Loading...
HomeMy WebLinkAbout20180411 Ver 1_401 Application_20180318DWR Division of WaaerResources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https:lledoes.deq. ne.govlWaterResources101edocl624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located: Brunswick Is this project a public transportation project?*(?) r Yes r No 1a. Type(s) of approval sought from the Corps:* Pr Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Number Other: List all MN nunbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply r 401 Water Quality Certification - Regular rJ 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization ............................................................................................................... * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: b Yes r No O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program 0 Yes P No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach document Stone Farm Credit Ltr.pdf 226.72KB RLETYFE "T BE FDF 1f. Is the project located in any of NC's twenty coastal counties? C Yes r No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* f Yes G No r Unknown 1h. Is the project located in a designated trout watershed?* r Yes r No Link to trout information: http://www.saw.usace.army.miI/Missions/Regulatory-Permit-ProgranitAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Curtis Dukes 1b. Primary Contact Email:* curtisdukes@icloud.com 1c. Primary Contact Phone:* (xxx)xxx-xxxx (828)217-2084 1d. Who is applying for the permit? rJ Owner r- Applicant (other than owner) rJ Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Blue Fox Development, LLC 2b. Deed book and page no.: 04002 0027 2c. Responsible party: (for Corporations) Curtis Dukes 2d. Address Street Address 1006 6th Avenue South Address Line 2 Suite 2 City North Myrtle Beach Fbstal / Zip Code 29582 2e. Telephone Number: (843)241-2084 2f. Fax Number: State / Province / Region South Carolina Country USA 2g. Email Address:* curtisdukes@icloud.com 4. Agent/Consultant (if applicable) 4a. Name: Joseph C. Floyd 4b. Business Name: (if applicable) The Brigman Company 4c. Address Street Address 607 Main Street Address Line 2 P.O. Box 1532 City State / Province/ Region Conway South Carolina Postal / Zip Code Country 29528 Horry 4d. Telephone Number: (843)602-0192 4e. Fax Number: (xxx)xxx-xxxx Email Address:* jfloyd@thebrigmancompany.com Agent Authorization Letter* Rease provide the Agent Authorization Letter if you are subrritting this docunent. Wetland Agent Authorization Ltr. Blue Fox.pdf 202.57KB RLETYFE MHr BE RDF C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Landmark at Lighthouse Cove 1b. Subdivision name: (if appropriate) Lighthouse Cove 1c. Nearest municipality / town: * Carolina Shores 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Lighthouse Cove subdivision is located on the west side of Thomasboro Road approximately 2 miles south of its intersection with US Hwy 17. It has a well marked entrance sign. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 241-00-00-602 2b. Property size: (in acres) 25.76 2c. Project Address Street Address Thomasboro Road Address Line 2 cay Carolina Shores Rbstal / Zip Code 28467 2d. Site coordinates in decimal degrees State / Province/ Region North Carolina Country Brunswick Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 33.911375 -78.564042 ex: 34.208504 -77.796371 I Surface Waters 3a. Name of the nearest body of water to proposed project:* Shingletree Swamp 3b. Water Resources Classification of nearest receiving water:* C; Sw Surface Water Lookup 3c. What river basin(s) is your project located in?* Lumber River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Undeveloped forested parcel that is surrounded on three sides by existing single family residences in developed subdivisions. The fourth side is bounded by forested, undeveloped property. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docunent Landmark at Lighthouse Cove USGS.pdf 501.05KB File type rust be pdt 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach document Landmark at Lighthouse Cove Soil Map.pdf 722.59KB File type rrust be pdr 4d. List the total estimated acreage of all existing wetlands on the property: 0.26 4e. List the total estimated linear feet of all existing streams on the property: (intermttent and perennial) n/a 4f. Explain the purpose of the proposed project:* The project purpose is to expand the existing Lighthouse Cove subdivision into its second and final phase of development. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* The timber on site will be harvested with current, standard logging equipment followed by infrastructure construction, such as roads, utilities and housing material. Each of these operations will use the standard, heavy equipment typically used in subdivision development. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent Landmark at Lighthouse Cove Permit Drawings.pdf 1.17MB File type crust be pdr 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: Landowner is submitting a JD request with this application. See Misc. tab. 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Unknown r N/A Corps AID Number: Example: SAW -2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Joseph C. Floyd The Brigman Company 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5dl. Jurisdictional determination upload Click the upload button or drag and drop files here to attach document File type must be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project?* r Yes r No 7b. If yes, explain. This will be the second and final phase of the Lighthouse Cove Subdivision. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): V Wetlands F- Open Waters r— Streams -tributaries F- Pond Construction r— Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland * 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Residential Construction P Ivhp label (e.g. Fbad Crossing 1 - Calvert, Ferrrenent (F) or dewatering, etc) Temporary (T) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.260 2g. Total Wetland Impact 0.260 2h. Comments: Non-Riverine Swamp PFO1C Yes Both 0.260 Forest (404, 10) or D,NR(401, (acres) other) E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The proposed layout of Phase II continues with the pre -approved layout constructed in Phase I. This layout accommodates an existing sewer lift station as well as space for on-site storm water retention ponds. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Due to the layout of the existing Phase I infrastructure and the required new infrastructure (including storm water management ponds) avoiding the wetland was not economically feasible. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): W DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? W Mitigation bank r Payment to in -lieu fee program r Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Stone Farm Mitigation Bank 3b. Credits Purchased/ Requested (attach receipt and letter) Type: Quantity: Non -riparian wetland 0.5 Attach Receipt and/or letter dick the upload button or drag and drop files hereto attach docurrent HLE TYPE MJST BE FDF 3c. Comments 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. r Yes r No F. Stormwater Management and Diffuse Flow Plan (required by DWR) ......... ......... ......... ......... ........... ......... ......... ................... *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state - approved local government stormwater program?* r Yes t: No Fant: projects that have vested rights, exerrptions, or grandfathering from state or locally implerrented storrrwater programs or projects that satisfy state or locally -implemented stormwater programs through use of cormunity in -lieu programs should answer no to this question. 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters. * r Stormwater Management Plan r Antidegradation Calculations 3b. Stormwater Management Plan: If submitting a SMP for review and approval, it shall comply with the high-density development requirements set forth in 15A NCAC 02H .1003. Include all appropriate stormwater control measure supplemental forms and associated items. gick the upload button or drag and drop files here to attach docurrent Stormwater Statement.pdf 185.9KB HLE IYFE M -ST BE FDF 3c. Antidegradation Calculations: If submitting calculations to document the project will not cause degradation of downstream surface waters, the documentation shall include a detailed analysis of the hydrological impacts from stormwater runoff when considering the volume and velocity of stormwater runoff from the project built upon area and the size and existing condition of the receiving waterbody(ies). gick the upload button or drag and drop files here to attach docurrent RLE TYPE NMT BE FDF G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 2b. Is this an after -the -fact permit application?* r Yes F No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes R No 3b. If you answered "no," provide a short narrative description. This project is the second and final phase of an existing subdivision, which is currently surrounded on three sides by existing, developed subdivisions. The developer will use all required storm water management techniques to protect downstream waters. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? G Yes r Nor N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Sewerage disposal will be provided by Brunswick County Water and Sewer. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes F No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes G No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? F Yes r No 5g. Does this project involve bridge maintenance or removal?* r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?** r Yes G No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* r Yes G No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* US Fish & Wildlife Service/Brunswick County Endangered Species List website: https://wwvv.fws.gov/raleigh/species/cntylist/brunsWck.html 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes F No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* n/a 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* North Carolina Historic Preservation Office Historic Properties Map website: http://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docunent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA Flood Map Service Center Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent Landmark at Lighthouse Wetland Map.pdf 1.24MB Landmark at Lighthouse JD Request.pdf 10.53MB File rrst be FDF or aE Signature m By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Joseph Cary Floyd Signature Initial Review Is this project a public transportation project?*(? C Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process? r Yes No BIMS # Assigned* 20180411 Version#* 1 Reviewing Office* Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Chad Coburn:eads\cccoburn Is a payment required for this project?* r No payment required r Fee received G Fee needed - send electronic notification What amout is owed? F $240.00 * $570.00