage used = 736,590 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Friday, 02 / 16 / 2018 Hyd. No. 3 WET POND 4 PPE=600 Hydrograph type = Reservoir Peak discharge = 59.05 cfs Storm frequency = 100 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 1,199,538 cuft Inflow hyd. No. = 2 - POND 4 POST-DEV Max. Elevation = 605.32 ft Reservoir name = WET POND 4 PPE=600 Max. Storage = 794,388 cuft Storage Indication method used. 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (hrs) WET POND 4 PPE=600 Hyd. No. 3 -- 100 Year Hyd No. 3 Hyd No. 2 Total storage used = 794,388 cuft I. Summary POND DA (AC) PRE‐TOC PRE‐CN POST‐TOC POST‐CN 1 13.07 22.2 70 16.8 89 2 20.37 33 70 10.2 90 3 12.29 17.4 73 11.4 90 4 62.60 30.6 74 19.8 91 STORM PRE‐DEV 1‐YEAR  STORM FLOW ROUTED 1‐YEAR  STORM FLOW DIFFERENCE 1‐YEAR 5.42 0.25 ‐5.17 2‐YEAR 9.64 0.66 ‐8.98 10‐YEAR 25.71 9.50 ‐16.21 25‐YEAR 36.11 20.59 ‐15.52 50‐YEAR 44.36 26.72 ‐17.64 100‐YEAR 49.98 28.91 ‐21.07 STORM PRE‐DEV 1‐YEAR  STORM FLOW ROUTED 1‐YEAR  STORM FLOW DIFFERENCE 1‐YEAR 6.54 0.32 ‐6.22 2‐YEAR 11.68 0.74 ‐10.95 10‐YEAR 31.70 13.77 ‐17.93 25‐YEAR 44.67 35.79 ‐8.88 50‐YEAR 54.85 53.35 ‐1.5 100‐YEAR 61.79 60.21 ‐1.58 STORM PRE‐DEV 1‐YEAR  STORM FLOW ROUTED 1‐YEAR  STORM FLOW DIFFERENCE 1‐YEAR 7.66 0.36 ‐7.31 2‐YEAR 12.44 1.11 ‐11.34 10‐YEAR 29.95 8.92 ‐21.03 25‐YEAR 41.13 12.53 ‐28.60 50‐YEAR 49.79 14.79 ‐35 100‐YEAR 55.66 16.05 ‐39.61 STORM PRE‐DEV 1‐YEAR  STORM FLOW ROUTED 1‐YEAR  STORM FLOW DIFFERENCE 1‐YEAR 30.13 1.32 ‐28.82 2‐YEAR 48.64 1.70 ‐46.94 10‐YEAR 115.89 21.94 ‐93.95 25‐YEAR 158.09 41.20 ‐116.89 50‐YEAR 190.98 48.41 ‐142.57 100‐YEAR 213.29 59.05 ‐154.24 SUMMARY TABLE SUMMARY TABLE POND 4 SUMMARY TABLE POND 3 SUMMARY TABLE POND 1 SUMMARY TABLE POND 2 . Impervious Area Calculations Buildings Roads and Curb Driveways SidewalksTotal Impervious Area Drainage Area % Impervious147,210.00 sf 54,810.71 sf 18,897.87 sf 15,960.00 sf 236,878.58 sf 569,502.52 sf 41.59%3.38 ac 1.26 ac 0.43 ac 0.37 ac 5.44 ac 13.07 ac 41.59%Buildings Roads and Curb Driveways SidewalksTotal Impervious Area Drainage Area % Impervious231,102.37 sf 124,690.61 sf 35,413.60 sf 33,482.36 sf 424,688.94 sf 887,133.90 sf 47.87%5.31 ac 2.86 ac 0.81 ac 0.77 ac 9.75 ac 20.37 ac 47.87%Buildings Roads and Curb Driveways SidewalksTotal Impervious Area Drainage Area % Impervious135,625.95 sf 46,166.57 sf 24,448.93 sf 16,250.81 sf 222,492.26 sf 535,346.05 sf 41.56%3.11 ac 1.06 ac 0.56 ac 0.37 ac 5.11 ac 12.29 ac 41.56%Buildings Roads and Curb Driveways SidewalksAmenity CenterTotal Impervious Area Drainage Area % Impervious623,907.24 sf 310,985.73 sf 108,932.22 sf 95,193.74 sf 97,356.95 sf 1,237,519.26 sf 2,727,027.48 sf 45.38%14.32 ac 7.14 ac 2.50 ac 2.19 ac 2.24 ac 28.41 ac 62.60 ac 45.38%Pond 1 Impervious AreasPond 2 Impervious AreasPond 3 Impervious AreasPond 4 Impervious Areas . Drainage Map 625 632 628630628627628627633628626629628630627625 622619617 6186226236146166196206 2 3 6 2 2 6206186 1 6 619621622623620618611605605610611618612618622623625 627629 629631625625623 62262162463063163062862962762762662362662 4 61761 5 61 4 612 61 2 6116 1 0 610611 611 61 0 60561060260860860160059359360060160859360060160861061361161161361561661761 8 618616617 61560 9 614611615618616620621621622625628628632627626625626625627 627 627 623 625621 622621 623 620 621622623625624625627 628 628 627618622 61862262061962462161961761861661461562360 9 610611 60 9 60 8 6 1 1 61 1 61 1 61 2 61 3 6 1 3 6 1 1 6 1 4 6 1 3611614612610 6 1 2 6 1 2 61 2 61 4 6 1 4616 614615 6 1 4 6 1 3 61 36143:13:13 : 1 3: 1 3:1 3:13:1 7:1188868512512636520520720623923823623534834717418118217516817616917717017817117317214616415614516315514416215415114316115315014216014916715915214816615814716515787821101171111181041121191051131201061211071141221081151231091161241031011022832912933012842943022852953032862963042872762682752672742662732652722642792712632782702622772692612552482562492572502582512592522602532462542472222402232312412242322422252432262332442272342452282212292372082002132202122192112182102042172092032162022152012141351271341411331401321391311371301291361281383453463383643633613623403393603433423413443153263233253243323273283293303313363333343353203193183173163123143133083113103093063073373052972802882982812892992822902923008192230345676463626170717578777673747284838081798891929089939694959998971001413121110151617191820212625242322DI#C14DI#C11DI#C13DI#C12CB#C5CB#C6DI#C10CB#C15CB#C4DI#C9DCB#C3JB#C2DI#C7DI#C8FES#C1DCB#B79DI#B62CB#B61CB#B60CB#B59DI#B84CB#B83CB#B58DI#B78DI#B77DCB#B35DCB#B36DI#B34CB#B57DI#B33DI#B82DI#B53CB#B80CB#B81DI#B48DI#B75DI#B76DI#B32CB#B21CB#B20CB#B54DI#B74DI#B51DCB#B56CB#B55DI#B40DI#B47CB#B43CB#B42DCB#B66CB#B65CB#B64CB#B68DI#B50DI#B52CB#B19CB#B27CB#B26DI#B49DI#B31CB#B71DCB#B18CB#B17DI#B39DI#B38DI#B46DI#B45CB#B73CB#B25CB#B41CB#B67CB#B70CB#B72DI#B37DI#B30CB#B10CB#B9DI#B44DI#B85DI#B16CB#B11CB#B6CB#B8DCB#B15CB#B14DI#B29DCB#B69CB#B7DCB#B28CB#B5DI#B13DI#B24DI#B63DI#B23DI#B22DCB#B3DCB#B4DI#B2FES#B1CB#D19CB#D20CB#D64CB#D18CB#D17CB#D16CB#D15CB#D42CB#D43CB#D41DI#D48CB#D62DI#D47CB#D14CB#D63CB#D40DI#D46CB#D13CB#D59CB#D58DI#D38CB#D39CB#D68CB#D11CB#D12DI#D45CB#D32CB#D31JB#D8DI#D44CB#D65CB#D10DI#D37CB#D61CB#D30DI#D35CB#D70CB#D29DI#D36CB#D7CB#D69DCB#D9CB#D67DI#D26DI#D34DI#D33CB#D6CB#D5DI#D4CB#D60DI#D27CB#D66CB#D28CB#D55CB#D54CB#D51CB#D49CB#D50CB#D53CB#D52DI#D25JB#D2DI#D24DCB#D21CB#D22DI#D23DI#D56DI#D3FES#D1CB#E6CB#E7CB#E23CB#E22CB#E34CB#E21DI#E31DI#E30DI#E29DI#E5CB#E20CB#E32CB#E4DI#G11CB#G12DI#G10DI#G9CB#F17CB#F18CB#F16CB#F15CB#F46CB#F47CB#F14CB#F45CB#F31CB#F30CB#F13CB#F12CB#F34CB#F11DI#F33DI#F39CB#F10DI#F37DI#F38DI#F36CB#F44DI#F32DCB#F9CB#A29CB#A28CB#A33DI#A15CB#A19CB#A20DCB#A9CB#A10DI#A14DI#A13CB#A18DI#A12DI#A8CB#A17CB#A32DI#A27DI#A7CB#A23DI#A26DI#A25CB#A22DI#A24CB#A21CB#A31DI#A6DI#A11CB#A16CB#A30DCB#A4DCB#A3DI#A5DI#A2FES#A1CB#B12RISER #4HW POND #4RISER #1FES POND #1606610629633634638 634 V:\FM26.400 - Bonterra\_FM26\Sheets\FM26-DRAINAGE AREAS.dwg, C3.15 STORM DRAINAGE AREAS - SHEET 1 OF 2, jcato SHEET:PROJECT MANAGER:PROJECT INFORMATIONDESIGNED BY:DRAWN BY:PROJECT NUMBER:ORIGINAL DATE:ESP Associates. P.A. P.O. Box 7030 Charlotte, NC 28241 3475 Lakemont Blvd. Fort Mill, SC 29708 704-583-4949 (NC) 803-802-2440 (SC) www.espassociates.com BYREVISIONDATENO. BRAEBURN INDIAN TRAIL, UNION COUNTY, NCMATTAMY CAROLINA CORP. STORM DRAINAGE AREAS - SHEET 1 OF 2 C3.15MRRCALCALFM26.42002/27/18PRELIMINARY NOT FOR CONSTRUCTIONR1 INCH = FT.( IN FEET )GRAPHIC SCALE0100'50'100'200'400'100FAITH CHURCH ROAD(EXIST. 60' PUBLIC R/W)DB 186 PG 155DB 186 PG 157ENDERBURY DRIVE(EXIST. 50' PUBLIC R/W)PROP. 30' RESIDENTIALBUFFER (TYP.)AIKEN CROSS LANE(PROP. 60' PUBLIC R/W)CALDER DRIVE(PROP. 50' PUBLIC R/W)DANIA ROAD(PROP. 50' PUBLIC R/W)EARLSTON ROAD(PROP. 50' PUBLIC R/W)FAIRBRAE LANE(PROP. 50' PUBLIC R/W)LAGGAN LANE(PROP. 50' PUBLIC R/W)HAT T O N R O A D (PR O P . 5 0 ' P U B L I C R / W )FAIRBRAE LANE(PROP. 50' PUBLIC R/W)RAELEA DR IVE (PROP . 50 ' PUBL IC R /W ) TO L L C R O S S R O A D (PR O P . 5 0 ' P U B L I C R / W ) DR YD EN ROAD ( P RO P . 5 0 ' P UB L IC R /W )AINSLIE PLACE ROAD(PROP. 50' PUBLIC R/W)TOP FLIGHT DRIVE(PROP. 60' PUBLIC R/W)BELLSHILL DRIVE(PROP. 50' PUBLIC R/W)MATCH L INESEE STORM DRA INAGE AREAS - SHEET 2 OF 2BMP #1BMP #4NOR T H O R I E N T E D T O NC G R I D ( N A D 8 3 / 2 0 1 1 )SCALE: 1" = 500'BRAEBURN KEY MAPPROP. 25' RESIDENTIALBUFFER (TYP.)PROP. 10' WETLANDBUFFERPROP. 30'WETLANDBUFFERSTORM ASTORM BSTORM DSTORMESTORM FSTORM GSTORM CW O O D E N D D R I V E (PR O P . 5 0 ' P U B L I C R / W )*SEE DRAINAGE AREA TABLES SHEET C3.16 619617 6186226236146166196206 2 3 6 2 2 6206186 1 6 61962162262363163062862362662 4 61761 5 61 4 61 2 6116 1 0 610611 611 61 0 600605611618615613609609607 60160560860660660060060660160661261360960660060 6 600 606606611609610612 61260960 4 59 8 6 1 0 6 09 6 0 9 6 0 6 6 0 2 599605605599597592592597599605605598 60 7 59 9 59 2 59 7 604601608610608 611 612610608 60 9 610611 60 9 60 86106116 1 1 6 1 1 61 1 61 1 61 2 61 3 6 1 3 6116 1 4 6 1 3611614612610 6 1 2 61261 2 6146086 1 1 60 9 6126126126 1 2611613615 61 4616 6146156 1 4 6 1 3 61 3614605617 6 1 6 610 3:1 3:13:13:1 3:13:17:13:15:13:13:13:13:13:1 3:118818318650514836519319435034934834718418518717418118217516817616917717017817117917318017215615515415115316015915215815728329129330128429430228529528629628736404342413839371901911921971951981961991893453463593383643633613563623533573513403543583393553603433423523413443153263233253243223213323273283293303313363333343353203193183173163123143133083113103093063073372972882982892992902923006867666564636261605859474945464455525756545370716972212625242322272830293132333534CB#D13CB#D59CB#D58DI#D38CB#D12CB#D32CB#D31CB#D65CB#D10DI#D37CB#D61CB#D30DI#D35CB#D70CB#D29DI#D36DI#D26DI#D34CB#D60DI#D27CB#D55CB#D54DI#D57CB#D51CB#D53CB#D52DI#D25DI#D24DI#D23DI#E12DI#E11DI#E13CB#E6CB#E7DI#E16CB#E23CB#E22DI#E10CB#E19CB#E18DI#E25CB#E26CB#E34CB#E21DI#E14DI#E31DI#E15DCB#E28CB#E27DI#E30CB#E33CB#E17DI#E8DI#E9DI#E24DI#E29DI#E5CB#E20CB#E32DCB#E3CB#E4DI#E2FES#E1DI#G11DI#G17CB#G13CB#G12CB#G8DI#G10CB#G16CB#G15CB#G3DI#G9DI#G2CB#G7CB#G18CB#G14CB#G4CB#G5CB#G6FES#G1CB#F18CB#F46CB#F47CB#F14CB#F45CB#F31CB#F30CB#F13CB#F12CB#F35CB#F29DI#F24CB#F34CB#F11CB#F28CB#F40DI#F23DI#F33DI#F39CB#F10DI#F5DI#F37DI#F38DI#F21CB#F27CB#F26DI#F36CB#F44CB#F43DI#F32DI#F22DI#F20DI#F6DCB#F8DCB#F9DI#F19DI#F7CB#F42CB#F41CB#F48CB#F25DCB#F3DCB#F4DI#F2FES#F1DI#A27CB#A23DI#A26DI#A25CB#A22DI#A24CB#A21CB#A31RISER #3FES POND #3RISER #2FES POND #25945985945 9 4 59 9 59 4 594599 V:\FM26.400 - Bonterra\_FM26\Sheets\FM26-DRAINAGE AREAS.dwg, C3.16 STORM DRAINAGE AREAS - SHEET 2 OF 2, jcato SHEET:PROJECT MANAGER:PROJECT INFORMATIONDESIGNED BY:DRAWN BY:PROJECT NUMBER:ORIGINAL DATE:ESP Associates. P.A. P.O. Box 7030 Charlotte, NC 28241 3475 Lakemont Blvd. Fort Mill, SC 29708 704-583-4949 (NC) 803-802-2440 (SC) www.espassociates.com BYREVISIONDATENO. BRAEBURN INDIAN TRAIL, UNION COUNTY, NCMATTAMY CAROLINA CORP. STORM DRAINAGE AREAS - SHEET 2 OF 2 C3.16MRRCALCALFM26.42002/27/18PRELIMINARY NOT FOR CONSTRUCTIONR1 INCH = FT.( IN FEET )GRAPHIC SCALE0100'50'100'200'400'100AINSL IE PLACE ROAD (PROP . 50 ' PUBL IC R /W )TOP FLIGHT DRIVE(PROP. 60' PUBLIC R/W)CANONGATE DR IVE (PROP . 50 ' PUBL IC R /W ) TO L LC RO S S ROAD ( PRO P . 5 0 ' P U B L I C R /W )WO O D E N D D R I V E (P R O P . 5 0 ' P U B L I C R /W )LAGGAN LANE (PROP . 50 ' PUBL IC R /W )TOP FLIGHT DRIVE(FUTURE 60' PUBLIC R/W)(SEE PLANS BY EAGLE ENGINEERINGINC. DATED MAY 12, 2017)(SAW-2014-01804)MOSER CIRCLE(EXIST. 60' PUBLIC R/W)MATCH L INESEE STORM DRA INAGE AREAS - SHEET 1 OF 2BMP #2BMP #3NOR T H O R I E N T E D T O NC G R I D ( N A D 8 3 / 2 0 1 1 )PROP. 25'RESIDENTIALBUFFER (TYP.)PROP. 30'WETLANDBUFFERSCALE: 1" = 500'BRAEBURN KEY MAPSTORM ASTORM BSTORM DSTORMESTORM FSTORM GSTORM C . Appendix A. Wetlands Reports BONTERRA Indian Trail, NC APPROXIMATE WETLAND MAP FOR STUDY PURPOSES ONLY SUBJECT TO USACE/NCDENR VERIFICATION March 11, 2013 Revised October 02, 2013 LEONARD S. RINDNER PLLC Wetlands & Environmental Planning Group 3714 Spokeshave Lane Matthews, NC 28105 (704) 904 – 2277 LEN.RINDNER.PWS@gmail.com LEGEND NON – JURISDICTIONAL CHANNEL, GULLY, OR SWALE KNOWN CULVERT KNOWN BRIDGE B1: PERENNIAL RPW E1: PERENNIAL RPW K1 – 4 (DNC/TO PL): WETLAND J1 – 60: WETLAND X1 - 20/Y1 - 31: WETLAND Project Side/Does Not Close I1 – 6: WETLAND H1 – 14: WETLAND Project Side/Does Not Close G1 – 15: WETLAND Project Side/Does Not Close W1 – 14/WW1 – 17: WETLAND Project Side/Does Not Close F1 – 7: WETLAND WETLANDS APPROXIMATED Project side flagged only AREA NOT EVALUATED FOR WATERS OF THE US - No development proposed for this area OUTPARCEL NOT INCLUDED RPW determined to be outside of review area RPW determined to be outside of review area BONTERRA Indian Trail, NC APPROXIMATE WETLAND MAP FOR STUDY PURPOSES ONLY SUBJECT TO USACE/NCDENR VERIFICATION March 11, 2013 Revised October 02, 2013 LEONARD S. RINDNER PLLC Wetlands & Environmental Planning Group 3714 Spokeshave Lane Matthews, NC 28105 (704) 904 – 2277 LEN.RINDNER.PWS@gmail.com LEGEND NON – JURISDICTIONAL CHANNEL, GULLY, OR SWALE KNOWN CULVERT KNOWN BRIDGE B1: PERENNIAL RPW E1: PERENNIAL RPW K1 – 4 (DNC/TO PL): WETLAND J1 – 60: WETLAND X1 - 20/Y1 - 31: WETLAND Project Side/Does Not Close I1 – 6: WETLAND H1 – 14: WETLAND Project Side/Does Not Close G1 – 15: WETLAND Project Side/Does Not Close W1 – 14/WW1 – 17: WETLAND Project Side/Does Not Close F1 – 7: WETLAND WETLANDS APPROXIMATED Project side flagged only AREA NOT EVALUATED FOR WATERS OF THE US - No development proposed for this area OUTPARCEL NOT INCLUDED RPW determined to be outside of review area RPW determined to be outside of review area 1 December 18, 2017 Mr. Bob Wiggins Mr. James Mathieson Mattamy Homes 2127 Ayrsley Town Blvd., Suite 201, Charlotte, NC 28273 Re: Faith Road Site - Waters of the US Opinion Report – 32 Acres, Indian Trail, Union County, North Carolina Dear Sirs: Based on your request I have reviewed the proposed residential development site to offer an opinion on whether this project can be developed in accordance with Federal and State wetlands regulations (Section 404 and Section 401 of the Clean Water Act (CWA) and NCDEQ Isolated Wetland Rules). The site is a slightly to moderate sloping ridge with varying levels of woodland in early to mid-succession from previous agricultural and timbering activities. In addition to an upland vegetative community, invasive dense vegetation such as Russian olive, Japanese Honeysuckle, Blackberry, and Nepalese Browntop were also present in some areas. An area is determined to be a wetland when it exhibits Hydric Soil, Hydrophytic Vegetation, and Wetland Hydrology characteristics. These characteristics are required to be in accordance with the definitions in the U.S. Army Corps of Engineers (USACE) Wetland Delineation Manual, 1987, and supplemental appendices. Surface waters such as perennial and intermittent streams and their impoundments are also subject to the permitting requirements of Section 404 and Section 401 of the Clean Water Act (CWA). An evaluation was conducted in accordance with these requirements and conditions. Based on our evaluation Jurisdictional Waters of the U.S. and/or North Carolina were not identified. In addition, streams, wetlands, or open waters are not indicated on the USGS map or the latest published version of the NRCS Soil Survey. In our opinion the site should be expected to be developable without the need for Section 404/Section 401 permits on this specific tract of land. Let me know if you have any questions or if I can be of further assistance. Thank you. Sincerely, Leonard S. Rindner, PWS Professional Wetland Scientist FIGURE NO. FAITH CHURCH RD Union Co., NC VICINITY MAP EXISTING CONDITIONS STUDY DATE: 12/15/17 Drawn By: LSR NRN Reviewed By: SITE PROJECT BOUNDARY STUDY LIMITS Drawn By: Reviewed By: NRN LSR DATE: 12/15/17 FIGURE NO. FAITH CHURCH ROAD Union Co., NC AERIAL MAP EXISTING CONDITIONS STUDY PROPERTY BOUNDARY STUDY LIMITS FIGURE NO. FAITH CHURCH RD Union Co., NC USGS MAP EXISTING CONDITIONS STUDY DATE: 12/15/17 Drawn By: LSR NRN Reviewed By: PROJECT BOUNDARY STUDY LIMIT LOCATION Lat: 35.0982 ºN Long: -80.6148 ºW HUC: 03040105 LOWER ROCKY RIVER SCALE 1:24,000 ACRES 32.135 USGS QUAD Matthews, NC NORTH FORK CROOKED CREEK FIGURE NO. FAITH CHURCH RD Union Co., NC NRCS PUBLISHED SOILS MAP EXISTING CONDITIONS STUDY DATE: 12/15/17 Drawn By: LSR NRN Reviewed By: PROJECT BOUNDARY STUDY LIMITS Drawn By: Reviewed By: NRN LSR DATE: 12/15/17 FIGURE NO. FAITH CHURCH ROAD Union Co., NC PRELIMINARY WETLANDS ASSESMENT MAP EXISTING CONDITIONS STUDY PROPERTY BOUNDARY STUDY LIMITS NON-JURISDICTIONAL SWALE 3 1-2 NO WATERS OF THE US IDENTIFIED ON SITE Faith Church Road Union Co., NC – 12/18/17 NON-JURISDICTION SWALE – PHOTO 1 NON-JURISDICTIONAL SWALE – PHOTO 2 Faith Church Road Union Co., NC – 12/15/17 NON-JURISDICATIONAL SWALE – PHOTO 3 WETLAND DETERMINATION DATA FORM – Eastern Mountains and Piedmont Region Project/Site: City/County: Sampling Date: Applicant/Owner: State: Sampling Point: Investigator(s): Section, Township, Range: Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%): Subregion (LRR or MLRA): Lat: Long: Datum: Soil Map Unit Name: NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are “Normal Circumstances” present? Yes No Are Vegetation , Soil , or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Hydric Soil Present? Wetland Hydrology Present? Yes Yes Yes No No No Is the Sampled Area within a Wetland? Yes No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) True Aquatic Plants (B14) Sparsely Vegetated Concave Surface (B8) High Water Table (A2) Hydrogen Sulfide Odor (C1) Drainage Patterns (B10) Saturation (A3) Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines (B16) Water Marks (B1) Presence of Reduced Iron (C4) Dry-Season Water Table (C2) Sediment Deposits (B2) Recent Iron Reduction in Tilled Soils (C6) Crayfish Burrows (C8) Drift Deposits (B3) Thin Muck Surface (C7) Saturation Visible on Aerial Imagery (C9) Algal Mat or Crust (B4) Other (Explain in Remarks) Stunted or Stressed Plants (D1) Iron Deposits (B5) Geomorphic Position (D2) Inundation Visible on Aerial Imagery (B7) Shallow Aquitard (D3) Water-Stained Leaves (B9) Microtopographic Relief (D4) Aquatic Fauna (B13) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes No Depth (inches): (includes capillary fringe) Wetland Hydrology Present? Yes No Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Five Strata) – Use scientific names of plants. Sampling Point: Absolute Dominant Indicator Tree Stratum (Plot size: ) % Cover Species? Status 1. 2. 3. 4. 5. 6. 7. = Total Cover Sapling Stratum (Plot size: ) 1. 2. 3. 4. 5. 6. 7. = Total Cover Shrub Stratum (Plot size: ) 1. 2. 3. 4. 5. 6. 7. = Total Cover Herb Stratum (Plot size: ) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. = Total Cover Woody Vine Stratum (Plot size: ) 1. 2. 3. 4. 5. = Total Cover Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: (A) Total Number of Dominant Species Across All Strata: (B) Percent of Dominant Species That Are OBL, FACW, or FAC: (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: (A) (B) Prevalence Index = B/A = Hydrophytic Vegetation Indicators: 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is ≤3.01 4 - Morphological Adaptations1 (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation1 (Explain) 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Five Vegetation Strata: Tree – Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Sapling – Woody plants, excluding woody vines, approximately 20 ft (6 m) or more in height and less than 3 in. (7.6 cm) DBH. Shrub – Woody plants, excluding woody vines, approximately 3 to 20 ft (1 to 6 m) in height. Herb – All herbaceous (non-woody) plants, including herbaceous vines, regardless of size, and woody plants, except woody vines, less than approximately 3 ft (1 m) in height. Woody vine – All woody vines, regardless of height. Hydrophytic Vegetation Present? Yes No Remarks: (Include photo numbers here or on a separate sheet.) US Army Corps of Engineers Eastern Mountains and Piedmont – Version 2.0 SOIL Sampling Point: Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Type1 Loc2 Texture Remarks 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol (A1) Dark Surface (S7) 2 cm Muck (A10) (MLRA 147) Histic Epipedon (A2) Polyvalue Below Surface (S8) (MLRA 147, 148) Coast Prairie Redox (A16) Black Histic (A3) Thin Dark Surface (S9) (MLRA 147, 148) (MLRA 147, 148) Hydrogen Sulfide (A4) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) Stratified Layers (A5) Depleted Matrix (F3) (MLRA 136, 147) 2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) Very Shallow Dark Surface (TF12) Depleted Below Dark Surface (A11) Depleted Dark Surface (F7) Other (Explain in Remarks) Thick Dark Surface (A12) Redox Depressions (F8) Sandy Mucky Mineral (S1) (LRR N, Iron-Manganese Masses (F12) (LRR N, MLRA 147, 148) MLRA 136) Sandy Gleyed Matrix (S4) Umbric Surface (F13) (MLRA 136, 122) 3Indicators of hydrophytic vegetation and Sandy Redox (S5) Piedmont Floodplain Soils (F19) (MLRA 148) wetland hydrology must be present, Stripped Matrix (S6) Red Parent Material (F21) (MLRA 127, 147) unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No Remarks: US Army Corps of Engineers Eastern Mountains and Piedmont – Version 2.0 STREAM REACH EVALUATION FORM Date: 12/15/17 Evaluator: NRN/LSR Easting: -80.6138 Project: Faith Church Road: Non-Jurisdictional Swale DP2 Northing: 35.0987 Total Points: Stream is at least intermittent if > 19 or perennial if > 30* (right-click the purple number and left-click Update Field to summarize points) 14.0 A. Geomorphology Absent Weak Moderate Strong SCORE 1a. Continuity of channel bed and bank 0 1 2 3 1 2. Sinuosity of channel along thalweg 0 1 2 3 1 3. In-channel structure: riffle- / step- pool sequence 0 1 2 3 1 4. Particle size of stream substrate 0 1 2 3 1 5. Active/relic floodplain 0 1 2 3 0 6. Depositional bars or benches 0 1 2 3 0 7. Recent alluvial deposits 0 1 2 3 0 8. Headcuts 0 1 2 3 0 9. Grade controls 0 0.5 1 1.5 1 10. Natural valley 0 0.5 1 1.5 1 11. Second or greater order channel No = 0 Yes = 3 0 Geomorphology Subtotal 6.0 a Man-made ditches are not rated: see discussion in NCDWQ Manual B. Hydrology 12. Presence of Baseflow 0 1 2 3 0 13. Iron Oxidizing Bacteria 0 1 2 3 0 14. Leaf litter 1.5 1 0.5 0 0.5 15. Sediment on plants or debris 0 0.5 1 1.5 0.5 16. Organic debris lines or piles (Wrack lines) 0 0.5 1 1.5 1 17. Soil-based Evidence of high water table? No = 0 Yes = 3 0 Hydrology Subtotal 2.0 C. Biology 18. Fibrous roots in streambed 3 2 1 0 1 19. Rooted upland plants in streambed 3 2 1 0 3 20. Macrobenthos (note diversity and abundance) 0 1 2 3 0 21. Aquatic Mollusks 0 1 2 3 0 22. Fish 0 0.5 1 1.5 0 23. Crayfish 0 0.5 1 1.5 0 24. Amphibians 0 0.5 1 1.5 0 25. Algae 0 0.5 1 1.5 0 26. Wetland plants in streambed FACW= 0.75, OBL= 1.5, Other= 0 0 Biology Subtotal 4.0 * perennial streams may also be identified using other methods. See page 35 of NCDWQ manual. Notes: Adapted from NCDWQ: Methodology for Identification of Intermittent and Perennial Streams and their Origins. (version 4.11) Nicholas Nelson - Environmental Scientist