Loading...
HomeMy WebLinkAboutWQ0000020_GW Monitoring Sampling and Analysis Results_20160601F& DUKE ENERGY ® Garry A. lMa Plant General Manager PROGRESS Asheville Steam Electric Plant Certified Mail: 7012 2210 00019784 4336 Duke Energy Progress ASVL PLT 200 CP&L Dr Arden, NC28704 File Pt.: 12520-Q o: 828-687-5201 May 23, 2016 f 828-687-5204 garty.whisnant@duke-energy.com NCDEQ Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, NC 27699-1617 jr, RE: Duke Energy Progress, LLC. Asheville Steam Electric Plant �GCiE��C. 216 April 2016 Groundwater Monitoring Sampling and Analysis Results Airport ills v A . 1 �e Dear Sir or Madam: No Tge t g Pe Attached are the results from the most recent semi-annual groundwater monitoring sampling event conducted in April 2016 for the wells near the Area I, III and IV structural fills at the Asheville Regional Airport. The results from these sampling events are included on the GW59CCR forms per permit WQ0000020, dated September 2, 2015. As these structural fill sampling events are not part of an NPDES permit, these forms were slightly modified and are not signed. Area I groundwater monitoring wells and surface water samples were collected on April 11, 2016. Area III groundwater monitoring wells were sampled on April 13, 2016 and Area IV groundwater monitoring wells were sampled on April 12, 2016. Arsenic was detected in the field blank for Area I, aluminum was detected in the field blank for Area III and arsenic and aluminum were detected in the field blank for Area IV. Therefore, the data with concentrations less than 10 times the field blank concentration are qualified with a 'B' flag on Form GW-59CCR. Per our letter to Mr. Brett Laverty, NC DENR, dated March 2, 2105, DEP contacted the MSD Industrial Waste Section and asked that they contact Mr. Laverty such that Mr. Laverty could retrieve information directly from MSD regarding leachate quantity and quality for Area III and Area IV leachate discharges. If this arrangement has proved unsuitable, please let Ms. Teresa Williams know at 828-687-5240. Sincerely, L�rfti� f� Ca4WLt' S�crk,i Garry A. Whisnant Asheville Plant Manager Attachments cc: Mr. G. Landon Davidson NCDEQ/Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778 Certified Mail: 7012 2210 0001 9784 4343 www.duke-energy.com