HomeMy WebLinkAboutCourtyards at Emerald Lakes - Complete Stormwater Report 02-22-2018 1.0 INTRODUCTION The Project is a proposed 35.3 acre single family residential subdivision with 93 lots, associated roadways and one clubhouse and pool. The site is undeveloped and is largely wooded. The site has a few defined drainage draws all conveying stormwater to the existing un-named stream along the southern property line and Lawyers Road. The site generally slopes 2% to 5% towards the un- named stream. The proposed development will be divided into two distinct watersheds. The majority of the watershed will be collected by storm sewers and conveyed to a wet pond BMP located at the northeast portion of the site. The southern portion of Avalon Place roadway and lot areas will have the stormwater runoff collected by storm sewers and conveyed to a wet pond BMP. There is 7.65 acres of off-site drainage area to the west that drains toward the southwest corner of the property and to the un-named stream. Currently, only a portion of this offsite drainage area flows across the project property. The post development grading will install a drainage swale along the west property line to effectively direct the stormwater to the un-named stream without entering the project site. Therefore, this offsite drainage area is shown on our drainage mapping, but not included in the stormwater calculations. The 0.32 acre offsite drainage area along the west property line will be collected and conveyed to the wet pond BMP. The offsite area drainage will be included in the stormwater calculations. The existing 0.36 acre and 0.63 acre drainage area to the northwest current drain from the project site to the adjacent properties. These areas will be reduced in areas that drain offsite and will remain largely undeveloped. The reduced areas will be included in the developed areas draining to the wet pond BMP; while the smaller, undeveloped areas will continue to drain offsite as they have and will have reduced stormwater runoff peak flows from the reduced areas. The 0.73 acre offsite drainage area located near the northeast portion of the site currently drains onto the project site and will continue to drain into the project and will be collected by storm sewers and conveyed to the wet pond. No change in to the existing charactoristics of the 0.73 acre area is proposed. The two on-site watersheds will have portions of the drainage areas that will be collected and conveyed to the proposed stormwater BMPs and will have portions of the drainage areas that will be left undeveloped and continue to direct discharge to the un-named stream. Each of the proposed watersheds area analyzed separately and provides water quality for the developed portions of the site and provides for a balanced overall stormwater control for the combined controlled and directly discharged portions of the developed project. See the Pre and Post Tributary Area Maps for reference. 2.0 EXISTING HYDROLOGY The existing conditions hydrology exhibited on the Pre-Development Tributary Plan within the construction plan set. The majority of the site is wooded in good hydrologic condition and is predominantly Secrest – Cid Complex (ScA), Type C soils. Smaller portions of the project site have Badin Channery Silt Loam, 2 to 8% slopes, Type B and Tarrus Gravelly Silt Loam, 2 to 8% slopes, Type B soils. Type C soils was used for calculations to be conservative. The time of concentration was calculated for each watershed and a minimum 7.5 minutes was used for the calculations, see the HydroCAD output in Appendix B. Rainfall Depths Storm Event Rainfall Depth Rainfall Distribution WQ 1.00 6-hr Type II 1-yr CPv 2.58 24-hr Type II 2 - year 2.28 6-hr Type II 10-year 3.72 6-hr Type II 25-year 4.38 6-hr Type II 50-year 4.92 6-hr Type II 3.0 PROPOSED CONDITIONS The proposed site consists of single family, 1/4 acre lots, an amenity area, associated roadways and the two stormwater BMP structures. The rooftops, driveways, parking lots and onsite lawn areas drain to storm inlets and yard catch basins that collects and conveys the runoff to the stormwater management structures. The on-site stormwater runoff is routed through the BMP basins structures to provide the required water quality BMP as well as Channel Protection Volume (CPv) control. The less frequent storm event runoff flows are routed through the BMP structures without topping the structures. BMP water quality calculations are included in Appendix A. The stormwater routing output from the HydroCAD models are included in Appendix B. Some key elements of the calculations are as follows: 1. The Channel Protection Volume (CPv) and peak release rates and elevations are calculated for the pre-development and post development 1 yr, 24 hr Type II storm events. The storm event volume difference is the CPv volume. The CPv and WQv volumes are added together to determine the control volume and peak elevation in the BMPs to provide the appropriate WQv and CPv control. 2. The 2 through 50 year, 6 hr Type II storm occurrence stormwater runoff release rates are routed through the Wet Pond basins without topping the basins. 3. Actual percent of pervious and impervious areas were calculated for each RG watershed. 4. The travel paths for the stormwater runoff were also calculated; the minimum Time of Concentration (Tc) was 7.5 minutes for all subareas. 4.0 WEST WET BASIN DESIGN The northern 4.19 acres of proposed development stormwater runoff is collected by storm sewers and conveyed to a wet basin system to the west. See Appendix A for Wet Pond calculations. The Wet Basin will provide the Channel Protection Volume (CPv) as well as control the peak release reates for the 2 year through 50 year storm event stormwater runoff to those of the pre- development peak release rates. The CPv for this area is calculated as the difference of the post development 1 year event hydrograph runoff volume and the pre-development 1 year event hydrograph volume. The CPv is to be release over 48 hours. CPv = Post Vol (19,921cf) – Pre Vol (15,045cf) = 4876 cf. The CPv added to the WQv of 7,595cf = 12,471cf of volume to control the release over 48 hours; the maximum diameter outlet orifice = 1.0 inches. The Wet Basin normal water elevation is 637.50; the top of basin elevation is 642.00. The maximum storage volume available is 67,620 cf. The basin will route the WQv, CPv and the 2 year through 50 year storm event runoffs without topping the basin crest. The outlet control is a two (2) stage structure. The primary control is provided by one (1) 1.00 inch orifice with invert set at 637.50 feet. The volume provided for the water quality/ CPv is from the wet pond normal pool elevation (637.50) to the crest of the secondary outlet control. The secondary outlet control is provided by one 24.0 inch wide by 9.0 inch high slot weirs with crests set at 638.55 located on the face of the concrete control structure box. A 10 feet long emergency weir is included along the top of the detention basin; the crest of the emergency weir is set at 641.50. The top of the wet pond is 642.00. West Wet Pond Water Quality & CPv Summary Table Event Peak Inflow (cfs) Peak Discharge (cfs) Peak HWL (ft) Peak Storage (cu-ft) WQ (HydoCAD) 1.51 0.02 638.27 7,679 CPv 0.33 638.68 12,485 West Wet Pond Routing Calculation Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 9.13 0.35 638.69 12,561 2 9.17 0.49 638.72 12,989 10 17.61 4.16 639.29 20,214 25 24.38 5.88 639.60 24,588 50 28.40 6.95 639.85 28,538 West Watershed Combined Hydrograph Summary Table Combined Summary Table Event Pre-Dev Peak Flow (cfs) Post-Dev Inflow (cfs) 1 4.16 1.39 2 3.65 1.36 10 13.20 8.05 25 20.04 12.47 50 25.19 15.67 5.0 EAST WET BASIN DESIGN The eastern 22.5 acres of proposed development stormwater runoff is collected by storm sewers and conveyed to a wet basin system located at the project eastern entry. The basin is comprised of two basins connected by a culvert that equalizes the basin stormwater peak elevations. The two compartment volumes are added together for routing calculations. See Appendix A for Wet Pond calculations. CPv = Post Vol (85,019cf) – Pre Vol (33,802cf) = 51,217cf. The CPv added to the WQv of 31,472 cf = 82,689 cf of volume. The WQv of 31,472 cf with a head of 1.36 feet is controlled to release over 48 hours; the maximum diameter outlet orifice = 2.00 inches. The Wet Basin normal water elevation is 634.50; the top of basin elevation is 640.00. The maximum storage volume available is 161,487 cf. The basin will route the WQv, CPv and the 2 year through 50 year storm event runoffs without topping the basin crest. The outlet control is a two (2) stage structure. The primary control is provided by one (1) 2.00 inch orifice with invert set at 634.50 feet. The volume provided for the water quality/ CPv is from the wet pond normal pool elevation (634.50) to the crest of the secondary outlet control. The secondary outlet control is provided by four (4) 24.0 inch wide by 9.0 inch high slot weirs with crests set at 637.68 located on the face of the concrete control structure box. A 10 feet long emergency weir is included along the top of the detention basin; the crest of the emergency weir is set at 639.50. The top of the wet pond is 640.00. Wet Pond Water Quality & CPv Summary Table Event Peak Inflow (cfs) Peak Discharge (cfs) Peak HWL (ft) Peak Storage (cu-ft) WQ (HydoCAD) 2.61 0.12 635.86 31,684 CPv 0.15 637.68 82,713 Wet Pond Routing Calculation Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 10.65 0.15 636.60 51,298 2 10.83 0.14 636.28 42,789 10 28.80 4.12 637.97 91,570 25 39.33 10.81 638.23 100,109 50 47.57 17.88 638.46 107,568 East Watershed Combined Hydrograph Summary Table Combined Summary Table Event Pre-Dev Peak Flow (cfs) Post-Dev Inflow (cfs) 1 4.64 2.45 2 4.93 1.97 10 17.82 6.89 25 25.54 10.79 50 32.21 13.52 APPENDIX A: Wet Pond Calculations Courtyards of Emerald Lake 9/26/2014 Stormwater Management Calculations East Wet Pond Design Notes Predeveloped Calculations Wet Basin Untreated Discharge Total Area (ac)18.85 0 18.85 acres total Existing Woods HSG C (RCN=70)18.85 Existing Pond HSG B (RCN=98)0.00 0.00 Open Grass / Weeds HSG B (RCN=61)0.00 Open Space Type C (RCN=74)0.00 Existing Impervious Area 0.00 0.00 acres of impervious area ex condition Composite RCN 70 70 RCN based on existing conditions Tc (min)57 0 1-year Peak (cfs)3.90 0.00 10-year Peak (cfs)14.96 0 Post Developed Subareas Subarea Wet Basin Untreated Discharge Area (ac)18.85 0.00 18.85 acres total % Imp 46%100% RCN 78 98 Tc 39.1 0 1-year Peak (cfs)10.65 0.00 undetained peak 10-year Peak (cfs)28.80 0.00 undetained peak Allowable Release Rate Total Area within Pre Subarea 18.85 Existing Woods Type B (RCN=55) Existing Woods Type C (RCN=70)18.85 Open Grass / Weeds HSG B (RCN=61)0 Open Space Type C (RCN=74)0 Existing Impervious Area 0 Composite RCN 70 Applied Existing Impervious Area 0.00 Modified RCN 70 Tc (min)57 Total 1-year Peak (cfs)3.90 Total 10-year Peak (cfs)14.96 Pro-rated 1-year Allowable (cfs)3.90 Pro-rated 10-year Allowable (cfs)14.96 Water Quality Calculations Existing Impervious Area Treated 0.00 0.00 existing impervious area treated Impervious Area not Treated 0.00 0.00 0.00 prop imperv area not treated for WQ % Imp 46 Rv 0.460 WQv (ac-ft)0.72 18.84 ac developed WQv (cu-ft)31472 75% WQv (cu-ft)23604 WQv Provided 51748 -see Hydrocad Output Water Quality Storage Pipe Design Lowest Top of Casting (ft) Invert (ft) Size (in) Length (ft) Top of Pipe Elevation (ft) Water Quality Elevation (ft)static water quality elevation Invert StormFilter Out (ft) Overflow Weir Elevation (ft) Min. Overflow Weir Width (ft) 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Detention Pipe Design Invert/Normal Pool (ft) Size (in) Length (ft) Top of Pipe/Bank Elevation (ft) Available Storage (cu-ft) 1st Stage Outlet: 2nd Stage Outlet: Tailwater Control Orifice (in) Inlet Pipe Size Outlet Pipe Size 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Wet/Dry/Sand Filter Surface Storage Design wet basin Top Sand/Normal Pool (ft)634.50 Top of Bank (ft)640.00 1st Stage Outlet:2.0" orifice @ 634.50 2nd Stage Outlet:(4) 24" wide weirs @ 637.68 3rd Stage Outlet:10' wide Trap weir @ 639.50 Tailwater Control Orifice (in)15" storm @ 632.00 Emergency Spillway Elevation (ft)639.50 Emergency Spillway Width (ft)10.00 1-year Peak Elevation (ft)636.6 10-year Peak Elevation (ft)637.97 50-year Peak Elevation (ft)638.46 Results 1-year Peak Release (cfs)na 0.00 1-year Allowable (cfs)na 0.00 10-year Peak Release (cfs)na 0 10-year Allowable (cfs)na 0.00 Total Storage (cu-ft)na 0 10-year Storage Used (cu-ft)na 0 Courtyards of Emerald Lake 9/26/2014 Stormwater Management Calculations West Wet Pond Design Notes Predeveloped Calculations Wet Basin Untreated Discharge Total Area (ac)4.192 0 4.19 acres total Existing Woods HSG C (RCN=70)4.19 Existing Pond HSG B (RCN=98)0.00 0.00 Open Grass / Weeds HSG B (RCN=61)0.00 Open Space Type C (RCN=74)0.00 Existing Impervious Area 0.00 0.00 acres of impervious area ex condition Composite RCN 70 70 RCN based on existing conditions Tc (min)16.5 0 1-year Peak (cfs)4.16 0.00 10-year Peak (cfs)13.2 0 Post Developed Subareas Subarea Wet Basin Untreated Discharge Area (ac)4.19 0.00 4.19 acres total % Imp 50%100% RCN 86 98 Tc 7.5 0 1-year Peak (cfs)9.13 0.00 undetained peak 10-year Peak (cfs)17.61 0.00 undetained peak Allowable Release Rate Total Area within Pre Subarea 4.192 Existing Woods Type B (RCN=55) Existing Woods Type C (RCN=70)4.192 Open Grass / Weeds HSG B (RCN=61)0 Open Space Type C (RCN=74)0 Existing Impervious Area 0 Composite RCN 70 Applied Existing Impervious Area 0.00 Modified RCN 70 Tc (min)16.5 Total 1-year Peak (cfs)4.16 Total 10-year Peak (cfs)13.20 Pro-rated 1-year Allowable (cfs)4.16 Pro-rated 10-year Allowable (cfs)13.20 Water Quality Calculations Existing Impervious Area Treated 0.00 0.00 existing impervious area treated Impervious Area not Treated 0.00 0.00 0.00 prop imperv area not treated for WQ % Imp 50 Rv 0.499 WQv (ac-ft)0.17 WQv (cu-ft)7595 75% WQv (cu-ft)5696 WQv Provided 51748 -see Hydrocad Output Water Quality Storage Pipe Design Lowest Top of Casting (ft) Invert (ft) Size (in) Length (ft) Top of Pipe Elevation (ft) Water Quality Elevation (ft)static water quality elevation Invert StormFilter Out (ft) Overflow Weir Elevation (ft) Min. Overflow Weir Width (ft) 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Detention Pipe Design Invert/Normal Pool (ft) Size (in) Length (ft) Top of Pipe/Bank Elevation (ft) Available Storage (cu-ft) 1st Stage Outlet: 2nd Stage Outlet: Tailwater Control Orifice (in) Inlet Pipe Size Outlet Pipe Size 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Wet/Dry/Sand Filter Surface Storage Design wet basin Top Sand/Normal Pool (ft)637.50 Top of Bank (ft)642.00 1st Stage Outlet:1.0" orifice @ 637.50 2nd Stage Outlet:24" wide weirs @ 638.55 3rd Stage Outlet:10' wide Trap weir @ 641.50 Tailwater Control Orifice (in)24" storm @ 636.70 Emergency Spillway Elevation (ft)641.50 Emergency Spillway Width (ft)10.00 1-year Peak Elevation (ft)638.69 10-year Peak Elevation (ft)639.29 50-year Peak Elevation (ft)639.85 Results 1-year Peak Release (cfs)na 0.00 1-year Allowable (cfs)na 0.00 10-year Peak Release (cfs)na 0 10-year Allowable (cfs)na 0.00 Total Storage (cu-ft)na 0 10-year Storage Used (cu-ft)na 0 APPENDIX B: HydroCAD Output 3S West Post E1 Pre. East WS E1-A Pre. East WS to BMP E2 East Post E3 East Onsite Bypass W1 Pre. West WS W1-A Pre. West WS W3 West Onsite Bypass 1P West Basin 5P Prop Retention Pond East 1L (new Link) 6L East Post Comb Routing Diagram for 20131483-RG1-Det-comb 2-20-18 Prepared by Symanetc, Printed 2/22/2018 HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 2HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 9.13 cfs @ 11.99 hrs, Volume= 19,921 cf, Depth= 1.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=4.192 ac Runoff Volume=19,921 cf Runoff Depth=1.31" Tc=7.5 min CN=86 9.13 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 3HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.02 10.00 0.47 0.01 0.06 11.00 0.61 0.04 0.19 12.00 1.71 0.64 9.07 13.00 1.99 0.84 0.55 14.00 2.12 0.94 0.33 15.00 2.20 1.00 0.26 16.00 2.27 1.06 0.21 17.00 2.33 1.10 0.18 18.00 2.38 1.14 0.16 19.00 2.42 1.18 0.14 20.00 2.46 1.21 0.12 21.00 2.49 1.23 0.11 22.00 2.52 1.26 0.11 23.00 2.55 1.29 0.10 24.00 2.58 1.31 0.10 25.00 2.58 1.31 0.00 26.00 2.58 1.31 0.00 27.00 2.58 1.31 0.00 28.00 2.58 1.31 0.00 29.00 2.58 1.31 0.00 30.00 2.58 1.31 0.00 31.00 2.58 1.31 0.00 32.00 2.58 1.31 0.00 33.00 2.58 1.31 0.00 34.00 2.58 1.31 0.00 35.00 2.58 1.31 0.00 36.00 2.58 1.31 0.00 37.00 2.58 1.31 0.00 38.00 2.58 1.31 0.00 39.00 2.58 1.31 0.00 40.00 2.58 1.31 0.00 41.00 2.58 1.31 0.00 42.00 2.58 1.31 0.00 43.00 2.58 1.31 0.00 44.00 2.58 1.31 0.00 45.00 2.58 1.31 0.00 46.00 2.58 1.31 0.00 47.00 2.58 1.31 0.00 48.00 2.58 1.31 0.00 49.00 2.58 1.31 0.00 50.00 2.58 1.31 0.00 51.00 2.58 1.31 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 1.31 0.00 53.00 2.58 1.31 0.00 54.00 2.58 1.31 0.00 55.00 2.58 1.31 0.00 56.00 2.58 1.31 0.00 57.00 2.58 1.31 0.00 58.00 2.58 1.31 0.00 59.00 2.58 1.31 0.00 60.00 2.58 1.31 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 4HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 4.64 cfs @ 12.70 hrs, Volume= 40,258 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=22.450 ac Runoff Volume=40,258 cf Runoff Depth=0.49" Flow Length=1,210' Tc=57.0 min CN=70 4.64 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 5HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 0.18 13.00 1.99 0.24 3.70 14.00 2.12 0.29 1.45 15.00 2.20 0.32 0.90 16.00 2.27 0.35 0.72 17.00 2.33 0.38 0.59 18.00 2.38 0.40 0.53 19.00 2.42 0.42 0.47 20.00 2.46 0.43 0.41 21.00 2.49 0.45 0.36 22.00 2.52 0.47 0.35 23.00 2.55 0.48 0.34 24.00 2.58 0.49 0.33 25.00 2.58 0.49 0.10 26.00 2.58 0.49 0.01 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 6HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 3.89 cfs @ 12.70 hrs, Volume= 33,802 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=18.850 ac Runoff Volume=33,802 cf Runoff Depth=0.49" Flow Length=1,210' Tc=57.0 min CN=70 3.89 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 7HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 0.16 13.00 1.99 0.24 3.11 14.00 2.12 0.29 1.22 15.00 2.20 0.32 0.76 16.00 2.27 0.35 0.60 17.00 2.33 0.38 0.50 18.00 2.38 0.40 0.44 19.00 2.42 0.42 0.40 20.00 2.46 0.43 0.35 21.00 2.49 0.45 0.30 22.00 2.52 0.47 0.29 23.00 2.55 0.48 0.28 24.00 2.58 0.49 0.27 25.00 2.58 0.49 0.08 26.00 2.58 0.49 0.01 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 8HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 10.61 cfs @ 12.39 hrs, Volume= 57,495 cf, Depth= 0.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=18.850 ac Runoff Volume=57,495 cf Runoff Depth=0.84" Flow Length=1,675' Tc=39.1 min CN=78 10.61 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 9HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.33 2.36 13.00 1.99 0.48 3.83 14.00 2.12 0.55 1.45 15.00 2.20 0.60 1.00 16.00 2.27 0.64 0.81 17.00 2.33 0.68 0.67 18.00 2.38 0.71 0.60 19.00 2.42 0.74 0.53 20.00 2.46 0.76 0.45 21.00 2.49 0.78 0.41 22.00 2.52 0.80 0.39 23.00 2.55 0.82 0.38 24.00 2.58 0.84 0.36 25.00 2.58 0.84 0.03 26.00 2.58 0.84 0.00 27.00 2.58 0.84 0.00 28.00 2.58 0.84 0.00 29.00 2.58 0.84 0.00 30.00 2.58 0.84 0.00 31.00 2.58 0.84 0.00 32.00 2.58 0.84 0.00 33.00 2.58 0.84 0.00 34.00 2.58 0.84 0.00 35.00 2.58 0.84 0.00 36.00 2.58 0.84 0.00 37.00 2.58 0.84 0.00 38.00 2.58 0.84 0.00 39.00 2.58 0.84 0.00 40.00 2.58 0.84 0.00 41.00 2.58 0.84 0.00 42.00 2.58 0.84 0.00 43.00 2.58 0.84 0.00 44.00 2.58 0.84 0.00 45.00 2.58 0.84 0.00 46.00 2.58 0.84 0.00 47.00 2.58 0.84 0.00 48.00 2.58 0.84 0.00 49.00 2.58 0.84 0.00 50.00 2.58 0.84 0.00 51.00 2.58 0.84 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.84 0.00 53.00 2.58 0.84 0.00 54.00 2.58 0.84 0.00 55.00 2.58 0.84 0.00 56.00 2.58 0.84 0.00 57.00 2.58 0.84 0.00 58.00 2.58 0.84 0.00 59.00 2.58 0.84 0.00 60.00 2.58 0.84 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 10HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 2.40 cfs @ 12.01 hrs, Volume= 5,900 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=3.290 ac Runoff Volume=5,900 cf Runoff Depth=0.49" Tc=7.5 min CN=70 2.40 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 11HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 2.39 13.00 1.99 0.24 0.21 14.00 2.12 0.29 0.13 15.00 2.20 0.32 0.11 16.00 2.27 0.35 0.09 17.00 2.33 0.38 0.08 18.00 2.38 0.40 0.07 19.00 2.42 0.42 0.06 20.00 2.46 0.43 0.05 21.00 2.49 0.45 0.05 22.00 2.52 0.47 0.05 23.00 2.55 0.48 0.05 24.00 2.58 0.49 0.05 25.00 2.58 0.49 0.00 26.00 2.58 0.49 0.00 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 12HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 4.16 cfs @ 12.12 hrs, Volume= 15,045 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=8.390 ac Runoff Volume=15,045 cf Runoff Depth=0.49" Flow Length=918' Tc=16.5 min CN=70 4.16 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 13HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 2.33 13.00 1.99 0.24 0.60 14.00 2.12 0.29 0.36 15.00 2.20 0.32 0.29 16.00 2.27 0.35 0.23 17.00 2.33 0.38 0.20 18.00 2.38 0.40 0.18 19.00 2.42 0.42 0.16 20.00 2.46 0.43 0.14 21.00 2.49 0.45 0.13 22.00 2.52 0.47 0.13 23.00 2.55 0.48 0.12 24.00 2.58 0.49 0.12 25.00 2.58 0.49 0.00 26.00 2.58 0.49 0.00 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 14HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 2.08 cfs @ 12.12 hrs, Volume= 7,514 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=4.190 ac Runoff Volume=7,514 cf Runoff Depth=0.49" Flow Length=918' Tc=16.5 min CN=70 2.08 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 15HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 1.16 13.00 1.99 0.24 0.30 14.00 2.12 0.29 0.18 15.00 2.20 0.32 0.14 16.00 2.27 0.35 0.12 17.00 2.33 0.38 0.10 18.00 2.38 0.40 0.09 19.00 2.42 0.42 0.08 20.00 2.46 0.43 0.07 21.00 2.49 0.45 0.07 22.00 2.52 0.47 0.06 23.00 2.55 0.48 0.06 24.00 2.58 0.49 0.06 25.00 2.58 0.49 0.00 26.00 2.58 0.49 0.00 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 16HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 1.33 cfs @ 12.32 hrs, Volume= 7,532 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 1 yr Rainfall=2.58" Runoff Area=4.200 ac Runoff Volume=7,532 cf Runoff Depth=0.49" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 1.33 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 17HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.09 0.00 0.00 4.00 0.12 0.00 0.00 5.00 0.16 0.00 0.00 6.00 0.21 0.00 0.00 7.00 0.26 0.00 0.00 8.00 0.31 0.00 0.00 9.00 0.38 0.00 0.00 10.00 0.47 0.00 0.00 11.00 0.61 0.00 0.00 12.00 1.71 0.14 0.22 13.00 1.99 0.24 0.42 14.00 2.12 0.29 0.20 15.00 2.20 0.32 0.15 16.00 2.27 0.35 0.12 17.00 2.33 0.38 0.10 18.00 2.38 0.40 0.09 19.00 2.42 0.42 0.08 20.00 2.46 0.43 0.07 21.00 2.49 0.45 0.07 22.00 2.52 0.47 0.06 23.00 2.55 0.48 0.06 24.00 2.58 0.49 0.06 25.00 2.58 0.49 0.00 26.00 2.58 0.49 0.00 27.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 29.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 31.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 33.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 35.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 37.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 39.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 41.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 43.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 45.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 47.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 49.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 51.00 2.58 0.49 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.58 0.49 0.00 53.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 55.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 57.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 59.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 18HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 1.31" for 1 yr event Inflow = 9.13 cfs @ 11.99 hrs, Volume= 19,921 cf Outflow = 0.35 cfs @ 13.86 hrs, Volume= 11,878 cf, Atten= 96%, Lag= 111.9 min Primary = 0.35 cfs @ 13.86 hrs, Volume= 11,878 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.69' @ 13.86 hrs Surf.Area= 11,987 sf Storage= 12,561 cf Plug-Flow detention time= 719.8 min calculated for 11,878 cf (60% of inflow) Center-of-Mass det. time= 604.1 min ( 1,434.6 - 830.5 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.35 cfs @ 13.86 hrs HW=638.69' (Free Discharge) 1=Culvert (Passes 0.35 cfs of 12.20 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.15 fps) 3=Orifice/Grate (Orifice Controls 0.32 cfs @ 1.19 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 19HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=182,604 sf Peak Elev=638.69' Storage=12,561 cf 9.13 cfs 0.35 cfs 0.35 cfs 0.00 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 20HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 0.00 0 637.50 0.00 0.00 0.00 5.00 0.00 0 637.50 0.00 0.00 0.00 7.50 0.00 0 637.50 0.00 0.00 0.00 10.00 0.06 144 637.52 0.00 0.00 0.00 12.50 0.91 11,295 638.58 0.06 0.06 0.00 15.00 0.26 12,411 638.67 0.31 0.31 0.00 17.50 0.17 12,000 638.64 0.20 0.20 0.00 20.00 0.12 11,755 638.62 0.15 0.15 0.00 22.50 0.11 11,596 638.61 0.12 0.12 0.00 25.00 0.00 11,288 638.58 0.06 0.06 0.00 27.50 0.00 10,927 638.55 0.03 0.03 0.00 30.00 0.00 10,691 638.53 0.03 0.03 0.00 32.50 0.00 10,458 638.51 0.03 0.03 0.00 35.00 0.00 10,226 638.49 0.03 0.03 0.00 37.50 0.00 9,997 638.47 0.03 0.03 0.00 40.00 0.00 9,771 638.45 0.03 0.03 0.00 42.50 0.00 9,547 638.43 0.02 0.02 0.00 45.00 0.00 9,325 638.41 0.02 0.02 0.00 47.50 0.00 9,106 638.39 0.02 0.02 0.00 50.00 0.00 8,889 638.37 0.02 0.02 0.00 52.50 0.00 8,674 638.36 0.02 0.02 0.00 55.00 0.00 8,462 638.34 0.02 0.02 0.00 57.50 0.00 8,252 638.32 0.02 0.02 0.00 60.00 0.00 8,045 638.30 0.02 0.02 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 21HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.84" for 1 yr event Inflow = 10.61 cfs @ 12.39 hrs, Volume= 57,495 cf Outflow = 0.15 cfs @ 24.61 hrs, Volume= 23,431 cf, Atten= 99%, Lag= 733.4 min Primary = 0.15 cfs @ 24.61 hrs, Volume= 23,431 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 636.60' @ 24.61 hrs Surf.Area= 27,558 sf Storage= 51,296 cf Plug-Flow detention time= 1,404.3 min calculated for 23,431 cf (41% of inflow) Center-of-Mass det. time= 1,258.6 min ( 2,147.7 - 889.1 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.15 cfs @ 24.61 hrs HW=636.60' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.15 cfs @ 6.84 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 22HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=821,106 sf Peak Elev=636.60' Storage=51,296 cf 10.61 cfs 0.15 cfs 0.15 cfs 0.00 cfs 0.00 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 23HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.00 0 634.50 0.00 0.00 0.00 0.00 5.00 0.00 0 634.50 0.00 0.00 0.00 0.00 7.50 0.00 0 634.50 0.00 0.00 0.00 0.00 10.00 0.00 0 634.50 0.00 0.00 0.00 0.00 12.50 9.80 15,309 635.20 0.08 0.08 0.00 0.00 15.00 1.00 37,958 636.10 0.13 0.13 0.00 0.00 17.50 0.63 43,777 636.32 0.14 0.14 0.00 0.00 20.00 0.45 47,403 636.46 0.14 0.14 0.00 0.00 22.50 0.38 49,752 636.54 0.15 0.15 0.00 0.00 25.00 0.03 51,196 636.59 0.15 0.15 0.00 0.00 27.50 0.00 49,893 636.55 0.15 0.15 0.00 0.00 30.00 0.00 48,576 636.50 0.15 0.15 0.00 0.00 32.50 0.00 47,276 636.45 0.14 0.14 0.00 0.00 35.00 0.00 45,992 636.40 0.14 0.14 0.00 0.00 37.50 0.00 44,725 636.36 0.14 0.14 0.00 0.00 40.00 0.00 43,474 636.31 0.14 0.14 0.00 0.00 42.50 0.00 42,240 636.26 0.14 0.14 0.00 0.00 45.00 0.00 41,022 636.22 0.13 0.13 0.00 0.00 47.50 0.00 39,822 636.17 0.13 0.13 0.00 0.00 50.00 0.00 38,638 636.13 0.13 0.13 0.00 0.00 52.50 0.00 37,472 636.08 0.13 0.13 0.00 0.00 55.00 0.00 36,322 636.04 0.13 0.13 0.00 0.00 57.50 0.00 35,190 636.00 0.12 0.12 0.00 0.00 60.00 0.00 34,075 635.95 0.12 0.12 0.00 0.00 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 24HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.64" for 1 yr event Inflow = 1.36 cfs @ 12.32 hrs, Volume= 19,409 cf Primary = 1.36 cfs @ 12.32 hrs, Volume= 19,409 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Inflow Area=365,556 sf 1.36 cfs 1.36 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 25HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 12.00 0.24 0.00 0.24 13.00 0.67 0.00 0.67 14.00 0.56 0.00 0.56 15.00 0.46 0.00 0.46 16.00 0.38 0.00 0.38 17.00 0.32 0.00 0.32 18.00 0.28 0.00 0.28 19.00 0.25 0.00 0.25 20.00 0.22 0.00 0.22 21.00 0.20 0.00 0.20 22.00 0.18 0.00 0.18 23.00 0.17 0.00 0.17 24.00 0.17 0.00 0.17 25.00 0.06 0.00 0.06 26.00 0.04 0.00 0.04 27.00 0.03 0.00 0.03 28.00 0.03 0.00 0.03 29.00 0.03 0.00 0.03 30.00 0.03 0.00 0.03 31.00 0.03 0.00 0.03 32.00 0.03 0.00 0.03 33.00 0.03 0.00 0.03 34.00 0.03 0.00 0.03 35.00 0.03 0.00 0.03 36.00 0.03 0.00 0.03 37.00 0.03 0.00 0.03 38.00 0.03 0.00 0.03 39.00 0.03 0.00 0.03 40.00 0.03 0.00 0.03 41.00 0.02 0.00 0.02 42.00 0.02 0.00 0.02 43.00 0.02 0.00 0.02 44.00 0.02 0.00 0.02 45.00 0.02 0.00 0.02 46.00 0.02 0.00 0.02 47.00 0.02 0.00 0.02 48.00 0.02 0.00 0.02 49.00 0.02 0.00 0.02 50.00 0.02 0.00 0.02 51.00 0.02 0.00 0.02 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.02 0.00 0.02 53.00 0.02 0.00 0.02 54.00 0.02 0.00 0.02 55.00 0.02 0.00 0.02 56.00 0.02 0.00 0.02 57.00 0.02 0.00 0.02 58.00 0.02 0.00 0.02 59.00 0.02 0.00 0.02 60.00 0.02 0.00 0.02 Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 26HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.36" for 1 yr event Inflow = 2.40 cfs @ 12.01 hrs, Volume= 29,331 cf Primary = 2.40 cfs @ 12.01 hrs, Volume= 29,331 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Inflow Area=964,418 sf 2.40 cfs 2.40 cfs Type II 24-hr 1 yr Rainfall=2.58"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 27HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 12.00 2.40 0.00 2.40 13.00 0.32 0.00 0.32 14.00 0.26 0.00 0.26 15.00 0.24 0.00 0.24 16.00 0.22 0.00 0.22 17.00 0.22 0.00 0.22 18.00 0.21 0.00 0.21 19.00 0.20 0.00 0.20 20.00 0.20 0.00 0.20 21.00 0.20 0.00 0.20 22.00 0.20 0.00 0.20 23.00 0.20 0.00 0.20 24.00 0.20 0.00 0.20 25.00 0.15 0.00 0.15 26.00 0.15 0.00 0.15 27.00 0.15 0.00 0.15 28.00 0.15 0.00 0.15 29.00 0.15 0.00 0.15 30.00 0.15 0.00 0.15 31.00 0.14 0.00 0.14 32.00 0.14 0.00 0.14 33.00 0.14 0.00 0.14 34.00 0.14 0.00 0.14 35.00 0.14 0.00 0.14 36.00 0.14 0.00 0.14 37.00 0.14 0.00 0.14 38.00 0.14 0.00 0.14 39.00 0.14 0.00 0.14 40.00 0.14 0.00 0.14 41.00 0.14 0.00 0.14 42.00 0.14 0.00 0.14 43.00 0.14 0.00 0.14 44.00 0.14 0.00 0.14 45.00 0.13 0.00 0.13 46.00 0.13 0.00 0.13 47.00 0.13 0.00 0.13 48.00 0.13 0.00 0.13 49.00 0.13 0.00 0.13 50.00 0.13 0.00 0.13 51.00 0.13 0.00 0.13 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.13 0.00 0.13 53.00 0.13 0.00 0.13 54.00 0.13 0.00 0.13 55.00 0.13 0.00 0.13 56.00 0.13 0.00 0.13 57.00 0.13 0.00 0.13 58.00 0.12 0.00 0.12 59.00 0.12 0.00 0.12 60.00 0.12 0.00 0.12 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 28HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 9.17 cfs @ 3.19 hrs, Volume= 16,225 cf, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=4.192 ac Runoff Volume=16,225 cf Runoff Depth=1.07" Tc=7.5 min CN=86 9.17 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 29HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.14 1.92 4.00 2.01 0.86 0.91 5.00 2.18 0.99 0.41 6.00 2.28 1.07 0.30 7.00 2.28 1.07 0.00 8.00 2.28 1.07 0.00 9.00 2.28 1.07 0.00 10.00 2.28 1.07 0.00 11.00 2.28 1.07 0.00 12.00 2.28 1.07 0.00 13.00 2.28 1.07 0.00 14.00 2.28 1.07 0.00 15.00 2.28 1.07 0.00 16.00 2.28 1.07 0.00 17.00 2.28 1.07 0.00 18.00 2.28 1.07 0.00 19.00 2.28 1.07 0.00 20.00 2.28 1.07 0.00 21.00 2.28 1.07 0.00 22.00 2.28 1.07 0.00 23.00 2.28 1.07 0.00 24.00 2.28 1.07 0.00 25.00 2.28 1.07 0.00 26.00 2.28 1.07 0.00 27.00 2.28 1.07 0.00 28.00 2.28 1.07 0.00 29.00 2.28 1.07 0.00 30.00 2.28 1.07 0.00 31.00 2.28 1.07 0.00 32.00 2.28 1.07 0.00 33.00 2.28 1.07 0.00 34.00 2.28 1.07 0.00 35.00 2.28 1.07 0.00 36.00 2.28 1.07 0.00 37.00 2.28 1.07 0.00 38.00 2.28 1.07 0.00 39.00 2.28 1.07 0.00 40.00 2.28 1.07 0.00 41.00 2.28 1.07 0.00 42.00 2.28 1.07 0.00 43.00 2.28 1.07 0.00 44.00 2.28 1.07 0.00 45.00 2.28 1.07 0.00 46.00 2.28 1.07 0.00 47.00 2.28 1.07 0.00 48.00 2.28 1.07 0.00 49.00 2.28 1.07 0.00 50.00 2.28 1.07 0.00 51.00 2.28 1.07 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 1.07 0.00 53.00 2.28 1.07 0.00 54.00 2.28 1.07 0.00 55.00 2.28 1.07 0.00 56.00 2.28 1.07 0.00 57.00 2.28 1.07 0.00 58.00 2.28 1.07 0.00 59.00 2.28 1.07 0.00 60.00 2.28 1.07 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 30HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 4.93 cfs @ 4.01 hrs, Volume= 28,901 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=22.450 ac Runoff Volume=28,901 cf Runoff Depth=0.35" Flow Length=1,210' Tc=57.0 min CN=70 4.93 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 31HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 4.92 5.00 2.18 0.31 2.19 6.00 2.28 0.35 1.17 7.00 2.28 0.35 0.30 8.00 2.28 0.35 0.02 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 32HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 4.14 cfs @ 4.01 hrs, Volume= 24,267 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=18.850 ac Runoff Volume=24,267 cf Runoff Depth=0.35" Flow Length=1,210' Tc=57.0 min CN=70 4.14 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 33HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 4.13 5.00 2.18 0.31 1.84 6.00 2.28 0.35 0.98 7.00 2.28 0.35 0.25 8.00 2.28 0.35 0.02 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 34HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 10.82 cfs @ 3.66 hrs, Volume= 44,411 cf, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=18.850 ac Runoff Volume=44,411 cf Runoff Depth=0.65" Flow Length=1,675' Tc=39.1 min CN=78 10.82 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 35HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.03 0.03 4.00 2.01 0.49 7.16 5.00 2.18 0.59 2.10 6.00 2.28 0.65 1.21 7.00 2.28 0.65 0.10 8.00 2.28 0.65 0.00 9.00 2.28 0.65 0.00 10.00 2.28 0.65 0.00 11.00 2.28 0.65 0.00 12.00 2.28 0.65 0.00 13.00 2.28 0.65 0.00 14.00 2.28 0.65 0.00 15.00 2.28 0.65 0.00 16.00 2.28 0.65 0.00 17.00 2.28 0.65 0.00 18.00 2.28 0.65 0.00 19.00 2.28 0.65 0.00 20.00 2.28 0.65 0.00 21.00 2.28 0.65 0.00 22.00 2.28 0.65 0.00 23.00 2.28 0.65 0.00 24.00 2.28 0.65 0.00 25.00 2.28 0.65 0.00 26.00 2.28 0.65 0.00 27.00 2.28 0.65 0.00 28.00 2.28 0.65 0.00 29.00 2.28 0.65 0.00 30.00 2.28 0.65 0.00 31.00 2.28 0.65 0.00 32.00 2.28 0.65 0.00 33.00 2.28 0.65 0.00 34.00 2.28 0.65 0.00 35.00 2.28 0.65 0.00 36.00 2.28 0.65 0.00 37.00 2.28 0.65 0.00 38.00 2.28 0.65 0.00 39.00 2.28 0.65 0.00 40.00 2.28 0.65 0.00 41.00 2.28 0.65 0.00 42.00 2.28 0.65 0.00 43.00 2.28 0.65 0.00 44.00 2.28 0.65 0.00 45.00 2.28 0.65 0.00 46.00 2.28 0.65 0.00 47.00 2.28 0.65 0.00 48.00 2.28 0.65 0.00 49.00 2.28 0.65 0.00 50.00 2.28 0.65 0.00 51.00 2.28 0.65 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.65 0.00 53.00 2.28 0.65 0.00 54.00 2.28 0.65 0.00 55.00 2.28 0.65 0.00 56.00 2.28 0.65 0.00 57.00 2.28 0.65 0.00 58.00 2.28 0.65 0.00 59.00 2.28 0.65 0.00 60.00 2.28 0.65 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 36HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 1.91 cfs @ 3.23 hrs, Volume= 4,235 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=3.290 ac Runoff Volume=4,235 cf Runoff Depth=0.35" Tc=7.5 min CN=70 1.91 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 37HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 0.35 5.00 2.18 0.31 0.17 6.00 2.28 0.35 0.13 7.00 2.28 0.35 0.00 8.00 2.28 0.35 0.00 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 38HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 3.65 cfs @ 3.37 hrs, Volume= 10,801 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=8.390 ac Runoff Volume=10,801 cf Runoff Depth=0.35" Flow Length=918' Tc=16.5 min CN=70 3.65 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 39HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 1.05 5.00 2.18 0.31 0.47 6.00 2.28 0.35 0.35 7.00 2.28 0.35 0.00 8.00 2.28 0.35 0.00 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 40HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 1.82 cfs @ 3.37 hrs, Volume= 5,394 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=4.190 ac Runoff Volume=5,394 cf Runoff Depth=0.35" Flow Length=918' Tc=16.5 min CN=70 1.82 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 41HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 0.52 5.00 2.18 0.31 0.24 6.00 2.28 0.35 0.17 7.00 2.28 0.35 0.00 8.00 2.28 0.35 0.00 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 42HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 1.31 cfs @ 3.61 hrs, Volume= 5,407 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Charlotte 6-hr 2-yr Rainfall=2.28" Runoff Area=4.200 ac Runoff Volume=5,407 cf Runoff Depth=0.35" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 1.31 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 43HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.09 0.00 0.00 2.00 0.25 0.00 0.00 3.00 0.89 0.00 0.00 4.00 2.01 0.24 0.78 5.00 2.18 0.31 0.28 6.00 2.28 0.35 0.18 7.00 2.28 0.35 0.01 8.00 2.28 0.35 0.00 9.00 2.28 0.35 0.00 10.00 2.28 0.35 0.00 11.00 2.28 0.35 0.00 12.00 2.28 0.35 0.00 13.00 2.28 0.35 0.00 14.00 2.28 0.35 0.00 15.00 2.28 0.35 0.00 16.00 2.28 0.35 0.00 17.00 2.28 0.35 0.00 18.00 2.28 0.35 0.00 19.00 2.28 0.35 0.00 20.00 2.28 0.35 0.00 21.00 2.28 0.35 0.00 22.00 2.28 0.35 0.00 23.00 2.28 0.35 0.00 24.00 2.28 0.35 0.00 25.00 2.28 0.35 0.00 26.00 2.28 0.35 0.00 27.00 2.28 0.35 0.00 28.00 2.28 0.35 0.00 29.00 2.28 0.35 0.00 30.00 2.28 0.35 0.00 31.00 2.28 0.35 0.00 32.00 2.28 0.35 0.00 33.00 2.28 0.35 0.00 34.00 2.28 0.35 0.00 35.00 2.28 0.35 0.00 36.00 2.28 0.35 0.00 37.00 2.28 0.35 0.00 38.00 2.28 0.35 0.00 39.00 2.28 0.35 0.00 40.00 2.28 0.35 0.00 41.00 2.28 0.35 0.00 42.00 2.28 0.35 0.00 43.00 2.28 0.35 0.00 44.00 2.28 0.35 0.00 45.00 2.28 0.35 0.00 46.00 2.28 0.35 0.00 47.00 2.28 0.35 0.00 48.00 2.28 0.35 0.00 49.00 2.28 0.35 0.00 50.00 2.28 0.35 0.00 51.00 2.28 0.35 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 2.28 0.35 0.00 53.00 2.28 0.35 0.00 54.00 2.28 0.35 0.00 55.00 2.28 0.35 0.00 56.00 2.28 0.35 0.00 57.00 2.28 0.35 0.00 58.00 2.28 0.35 0.00 59.00 2.28 0.35 0.00 60.00 2.28 0.35 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 44HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 1.07" for 2-yr event Inflow = 9.17 cfs @ 3.19 hrs, Volume= 16,225 cf Outflow = 0.49 cfs @ 4.71 hrs, Volume= 9,489 cf, Atten= 95%, Lag= 91.1 min Primary = 0.49 cfs @ 4.71 hrs, Volume= 9,489 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.72' @ 4.71 hrs Surf.Area= 12,032 sf Storage= 12,988 cf Plug-Flow detention time= 917.8 min calculated for 9,481 cf (58% of inflow) Center-of-Mass det. time= 892.2 min ( 1,110.4 - 218.2 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.49 cfs @ 4.71 hrs HW=638.72' (Free Discharge) 1=Culvert (Passes 0.49 cfs of 12.51 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.23 fps) 3=Orifice/Grate (Orifice Controls 0.46 cfs @ 1.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 45HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=182,604 sf Peak Elev=638.72' Storage=12,988 cf 9.17 cfs 0.49 cfs 0.49 cfs 0.00 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 46HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 0.05 11 637.50 0.00 0.00 0.00 5.00 0.41 12,952 638.72 0.47 0.47 0.00 7.50 0.00 11,590 638.60 0.12 0.12 0.00 10.00 0.00 11,036 638.56 0.04 0.04 0.00 12.50 0.00 10,785 638.54 0.03 0.03 0.00 15.00 0.00 10,551 638.52 0.03 0.03 0.00 17.50 0.00 10,318 638.50 0.03 0.03 0.00 20.00 0.00 10,088 638.48 0.03 0.03 0.00 22.50 0.00 9,861 638.46 0.03 0.03 0.00 25.00 0.00 9,636 638.44 0.02 0.02 0.00 27.50 0.00 9,413 638.42 0.02 0.02 0.00 30.00 0.00 9,193 638.40 0.02 0.02 0.00 32.50 0.00 8,975 638.38 0.02 0.02 0.00 35.00 0.00 8,760 638.36 0.02 0.02 0.00 37.50 0.00 8,546 638.35 0.02 0.02 0.00 40.00 0.00 8,336 638.33 0.02 0.02 0.00 42.50 0.00 8,128 638.31 0.02 0.02 0.00 45.00 0.00 7,922 638.29 0.02 0.02 0.00 47.50 0.00 7,718 638.27 0.02 0.02 0.00 50.00 0.00 7,517 638.26 0.02 0.02 0.00 52.50 0.00 7,319 638.24 0.02 0.02 0.00 55.00 0.00 7,123 638.22 0.02 0.02 0.00 57.50 0.00 6,929 638.20 0.02 0.02 0.00 60.00 0.00 6,738 638.19 0.02 0.02 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 47HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.65" for 2-yr event Inflow = 10.82 cfs @ 3.66 hrs, Volume= 44,411 cf Outflow = 0.14 cfs @ 6.92 hrs, Volume= 23,833 cf, Atten= 99%, Lag= 195.4 min Primary = 0.14 cfs @ 6.92 hrs, Volume= 23,833 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 636.28' @ 6.92 hrs Surf.Area= 26,708 sf Storage= 42,787 cf Plug-Flow detention time= 1,592.3 min calculated for 23,813 cf (54% of inflow) Center-of-Mass det. time= 1,558.6 min ( 1,814.1 - 255.5 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.14 cfs @ 6.92 hrs HW=636.28' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.28 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 48HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=821,106 sf Peak Elev=636.28' Storage=42,787 cf 10.82 cfs 0.14 cfs 0.14 cfs 0.00 cfs 0.00 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 49HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.00 0 634.50 0.00 0.00 0.00 0.00 5.00 2.10 35,856 636.02 0.13 0.13 0.00 0.00 7.50 0.01 42,617 636.28 0.14 0.14 0.00 0.00 10.00 0.00 41,404 636.23 0.13 0.13 0.00 0.00 12.50 0.00 40,199 636.19 0.13 0.13 0.00 0.00 15.00 0.00 39,010 636.14 0.13 0.13 0.00 0.00 17.50 0.00 37,838 636.10 0.13 0.13 0.00 0.00 20.00 0.00 36,683 636.05 0.13 0.13 0.00 0.00 22.50 0.00 35,545 636.01 0.13 0.13 0.00 0.00 25.00 0.00 34,425 635.97 0.12 0.12 0.00 0.00 27.50 0.00 33,321 635.92 0.12 0.12 0.00 0.00 30.00 0.00 32,236 635.88 0.12 0.12 0.00 0.00 32.50 0.00 31,167 635.84 0.12 0.12 0.00 0.00 35.00 0.00 30,116 635.80 0.12 0.12 0.00 0.00 37.50 0.00 29,083 635.76 0.11 0.11 0.00 0.00 40.00 0.00 28,067 635.72 0.11 0.11 0.00 0.00 42.50 0.00 27,069 635.68 0.11 0.11 0.00 0.00 45.00 0.00 26,089 635.64 0.11 0.11 0.00 0.00 47.50 0.00 25,127 635.60 0.11 0.11 0.00 0.00 50.00 0.00 24,183 635.56 0.10 0.10 0.00 0.00 52.50 0.00 23,256 635.52 0.10 0.10 0.00 0.00 55.00 0.00 22,348 635.49 0.10 0.10 0.00 0.00 57.50 0.00 21,458 635.45 0.10 0.10 0.00 0.00 60.00 0.00 20,587 635.42 0.10 0.10 0.00 0.00 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 50HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.49" for 2-yr event Inflow = 1.34 cfs @ 3.64 hrs, Volume= 14,896 cf Primary = 1.34 cfs @ 3.64 hrs, Volume= 14,896 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Inflow Area=365,556 sf 1.34 cfs 1.34 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 51HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.01 0.00 0.01 4.00 1.09 0.00 1.09 5.00 0.76 0.00 0.76 6.00 0.57 0.00 0.57 7.00 0.17 0.00 0.17 8.00 0.08 0.00 0.08 9.00 0.05 0.00 0.05 10.00 0.04 0.00 0.04 11.00 0.03 0.00 0.03 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.03 0.00 0.03 16.00 0.03 0.00 0.03 17.00 0.03 0.00 0.03 18.00 0.03 0.00 0.03 19.00 0.03 0.00 0.03 20.00 0.03 0.00 0.03 21.00 0.03 0.00 0.03 22.00 0.03 0.00 0.03 23.00 0.03 0.00 0.03 24.00 0.02 0.00 0.02 25.00 0.02 0.00 0.02 26.00 0.02 0.00 0.02 27.00 0.02 0.00 0.02 28.00 0.02 0.00 0.02 29.00 0.02 0.00 0.02 30.00 0.02 0.00 0.02 31.00 0.02 0.00 0.02 32.00 0.02 0.00 0.02 33.00 0.02 0.00 0.02 34.00 0.02 0.00 0.02 35.00 0.02 0.00 0.02 36.00 0.02 0.00 0.02 37.00 0.02 0.00 0.02 38.00 0.02 0.00 0.02 39.00 0.02 0.00 0.02 40.00 0.02 0.00 0.02 41.00 0.02 0.00 0.02 42.00 0.02 0.00 0.02 43.00 0.02 0.00 0.02 44.00 0.02 0.00 0.02 45.00 0.02 0.00 0.02 46.00 0.02 0.00 0.02 47.00 0.02 0.00 0.02 48.00 0.02 0.00 0.02 49.00 0.02 0.00 0.02 50.00 0.02 0.00 0.02 51.00 0.02 0.00 0.02 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.02 0.00 0.02 53.00 0.02 0.00 0.02 54.00 0.02 0.00 0.02 55.00 0.02 0.00 0.02 56.00 0.02 0.00 0.02 57.00 0.02 0.00 0.02 58.00 0.02 0.00 0.02 59.00 0.02 0.00 0.02 60.00 0.02 0.00 0.02 Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 52HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.35" for 2-yr event Inflow = 1.91 cfs @ 3.23 hrs, Volume= 28,068 cf Primary = 1.91 cfs @ 3.23 hrs, Volume= 28,068 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Inflow Area=964,418 sf 1.91 cfs 1.91 cfs Charlotte 6-hr 2-yr Rainfall=2.28"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 53HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.45 0.00 0.45 5.00 0.30 0.00 0.30 6.00 0.26 0.00 0.26 7.00 0.14 0.00 0.14 8.00 0.14 0.00 0.14 9.00 0.14 0.00 0.14 10.00 0.13 0.00 0.13 11.00 0.13 0.00 0.13 12.00 0.13 0.00 0.13 13.00 0.13 0.00 0.13 14.00 0.13 0.00 0.13 15.00 0.13 0.00 0.13 16.00 0.13 0.00 0.13 17.00 0.13 0.00 0.13 18.00 0.13 0.00 0.13 19.00 0.13 0.00 0.13 20.00 0.13 0.00 0.13 21.00 0.13 0.00 0.13 22.00 0.13 0.00 0.13 23.00 0.13 0.00 0.13 24.00 0.12 0.00 0.12 25.00 0.12 0.00 0.12 26.00 0.12 0.00 0.12 27.00 0.12 0.00 0.12 28.00 0.12 0.00 0.12 29.00 0.12 0.00 0.12 30.00 0.12 0.00 0.12 31.00 0.12 0.00 0.12 32.00 0.12 0.00 0.12 33.00 0.12 0.00 0.12 34.00 0.12 0.00 0.12 35.00 0.12 0.00 0.12 36.00 0.12 0.00 0.12 37.00 0.11 0.00 0.11 38.00 0.11 0.00 0.11 39.00 0.11 0.00 0.11 40.00 0.11 0.00 0.11 41.00 0.11 0.00 0.11 42.00 0.11 0.00 0.11 43.00 0.11 0.00 0.11 44.00 0.11 0.00 0.11 45.00 0.11 0.00 0.11 46.00 0.11 0.00 0.11 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.10 0.00 0.10 50.00 0.10 0.00 0.10 51.00 0.10 0.00 0.10 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.10 0.00 0.10 53.00 0.10 0.00 0.10 54.00 0.10 0.00 0.10 55.00 0.10 0.00 0.10 56.00 0.10 0.00 0.10 57.00 0.10 0.00 0.10 58.00 0.10 0.00 0.10 59.00 0.10 0.00 0.10 60.00 0.10 0.00 0.10 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 54HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 17.61 cfs @ 3.19 hrs, Volume= 34,910 cf, Depth= 2.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=4.192 ac Runoff Volume=34,910 cf Runoff Depth=2.29" Tc=7.5 min CN=86 17.61 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 55HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.05 3.00 1.50 0.49 5.67 4.00 3.29 1.91 1.83 5.00 3.56 2.15 0.74 6.00 3.72 2.29 0.52 7.00 3.72 2.29 0.00 8.00 3.72 2.29 0.00 9.00 3.72 2.29 0.00 10.00 3.72 2.29 0.00 11.00 3.72 2.29 0.00 12.00 3.72 2.29 0.00 13.00 3.72 2.29 0.00 14.00 3.72 2.29 0.00 15.00 3.72 2.29 0.00 16.00 3.72 2.29 0.00 17.00 3.72 2.29 0.00 18.00 3.72 2.29 0.00 19.00 3.72 2.29 0.00 20.00 3.72 2.29 0.00 21.00 3.72 2.29 0.00 22.00 3.72 2.29 0.00 23.00 3.72 2.29 0.00 24.00 3.72 2.29 0.00 25.00 3.72 2.29 0.00 26.00 3.72 2.29 0.00 27.00 3.72 2.29 0.00 28.00 3.72 2.29 0.00 29.00 3.72 2.29 0.00 30.00 3.72 2.29 0.00 31.00 3.72 2.29 0.00 32.00 3.72 2.29 0.00 33.00 3.72 2.29 0.00 34.00 3.72 2.29 0.00 35.00 3.72 2.29 0.00 36.00 3.72 2.29 0.00 37.00 3.72 2.29 0.00 38.00 3.72 2.29 0.00 39.00 3.72 2.29 0.00 40.00 3.72 2.29 0.00 41.00 3.72 2.29 0.00 42.00 3.72 2.29 0.00 43.00 3.72 2.29 0.00 44.00 3.72 2.29 0.00 45.00 3.72 2.29 0.00 46.00 3.72 2.29 0.00 47.00 3.72 2.29 0.00 48.00 3.72 2.29 0.00 49.00 3.72 2.29 0.00 50.00 3.72 2.29 0.00 51.00 3.72 2.29 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 2.29 0.00 53.00 3.72 2.29 0.00 54.00 3.72 2.29 0.00 55.00 3.72 2.29 0.00 56.00 3.72 2.29 0.00 57.00 3.72 2.29 0.00 58.00 3.72 2.29 0.00 59.00 3.72 2.29 0.00 60.00 3.72 2.29 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 56HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 17.81 cfs @ 3.92 hrs, Volume= 93,434 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=22.450 ac Runoff Volume=93,434 cf Runoff Depth=1.15" Flow Length=1,210' Tc=57.0 min CN=70 17.81 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 57HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 0.05 4.00 3.29 0.88 17.57 5.00 3.56 1.05 6.09 6.00 3.72 1.15 2.80 7.00 3.72 1.15 0.68 8.00 3.72 1.15 0.05 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 58HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 14.95 cfs @ 3.92 hrs, Volume= 78,451 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=18.850 ac Runoff Volume=78,451 cf Runoff Depth=1.15" Flow Length=1,210' Tc=57.0 min CN=70 14.95 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 59HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 0.04 4.00 3.29 0.88 14.75 5.00 3.56 1.05 5.12 6.00 3.72 1.15 2.35 7.00 3.72 1.15 0.57 8.00 3.72 1.15 0.04 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 60HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 28.74 cfs @ 3.63 hrs, Volume= 114,031 cf, Depth= 1.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=18.850 ac Runoff Volume=114,031 cf Runoff Depth=1.67" Flow Length=1,675' Tc=39.1 min CN=78 28.74 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 61HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.23 1.33 4.00 3.29 1.34 17.82 5.00 3.56 1.54 4.49 6.00 3.72 1.67 2.41 7.00 3.72 1.67 0.20 8.00 3.72 1.67 0.00 9.00 3.72 1.67 0.00 10.00 3.72 1.67 0.00 11.00 3.72 1.67 0.00 12.00 3.72 1.67 0.00 13.00 3.72 1.67 0.00 14.00 3.72 1.67 0.00 15.00 3.72 1.67 0.00 16.00 3.72 1.67 0.00 17.00 3.72 1.67 0.00 18.00 3.72 1.67 0.00 19.00 3.72 1.67 0.00 20.00 3.72 1.67 0.00 21.00 3.72 1.67 0.00 22.00 3.72 1.67 0.00 23.00 3.72 1.67 0.00 24.00 3.72 1.67 0.00 25.00 3.72 1.67 0.00 26.00 3.72 1.67 0.00 27.00 3.72 1.67 0.00 28.00 3.72 1.67 0.00 29.00 3.72 1.67 0.00 30.00 3.72 1.67 0.00 31.00 3.72 1.67 0.00 32.00 3.72 1.67 0.00 33.00 3.72 1.67 0.00 34.00 3.72 1.67 0.00 35.00 3.72 1.67 0.00 36.00 3.72 1.67 0.00 37.00 3.72 1.67 0.00 38.00 3.72 1.67 0.00 39.00 3.72 1.67 0.00 40.00 3.72 1.67 0.00 41.00 3.72 1.67 0.00 42.00 3.72 1.67 0.00 43.00 3.72 1.67 0.00 44.00 3.72 1.67 0.00 45.00 3.72 1.67 0.00 46.00 3.72 1.67 0.00 47.00 3.72 1.67 0.00 48.00 3.72 1.67 0.00 49.00 3.72 1.67 0.00 50.00 3.72 1.67 0.00 51.00 3.72 1.67 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.67 0.00 53.00 3.72 1.67 0.00 54.00 3.72 1.67 0.00 55.00 3.72 1.67 0.00 56.00 3.72 1.67 0.00 57.00 3.72 1.67 0.00 58.00 3.72 1.67 0.00 59.00 3.72 1.67 0.00 60.00 3.72 1.67 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 62HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 6.80 cfs @ 3.20 hrs, Volume= 13,692 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=3.290 ac Runoff Volume=13,692 cf Runoff Depth=1.15" Tc=7.5 min CN=70 6.80 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 63HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 1.03 4.00 3.29 0.88 0.97 5.00 3.56 1.05 0.41 6.00 3.72 1.15 0.29 7.00 3.72 1.15 0.00 8.00 3.72 1.15 0.00 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 64HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 13.20 cfs @ 3.33 hrs, Volume= 34,918 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=8.390 ac Runoff Volume=34,918 cf Runoff Depth=1.15" Flow Length=918' Tc=16.5 min CN=70 13.20 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 65HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 0.72 4.00 3.29 0.88 2.93 5.00 3.56 1.05 1.11 6.00 3.72 1.15 0.78 7.00 3.72 1.15 0.00 8.00 3.72 1.15 0.00 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 66HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 6.59 cfs @ 3.33 hrs, Volume= 17,438 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=4.190 ac Runoff Volume=17,438 cf Runoff Depth=1.15" Flow Length=918' Tc=16.5 min CN=70 6.59 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 67HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 0.36 4.00 3.29 0.88 1.46 5.00 3.56 1.05 0.55 6.00 3.72 1.15 0.39 7.00 3.72 1.15 0.00 8.00 3.72 1.15 0.00 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 68HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 4.79 cfs @ 3.55 hrs, Volume= 17,480 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Charlotte 6-hr 10-yr Rainfall=3.72" Runoff Area=4.200 ac Runoff Volume=17,480 cf Runoff Depth=1.15" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 4.79 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 69HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.14 0.00 0.00 2.00 0.39 0.00 0.00 3.00 1.50 0.08 0.06 4.00 3.29 0.88 2.40 5.00 3.56 1.05 0.69 6.00 3.72 1.15 0.42 7.00 3.72 1.15 0.01 8.00 3.72 1.15 0.00 9.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 11.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 13.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 15.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 17.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 19.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 21.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 23.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 25.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 27.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 29.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 31.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 33.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 35.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 37.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 39.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 41.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 43.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 45.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 47.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 49.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 51.00 3.72 1.15 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 3.72 1.15 0.00 53.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 55.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 57.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 59.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 70HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 2.29" for 10-yr event Inflow = 17.61 cfs @ 3.19 hrs, Volume= 34,910 cf Outflow = 4.16 cfs @ 3.55 hrs, Volume= 28,133 cf, Atten= 76%, Lag= 21.7 min Primary = 4.16 cfs @ 3.55 hrs, Volume= 28,133 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 639.29' @ 3.55 hrs Surf.Area= 13,673 sf Storage= 20,214 cf Plug-Flow detention time= 347.6 min calculated for 28,110 cf (81% of inflow) Center-of-Mass det. time= 331.9 min ( 544.3 - 212.4 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=4.15 cfs @ 3.55 hrs HW=639.29' (Free Discharge) 1=Culvert (Passes 4.15 cfs of 16.53 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 6.37 fps) 3=Orifice/Grate (Orifice Controls 4.12 cfs @ 2.77 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 71HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=182,604 sf Peak Elev=639.29' Storage=20,214 cf 17.61 cfs 4.16 cfs 4.16 cfs 0.00 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 72HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 0.60 509 637.57 0.00 0.00 0.00 5.00 0.74 15,060 638.89 1.32 1.32 0.00 7.50 0.00 11,859 638.63 0.17 0.17 0.00 10.00 0.00 11,112 638.56 0.04 0.04 0.00 12.50 0.00 10,836 638.54 0.03 0.03 0.00 15.00 0.00 10,601 638.52 0.03 0.03 0.00 17.50 0.00 10,368 638.50 0.03 0.03 0.00 20.00 0.00 10,138 638.48 0.03 0.03 0.00 22.50 0.00 9,910 638.46 0.03 0.03 0.00 25.00 0.00 9,684 638.44 0.02 0.02 0.00 27.50 0.00 9,461 638.42 0.02 0.02 0.00 30.00 0.00 9,240 638.41 0.02 0.02 0.00 32.50 0.00 9,022 638.39 0.02 0.02 0.00 35.00 0.00 8,806 638.37 0.02 0.02 0.00 37.50 0.00 8,592 638.35 0.02 0.02 0.00 40.00 0.00 8,381 638.33 0.02 0.02 0.00 42.50 0.00 8,172 638.31 0.02 0.02 0.00 45.00 0.00 7,966 638.29 0.02 0.02 0.00 47.50 0.00 7,762 638.28 0.02 0.02 0.00 50.00 0.00 7,561 638.26 0.02 0.02 0.00 52.50 0.00 7,361 638.24 0.02 0.02 0.00 55.00 0.00 7,165 638.22 0.02 0.02 0.00 57.50 0.00 6,971 638.21 0.02 0.02 0.00 60.00 0.00 6,779 638.19 0.02 0.02 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 73HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 1.67" for 10-yr event Inflow = 28.74 cfs @ 3.63 hrs, Volume= 114,031 cf Outflow = 4.12 cfs @ 5.09 hrs, Volume= 61,985 cf, Atten= 86%, Lag= 87.8 min Primary = 0.19 cfs @ 5.09 hrs, Volume= 34,540 cf Secondary = 3.92 cfs @ 5.09 hrs, Volume= 27,446 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 637.97' @ 5.09 hrs Surf.Area= 31,372 sf Storage= 91,562 cf Plug-Flow detention time= 963.7 min calculated for 61,985 cf (54% of inflow) Center-of-Mass det. time= 931.4 min ( 1,179.3 - 247.9 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.19 cfs @ 5.09 hrs HW=637.97' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.19 cfs @ 8.86 fps) Secondary OutFlow Max=3.92 cfs @ 5.09 hrs HW=637.97' (Free Discharge) 2=Orifice/Grate (Orifice Controls 3.92 cfs @ 1.72 fps) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 74HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=821,106 sf Peak Elev=637.97' Storage=91,562 cf 28.74 cfs 4.12 cfs 0.19 cfs 3.92 cfs 0.00 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 75HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.00 0 634.50 0.00 0.00 0.00 0.00 5.00 4.49 91,500 637.96 4.08 0.19 3.88 0.00 7.50 0.03 84,862 637.75 0.67 0.19 0.48 0.00 10.00 0.00 82,215 637.66 0.18 0.18 0.00 0.00 12.50 0.00 80,563 637.61 0.18 0.18 0.00 0.00 15.00 0.00 78,926 637.56 0.18 0.18 0.00 0.00 17.50 0.00 77,304 637.50 0.18 0.18 0.00 0.00 20.00 0.00 75,696 637.45 0.18 0.18 0.00 0.00 22.50 0.00 74,103 637.39 0.18 0.18 0.00 0.00 25.00 0.00 72,526 637.34 0.17 0.17 0.00 0.00 27.50 0.00 70,963 637.29 0.17 0.17 0.00 0.00 30.00 0.00 69,416 637.24 0.17 0.17 0.00 0.00 32.50 0.00 67,884 637.18 0.17 0.17 0.00 0.00 35.00 0.00 66,367 637.13 0.17 0.17 0.00 0.00 37.50 0.00 64,866 637.08 0.17 0.17 0.00 0.00 40.00 0.00 63,380 637.03 0.16 0.16 0.00 0.00 42.50 0.00 61,909 636.98 0.16 0.16 0.00 0.00 45.00 0.00 60,455 636.93 0.16 0.16 0.00 0.00 47.50 0.00 59,016 636.87 0.16 0.16 0.00 0.00 50.00 0.00 57,593 636.82 0.16 0.16 0.00 0.00 52.50 0.00 56,185 636.77 0.16 0.16 0.00 0.00 55.00 0.00 54,794 636.72 0.15 0.15 0.00 0.00 57.50 0.00 53,418 636.68 0.15 0.15 0.00 0.00 60.00 0.00 52,059 636.63 0.15 0.15 0.00 0.00 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 76HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 1.50" for 10-yr event Inflow = 8.95 cfs @ 3.55 hrs, Volume= 45,613 cf Primary = 8.95 cfs @ 3.55 hrs, Volume= 45,613 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=365,556 sf 8.95 cfs 8.95 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 77HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.08 0.00 0.08 4.00 5.48 0.00 5.48 5.00 2.01 0.00 2.01 6.00 1.18 0.00 1.18 7.00 0.28 0.00 0.28 8.00 0.12 0.00 0.12 9.00 0.06 0.00 0.06 10.00 0.04 0.00 0.04 11.00 0.03 0.00 0.03 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.03 0.00 0.03 16.00 0.03 0.00 0.03 17.00 0.03 0.00 0.03 18.00 0.03 0.00 0.03 19.00 0.03 0.00 0.03 20.00 0.03 0.00 0.03 21.00 0.03 0.00 0.03 22.00 0.03 0.00 0.03 23.00 0.03 0.00 0.03 24.00 0.03 0.00 0.03 25.00 0.02 0.00 0.02 26.00 0.02 0.00 0.02 27.00 0.02 0.00 0.02 28.00 0.02 0.00 0.02 29.00 0.02 0.00 0.02 30.00 0.02 0.00 0.02 31.00 0.02 0.00 0.02 32.00 0.02 0.00 0.02 33.00 0.02 0.00 0.02 34.00 0.02 0.00 0.02 35.00 0.02 0.00 0.02 36.00 0.02 0.00 0.02 37.00 0.02 0.00 0.02 38.00 0.02 0.00 0.02 39.00 0.02 0.00 0.02 40.00 0.02 0.00 0.02 41.00 0.02 0.00 0.02 42.00 0.02 0.00 0.02 43.00 0.02 0.00 0.02 44.00 0.02 0.00 0.02 45.00 0.02 0.00 0.02 46.00 0.02 0.00 0.02 47.00 0.02 0.00 0.02 48.00 0.02 0.00 0.02 49.00 0.02 0.00 0.02 50.00 0.02 0.00 0.02 51.00 0.02 0.00 0.02 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.02 0.00 0.02 53.00 0.02 0.00 0.02 54.00 0.02 0.00 0.02 55.00 0.02 0.00 0.02 56.00 0.02 0.00 0.02 57.00 0.02 0.00 0.02 58.00 0.02 0.00 0.02 59.00 0.02 0.00 0.02 60.00 0.02 0.00 0.02 Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 78HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.60" for 10-yr event Inflow = 6.83 cfs @ 3.21 hrs, Volume= 48,232 cf Primary = 6.83 cfs @ 3.21 hrs, Volume= 48,232 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Inflow Area=964,418 sf 6.83 cfs 6.83 cfs Charlotte 6-hr 10-yr Rainfall=3.72"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 79HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 1.03 0.00 1.03 4.00 1.13 0.00 1.13 5.00 0.60 0.00 0.60 6.00 0.48 0.00 0.48 7.00 0.19 0.00 0.19 8.00 0.19 0.00 0.19 9.00 0.19 0.00 0.19 10.00 0.18 0.00 0.18 11.00 0.18 0.00 0.18 12.00 0.18 0.00 0.18 13.00 0.18 0.00 0.18 14.00 0.18 0.00 0.18 15.00 0.18 0.00 0.18 16.00 0.18 0.00 0.18 17.00 0.18 0.00 0.18 18.00 0.18 0.00 0.18 19.00 0.18 0.00 0.18 20.00 0.18 0.00 0.18 21.00 0.18 0.00 0.18 22.00 0.18 0.00 0.18 23.00 0.18 0.00 0.18 24.00 0.18 0.00 0.18 25.00 0.17 0.00 0.17 26.00 0.17 0.00 0.17 27.00 0.17 0.00 0.17 28.00 0.17 0.00 0.17 29.00 0.17 0.00 0.17 30.00 0.17 0.00 0.17 31.00 0.17 0.00 0.17 32.00 0.17 0.00 0.17 33.00 0.17 0.00 0.17 34.00 0.17 0.00 0.17 35.00 0.17 0.00 0.17 36.00 0.17 0.00 0.17 37.00 0.17 0.00 0.17 38.00 0.17 0.00 0.17 39.00 0.16 0.00 0.16 40.00 0.16 0.00 0.16 41.00 0.16 0.00 0.16 42.00 0.16 0.00 0.16 43.00 0.16 0.00 0.16 44.00 0.16 0.00 0.16 45.00 0.16 0.00 0.16 46.00 0.16 0.00 0.16 47.00 0.16 0.00 0.16 48.00 0.16 0.00 0.16 49.00 0.16 0.00 0.16 50.00 0.16 0.00 0.16 51.00 0.16 0.00 0.16 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.16 0.00 0.16 53.00 0.16 0.00 0.16 54.00 0.15 0.00 0.15 55.00 0.15 0.00 0.15 56.00 0.15 0.00 0.15 57.00 0.15 0.00 0.15 58.00 0.15 0.00 0.15 59.00 0.15 0.00 0.15 60.00 0.15 0.00 0.15 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 80HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 24.38 cfs @ 3.19 hrs, Volume= 44,021 cf, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=4.192 ac Runoff Volume=44,021 cf Runoff Depth=2.89" Tc=7.5 min CN=86 24.38 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 81HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.01 0.20 3.00 1.71 0.63 6.82 4.00 3.86 2.42 2.08 5.00 4.18 2.71 0.92 6.00 4.38 2.89 0.66 7.00 4.38 2.89 0.00 8.00 4.38 2.89 0.00 9.00 4.38 2.89 0.00 10.00 4.38 2.89 0.00 11.00 4.38 2.89 0.00 12.00 4.38 2.89 0.00 13.00 4.38 2.89 0.00 14.00 4.38 2.89 0.00 15.00 4.38 2.89 0.00 16.00 4.38 2.89 0.00 17.00 4.38 2.89 0.00 18.00 4.38 2.89 0.00 19.00 4.38 2.89 0.00 20.00 4.38 2.89 0.00 21.00 4.38 2.89 0.00 22.00 4.38 2.89 0.00 23.00 4.38 2.89 0.00 24.00 4.38 2.89 0.00 25.00 4.38 2.89 0.00 26.00 4.38 2.89 0.00 27.00 4.38 2.89 0.00 28.00 4.38 2.89 0.00 29.00 4.38 2.89 0.00 30.00 4.38 2.89 0.00 31.00 4.38 2.89 0.00 32.00 4.38 2.89 0.00 33.00 4.38 2.89 0.00 34.00 4.38 2.89 0.00 35.00 4.38 2.89 0.00 36.00 4.38 2.89 0.00 37.00 4.38 2.89 0.00 38.00 4.38 2.89 0.00 39.00 4.38 2.89 0.00 40.00 4.38 2.89 0.00 41.00 4.38 2.89 0.00 42.00 4.38 2.89 0.00 43.00 4.38 2.89 0.00 44.00 4.38 2.89 0.00 45.00 4.38 2.89 0.00 46.00 4.38 2.89 0.00 47.00 4.38 2.89 0.00 48.00 4.38 2.89 0.00 49.00 4.38 2.89 0.00 50.00 4.38 2.89 0.00 51.00 4.38 2.89 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 2.89 0.00 53.00 4.38 2.89 0.00 54.00 4.38 2.89 0.00 55.00 4.38 2.89 0.00 56.00 4.38 2.89 0.00 57.00 4.38 2.89 0.00 58.00 4.38 2.89 0.00 59.00 4.38 2.89 0.00 60.00 4.38 2.89 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 82HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 25.51 cfs @ 3.89 hrs, Volume= 129,521 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=22.450 ac Runoff Volume=129,521 cf Runoff Depth=1.59" Flow Length=1,210' Tc=57.0 min CN=70 25.51 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 83HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 0.14 4.00 3.86 1.24 24.75 5.00 4.18 1.45 7.91 6.00 4.38 1.59 3.74 7.00 4.38 1.59 0.92 8.00 4.38 1.59 0.06 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 84HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 21.42 cfs @ 3.89 hrs, Volume= 108,752 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=18.850 ac Runoff Volume=108,752 cf Runoff Depth=1.59" Flow Length=1,210' Tc=57.0 min CN=70 21.42 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 85HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 0.11 4.00 3.86 1.24 20.78 5.00 4.18 1.45 6.64 6.00 4.38 1.59 3.14 7.00 4.38 1.59 0.77 8.00 4.38 1.59 0.05 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 86HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 39.25 cfs @ 3.61 hrs, Volume= 150,134 cf, Depth= 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=18.850 ac Runoff Volume=150,134 cf Runoff Depth=2.19" Flow Length=1,675' Tc=39.1 min CN=78 39.25 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 87HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.33 2.31 4.00 3.86 1.78 22.55 5.00 4.18 2.04 5.64 6.00 4.38 2.19 3.14 7.00 4.38 2.19 0.26 8.00 4.38 2.19 0.00 9.00 4.38 2.19 0.00 10.00 4.38 2.19 0.00 11.00 4.38 2.19 0.00 12.00 4.38 2.19 0.00 13.00 4.38 2.19 0.00 14.00 4.38 2.19 0.00 15.00 4.38 2.19 0.00 16.00 4.38 2.19 0.00 17.00 4.38 2.19 0.00 18.00 4.38 2.19 0.00 19.00 4.38 2.19 0.00 20.00 4.38 2.19 0.00 21.00 4.38 2.19 0.00 22.00 4.38 2.19 0.00 23.00 4.38 2.19 0.00 24.00 4.38 2.19 0.00 25.00 4.38 2.19 0.00 26.00 4.38 2.19 0.00 27.00 4.38 2.19 0.00 28.00 4.38 2.19 0.00 29.00 4.38 2.19 0.00 30.00 4.38 2.19 0.00 31.00 4.38 2.19 0.00 32.00 4.38 2.19 0.00 33.00 4.38 2.19 0.00 34.00 4.38 2.19 0.00 35.00 4.38 2.19 0.00 36.00 4.38 2.19 0.00 37.00 4.38 2.19 0.00 38.00 4.38 2.19 0.00 39.00 4.38 2.19 0.00 40.00 4.38 2.19 0.00 41.00 4.38 2.19 0.00 42.00 4.38 2.19 0.00 43.00 4.38 2.19 0.00 44.00 4.38 2.19 0.00 45.00 4.38 2.19 0.00 46.00 4.38 2.19 0.00 47.00 4.38 2.19 0.00 48.00 4.38 2.19 0.00 49.00 4.38 2.19 0.00 50.00 4.38 2.19 0.00 51.00 4.38 2.19 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 2.19 0.00 53.00 4.38 2.19 0.00 54.00 4.38 2.19 0.00 55.00 4.38 2.19 0.00 56.00 4.38 2.19 0.00 57.00 4.38 2.19 0.00 58.00 4.38 2.19 0.00 59.00 4.38 2.19 0.00 60.00 4.38 2.19 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 88HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 10.61 cfs @ 3.20 hrs, Volume= 18,981 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=3.290 ac Runoff Volume=18,981 cf Runoff Depth=1.59" Tc=7.5 min CN=70 10.61 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 89HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 1.63 4.00 3.86 1.24 1.18 5.00 4.18 1.45 0.54 6.00 4.38 1.59 0.39 7.00 4.38 1.59 0.00 8.00 4.38 1.59 0.00 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 90HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 20.04 cfs @ 3.32 hrs, Volume= 48,405 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=8.390 ac Runoff Volume=48,405 cf Runoff Depth=1.59" Flow Length=918' Tc=16.5 min CN=70 20.04 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 91HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 1.46 4.00 3.86 1.24 3.60 5.00 4.18 1.45 1.51 6.00 4.38 1.59 1.07 7.00 4.38 1.59 0.00 8.00 4.38 1.59 0.00 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 92HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 10.01 cfs @ 3.32 hrs, Volume= 24,173 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=4.190 ac Runoff Volume=24,173 cf Runoff Depth=1.59" Flow Length=918' Tc=16.5 min CN=70 10.01 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 93HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 0.73 4.00 3.86 1.24 1.80 5.00 4.18 1.45 0.75 6.00 4.38 1.59 0.54 7.00 4.38 1.59 0.00 8.00 4.38 1.59 0.00 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 94HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 7.02 cfs @ 3.53 hrs, Volume= 24,231 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Runoff Area=4.200 ac Runoff Volume=24,231 cf Runoff Depth=1.59" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 7.02 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 95HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 2.00 0.48 0.00 0.00 3.00 1.71 0.14 0.16 4.00 3.86 1.24 3.11 5.00 4.18 1.45 0.91 6.00 4.38 1.59 0.57 7.00 4.38 1.59 0.02 8.00 4.38 1.59 0.00 9.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 11.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 13.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 15.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 17.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 19.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 21.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 23.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 25.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 27.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 29.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 31.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 33.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 35.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 37.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 39.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 41.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 43.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 45.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 47.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 49.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 51.00 4.38 1.59 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.38 1.59 0.00 53.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 55.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 57.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 59.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 96HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 2.89" for 25-yr event Inflow = 24.38 cfs @ 3.19 hrs, Volume= 44,021 cf Outflow = 5.88 cfs @ 3.47 hrs, Volume= 37,232 cf, Atten= 76%, Lag= 17.0 min Primary = 5.88 cfs @ 3.47 hrs, Volume= 37,232 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 639.60' @ 3.47 hrs Surf.Area= 15,012 sf Storage= 24,587 cf Plug-Flow detention time= 274.3 min calculated for 37,201 cf (85% of inflow) Center-of-Mass det. time= 260.7 min ( 471.8 - 211.1 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.88 cfs @ 3.47 hrs HW=639.60' (Free Discharge) 1=Culvert (Passes 5.88 cfs of 18.63 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 6.90 fps) 3=Orifice/Grate (Orifice Controls 5.84 cfs @ 3.89 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 97HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=182,604 sf Peak Elev=639.60' Storage=24,587 cf 24.38 cfs 5.88 cfs 5.88 cfs 0.00 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 98HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 0.87 977 637.62 0.01 0.01 0.00 5.00 0.92 15,759 638.95 1.65 1.65 0.00 7.50 0.00 11,956 638.64 0.19 0.19 0.00 10.00 0.00 11,136 638.57 0.05 0.05 0.00 12.50 0.00 10,850 638.54 0.03 0.03 0.00 15.00 0.00 10,615 638.52 0.03 0.03 0.00 17.50 0.00 10,382 638.50 0.03 0.03 0.00 20.00 0.00 10,152 638.48 0.03 0.03 0.00 22.50 0.00 9,923 638.46 0.03 0.03 0.00 25.00 0.00 9,698 638.44 0.02 0.02 0.00 27.50 0.00 9,474 638.43 0.02 0.02 0.00 30.00 0.00 9,253 638.41 0.02 0.02 0.00 32.50 0.00 9,035 638.39 0.02 0.02 0.00 35.00 0.00 8,819 638.37 0.02 0.02 0.00 37.50 0.00 8,605 638.35 0.02 0.02 0.00 40.00 0.00 8,394 638.33 0.02 0.02 0.00 42.50 0.00 8,185 638.31 0.02 0.02 0.00 45.00 0.00 7,978 638.30 0.02 0.02 0.00 47.50 0.00 7,774 638.28 0.02 0.02 0.00 50.00 0.00 7,573 638.26 0.02 0.02 0.00 52.50 0.00 7,373 638.24 0.02 0.02 0.00 55.00 0.00 7,177 638.23 0.02 0.02 0.00 57.50 0.00 6,982 638.21 0.02 0.02 0.00 60.00 0.00 6,791 638.19 0.02 0.02 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 99HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 2.19" for 25-yr event Inflow = 39.25 cfs @ 3.61 hrs, Volume= 150,134 cf Outflow = 10.82 cfs @ 4.43 hrs, Volume= 98,014 cf, Atten= 72%, Lag= 49.1 min Primary = 0.20 cfs @ 4.43 hrs, Volume= 34,688 cf Secondary = 10.62 cfs @ 4.43 hrs, Volume= 63,326 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.23' @ 4.43 hrs Surf.Area= 32,155 sf Storage= 100,108 cf Plug-Flow detention time= 633.9 min calculated for 98,014 cf (65% of inflow) Center-of-Mass det. time= 606.0 min ( 852.3 - 246.3 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.20 cfs @ 4.43 hrs HW=638.23' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.20 cfs @ 9.20 fps) Secondary OutFlow Max=10.60 cfs @ 4.43 hrs HW=638.23' (Free Discharge) 2=Orifice/Grate (Orifice Controls 10.60 cfs @ 2.39 fps) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 100HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=821,106 sf Peak Elev=638.23' Storage=100,108 cf 39.25 cfs 10.82 cfs 0.20 cfs 10.62 cfs 0.00 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 101HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.04 10 634.50 0.00 0.00 0.00 0.00 5.00 5.64 96,489 638.12 7.74 0.20 7.54 0.00 7.50 0.04 85,224 637.76 0.81 0.19 0.62 0.00 10.00 0.00 82,307 637.67 0.18 0.18 0.00 0.00 12.50 0.00 80,654 637.61 0.18 0.18 0.00 0.00 15.00 0.00 79,016 637.56 0.18 0.18 0.00 0.00 17.50 0.00 77,392 637.50 0.18 0.18 0.00 0.00 20.00 0.00 75,784 637.45 0.18 0.18 0.00 0.00 22.50 0.00 74,191 637.40 0.18 0.18 0.00 0.00 25.00 0.00 72,612 637.34 0.17 0.17 0.00 0.00 27.50 0.00 71,049 637.29 0.17 0.17 0.00 0.00 30.00 0.00 69,501 637.24 0.17 0.17 0.00 0.00 32.50 0.00 67,968 637.19 0.17 0.17 0.00 0.00 35.00 0.00 66,450 637.13 0.17 0.17 0.00 0.00 37.50 0.00 64,948 637.08 0.17 0.17 0.00 0.00 40.00 0.00 63,461 637.03 0.16 0.16 0.00 0.00 42.50 0.00 61,990 636.98 0.16 0.16 0.00 0.00 45.00 0.00 60,534 636.93 0.16 0.16 0.00 0.00 47.50 0.00 59,094 636.88 0.16 0.16 0.00 0.00 50.00 0.00 57,670 636.83 0.16 0.16 0.00 0.00 52.50 0.00 56,262 636.78 0.16 0.16 0.00 0.00 55.00 0.00 54,870 636.73 0.15 0.15 0.00 0.00 57.50 0.00 53,494 636.68 0.15 0.15 0.00 0.00 60.00 0.00 52,133 636.63 0.15 0.15 0.00 0.00 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 102HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 2.02" for 25-yr event Inflow = 12.87 cfs @ 3.52 hrs, Volume= 61,463 cf Primary = 12.87 cfs @ 3.52 hrs, Volume= 61,463 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=365,556 sf 12.87 cfs 12.87 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 103HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.18 0.00 0.18 4.00 7.51 0.00 7.51 5.00 2.56 0.00 2.56 6.00 1.51 0.00 1.51 7.00 0.32 0.00 0.32 8.00 0.13 0.00 0.13 9.00 0.07 0.00 0.07 10.00 0.05 0.00 0.05 11.00 0.03 0.00 0.03 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.03 0.00 0.03 16.00 0.03 0.00 0.03 17.00 0.03 0.00 0.03 18.00 0.03 0.00 0.03 19.00 0.03 0.00 0.03 20.00 0.03 0.00 0.03 21.00 0.03 0.00 0.03 22.00 0.03 0.00 0.03 23.00 0.03 0.00 0.03 24.00 0.03 0.00 0.03 25.00 0.02 0.00 0.02 26.00 0.02 0.00 0.02 27.00 0.02 0.00 0.02 28.00 0.02 0.00 0.02 29.00 0.02 0.00 0.02 30.00 0.02 0.00 0.02 31.00 0.02 0.00 0.02 32.00 0.02 0.00 0.02 33.00 0.02 0.00 0.02 34.00 0.02 0.00 0.02 35.00 0.02 0.00 0.02 36.00 0.02 0.00 0.02 37.00 0.02 0.00 0.02 38.00 0.02 0.00 0.02 39.00 0.02 0.00 0.02 40.00 0.02 0.00 0.02 41.00 0.02 0.00 0.02 42.00 0.02 0.00 0.02 43.00 0.02 0.00 0.02 44.00 0.02 0.00 0.02 45.00 0.02 0.00 0.02 46.00 0.02 0.00 0.02 47.00 0.02 0.00 0.02 48.00 0.02 0.00 0.02 49.00 0.02 0.00 0.02 50.00 0.02 0.00 0.02 51.00 0.02 0.00 0.02 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.02 0.00 0.02 53.00 0.02 0.00 0.02 54.00 0.02 0.00 0.02 55.00 0.02 0.00 0.02 56.00 0.02 0.00 0.02 57.00 0.02 0.00 0.02 58.00 0.02 0.00 0.02 59.00 0.02 0.00 0.02 60.00 0.02 0.00 0.02 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 104HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.67" for 25-yr event Inflow = 10.65 cfs @ 3.20 hrs, Volume= 53,669 cf Primary = 10.65 cfs @ 3.20 hrs, Volume= 53,669 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=964,418 sf 10.65 cfs 10.65 cfs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 105HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 1.64 0.00 1.64 4.00 1.37 0.00 1.37 5.00 0.74 0.00 0.74 6.00 0.59 0.00 0.59 7.00 0.19 0.00 0.19 8.00 0.19 0.00 0.19 9.00 0.19 0.00 0.19 10.00 0.18 0.00 0.18 11.00 0.18 0.00 0.18 12.00 0.18 0.00 0.18 13.00 0.18 0.00 0.18 14.00 0.18 0.00 0.18 15.00 0.18 0.00 0.18 16.00 0.18 0.00 0.18 17.00 0.18 0.00 0.18 18.00 0.18 0.00 0.18 19.00 0.18 0.00 0.18 20.00 0.18 0.00 0.18 21.00 0.18 0.00 0.18 22.00 0.18 0.00 0.18 23.00 0.18 0.00 0.18 24.00 0.18 0.00 0.18 25.00 0.17 0.00 0.17 26.00 0.17 0.00 0.17 27.00 0.17 0.00 0.17 28.00 0.17 0.00 0.17 29.00 0.17 0.00 0.17 30.00 0.17 0.00 0.17 31.00 0.17 0.00 0.17 32.00 0.17 0.00 0.17 33.00 0.17 0.00 0.17 34.00 0.17 0.00 0.17 35.00 0.17 0.00 0.17 36.00 0.17 0.00 0.17 37.00 0.17 0.00 0.17 38.00 0.17 0.00 0.17 39.00 0.17 0.00 0.17 40.00 0.16 0.00 0.16 41.00 0.16 0.00 0.16 42.00 0.16 0.00 0.16 43.00 0.16 0.00 0.16 44.00 0.16 0.00 0.16 45.00 0.16 0.00 0.16 46.00 0.16 0.00 0.16 47.00 0.16 0.00 0.16 48.00 0.16 0.00 0.16 49.00 0.16 0.00 0.16 50.00 0.16 0.00 0.16 51.00 0.16 0.00 0.16 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.16 0.00 0.16 53.00 0.16 0.00 0.16 54.00 0.15 0.00 0.15 55.00 0.15 0.00 0.15 56.00 0.15 0.00 0.15 57.00 0.15 0.00 0.15 58.00 0.15 0.00 0.15 59.00 0.15 0.00 0.15 60.00 0.15 0.00 0.15 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 106HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 28.40 cfs @ 3.19 hrs, Volume= 51,622 cf, Depth= 3.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=4.192 ac Runoff Volume=51,622 cf Runoff Depth=3.39" Tc=7.5 min CN=86 28.40 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 107HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.02 0.31 3.00 1.92 0.79 8.21 4.00 4.34 2.86 2.38 5.00 4.70 3.19 1.05 6.00 4.92 3.39 0.75 7.00 4.92 3.39 0.00 8.00 4.92 3.39 0.00 9.00 4.92 3.39 0.00 10.00 4.92 3.39 0.00 11.00 4.92 3.39 0.00 12.00 4.92 3.39 0.00 13.00 4.92 3.39 0.00 14.00 4.92 3.39 0.00 15.00 4.92 3.39 0.00 16.00 4.92 3.39 0.00 17.00 4.92 3.39 0.00 18.00 4.92 3.39 0.00 19.00 4.92 3.39 0.00 20.00 4.92 3.39 0.00 21.00 4.92 3.39 0.00 22.00 4.92 3.39 0.00 23.00 4.92 3.39 0.00 24.00 4.92 3.39 0.00 25.00 4.92 3.39 0.00 26.00 4.92 3.39 0.00 27.00 4.92 3.39 0.00 28.00 4.92 3.39 0.00 29.00 4.92 3.39 0.00 30.00 4.92 3.39 0.00 31.00 4.92 3.39 0.00 32.00 4.92 3.39 0.00 33.00 4.92 3.39 0.00 34.00 4.92 3.39 0.00 35.00 4.92 3.39 0.00 36.00 4.92 3.39 0.00 37.00 4.92 3.39 0.00 38.00 4.92 3.39 0.00 39.00 4.92 3.39 0.00 40.00 4.92 3.39 0.00 41.00 4.92 3.39 0.00 42.00 4.92 3.39 0.00 43.00 4.92 3.39 0.00 44.00 4.92 3.39 0.00 45.00 4.92 3.39 0.00 46.00 4.92 3.39 0.00 47.00 4.92 3.39 0.00 48.00 4.92 3.39 0.00 49.00 4.92 3.39 0.00 50.00 4.92 3.39 0.00 51.00 4.92 3.39 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 3.39 0.00 53.00 4.92 3.39 0.00 54.00 4.92 3.39 0.00 55.00 4.92 3.39 0.00 56.00 4.92 3.39 0.00 57.00 4.92 3.39 0.00 58.00 4.92 3.39 0.00 59.00 4.92 3.39 0.00 60.00 4.92 3.39 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 108HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 32.12 cfs @ 3.88 hrs, Volume= 161,129 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=22.450 ac Runoff Volume=161,129 cf Runoff Depth=1.98" Flow Length=1,210' Tc=57.0 min CN=70 32.12 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 109HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 0.32 4.00 4.34 1.56 30.94 5.00 4.70 1.82 9.54 6.00 4.92 1.98 4.45 7.00 4.92 1.98 1.09 8.00 4.92 1.98 0.08 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 110HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 26.97 cfs @ 3.88 hrs, Volume= 135,291 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=18.850 ac Runoff Volume=135,291 cf Runoff Depth=1.98" Flow Length=1,210' Tc=57.0 min CN=70 26.97 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 111HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 0.27 4.00 4.34 1.56 25.98 5.00 4.70 1.82 8.01 6.00 4.92 1.98 3.74 7.00 4.92 1.98 0.92 8.00 4.92 1.98 0.06 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 112HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 47.46 cfs @ 3.61 hrs, Volume= 180,911 cf, Depth= 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=18.850 ac Runoff Volume=180,911 cf Runoff Depth=2.64" Flow Length=1,675' Tc=39.1 min CN=78 47.46 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 113HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.44 3.42 4.00 4.34 2.16 26.80 5.00 4.70 2.46 6.57 6.00 4.92 2.64 3.64 7.00 4.92 2.64 0.30 8.00 4.92 2.64 0.00 9.00 4.92 2.64 0.00 10.00 4.92 2.64 0.00 11.00 4.92 2.64 0.00 12.00 4.92 2.64 0.00 13.00 4.92 2.64 0.00 14.00 4.92 2.64 0.00 15.00 4.92 2.64 0.00 16.00 4.92 2.64 0.00 17.00 4.92 2.64 0.00 18.00 4.92 2.64 0.00 19.00 4.92 2.64 0.00 20.00 4.92 2.64 0.00 21.00 4.92 2.64 0.00 22.00 4.92 2.64 0.00 23.00 4.92 2.64 0.00 24.00 4.92 2.64 0.00 25.00 4.92 2.64 0.00 26.00 4.92 2.64 0.00 27.00 4.92 2.64 0.00 28.00 4.92 2.64 0.00 29.00 4.92 2.64 0.00 30.00 4.92 2.64 0.00 31.00 4.92 2.64 0.00 32.00 4.92 2.64 0.00 33.00 4.92 2.64 0.00 34.00 4.92 2.64 0.00 35.00 4.92 2.64 0.00 36.00 4.92 2.64 0.00 37.00 4.92 2.64 0.00 38.00 4.92 2.64 0.00 39.00 4.92 2.64 0.00 40.00 4.92 2.64 0.00 41.00 4.92 2.64 0.00 42.00 4.92 2.64 0.00 43.00 4.92 2.64 0.00 44.00 4.92 2.64 0.00 45.00 4.92 2.64 0.00 46.00 4.92 2.64 0.00 47.00 4.92 2.64 0.00 48.00 4.92 2.64 0.00 49.00 4.92 2.64 0.00 50.00 4.92 2.64 0.00 51.00 4.92 2.64 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 2.64 0.00 53.00 4.92 2.64 0.00 54.00 4.92 2.64 0.00 55.00 4.92 2.64 0.00 56.00 4.92 2.64 0.00 57.00 4.92 2.64 0.00 58.00 4.92 2.64 0.00 59.00 4.92 2.64 0.00 60.00 4.92 2.64 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 114HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 13.28 cfs @ 3.20 hrs, Volume= 23,613 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=3.290 ac Runoff Volume=23,613 cf Runoff Depth=1.98" Tc=7.5 min CN=70 13.28 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 115HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 2.35 4.00 4.34 1.56 1.41 5.00 4.70 1.82 0.64 6.00 4.92 1.98 0.47 7.00 4.92 1.98 0.00 8.00 4.92 1.98 0.00 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 116HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 25.19 cfs @ 3.32 hrs, Volume= 60,217 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=8.390 ac Runoff Volume=60,217 cf Runoff Depth=1.98" Flow Length=918' Tc=16.5 min CN=70 25.19 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 117HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 2.40 4.00 4.34 1.56 4.31 5.00 4.70 1.82 1.79 6.00 4.92 1.98 1.27 7.00 4.92 1.98 0.00 8.00 4.92 1.98 0.00 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 118HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 12.58 cfs @ 3.32 hrs, Volume= 30,073 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=4.190 ac Runoff Volume=30,073 cf Runoff Depth=1.98" Flow Length=918' Tc=16.5 min CN=70 12.58 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 119HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 1.20 4.00 4.34 1.56 2.15 5.00 4.70 1.82 0.89 6.00 4.92 1.98 0.64 7.00 4.92 1.98 0.00 8.00 4.92 1.98 0.00 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 120HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 8.84 cfs @ 3.53 hrs, Volume= 30,144 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)9 8 7 6 5 4 3 2 1 0 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Runoff Area=4.200 ac Runoff Volume=30,144 cf Runoff Depth=1.98" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 8.84 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 121HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 2.00 0.54 0.00 0.00 3.00 1.92 0.21 0.33 4.00 4.34 1.56 3.79 5.00 4.70 1.82 1.08 6.00 4.92 1.98 0.67 7.00 4.92 1.98 0.02 8.00 4.92 1.98 0.00 9.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 11.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 13.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 15.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 17.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 19.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 21.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 23.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 25.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 27.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 29.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 31.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 33.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 35.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 37.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 39.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 41.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 43.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 45.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 47.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 49.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 51.00 4.92 1.98 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 4.92 1.98 0.00 53.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 55.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 57.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 59.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 122HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 3.39" for 50 yr event Inflow = 28.40 cfs @ 3.19 hrs, Volume= 51,622 cf Outflow = 6.95 cfs @ 3.46 hrs, Volume= 44,827 cf, Atten= 76%, Lag= 16.7 min Primary = 6.95 cfs @ 3.46 hrs, Volume= 44,827 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 639.85' @ 3.46 hrs Surf.Area= 16,125 sf Storage= 28,537 cf Plug-Flow detention time= 239.1 min calculated for 44,827 cf (87% of inflow) Center-of-Mass det. time= 224.6 min ( 434.5 - 210.0 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.94 cfs @ 3.46 hrs HW=639.85' (Free Discharge) 1=Culvert (Passes 6.94 cfs of 20.67 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 7.32 fps) 3=Orifice/Grate (Orifice Controls 6.90 cfs @ 4.60 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 123HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=182,604 sf Peak Elev=639.85' Storage=28,537 cf 28.40 cfs 6.95 cfs 6.95 cfs 0.00 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 124HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 1.14 1,427 637.68 0.01 0.01 0.00 5.00 1.05 16,434 639.00 2.00 2.00 0.00 7.50 0.00 12,020 638.64 0.21 0.21 0.00 10.00 0.00 11,150 638.57 0.05 0.05 0.00 12.50 0.00 10,859 638.54 0.03 0.03 0.00 15.00 0.00 10,623 638.52 0.03 0.03 0.00 17.50 0.00 10,390 638.50 0.03 0.03 0.00 20.00 0.00 10,160 638.48 0.03 0.03 0.00 22.50 0.00 9,932 638.46 0.03 0.03 0.00 25.00 0.00 9,706 638.45 0.02 0.02 0.00 27.50 0.00 9,482 638.43 0.02 0.02 0.00 30.00 0.00 9,261 638.41 0.02 0.02 0.00 32.50 0.00 9,043 638.39 0.02 0.02 0.00 35.00 0.00 8,826 638.37 0.02 0.02 0.00 37.50 0.00 8,612 638.35 0.02 0.02 0.00 40.00 0.00 8,401 638.33 0.02 0.02 0.00 42.50 0.00 8,192 638.31 0.02 0.02 0.00 45.00 0.00 7,986 638.30 0.02 0.02 0.00 47.50 0.00 7,781 638.28 0.02 0.02 0.00 50.00 0.00 7,580 638.26 0.02 0.02 0.00 52.50 0.00 7,380 638.24 0.02 0.02 0.00 55.00 0.00 7,184 638.23 0.02 0.02 0.00 57.50 0.00 6,989 638.21 0.02 0.02 0.00 60.00 0.00 6,797 638.19 0.02 0.02 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 125HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 2.64" for 50 yr event Inflow = 47.46 cfs @ 3.61 hrs, Volume= 180,911 cf Outflow = 17.90 cfs @ 4.22 hrs, Volume= 128,754 cf, Atten= 62%, Lag= 36.8 min Primary = 0.21 cfs @ 4.22 hrs, Volume= 34,779 cf Secondary = 17.69 cfs @ 4.22 hrs, Volume= 93,975 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.47' @ 4.22 hrs Surf.Area= 32,828 sf Storage= 107,595 cf Plug-Flow detention time= 491.4 min calculated for 128,647 cf (71% of inflow) Center-of-Mass det. time= 468.9 min ( 713.9 - 245.0 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.21 cfs @ 4.22 hrs HW=638.46' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.21 cfs @ 9.49 fps) Secondary OutFlow Max=17.67 cfs @ 4.22 hrs HW=638.46' (Free Discharge) 2=Orifice/Grate (Orifice Controls 17.67 cfs @ 2.94 fps) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 126HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Inflow Area=821,106 sf Peak Elev=638.47' Storage=107,595 cf 47.46 cfs 17.90 cfs 0.21 cfs 17.69 cfs 0.00 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 127HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.17 53 634.50 0.00 0.00 0.00 0.00 5.00 6.57 98,547 638.19 9.45 0.20 9.25 0.00 7.50 0.04 85,433 637.77 0.89 0.19 0.70 0.00 10.00 0.00 82,352 637.67 0.18 0.18 0.00 0.00 12.50 0.00 80,699 637.61 0.18 0.18 0.00 0.00 15.00 0.00 79,061 637.56 0.18 0.18 0.00 0.00 17.50 0.00 77,437 637.51 0.18 0.18 0.00 0.00 20.00 0.00 75,828 637.45 0.18 0.18 0.00 0.00 22.50 0.00 74,234 637.40 0.18 0.18 0.00 0.00 25.00 0.00 72,655 637.35 0.17 0.17 0.00 0.00 27.50 0.00 71,092 637.29 0.17 0.17 0.00 0.00 30.00 0.00 69,543 637.24 0.17 0.17 0.00 0.00 32.50 0.00 68,010 637.19 0.17 0.17 0.00 0.00 35.00 0.00 66,492 637.14 0.17 0.17 0.00 0.00 37.50 0.00 64,989 637.08 0.17 0.17 0.00 0.00 40.00 0.00 63,502 637.03 0.16 0.16 0.00 0.00 42.50 0.00 62,030 636.98 0.16 0.16 0.00 0.00 45.00 0.00 60,574 636.93 0.16 0.16 0.00 0.00 47.50 0.00 59,134 636.88 0.16 0.16 0.00 0.00 50.00 0.00 57,709 636.83 0.16 0.16 0.00 0.00 52.50 0.00 56,301 636.78 0.16 0.16 0.00 0.00 55.00 0.00 54,908 636.73 0.15 0.15 0.00 0.00 57.50 0.00 53,531 636.68 0.15 0.15 0.00 0.00 60.00 0.00 52,171 636.63 0.15 0.15 0.00 0.00 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 128HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 2.46" for 50 yr event Inflow = 15.76 cfs @ 3.52 hrs, Volume= 74,971 cf Primary = 15.76 cfs @ 3.52 hrs, Volume= 74,971 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=365,556 sf 15.76 cfs 15.76 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 129HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.35 0.00 0.35 4.00 9.31 0.00 9.31 5.00 3.07 0.00 3.07 6.00 1.74 0.00 1.74 7.00 0.36 0.00 0.36 8.00 0.14 0.00 0.14 9.00 0.07 0.00 0.07 10.00 0.05 0.00 0.05 11.00 0.03 0.00 0.03 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.03 0.00 0.03 16.00 0.03 0.00 0.03 17.00 0.03 0.00 0.03 18.00 0.03 0.00 0.03 19.00 0.03 0.00 0.03 20.00 0.03 0.00 0.03 21.00 0.03 0.00 0.03 22.00 0.03 0.00 0.03 23.00 0.03 0.00 0.03 24.00 0.03 0.00 0.03 25.00 0.02 0.00 0.02 26.00 0.02 0.00 0.02 27.00 0.02 0.00 0.02 28.00 0.02 0.00 0.02 29.00 0.02 0.00 0.02 30.00 0.02 0.00 0.02 31.00 0.02 0.00 0.02 32.00 0.02 0.00 0.02 33.00 0.02 0.00 0.02 34.00 0.02 0.00 0.02 35.00 0.02 0.00 0.02 36.00 0.02 0.00 0.02 37.00 0.02 0.00 0.02 38.00 0.02 0.00 0.02 39.00 0.02 0.00 0.02 40.00 0.02 0.00 0.02 41.00 0.02 0.00 0.02 42.00 0.02 0.00 0.02 43.00 0.02 0.00 0.02 44.00 0.02 0.00 0.02 45.00 0.02 0.00 0.02 46.00 0.02 0.00 0.02 47.00 0.02 0.00 0.02 48.00 0.02 0.00 0.02 49.00 0.02 0.00 0.02 50.00 0.02 0.00 0.02 51.00 0.02 0.00 0.02 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.02 0.00 0.02 53.00 0.02 0.00 0.02 54.00 0.02 0.00 0.02 55.00 0.02 0.00 0.02 56.00 0.02 0.00 0.02 57.00 0.02 0.00 0.02 58.00 0.02 0.00 0.02 59.00 0.02 0.00 0.02 60.00 0.02 0.00 0.02 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 130HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.73" for 50 yr event Inflow = 13.34 cfs @ 3.20 hrs, Volume= 58,392 cf Primary = 13.34 cfs @ 3.20 hrs, Volume= 58,392 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=964,418 sf 13.34 cfs 13.34 cfs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 131HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 2.37 0.00 2.37 4.00 1.61 0.00 1.61 5.00 0.84 0.00 0.84 6.00 0.66 0.00 0.66 7.00 0.19 0.00 0.19 8.00 0.19 0.00 0.19 9.00 0.19 0.00 0.19 10.00 0.18 0.00 0.18 11.00 0.18 0.00 0.18 12.00 0.18 0.00 0.18 13.00 0.18 0.00 0.18 14.00 0.18 0.00 0.18 15.00 0.18 0.00 0.18 16.00 0.18 0.00 0.18 17.00 0.18 0.00 0.18 18.00 0.18 0.00 0.18 19.00 0.18 0.00 0.18 20.00 0.18 0.00 0.18 21.00 0.18 0.00 0.18 22.00 0.18 0.00 0.18 23.00 0.18 0.00 0.18 24.00 0.18 0.00 0.18 25.00 0.17 0.00 0.17 26.00 0.17 0.00 0.17 27.00 0.17 0.00 0.17 28.00 0.17 0.00 0.17 29.00 0.17 0.00 0.17 30.00 0.17 0.00 0.17 31.00 0.17 0.00 0.17 32.00 0.17 0.00 0.17 33.00 0.17 0.00 0.17 34.00 0.17 0.00 0.17 35.00 0.17 0.00 0.17 36.00 0.17 0.00 0.17 37.00 0.17 0.00 0.17 38.00 0.17 0.00 0.17 39.00 0.17 0.00 0.17 40.00 0.16 0.00 0.16 41.00 0.16 0.00 0.16 42.00 0.16 0.00 0.16 43.00 0.16 0.00 0.16 44.00 0.16 0.00 0.16 45.00 0.16 0.00 0.16 46.00 0.16 0.00 0.16 47.00 0.16 0.00 0.16 48.00 0.16 0.00 0.16 49.00 0.16 0.00 0.16 50.00 0.16 0.00 0.16 51.00 0.16 0.00 0.16 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.16 0.00 0.16 53.00 0.16 0.00 0.16 54.00 0.15 0.00 0.15 55.00 0.15 0.00 0.15 56.00 0.15 0.00 0.15 57.00 0.15 0.00 0.15 58.00 0.15 0.00 0.15 59.00 0.15 0.00 0.15 60.00 0.15 0.00 0.15 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 132HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 3S: West Post Runoff = 1.51 cfs @ 3.22 hrs, Volume= 3,006 cf, Depth= 0.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=4.192 ac Runoff Volume=3,006 cf Runoff Depth=0.20" Tc=7.5 min CN=86 1.51 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 133HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 3S: West Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.01 4.00 0.88 0.14 0.23 5.00 0.96 0.18 0.11 6.00 1.00 0.20 0.08 7.00 1.00 0.20 0.00 8.00 1.00 0.20 0.00 9.00 1.00 0.20 0.00 10.00 1.00 0.20 0.00 11.00 1.00 0.20 0.00 12.00 1.00 0.20 0.00 13.00 1.00 0.20 0.00 14.00 1.00 0.20 0.00 15.00 1.00 0.20 0.00 16.00 1.00 0.20 0.00 17.00 1.00 0.20 0.00 18.00 1.00 0.20 0.00 19.00 1.00 0.20 0.00 20.00 1.00 0.20 0.00 21.00 1.00 0.20 0.00 22.00 1.00 0.20 0.00 23.00 1.00 0.20 0.00 24.00 1.00 0.20 0.00 25.00 1.00 0.20 0.00 26.00 1.00 0.20 0.00 27.00 1.00 0.20 0.00 28.00 1.00 0.20 0.00 29.00 1.00 0.20 0.00 30.00 1.00 0.20 0.00 31.00 1.00 0.20 0.00 32.00 1.00 0.20 0.00 33.00 1.00 0.20 0.00 34.00 1.00 0.20 0.00 35.00 1.00 0.20 0.00 36.00 1.00 0.20 0.00 37.00 1.00 0.20 0.00 38.00 1.00 0.20 0.00 39.00 1.00 0.20 0.00 40.00 1.00 0.20 0.00 41.00 1.00 0.20 0.00 42.00 1.00 0.20 0.00 43.00 1.00 0.20 0.00 44.00 1.00 0.20 0.00 45.00 1.00 0.20 0.00 46.00 1.00 0.20 0.00 47.00 1.00 0.20 0.00 48.00 1.00 0.20 0.00 49.00 1.00 0.20 0.00 50.00 1.00 0.20 0.00 51.00 1.00 0.20 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.20 0.00 53.00 1.00 0.20 0.00 54.00 1.00 0.20 0.00 55.00 1.00 0.20 0.00 56.00 1.00 0.20 0.00 57.00 1.00 0.20 0.00 58.00 1.00 0.20 0.00 59.00 1.00 0.20 0.00 60.00 1.00 0.20 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 134HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1: Pre. East WS Runoff = 0.05 cfs @ 6.16 hrs, Volume= 376 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1: Pre. East WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=22.450 ac Runoff Volume=376 cf Runoff Depth=0.00" Flow Length=1,210' Tc=57.0 min CN=70 0.05 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 135HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1: Pre. East WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.03 6.00 1.00 0.00 0.05 7.00 1.00 0.00 0.02 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 136HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E1-A: Pre. East WS to BMP Runoff = 0.04 cfs @ 6.16 hrs, Volume= 315 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total Subcatchment E1-A: Pre. East WS to BMP Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.048 0.046 0.044 0.042 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=18.850 ac Runoff Volume=315 cf Runoff Depth=0.00" Flow Length=1,210' Tc=57.0 min CN=70 0.04 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 137HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E1-A: Pre. East WS to BMP Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.03 6.00 1.00 0.00 0.04 7.00 1.00 0.00 0.01 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 138HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E2: East Post Runoff = 0.64 cfs @ 3.89 hrs, Volume= 3,993 cf, Depth= 0.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 0.320 70 Woods, Good, HSG C * 0.390 98 Retention Ponds * 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=18.850 ac Runoff Volume=3,993 cf Runoff Depth=0.06" Flow Length=1,675' Tc=39.1 min CN=78 0.64 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 139HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E2: East Post Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.03 0.62 5.00 0.96 0.05 0.32 6.00 1.00 0.06 0.21 7.00 1.00 0.06 0.02 8.00 1.00 0.06 0.00 9.00 1.00 0.06 0.00 10.00 1.00 0.06 0.00 11.00 1.00 0.06 0.00 12.00 1.00 0.06 0.00 13.00 1.00 0.06 0.00 14.00 1.00 0.06 0.00 15.00 1.00 0.06 0.00 16.00 1.00 0.06 0.00 17.00 1.00 0.06 0.00 18.00 1.00 0.06 0.00 19.00 1.00 0.06 0.00 20.00 1.00 0.06 0.00 21.00 1.00 0.06 0.00 22.00 1.00 0.06 0.00 23.00 1.00 0.06 0.00 24.00 1.00 0.06 0.00 25.00 1.00 0.06 0.00 26.00 1.00 0.06 0.00 27.00 1.00 0.06 0.00 28.00 1.00 0.06 0.00 29.00 1.00 0.06 0.00 30.00 1.00 0.06 0.00 31.00 1.00 0.06 0.00 32.00 1.00 0.06 0.00 33.00 1.00 0.06 0.00 34.00 1.00 0.06 0.00 35.00 1.00 0.06 0.00 36.00 1.00 0.06 0.00 37.00 1.00 0.06 0.00 38.00 1.00 0.06 0.00 39.00 1.00 0.06 0.00 40.00 1.00 0.06 0.00 41.00 1.00 0.06 0.00 42.00 1.00 0.06 0.00 43.00 1.00 0.06 0.00 44.00 1.00 0.06 0.00 45.00 1.00 0.06 0.00 46.00 1.00 0.06 0.00 47.00 1.00 0.06 0.00 48.00 1.00 0.06 0.00 49.00 1.00 0.06 0.00 50.00 1.00 0.06 0.00 51.00 1.00 0.06 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.06 0.00 53.00 1.00 0.06 0.00 54.00 1.00 0.06 0.00 55.00 1.00 0.06 0.00 56.00 1.00 0.06 0.00 57.00 1.00 0.06 0.00 58.00 1.00 0.06 0.00 59.00 1.00 0.06 0.00 60.00 1.00 0.06 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 140HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment E3: East Onsite Bypass Runoff = 0.01 cfs @ 5.90 hrs, Volume= 55 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.009 0.009 0.008 0.007 0.007 0.006 0.006 0.005 0.005 0.004 0.004 0.003 0.003 0.002 0.002 0.001 0.001 0.000 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=3.290 ac Runoff Volume=55 cf Runoff Depth=0.00" Tc=7.5 min CN=70 0.01 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 141HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment E3: East Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.01 6.00 1.00 0.00 0.01 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 142HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1: Pre. West WS Runoff = 0.02 cfs @ 5.98 hrs, Volume= 140 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.023 0.022 0.021 0.02 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=8.390 ac Runoff Volume=140 cf Runoff Depth=0.00" Flow Length=918' Tc=16.5 min CN=70 0.02 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 143HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.02 6.00 1.00 0.00 0.02 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 144HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W1-A: Pre. West WS Runoff = 0.01 cfs @ 5.98 hrs, Volume= 70 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West-Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 16.5 918 Total Subcatchment W1-A: Pre. West WS Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.011 0.011 0.01 0.01 0.009 0.009 0.008 0.008 0.007 0.007 0.006 0.006 0.005 0.005 0.004 0.004 0.003 0.003 0.002 0.002 0.001 0.001 0.000 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=4.190 ac Runoff Volume=70 cf Runoff Depth=0.00" Flow Length=918' Tc=16.5 min CN=70 0.01 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 145HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W1-A: Pre. West WS Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.01 6.00 1.00 0.00 0.01 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 146HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment W3: West Onsite Bypass Runoff = 0.01 cfs @ 6.04 hrs, Volume= 70 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.011 0.01 0.01 0.009 0.009 0.008 0.008 0.007 0.007 0.006 0.006 0.005 0.005 0.004 0.004 0.003 0.003 0.002 0.002 0.001 0.001 0.000 0 Charlotte 6-hr 2-yr WQ Rainfall=1.00" Runoff Area=4.200 ac Runoff Volume=70 cf Runoff Depth=0.00" Flow Length=264' Slope=0.0550 '/' Tc=31.5 min CN=70 0.01 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 147HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment W3: West Onsite Bypass Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.39 0.00 0.00 4.00 0.88 0.00 0.00 5.00 0.96 0.00 0.01 6.00 1.00 0.00 0.01 7.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 9.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 11.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 13.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 15.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 17.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 19.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 21.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 23.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 1.00 0.00 0.00 53.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 55.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 57.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 59.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 148HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 0.20" for WQ event Inflow = 1.51 cfs @ 3.22 hrs, Volume= 3,006 cf Outflow = 0.01 cfs @ 6.17 hrs, Volume= 2,172 cf, Atten= 99%, Lag= 177.1 min Primary = 0.01 cfs @ 6.17 hrs, Volume= 2,172 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 637.83' @ 6.17 hrs Surf.Area= 9,874 sf Storage= 2,870 cf Plug-Flow detention time= 1,495.4 min calculated for 2,172 cf (72% of inflow) Center-of-Mass det. time= 1,469.6 min ( 1,701.3 - 231.7 ) Volume Invert Avail.Storage Storage Description #1 637.50' 67,620 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 637.50 7,400 0 0 638.00 11,122 4,631 4,631 639.00 12,383 11,753 16,383 640.00 16,772 14,578 30,961 641.00 18,330 17,551 48,512 642.00 19,887 19,109 67,620 Device Routing Invert Outlet Devices #1 Primary 636.70'24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.70' / 636.50' S= 0.0049 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 637.50'1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 638.55'24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 641.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.01 cfs @ 6.17 hrs HW=637.83' (Free Discharge) 1=Culvert (Passes 0.01 cfs of 4.90 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.01 cfs @ 2.60 fps) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.50' (Free Discharge) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 149HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 1P: West Basin Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)1 0 Inflow Area=182,604 sf Peak Elev=637.83' Storage=2,870 cf 1.51 cfs 0.01 cfs 0.01 cfs 0.00 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 150HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 1P: West Basin Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 637.50 0.00 0.00 0.00 2.50 0.00 0 637.50 0.00 0.00 0.00 5.00 0.11 2,554 637.80 0.01 0.01 0.00 7.50 0.00 2,806 637.83 0.01 0.01 0.00 10.00 0.00 2,682 637.81 0.01 0.01 0.00 12.50 0.00 2,560 637.80 0.01 0.01 0.00 15.00 0.00 2,442 637.79 0.01 0.01 0.00 17.50 0.00 2,326 637.78 0.01 0.01 0.00 20.00 0.00 2,213 637.76 0.01 0.01 0.00 22.50 0.00 2,103 637.75 0.01 0.01 0.00 25.00 0.00 1,996 637.74 0.01 0.01 0.00 27.50 0.00 1,893 637.73 0.01 0.01 0.00 30.00 0.00 1,792 637.72 0.01 0.01 0.00 32.50 0.00 1,694 637.71 0.01 0.01 0.00 35.00 0.00 1,600 637.70 0.01 0.01 0.00 37.50 0.00 1,509 637.69 0.01 0.01 0.00 40.00 0.00 1,421 637.68 0.01 0.01 0.00 42.50 0.00 1,336 637.67 0.01 0.01 0.00 45.00 0.00 1,254 637.66 0.01 0.01 0.00 47.50 0.00 1,176 637.65 0.01 0.01 0.00 50.00 0.00 1,101 637.64 0.01 0.01 0.00 52.50 0.00 1,029 637.63 0.01 0.01 0.00 55.00 0.00 961 637.62 0.01 0.01 0.00 57.50 0.00 896 637.61 0.01 0.01 0.00 60.00 0.00 835 637.61 0.01 0.01 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 151HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Pond 5P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.06" for WQ event Inflow = 0.64 cfs @ 3.89 hrs, Volume= 3,993 cf Outflow = 0.03 cfs @ 6.83 hrs, Volume= 3,007 cf, Atten= 95%, Lag= 176.8 min Primary = 0.03 cfs @ 6.83 hrs, Volume= 3,007 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 634.69' @ 6.83 hrs Surf.Area= 20,775 sf Storage= 3,707 cf Plug-Flow detention time= 1,127.0 min calculated for 3,007 cf (75% of inflow) Center-of-Mass det. time= 1,102.2 min ( 1,384.2 - 282.0 ) Volume Invert Avail.Storage Storage Description #1 634.50' 161,487 cf East Wet Ponds (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.50 19,267 0 0 635.00 23,340 10,652 10,652 636.00 25,936 24,638 35,290 637.00 28,646 27,291 62,581 638.00 31,469 30,058 92,638 639.00 34,391 32,930 125,568 640.00 37,447 35,919 161,487 Device Routing Invert Outlet Devices #1 Primary 634.50'2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 637.68'24.0" W x 9.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 639.50'10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.03 cfs @ 6.83 hrs HW=634.69' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.03 cfs @ 1.54 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 152HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Pond 5P: Prop Retention Pond East Inflow Outflow Primary Secondary Tertiary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=821,106 sf Peak Elev=634.69' Storage=3,707 cf 0.64 cfs 0.03 cfs 0.03 cfs 0.00 cfs 0.00 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 153HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Prop Retention Pond East Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) Tertiary (cfs) 0.00 0.00 0 634.50 0.00 0.00 0.00 0.00 2.50 0.00 0 634.50 0.00 0.00 0.00 0.00 5.00 0.32 2,604 634.63 0.02 0.02 0.00 0.00 7.50 0.00 3,659 634.68 0.03 0.03 0.00 0.00 10.00 0.00 3,374 634.67 0.03 0.03 0.00 0.00 12.50 0.00 3,109 634.66 0.03 0.03 0.00 0.00 15.00 0.00 2,869 634.64 0.03 0.03 0.00 0.00 17.50 0.00 2,653 634.63 0.02 0.02 0.00 0.00 20.00 0.00 2,458 634.62 0.02 0.02 0.00 0.00 22.50 0.00 2,282 634.62 0.02 0.02 0.00 0.00 25.00 0.00 2,123 634.61 0.02 0.02 0.00 0.00 27.50 0.00 1,980 634.60 0.02 0.02 0.00 0.00 30.00 0.00 1,850 634.59 0.01 0.01 0.00 0.00 32.50 0.00 1,733 634.59 0.01 0.01 0.00 0.00 35.00 0.00 1,627 634.58 0.01 0.01 0.00 0.00 37.50 0.00 1,531 634.58 0.01 0.01 0.00 0.00 40.00 0.00 1,444 634.57 0.01 0.01 0.00 0.00 42.50 0.00 1,366 634.57 0.01 0.01 0.00 0.00 45.00 0.00 1,295 634.57 0.01 0.01 0.00 0.00 47.50 0.00 1,230 634.56 0.01 0.01 0.00 0.00 50.00 0.00 1,172 634.56 0.01 0.01 0.00 0.00 52.50 0.00 1,120 634.56 0.01 0.01 0.00 0.00 55.00 0.00 1,072 634.56 0.01 0.01 0.00 0.00 57.50 0.00 1,028 634.55 0.00 0.00 0.00 0.00 60.00 0.00 986 634.55 0.00 0.00 0.00 0.00 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 154HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 1L: (new Link) Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.07" for WQ event Inflow = 0.02 cfs @ 6.06 hrs, Volume= 2,242 cf Primary = 0.02 cfs @ 6.06 hrs, Volume= 2,242 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Inflow Area=365,556 sf 0.02 cfs 0.02 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 155HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 1L: (new Link) Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.01 0.00 0.01 5.00 0.02 0.00 0.02 6.00 0.02 0.00 0.02 7.00 0.01 0.00 0.01 8.00 0.01 0.00 0.01 9.00 0.01 0.00 0.01 10.00 0.01 0.00 0.01 11.00 0.01 0.00 0.01 12.00 0.01 0.00 0.01 13.00 0.01 0.00 0.01 14.00 0.01 0.00 0.01 15.00 0.01 0.00 0.01 16.00 0.01 0.00 0.01 17.00 0.01 0.00 0.01 18.00 0.01 0.00 0.01 19.00 0.01 0.00 0.01 20.00 0.01 0.00 0.01 21.00 0.01 0.00 0.01 22.00 0.01 0.00 0.01 23.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 25.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 27.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 29.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 31.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 33.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 35.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 37.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 39.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 41.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 43.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 45.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 47.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 49.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 51.00 0.01 0.00 0.01 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.01 0.00 0.01 53.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 55.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 57.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 59.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 156HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Summary for Link 6L: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.04" for WQ event Inflow = 0.04 cfs @ 5.97 hrs, Volume= 3,062 cf Primary = 0.04 cfs @ 5.97 hrs, Volume= 3,062 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: East Post Comb Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)0.042 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Inflow Area=964,418 sf 0.04 cfs 0.04 cfs Charlotte 6-hr 2-yr WQ Rainfall=1.00"20131483-RG1-Det-comb 2-20-18 Printed 2/22/2018Prepared by Symanetc Page 157HydroCAD® 10.00-15 s/n 07459 © 2015 HydroCAD Software Solutions LLC Hydrograph for Link 6L: East Post Comb Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.01 0.00 0.01 5.00 0.03 0.00 0.03 6.00 0.04 0.00 0.04 7.00 0.03 0.00 0.03 8.00 0.03 0.00 0.03 9.00 0.03 0.00 0.03 10.00 0.03 0.00 0.03 11.00 0.03 0.00 0.03 12.00 0.03 0.00 0.03 13.00 0.03 0.00 0.03 14.00 0.03 0.00 0.03 15.00 0.03 0.00 0.03 16.00 0.02 0.00 0.02 17.00 0.02 0.00 0.02 18.00 0.02 0.00 0.02 19.00 0.02 0.00 0.02 20.00 0.02 0.00 0.02 21.00 0.02 0.00 0.02 22.00 0.02 0.00 0.02 23.00 0.02 0.00 0.02 24.00 0.02 0.00 0.02 25.00 0.02 0.00 0.02 26.00 0.02 0.00 0.02 27.00 0.02 0.00 0.02 28.00 0.01 0.00 0.01 29.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 31.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 33.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 35.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 37.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 39.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 41.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 43.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 45.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 47.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 49.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 51.00 0.01 0.00 0.01 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.01 0.00 0.01 53.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 55.00 0.01 0.00 0.01 56.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 APPENDIX C: Site Aerial Map GoMAPS - Union County NC Public Access Monday, February 10 2014 This map is prepared for the inventory of real property found within Union County, NC and is compiled from recorded deeds, plats, and other public records and data. Users of this map are hereby notified that the aforementioned public primary information sources should be consulted for verification of the information contained on this map. Union County and the mapping companies assume no legal responsibilities for the information contained on this map. Grid based on the North Carolina State Plane Coordinate System All dimensions in feet APPENDIX D: Soils Map Soil Map—Union County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2014 Page 1 of 338882003888300388840038885003888600388870038888003888900388900038891003888200388830038884003888500388860038887003888800388890038890003889100534300534400534500534600534700534800534900535000 534300 534400 534500 534600 534700 534800 534900 535000 35° 8' 40'' N 80° 37' 28'' W35° 8' 40'' N80° 36' 56'' W35° 8' 6'' N 80° 37' 28'' W35° 8' 6'' N 80° 36' 56'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:5,110 if printed on A portrait (8.5" x 11") sheet. Map Unit Legend Union County, North Carolina (NC179) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Badin channery silt loam, 2 to 8 percent slopes 16.1 30.6% CmB Cid channery silt loam, 1 to 5 percent slopes 1.5 2.9% ScA Secrest-Cid complex, 0 to 3 percent slopes 29.5 56.3% TaB Tarrus gravelly silt loam, 2 to 8 percent slopes 5.4 10.2% Totals for Area of Interest 52.5 100.0% Soil Map—Union County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2014 Page 3 of 3 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Union County, North Carolina (NC179) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Badin channery silt loam, 2 to 8 percent slopes B 16.1 30.6% CmB Cid channery silt loam, 1 to 5 percent slopes D 1.5 2.9% ScA Secrest-Cid complex, 0 to 3 percent slopes C 29.5 56.3% TaB Tarrus gravelly silt loam, 2 to 8 percent slopes B 5.4 10.2% Totals for Area of Interest 52.5 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Union County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/17/2014 Page 3 of 4 APPENDIX E: NCDENR Supplemental BMP Calculations Permit No.______________________ (to be provided by DWQ) I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 821,106 ft2 Impervious area, post-development 374,014 ft2 % impervious 45.55 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 31,472 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required?y (Y or N) 1-yr, 24-hr rainfall depth 2.6 in Rational C, pre-development 70.00 (unitless) Rational C, post-development 78.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 2.58 in/hr OK Pre-development 1-yr, 24-hr peak flow 3.90 ft3/sec Post-development 1-yr, 24-hr peak flow 10.65 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 6.75 ft3/sec Elevations Temporary pool elevation 635.86 fmsl Permanent pool elevation 634.50 fmsl SHWT elevation (approx. at the perm. pool elevation)fmsl Top of 10ft vegetated shelf elevation 635.00 fmsl Bottom of 10ft vegetated shelf elevation 634.00 fmsl Sediment cleanout, top elevation (bottom of pond)627.00 fmsl Sediment cleanout, bottom elevation 626.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool?y (Y or N) Elevation of the top of the additional volume 635.9 fmsl OK Surface Areas Area, temporary pool 25,573 ft2 Area REQUIRED, permanent pool 15,519 ft2 SA/DA ratio 1.89 (unitless) Area PROVIDED, permanent pool, Aperm_pool 19,267 ft2 OK Area, bottom of 10ft vegetated shelf, Abot_shelf 15,541 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 3,278 ft2 Volumes Volume, temporary pool 31,684 ft3 OK Volume, permanent pool, Vperm_pool 75,868 ft3 Volume, forebay (sum of forebays if more than one forebay)15,200 ft3 Forebay % of permanent pool volume 20.0%%OK SA/DA Table Data Design TSS removal 85 % Coastal SA/DA Table Used?n (Y or N) Mountain/Piedmont SA/DA Table Used?y (Y or N) SA/DA ratio 1.89 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b)n (Y or N) Volume, permanent pool, Vperm_pool 75,868 ft3 Area provided, permanent pool, Aperm_pool 19,267 ft2 Average depth calculated 6.50 ft OK Average depth used in SA/DA, dav, (Round to nearest 0.5ft)6.5 ft OK Calculation option 2 used? (See Figure 10-2b)y (Y or N) Area provided, permanent pool, Aperm_pool 19,267 ft2 Area, bottom of 10ft vegetated shelf, Abot_shelf 15,541 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 3,278 ft2 "Depth" (distance b/w bottom of 10ft shelf and top of sediment)7.00 ft Average depth calculated 5.50 ft OK Average depth used in SA/DA, dav, (Round to down to nearest 0.5ft)5.5 ft OK Drawdown Calculations Drawdown through orifice?y (Y or N) Diameter of orifice (if circular)2.00 in Area of orifice (if-non-circular)in2 Coefficient of discharge (CD)0.60 (unitless) Driving head (Ho)1.36 ft Drawdown through weir?n (Y or N) Weir type (unitless) Coefficient of discharge (Cw)(unitless) Length of weir (L)ft Driving head (H)ft Pre-development 1-yr, 24-hr peak flow 3.90 ft3/sec Post-development 1-yr, 24-hr peak flow 10.65 ft3/sec Storage volume discharge rate (through discharge orifice or weir)0.12 ft3/sec OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice?y (Y or N)OK Freeboard provided 1.0 ft OK Vegetated filter provided?n (Y or N)Insufficient. Vegetated filter required. Recorded drainage easement provided?y (Y or N)OK Capures all runoff at ultimate build-out?y (Y or N)OK Drain mechanism for maintenance or emergencies is: STORMWATER MANAGEMENT PERMIT APPLICATION FORM Doug Turney 401 CERTIFICATION APPLICATION FORM The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. East Basins 1 & 2 Storage volume drawdown time 2.96 days Courtyards at Emerald Lake Volume provided 31,684 pump out 614-775-4213 26-Sep-14 This form must be filled out, printed and submitted. WET DETENTION BASIN SUPPLEMENT Volume provided ft3 ft3 Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 1 Permit No.______________________ (to be provided by DWQ) I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 182,516 ft2 Impervious area, post-development 91,076 ft2 % impervious 49.90 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 7,595 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 2.6 in Rational C, pre-development 70.00 (unitless) Rational C, post-development 78.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 2.58 in/hr OK Pre-development 1-yr, 24-hr peak flow 4.16 ft3/sec Post-development 1-yr, 24-hr peak flow 9.13 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 4.97 ft3/sec Elevations Temporary pool elevation 638.68 fmsl Permanent pool elevation 637.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 10ft vegetated shelf elevation 637.00 fmsl Bottom of 10ft vegetated shelf elevation 636.00 fmsl Sediment cleanout, top elevation (bottom of pond) 633.00 fmsl Sediment cleanout, bottom elevation 632.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? y (Y or N) Elevation of the top of the additional volume 638.7 fmsl OK Surface Areas Area, temporary pool 11,979 ft2 Area REQUIRED, permanent pool 2,957 ft2 SA/DA ratio 1.62 (unitless) Area PROVIDED, permanent pool, Aperm_pool 7,400 ft2 OK Area, bottom of 10ft vegetated shelf, Abot_shelf 6,516 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 3,647 ft2 Volumes Volume, temporary pool 7,679 ft3 OK Volume, permanent pool, Vperm_pool 27,042 ft3 Volume, forebay (sum of forebays if more than one forebay) 5,408 ft3 Forebay % of permanent pool volume 20.0% % OK SA/DA Table Data Design TSS removal 85 % Coastal SA/DA Table Used?n (Y or N) Mountain/Piedmont SA/DA Table Used?y (Y or N) SA/DA ratio 1.62 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b)n (Y or N) Volume, permanent pool, Vperm_pool 27,042 ft3 Area provided, permanent pool, Aperm_pool 7,400 ft2 Average depth calculated 3.65 ft OK Average depth used in SA/DA, dav, (Round to nearest 0.5ft)3.5 ft OK Calculation option 2 used? (See Figure 10-2b)y (Y or N) Area provided, permanent pool, Aperm_pool 7,400 ft2 Area, bottom of 10ft vegetated shelf, Abot_shelf 6,516 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 3,647 ft2 "Depth" (distance b/w bottom of 10ft shelf and top of sediment)3.00 ft Average depth calculated 3.98 ft OK Average depth used in SA/DA, dav, (Round to down to nearest 0.5ft)4.0 ft OK Drawdown Calculations Drawdown through orifice?y (Y or N) Diameter of orifice (if circular)1.00 in Area of orifice (if-non-circular)in2 Coefficient of discharge (CD)0.60 (unitless) Driving head (Ho)0.77 ft Drawdown through weir?n (Y or N) Weir type (unitless) Coefficient of discharge (Cw) (unitless) Length of weir (L)ft Driving head (H)ft Pre-development 1-yr, 24-hr peak flow 4.16 ft3/sec Post-development 1-yr, 24-hr peak flow 9.13 ft3/sec Storage volume discharge rate (through discharge orifice or weir)0.02 ft3/sec OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice?y (Y or N)OK Freeboard provided 1.0 ft OK Vegetated filter provided?n (Y or N)Insufficient. Vegetated filter required. Recorded drainage easement provided?y (Y or N)OK Capures all runoff at ultimate build-out?y (Y or N)OK Drain mechanism for maintenance or emergencies is: STORMWATER MANAGEMENT PERMIT APPLICATION FORM Doug Turney 401 CERTIFICATION APPLICATION FORM The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. West Basin 3 Storage volume drawdown time 4.44 days Courtyards at Emerald Lake Volume provided 7,679 pump out 614-775-4213 21-Feb-18 This form must be filled out, printed and submitted. WET DETENTION BASIN SUPPLEMENT Volume provided ft3 ft3 Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 1