Loading...
HomeMy WebLinkAbout20180372 Ver 1_More Info Received_20180313NORTH CAROLINA FINAL DRAWING NOT RELEASED FOR CONSTRUCTION NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 OR 811 CONTRACTOR SHALL ADHERE TO THE NORTH CAROLINA UNDERGROUND UTILITY SAFETYAND DAMAGE PREVENTION ACT FOR ALL EXCAVATIONS OPERATIONS. UTILITIES EXTENSION VICINITY MAP NOT TO SCALE TWC PROJECT NO. 2488-GX m.mm"EBRUARY 2018 CHAIRMAN LEONARD WIGGINS VICE CHAIRMAN ,JONATHAN FELTON COMMISSIONERS EVELYN POWELL VIOLA HARRIS. DONALD C. BOSWELL REV. WAYN E H I N ES WILLIAM "BILLY" WOOTEN COUNTY MANAGER ERIC EVANS DIRECTOR OF WATER AND SEWER WORKS MICHAEL MATTHEWS THE WOOTEN COMPANY 301 West 14th Street Greenville NC 27834 252.757.1096 fax 252.757.3221 License Number: F-0115 a. 041415 •� Z.1Fi.Zo1 %�,/� ••:�NG INET ��'• ; �AA1 A`a� �c C"10 T a 'Qa r NC Hwy 97 v L r U PROJECT SITE Ug �Wy 64 ByAvss Bz < � o Anaconda Rd. 1 LIS rrY 64 Bypass Li C wY 43 PROJECT AREA MAP NOT TO SCALE :� o U Q �o a, 0 O a N ti NORTH CAROLINA FINAL DRAWING NOT RELEASED FOR CONSTRUCTION NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 OR 811 CONTRACTOR SHALL ADHERE TO THE NORTH CAROLINA UNDERGROUND UTILITY SAFETYAND DAMAGE PREVENTION ACT FOR ALL EXCAVATIONS OPERATIONS. UTILITIES EXTENSION VICINITY MAP NOT TO SCALE TWC PROJECT NO. 2488-GX m.mm"EBRUARY 2018 CHAIRMAN LEONARD WIGGINS VICE CHAIRMAN ,JONATHAN FELTON COMMISSIONERS EVELYN POWELL VIOLA HARRIS. DONALD C. BOSWELL REV. WAYN E H I N ES WILLIAM "BILLY" WOOTEN COUNTY MANAGER ERIC EVANS DIRECTOR OF WATER AND SEWER WORKS MICHAEL MATTHEWS THE WOOTEN COMPANY 301 West 14th Street Greenville NC 27834 252.757.1096 fax 252.757.3221 License Number: F-0115 a. 041415 •� Z.1Fi.Zo1 %�,/� ••:�NG INET ��'• ; �AA1 A`a� �c C"10 T a 'Qa r NC Hwy 97 v L r U PROJECT SITE Ug �Wy 64 ByAvss Bz < � o Anaconda Rd. 1 LIS rrY 64 Bypass Li C wY 43 PROJECT AREA MAP NOT TO SCALE N O Z 0 NEW STABILIZATION TIME FRAME O -p STABILIZATIOIN 66 I� E O 7 DAYS LEFT m ° HIGH QUALITY WATER (HQW) ZONES 7 DAYS a _ Q.0 STAPES STEEPER THAN 3:1 Li IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 21,14 DAYS ARE ALLOWED. WATER VALVE C9 ® rsnr TEMPORARY BENCHMARK MAXIMUM PN 7 DA S FOR SLOPES GREATER THAN S LOPES 3:1 OR FLATTER 14 DAYS 4 50' IN LENGTH NEW STABILIZATION TIME FRAME (Effective August 3, 2011) SITE AREA DESCRIPTION STABILIZATIOIN TIME FRAME EXCEPTIONS OPERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS LEFT NONE ° HIGH QUALITY WATER (HQW) ZONES 7 DAYS NEW NONE STAPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 21,14 DAYS ARE ALLOWED. WATER VALVE ►� ® rsnr TEMPORARY BENCHMARK MAXIMUM PN 7 DA S FOR SLOPES GREATER THAN S LOPES 3:1 OR FLATTER 14 DAYS 4 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS • man AND HQW ZONES. I FC-FNn MISCELLANEOUS EXISTING NEW - - - - PROPERTY LINE TREE / WOODS LINE FIELD LINE - - - RIGHT-OF-WAY MAJOR CONTOUR - - - - - - - MINOR CONTOUR PERM. UTILITY EASEMENT [ Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org INDEX TO DRAWINGS C.1.1 COVER SHEET C.1.2 SHEET INDEX, ABBREVIATIONS, GENERAL NOTES & LEGEND C.1.3 INDEX TO SHEET C.2.1 NEW 16" WATERLINE PLAN VIEW STA o+oo TO 20+00 (+/-) C.2.2 NEW 16" WATERLINE PLAN VIEW STA 20+00 TO 53+00 (+/-) C.2.3 NEW 16" WATERLINE PLAN VIEW STA 53+oo TO 84+00 (+/-) C.2.4 NEW 16" WATERLINE PLAN VIEW STA 84+oo TO 1o6+oo (+/-) C.2.5 NEW 16" WATERLINE PLAN VIEW STA 106+oo TO 138+oo (+/-) C.2.6 NEW 16" WATERLINE PLAN VIEW STA 138+oo TO 17o+oo (+/-) C.2.7 NEW 16" WATERLINE PLAN VIEW STA i7o+oo TO END. C.2.8 NEW 16" WATERLINE PLAN VIEW HART CHAPEL RD. STA o+oo TO END. C.3.1 NEW lo" FORCE MAIN PLAN VIEW STA o+oo TO 20+00 (+/-) C.3.2 NEW 1o" FORCE MAIN PLAN VIEW STA 20+00 TO 42+00 (+/-) C.3.3 NEW 1o" FORCE MAIN PLAN VIEW STA 42+oo TO 6o+oo (+/-) C.3.4 NEW 1o" FORCE MAIN PLAN VIEW STA 6o+oo TO END. C.4.1 NEW 3o" GRAVITY SEWER PLAN & PROFILE STA o+oo TO 13+50 (+/-) C.4.2 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 13.00+oo TO 23+00 C.4.3 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 23.00+oo TO 36+oo C.4.4 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 36+oo TO END. C.5.1. NEW KINGSBORO PUMP STATION EXISTING & GRADING PLAN C.5.2 NEW KINGSBORO PUMP STATION SITE PLAN C.5.3 NEW KINGSBORO PUMP STATION SITE PLAN LAYOUT & SECTION C.5.4 NEW KINGSBORO PUMP STATION DETAILS C.5.5 ADD ALTERNATIVE 1 & 2 MECHANICAL BAR SCREEN SITE PLAN & DETAILS C.5.6 ADD ALTERNATIVE 1 & 2 MECHANICAL BAR SCREEN LAYOUT & DETAILS C.6.1 WATER DETAILS C.7.1 SEWER DETAILS C.8.1 GENERAL DETAILS C.8.2 GENERAL DETAILS C.9.1 SEDIMENT AND EROSION CONTROL DETAILS SURVEY LP LIGHT POLE WATER AREA EXISTING LEFT NEW EXISTING I V& NEW °M BENCHMARK xwv WATER VALVE ►� ® rsnr TEMPORARY BENCHMARK MAXIMUM PN FIRE HYDRANT -�►� ®cu CONCRETE MONUMENT AL 4 REDUCERIINCREASER MECHANICAL 0" IRON PIPE • man AIR RELEASE 4+4 ® MANHOLE N mw" WATER METER • H$T HUB & TACK MIN MINIMUM ARV AIR RELEASE VALVE 0 NRk NAIL • LPLUG PLUG r 0 NAIL & CAP N/A 5" YARD HYDRANT i 0 PKNAIL • ®WELL WELL NORTH AMERICAN DATUM 1963 BLDG BUILDING NC ---W- WATER LINE -W- cTcr CONIFEROUS TREE BOA ® PRV B BOT BOTTOM NO. NUMBER BW BARB WIRE NTS DECIDUOUS TREE NOM NOMINAL oTrrEE CURB AND GUTTER NWL NORMAL WATER LEVEL CB CATCH BASIN Orae SHRUB C CENTERLINE DC ON CENTER CIP CAST IRON PIPE OD OUTSIDE DIAMETER CI CURB INLET +665.5UTILITIES SPOT ELEVATION CLR CLEARANCE ORIG ORIGINAL CM CONCRETE MONUMENT EXISTING CMP NEW PC PAVED ROADS CMU �PP POWER POLE PEDESTAL Q FIBER OPTIC MARKER POST PE RLv LIGHT POLE CONCRETE PI POINT OF INTERSECTION CONT -)GUY GUYWIRE POST INDICATOR VALVE CONSIR CONSTRUCTION P °ry CABLE TV PEDESTAL CONTRACTOR PP POWER POLE CDR (D,, TELEPHONE PEDESTAL PRESSURE REDUCING VALVE CULV SEWER PSI R." ELECTRIC METER PVC POLYVINYLCHLORIDE ❑rRav TRANSFORMER PT EXISTING DI NEW PVMT PAVEMENT DIA 0C, ssuN MANHOLE © G- GAS LINE R RADIUS DIM DIMENSION -FO FIBER OPTIC LINE DISCH O co CLEAN OUT o DIST DISTANCE REF REFERENCE DOT DEPARTMENT OF TRANSPORTATION -T- TELEPHONE LINE DW SS SEWER LIINE -SS- RETAINING DELTA REV REVISED -E- ELECTRIC LINE E -FM FORCE MAIN -FM- REVOLUTIONS PER MINUTE EACH REINF Qem ARV EFFLUENT RT RIGHT EIP 7vr-aexr ARV -OFFSET EL ELEVATION SAN SIDEWALK IC EROSION CONTROL SANITARY EP EDGE OF PAVEMENT EXISTING SCHEDULE NEW EACH WAY SDMH STORM DRAINAGE MANHOLE ----- DITCH/SWALE SF STORM DRAINAGE EXPANSION JOINT SHT SHEET S SOUTH F.F.E. STONE CHECK DAM SPECS EXISTING S NEW S INLET PROTECTION FH pceiw CATCH BASINI INLET STEEL FIN FINISH ST DEQ FLARED END SECTION FLANGE STA. RIP -RAP °psrMN MANHOLE SID STANDARD SILT FENCE FIRE PROTECTION _ - - - CULVERT FES FEET PER SECOND ARC FILTER FT DIRECTION OF FLOW T TEMPORARY SEDIMENT TRAP a FOOTING IBM TEMPORARY BENCH MARK LIMIT OF DISTURBANCE -LOD- MISCELLANEOUS EXISTING NEW - - - - PROPERTY LINE TREE / WOODS LINE FIELD LINE - - - RIGHT-OF-WAY MAJOR CONTOUR - - - - - - - MINOR CONTOUR PERM. UTILITY EASEMENT [ Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org INDEX TO DRAWINGS C.1.1 COVER SHEET C.1.2 SHEET INDEX, ABBREVIATIONS, GENERAL NOTES & LEGEND C.1.3 INDEX TO SHEET C.2.1 NEW 16" WATERLINE PLAN VIEW STA o+oo TO 20+00 (+/-) C.2.2 NEW 16" WATERLINE PLAN VIEW STA 20+00 TO 53+00 (+/-) C.2.3 NEW 16" WATERLINE PLAN VIEW STA 53+oo TO 84+00 (+/-) C.2.4 NEW 16" WATERLINE PLAN VIEW STA 84+oo TO 1o6+oo (+/-) C.2.5 NEW 16" WATERLINE PLAN VIEW STA 106+oo TO 138+oo (+/-) C.2.6 NEW 16" WATERLINE PLAN VIEW STA 138+oo TO 17o+oo (+/-) C.2.7 NEW 16" WATERLINE PLAN VIEW STA i7o+oo TO END. C.2.8 NEW 16" WATERLINE PLAN VIEW HART CHAPEL RD. STA o+oo TO END. C.3.1 NEW lo" FORCE MAIN PLAN VIEW STA o+oo TO 20+00 (+/-) C.3.2 NEW 1o" FORCE MAIN PLAN VIEW STA 20+00 TO 42+00 (+/-) C.3.3 NEW 1o" FORCE MAIN PLAN VIEW STA 42+oo TO 6o+oo (+/-) C.3.4 NEW 1o" FORCE MAIN PLAN VIEW STA 6o+oo TO END. C.4.1 NEW 3o" GRAVITY SEWER PLAN & PROFILE STA o+oo TO 13+50 (+/-) C.4.2 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 13.00+oo TO 23+00 C.4.3 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 23.00+oo TO 36+oo C.4.4 NEW 18" GRAVITY SEWER PLAN & PROFILE STA 36+oo TO END. C.5.1. NEW KINGSBORO PUMP STATION EXISTING & GRADING PLAN C.5.2 NEW KINGSBORO PUMP STATION SITE PLAN C.5.3 NEW KINGSBORO PUMP STATION SITE PLAN LAYOUT & SECTION C.5.4 NEW KINGSBORO PUMP STATION DETAILS C.5.5 ADD ALTERNATIVE 1 & 2 MECHANICAL BAR SCREEN SITE PLAN & DETAILS C.5.6 ADD ALTERNATIVE 1 & 2 MECHANICAL BAR SCREEN LAYOUT & DETAILS C.6.1 WATER DETAILS C.7.1 SEWER DETAILS C.8.1 GENERAL DETAILS C.8.2 GENERAL DETAILS C.9.1 SEDIMENT AND EROSION CONTROL DETAILS GENERAL NOTES: ADHERE TO THE FOLLOWING ITEMS IN THE CONSTRUCTION OF CONTRACT 1: KINGSBORO INDUSTRIAL PARK, UTILITIES EXTENSION FOR EDGECOMBE COUNTY UNLESS OTHERWISE NOTED. 1. EXISTING UTILITIES ARE LOCATED ON PLANS APPROXIMATELY. NOTIFY UTILITY LOCATING SERVICE TO MARK LOCATION OF EXISTING UTILITIES AT LEAST 72 HOURS PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. CONTRACTOR RESPONSIBLE FOR VERIFYING EXACT LOCATION OF THESE EXISTING UTILITIES. THE COST TO REPAIR THESE FACILITIES, IF DAMAGED, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 2. CONTRACTOR SHALL CONTACT THE N.C. DEPARTMENT OF TRANSPORTATION PRIOR TO ANY WORK WITHIN NCDOT RIGHT-OF-WAY. THE NCDOT ASSTfANT DISTRICT ENGINEER FOR THIS PROJECT IS KRISTIN BARNES,PE (252-5834230) FOR EDGECOMBE COUNTY. 3. CONTRACTOR SHALL PROTECT EXISTING PROPERTY CORNER MARKERS. DISTURBED PROPERTY CORNERS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 4. TEMPORARILY REMOVE MINOR ITEMS AS REQUIRED FOR THE INSTALLATION OF THE UTILITY. MINOR ITEMS SHALL INCLUDE, BUT NOT BE LIMITED TO, EXISTING SIGNS, MAIL BOXES, SHRUBS (UNDER 6FT IN HEIGHT, AND TREES (UNDER 3 INCHES IN DIAMETER). REINSTALL ITEMS TO THEIR ORIGINAL CONDITION. TREES AND SHRUBS SHALL BE REPLANTED OUTSIDE OF EASEMENT AND RIGHTS-OF-WAY AT A LOCATION AGREED TO BY THE PROPERTY OWNER. INCLUDE COST IN THE PER FOOT COST OF THE UTILITY BEING INSTALLED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGES TO EXISTING UTILITIES, STORM DRAINAGE, HEADWALLS, AND OTHER FACILITIES CAUSED BY THE CONTRACTOR OR RESULTING FROM THE CONTRACTOR'S WORK ASSOCIATED WITH ACCOMPLISHING THE PROJECT. THE CONTRACTOR SHALL CORRECT OR REPLACE THOSE UTILITIES, STORM DRAINAGE, HEADWALLS, AND OTHER FACILITIES DAMAGED OR DESTROYED DURING CONSTRUCTION WHETHER SHOWN ON THE PLANS ORNOT, ACCORDING TO THE NCDOT ENGINEER'S SPECIFICATIONS WITHIN NCDOT RIGHT - OF - WAY AND ENGINEER'S SPECIFICATIONS OUTSIDE OF RIGHT - OF - WAY. 6. SUPPORT EXISTING POLES, FENCES, CULVERTS, PAVEMENT, UTILITIES, CURBING AND OTHER STRUCTURES DURING CONSTRUCTION. REPAIR DAMAGED ITEMS TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER ACCORDING TO THE NCDOT ENGINEER'S SPECIFICATIONS WITHIN NCDOT RIGHT - OF - WAY AND ENGINEER'S SPECIFICATIONS OUTSIDE OF RIGHT - OF - WAY. 7. 6 INCHES OF NCDOT ABC AGGREGATE SHALL BE PROVIDED FOR THE FULL WIDTH OF UNPAVED DRIVEWAYS AND ROADS 5 FOOT WIDE. 8. OPEN CUT GRAVEL DRIVEWAYS, REPLACE CURB AND GUTTER AND SIDEWALK WITH NEW CONCRETE TO MATCH THE EXISTING CROSS SECTION. PROVIDE PAVEMENT PATCHING PER DETAILS. 9. THE PROJECT AREA INCLUDES RESIDENTIAL AND COMMERCIAL NEIGHBORHOODS REQUIRING CONTINUOUS INGRESS AND EGRESS FACILITIES. THE CONTRACTOR SHALL UTILIZE ANY AND ALL CONSTRUCTION METHODS, INCLUDING INCIDENTAL STONE, AS NECESSARY TO MAINTAIN INGRESS AND EGRESS TO ALL PROPERTIES AT ALL TIMES DURING THE CONSTRUCTION PERIOD EXCEPT DURING THE TIME PERIOD REQUIRED FOR EXCAVATION, PIPE LAYING, AND BACKFILLING. 10. SEE NCDOT STANDARD SPECIFICATIONS FOR INSTALLATION OF UTILITIES WITHIN NCDOT RIGHTS-OF-WAY. 11. CONTRACTOR SHALL INSTALL VALVE MARKERS FOR EACH MAIN LINE VALVE PER DETAIL. 12. CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION AND SIZE OF ALL EXISTING UTILITIES A MINIMUM OF 300 FEET IN ADVANCE OF PIPE LAYING ACTIVITIES. NOTIFY THE ENGINEER IMMEDIATELY IF A POTENTIAL CONFLICT ARISES BETWEEN THE EXISTING AND PROPOSED UTILITIES. 13. VALVES SHALL NOT BE PLACED WITHIN A DITCH OR DRAINAGE FEATURES. 14. EXISTING TREES ARE TO BE PROTECTED UNLESS OTHERWISE NOTED. 15. RIVER BASIN: TAR-PAMLICO 16. LIDAR SOURCE: JAMES C. GRAY JR., FIRM/ESP # L-4778 EROSION CONTROL NOTES: 1. INSTALL SILT FENCE OVER AND AROUND THE TOP OF EXISTING PIPES AND INLETS AT DISTURBED AREAS. 2. ALL DISTURBED AREAS SHALL BE GRADED TO MINIMIZE RUNOFF. 3. INSTALL SILT FENCE AROUND SPOIL PILES AND ALONG TRENCHES TO MINIMIZE SEDIMENT FROM ENTERING ROADSIDE DITCHES AND EXISTING DRAINAGE OUTLETS. 4. ALL DISTURBED AREAS ON THE BANKS AND APPROACHES TO DITCH, STREAM OR CREEK CROSSINGS SHALL BE GRADED NOT TO EXCEED 2:1 RATIO AND STABILIZED WITH BANK STABILIZATION. SURFACE WATER RUNOFF SHALL BE DIVERTED FROM DISTURBED AREAS. 5. PROVIDE EROSION CONTROL MEASURES AROUND STOCKIWASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 6. PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF FROM LAND DISTURBING ACTIVITIES WITH SILT FENCE, STONE CHECK DAM, OR ARC FILTER AS APPROPRIATE FOR SITE CONDITIONS. 7. REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH EQUAL OR GREATER AMOUNT OF RIP -RAP IMMEDIATELY UPON COMPLETION OF INSTALLATION OF PIPE. 8. WHERE THE AREA AROUND AN OUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS, CLASS "I" RIP -RAP SHALL BE PLACED AROUND PIPE OUTLET AS NEEDED OR AS DIRECTED BY THE ENGINEER. 9. ALL DISTURBED AREAS RELATED TO PIPE INSTALLATION SHALL BE TEMPORARY SEEDED WITHIN SEVEN (7) CALENDAR DAYS ON SLOPES AND FOURTEEN (14) CALENDAR DAYS ON ANY OTHER DISTURBED AREA. 10. TRENCH SHOULD BE BACKFILLED DAILY. 11. NEW OR AFFECTED CUT OR FILLED SLOPES MUST BE AT AN ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, AND MUST BE PROVIDED WITH A GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE (ROUGH OR FINAL) OF GRADING (RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS NOR IS IT AN ACCEPTABLE SUBSTITUTE FOR THE PROVIDING OF A TEMPORARY GROUND COVER). 12. PROVIDE STABILIZATION PER NPDES PERMIT UNLESS OTHERWISE STIPULATED. 13. TO FACILITATE IN CLEANUP, PLACE A LAYER OF SAND, SCREENING OR FINES ON ANY PAVED SURFACE PRIOR TO DEPOSITING ANY EXCAVATED MATERIAL. 14. EROSION CONTROL MATTING SHALL BE ADDED TO THE SILT FENCING OUTLETS AS NEEDED. 15. ADEQUATE E&S CONTROL MEASURES MUST BE INSTALLED DURING CLEARING/GRUBBING OR DEMOLITION PHASES. 16. AT NO POINT DURING CONSTRUCTION OF CONTRACT I SHALL THE CONTRACTOR HAVE GREATER THAN 5 AC. OF DISTURBED, NON -SEEDED AREA. EROSION CONTROL CONSTRUCTION SEQUENCE: 1. CONTACT LAND QUALITY AT (919-791-4200) BEFORE ANY WORK BEGINS. 2. POST COPY OF CERTIFICATE OF EROSION CONTROL PLAN APPROVAL. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS OR SPECIFIED IN THE SPECIFICATIONS. 4. ONCE EROSION CONTROL DEVICES ARE APPROVED, BEGIN CONSTRUCTION OPERATIONS. 5. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING INSTALLATION OF SEWER SYSTEM INSPECT DEVICES AFTER EVERY RAINFALL EVENT AND CLEAN OUT TRAPS AND/OR CHECK DAMS WHEN HALF FULL. 6. AS CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, OR AS NEEDED OR DIRECTED BY ENGINEER. 7. SEED AND MULCH DISTURBED AREAS WITHIN SEVEN (7) CALENDAR DAYS ON SLOPES AND FOURTEEN (14) CALENDAR DAYS ANYWHERE ELSE AND: A. UPON COMPLETION OF ANY PHASE OF CONSTRUCTION B. WHEN WORK WILL NOT PROCEED IN AN AREA WITHIN THE ABOVE TIME FRAME. 8. AFTER SITE IS STABILIZED, REQUEST AN INSPECTION BY LAND QUALITY. UPON APPROVAL OF SITE STABILIZATION, REMOVE TEMPORARY EROSION DEVICES, DRESS OUT AREA, AND SEED AND MULCH. PERMANENT EROSION CONTROL DEVICES SHALL BE INSTALLED AND APPROVED BY ENGINEER- 9. NGINEER9. POST CONSTRUCTION AND EXISTING GRADES WITHIN THE LIMITS OF DISTURBANCE SHALL BE THE SAME TO THE GREATEST EXTENT PRACTICABLE SO AS NOT TO CHANGE DRAINAGE PATTERNS, NOR TO CREATE POCKET WETLANDS. POSITIVE DRAINAGE SHALL BE PROVIDED. 10. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRED THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM ht4)://deq.nc.gov/about/divisions/energy-mineral-land-resources/crosion-sediment-control. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. 111. PERMANENT GROUND COVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER 1 IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. rn Z 0 w <r z w 0 0 U co Ir w a LU LU Cn F_ Z 0 W m 0 W 0 W z J 0 U x R z f Z Z3 0 W m m O w C'3 w W LL Z Q 0 CC 55 W U) 0 W z rn W Cr 0 ~ J U U11 Cn W W (/) W z d Z W CD J W Z J a W Z W S EIIIL�_ 041415 I G....vf�IOPP`��=: ," 'jAM ,,A,�P0. DESIGNED BY: LP LIGHT POLE A AREA IT LEFT ARAND ABANDONED I V& LOW WATER LEVEL ABC AGGREGATE BASE COURSE 2488 - GX AC ACRES MAX MAXIMUM A.F.E ABOVE FINISHED FLOUR MECH MATERIAL AL ALUMINUM MAn MECHANICAL APPROX APPROXIMATE MFR. MANUFACTURER ASPH ASPHALT MH MANHOLE ASSY ASSEMBLY MI MECHANICAL JOINT AVG AVERAGE MIN MINIMUM ARV AIR RELEASE VALVE MON MONUMENT AZ AZIMUTH AWWA AMERICAN WATER WORKS ASSOCIATION N/A NOT AVAILABLE N NORTH B -B BACK OF CURB TO BACK OF CURB NAD 83 NORTH AMERICAN DATUM 1963 BLDG BUILDING NC NORMAL CROWN BM BENCHMARK NC GRID NORTH CAROLINA GRID BOA BLOW -OFF ASSEMBLY NOGS NORTH CAROLINA GEODETIC SURVE BOT BOTTOM NO. NUMBER BW BARB WIRE NTS NOT TO SCALE NOM NOMINAL C&G CURB AND GUTTER NWL NORMAL WATER LEVEL CB CATCH BASIN C CENTERLINE DC ON CENTER CIP CAST IRON PIPE OD OUTSIDE DIAMETER CI CURB INLET O/H OVERHEAD CLR CLEARANCE ORIG ORIGINAL CM CONCRETE MONUMENT CMP CORRUGATED METAL PIPE PC POINT OF CURVATURE CMU CONCRETE MASONARY UNIT PED PEDESTAL CO CLEAN OUT PE PLAIN END CONC CONCRETE PI POINT OF INTERSECTION CONT CONTINUOUS PIV POST INDICATOR VALVE CONSIR CONSTRUCTION P PROPERTY LINE CONTR CONTRACTOR PP POWER POLE CDR CORNER PRV PRESSURE REDUCING VALVE CULV CULVERT PSI POUNDS PER SQUARE INCH PVC POLYVINYLCHLORIDE D DEPTH PT POINT OR POINT OF TANGENCY DI DROPINLET PVMT PAVEMENT DIA DIAMETER DIP DUCTILE IRON PIPE R RADIUS DIM DIMENSION RIGHT OF WAY DISCH DISCHARGE RCP REINFORCED CONCRETE PIPE DIST DISTANCE REF REFERENCE DOT DEPARTMENT OF TRANSPORTATION REQ'D REQUIRED DW DOMESTIC WATER RET RETAINING DELTA REV REVISED RPZ REDUCED PRESSURE ZONE E EAST RPM REVOLUTIONS PER MINUTE EA EACH REINF REINFORCED EFF EFFLUENT RT RIGHT EIP EXISTING IRON PIPE EL ELEVATION SAN SIDEWALK IC ELECTRIC SANITARY EP EDGE OF PAVEMENT SOH SCHEDULE EW EACH WAY SDMH STORM DRAINAGE MANHOLE EI EXISTING SF SILT FENCE EXP -H. EXPANSION JOINT SHT SHEET S SOUTH F.F.E. FINISHED FLOOR ELEVATION SPECS SPECIFICATIONS S FINISHED GRADE S SQUARE FH FIRE HYDRANTSS STEEL FIN FINISH ST STREET FIG FLANGE STA. STATION FM FORCE MAIN SID STANDARD FP FIRE PROTECTION SYM SYMBOL FES FEET PER SECOND FT FEET T TANGENT FIG FOOTING IBM TEMPORARY BENCH MARK TCP TERRA COTTA PIPE G GAS TDD TEMPORARY DIVERSION DITCH GA GAGE TEL TELEPHONE GALV GALVANIZED TEL PED TELEPHONE PEDESTAL GM GAS METER TEMP TEMPORARY GPM GALLONS PER MINUTE THK THICK R GRADE TOC TOP OF CURB 'N GATE VALVE TOP TDP OF SLOPE GYP GYPSUM TOW TOP OF WALL TP TELEPHONE POLE HCP HANDICAPPED TRANS TRANSFORMER HT HEIGHT TYP TYPICAL HOR HORIZONTAL HP HORSEPOWER U/G UNDERGROUND HWA HIGH WATER ALARM HWL HIGH WATER LEVEL VC VERTICAL CURVE HYD HYDRANT VCP VITRIFIED CLAY PIPE VERT VERTICAL ID INSIDE DIAMETER VOL VOLUME IN INCH VPC VERTICAL POINT OF CURVATURE IN/HR INCHES PER HOUR VPI VERTICAL POINT OF INTERSECTION INF INFLUENT VPT VERTICAL POINT OF TANGENCY IM INV INVERT W/ WITH IES IRON PIPE SET WL WATER LINE ESL ISLAND WM WATER METER WT WEIGHT )B JUNCTION BOX WV WATER VALVE WTP WATER TREATMENT PLANT KWY KEYWAY WWF WELDED WIRE FABRIC W WTP WASTE WATER TREATMENT PLANT U LINEAR FEET L LENGTH YI YARD INLET GENERAL NOTES: ADHERE TO THE FOLLOWING ITEMS IN THE CONSTRUCTION OF CONTRACT 1: KINGSBORO INDUSTRIAL PARK, UTILITIES EXTENSION FOR EDGECOMBE COUNTY UNLESS OTHERWISE NOTED. 1. EXISTING UTILITIES ARE LOCATED ON PLANS APPROXIMATELY. NOTIFY UTILITY LOCATING SERVICE TO MARK LOCATION OF EXISTING UTILITIES AT LEAST 72 HOURS PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. CONTRACTOR RESPONSIBLE FOR VERIFYING EXACT LOCATION OF THESE EXISTING UTILITIES. THE COST TO REPAIR THESE FACILITIES, IF DAMAGED, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 2. CONTRACTOR SHALL CONTACT THE N.C. DEPARTMENT OF TRANSPORTATION PRIOR TO ANY WORK WITHIN NCDOT RIGHT-OF-WAY. THE NCDOT ASSTfANT DISTRICT ENGINEER FOR THIS PROJECT IS KRISTIN BARNES,PE (252-5834230) FOR EDGECOMBE COUNTY. 3. CONTRACTOR SHALL PROTECT EXISTING PROPERTY CORNER MARKERS. DISTURBED PROPERTY CORNERS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 4. TEMPORARILY REMOVE MINOR ITEMS AS REQUIRED FOR THE INSTALLATION OF THE UTILITY. MINOR ITEMS SHALL INCLUDE, BUT NOT BE LIMITED TO, EXISTING SIGNS, MAIL BOXES, SHRUBS (UNDER 6FT IN HEIGHT, AND TREES (UNDER 3 INCHES IN DIAMETER). REINSTALL ITEMS TO THEIR ORIGINAL CONDITION. TREES AND SHRUBS SHALL BE REPLANTED OUTSIDE OF EASEMENT AND RIGHTS-OF-WAY AT A LOCATION AGREED TO BY THE PROPERTY OWNER. INCLUDE COST IN THE PER FOOT COST OF THE UTILITY BEING INSTALLED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGES TO EXISTING UTILITIES, STORM DRAINAGE, HEADWALLS, AND OTHER FACILITIES CAUSED BY THE CONTRACTOR OR RESULTING FROM THE CONTRACTOR'S WORK ASSOCIATED WITH ACCOMPLISHING THE PROJECT. THE CONTRACTOR SHALL CORRECT OR REPLACE THOSE UTILITIES, STORM DRAINAGE, HEADWALLS, AND OTHER FACILITIES DAMAGED OR DESTROYED DURING CONSTRUCTION WHETHER SHOWN ON THE PLANS ORNOT, ACCORDING TO THE NCDOT ENGINEER'S SPECIFICATIONS WITHIN NCDOT RIGHT - OF - WAY AND ENGINEER'S SPECIFICATIONS OUTSIDE OF RIGHT - OF - WAY. 6. SUPPORT EXISTING POLES, FENCES, CULVERTS, PAVEMENT, UTILITIES, CURBING AND OTHER STRUCTURES DURING CONSTRUCTION. REPAIR DAMAGED ITEMS TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER ACCORDING TO THE NCDOT ENGINEER'S SPECIFICATIONS WITHIN NCDOT RIGHT - OF - WAY AND ENGINEER'S SPECIFICATIONS OUTSIDE OF RIGHT - OF - WAY. 7. 6 INCHES OF NCDOT ABC AGGREGATE SHALL BE PROVIDED FOR THE FULL WIDTH OF UNPAVED DRIVEWAYS AND ROADS 5 FOOT WIDE. 8. OPEN CUT GRAVEL DRIVEWAYS, REPLACE CURB AND GUTTER AND SIDEWALK WITH NEW CONCRETE TO MATCH THE EXISTING CROSS SECTION. PROVIDE PAVEMENT PATCHING PER DETAILS. 9. THE PROJECT AREA INCLUDES RESIDENTIAL AND COMMERCIAL NEIGHBORHOODS REQUIRING CONTINUOUS INGRESS AND EGRESS FACILITIES. THE CONTRACTOR SHALL UTILIZE ANY AND ALL CONSTRUCTION METHODS, INCLUDING INCIDENTAL STONE, AS NECESSARY TO MAINTAIN INGRESS AND EGRESS TO ALL PROPERTIES AT ALL TIMES DURING THE CONSTRUCTION PERIOD EXCEPT DURING THE TIME PERIOD REQUIRED FOR EXCAVATION, PIPE LAYING, AND BACKFILLING. 10. SEE NCDOT STANDARD SPECIFICATIONS FOR INSTALLATION OF UTILITIES WITHIN NCDOT RIGHTS-OF-WAY. 11. CONTRACTOR SHALL INSTALL VALVE MARKERS FOR EACH MAIN LINE VALVE PER DETAIL. 12. CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION AND SIZE OF ALL EXISTING UTILITIES A MINIMUM OF 300 FEET IN ADVANCE OF PIPE LAYING ACTIVITIES. NOTIFY THE ENGINEER IMMEDIATELY IF A POTENTIAL CONFLICT ARISES BETWEEN THE EXISTING AND PROPOSED UTILITIES. 13. VALVES SHALL NOT BE PLACED WITHIN A DITCH OR DRAINAGE FEATURES. 14. EXISTING TREES ARE TO BE PROTECTED UNLESS OTHERWISE NOTED. 15. RIVER BASIN: TAR-PAMLICO 16. LIDAR SOURCE: JAMES C. GRAY JR., FIRM/ESP # L-4778 EROSION CONTROL NOTES: 1. INSTALL SILT FENCE OVER AND AROUND THE TOP OF EXISTING PIPES AND INLETS AT DISTURBED AREAS. 2. ALL DISTURBED AREAS SHALL BE GRADED TO MINIMIZE RUNOFF. 3. INSTALL SILT FENCE AROUND SPOIL PILES AND ALONG TRENCHES TO MINIMIZE SEDIMENT FROM ENTERING ROADSIDE DITCHES AND EXISTING DRAINAGE OUTLETS. 4. ALL DISTURBED AREAS ON THE BANKS AND APPROACHES TO DITCH, STREAM OR CREEK CROSSINGS SHALL BE GRADED NOT TO EXCEED 2:1 RATIO AND STABILIZED WITH BANK STABILIZATION. SURFACE WATER RUNOFF SHALL BE DIVERTED FROM DISTURBED AREAS. 5. PROVIDE EROSION CONTROL MEASURES AROUND STOCKIWASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 6. PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF FROM LAND DISTURBING ACTIVITIES WITH SILT FENCE, STONE CHECK DAM, OR ARC FILTER AS APPROPRIATE FOR SITE CONDITIONS. 7. REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH EQUAL OR GREATER AMOUNT OF RIP -RAP IMMEDIATELY UPON COMPLETION OF INSTALLATION OF PIPE. 8. WHERE THE AREA AROUND AN OUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS, CLASS "I" RIP -RAP SHALL BE PLACED AROUND PIPE OUTLET AS NEEDED OR AS DIRECTED BY THE ENGINEER. 9. ALL DISTURBED AREAS RELATED TO PIPE INSTALLATION SHALL BE TEMPORARY SEEDED WITHIN SEVEN (7) CALENDAR DAYS ON SLOPES AND FOURTEEN (14) CALENDAR DAYS ON ANY OTHER DISTURBED AREA. 10. TRENCH SHOULD BE BACKFILLED DAILY. 11. NEW OR AFFECTED CUT OR FILLED SLOPES MUST BE AT AN ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, AND MUST BE PROVIDED WITH A GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE (ROUGH OR FINAL) OF GRADING (RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS NOR IS IT AN ACCEPTABLE SUBSTITUTE FOR THE PROVIDING OF A TEMPORARY GROUND COVER). 12. PROVIDE STABILIZATION PER NPDES PERMIT UNLESS OTHERWISE STIPULATED. 13. TO FACILITATE IN CLEANUP, PLACE A LAYER OF SAND, SCREENING OR FINES ON ANY PAVED SURFACE PRIOR TO DEPOSITING ANY EXCAVATED MATERIAL. 14. EROSION CONTROL MATTING SHALL BE ADDED TO THE SILT FENCING OUTLETS AS NEEDED. 15. ADEQUATE E&S CONTROL MEASURES MUST BE INSTALLED DURING CLEARING/GRUBBING OR DEMOLITION PHASES. 16. AT NO POINT DURING CONSTRUCTION OF CONTRACT I SHALL THE CONTRACTOR HAVE GREATER THAN 5 AC. OF DISTURBED, NON -SEEDED AREA. EROSION CONTROL CONSTRUCTION SEQUENCE: 1. CONTACT LAND QUALITY AT (919-791-4200) BEFORE ANY WORK BEGINS. 2. POST COPY OF CERTIFICATE OF EROSION CONTROL PLAN APPROVAL. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS OR SPECIFIED IN THE SPECIFICATIONS. 4. ONCE EROSION CONTROL DEVICES ARE APPROVED, BEGIN CONSTRUCTION OPERATIONS. 5. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING INSTALLATION OF SEWER SYSTEM INSPECT DEVICES AFTER EVERY RAINFALL EVENT AND CLEAN OUT TRAPS AND/OR CHECK DAMS WHEN HALF FULL. 6. AS CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, OR AS NEEDED OR DIRECTED BY ENGINEER. 7. SEED AND MULCH DISTURBED AREAS WITHIN SEVEN (7) CALENDAR DAYS ON SLOPES AND FOURTEEN (14) CALENDAR DAYS ANYWHERE ELSE AND: A. UPON COMPLETION OF ANY PHASE OF CONSTRUCTION B. WHEN WORK WILL NOT PROCEED IN AN AREA WITHIN THE ABOVE TIME FRAME. 8. AFTER SITE IS STABILIZED, REQUEST AN INSPECTION BY LAND QUALITY. UPON APPROVAL OF SITE STABILIZATION, REMOVE TEMPORARY EROSION DEVICES, DRESS OUT AREA, AND SEED AND MULCH. PERMANENT EROSION CONTROL DEVICES SHALL BE INSTALLED AND APPROVED BY ENGINEER- 9. NGINEER9. POST CONSTRUCTION AND EXISTING GRADES WITHIN THE LIMITS OF DISTURBANCE SHALL BE THE SAME TO THE GREATEST EXTENT PRACTICABLE SO AS NOT TO CHANGE DRAINAGE PATTERNS, NOR TO CREATE POCKET WETLANDS. POSITIVE DRAINAGE SHALL BE PROVIDED. 10. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRED THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM ht4)://deq.nc.gov/about/divisions/energy-mineral-land-resources/crosion-sediment-control. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. 111. PERMANENT GROUND COVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER 1 IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. rn Z 0 w <r z w 0 0 U co Ir w a LU LU Cn F_ Z 0 W m 0 W 0 W z J 0 U x R z f Z Z3 0 W m m O w C'3 w W LL Z Q 0 CC 55 W U) 0 W z rn W Cr 0 ~ J U U11 Cn W W (/) W z d Z W CD J W Z J a W Z W S EIIIL�_ 041415 I G....vf�IOPP`��=: ," 'jAM ,,A,�P0. DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX !7.117 SCALE: FEBRUARY 2018 AS NOTED SHEET C.1.2 n 0 • � 1 I Notify NC811 Three Full Working Days Before Digging i Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NC Alt. HwOY 64 C. 3. C.2 C.2. C.,3. C. J. TBM "BARBARA" N: 797,191.55 E: 2,395,920.40 ELEV. 103.33 C. 3.4 C. 5.1-5.4 C. 4. C. 4.2 C. 4. PROJECT MAP LEGEND 0 N" 2 NEW UTILITY SHEET AREA NC Alt. y�, �_ G y 6¢ C. 4.4 C. 2. C.2. 500 250 0 500 1000 1500 SCALE: 1" = 500' C.2 C. 2. m M 0 m Lu m 9 z O U W m 2 O Lu C7 0 w Z J O ccQ U Cc Z i z D O U W CD c W w W Y Q d Z Q O � z CD w � X O W Z cn O LL1 oc E_ - O U Z Y C) t— w w U) O X W Z �OPZH CAR61.l POSE .. 041415 AZ r�'•FNGINEE: Pg,� ' SIAM, A. p``• DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.1.3 In I • f Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org PP _ _20'Utility Easement -- CONTRACTOR TO VERIFY LOCATION FM _SOF EX. 10" FORCE MAIN & KEEP 18"—� MIN. VERTICAL SEPARATION. 84LF OF 16" DIP WATER LINE W/ ea• Oitcq_ 41LF OF 28" STEEL ENCASEMENT, _MIN. WALL THICKNESS 0.312" —INSTALLED BY DRY BORE & JACK. /'1'a M 7019 CFr va%e BORE PIT - •`loo�ox. 1 8 S Ex 600 psi k' NEW 2-16" 45° BENDS V o FM_ RECOVERY PIT NEW 16" C-900 PVC WATER LINE (10' OFF EX. EASEMENT) P E _ e- PP= Ex. 10" Force Main �1 —TEMP. CONSTRUCTION 5 ENTRANCE. SEE DETAIL c.9.1 Aspho/t Pavement NoturalGos 0 0 �\ \ \ E d o U �\ \ CONNECT a� W 0 0 D S — — — _ _—�L00���� 4 \ EX. 16" WATER W/16" � 4 cp 0 U 1 N O o,N o NEW 16" 22.5° BEND LOp� D LOO,�_Lo, `��1-L I • f Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org PP _ _20'Utility Easement -- CONTRACTOR TO VERIFY LOCATION FM _SOF EX. 10" FORCE MAIN & KEEP 18"—� MIN. VERTICAL SEPARATION. 84LF OF 16" DIP WATER LINE W/ ea• Oitcq_ 41LF OF 28" STEEL ENCASEMENT, _MIN. WALL THICKNESS 0.312" —INSTALLED BY DRY BORE & JACK. /'1'a M 7019 CFr va%e BORE PIT - •`loo�ox. 1 8 S Ex 600 psi k' NEW 2-16" 45° BENDS V o FM_ RECOVERY PIT NEW 16" C-900 PVC WATER LINE (10' OFF EX. EASEMENT) P E _ e- PP= Ex. 10" Force Main �1 —TEMP. CONSTRUCTION 5 ENTRANCE. SEE DETAIL c.9.1 Aspho/t Pavement NoturalGos 0 16" 11.250 BEND �\ \ \ of Ex. 10" Force Main lnv. 101.32' FH Ex. 76" Water Cine �\ \ CONNECT NEW 16" WATER W 0 0 D S — — — _ _—�L00���� LINE TO EX. 16" WATER W/16" 1 --CLOD TAPPING SLEEVE & VALVE. — LO —'�LOOt- NEW 16" 22.5° BEND LOp� D LOO,�_Lo, `��1-L CONTRACTOR TO VERIFY Century Link iE L 2282 tem CF V arve LOCATION OF EX. 16" WATER Telephone 9oO�ox LINE. � _ �—_ 9 c. \ � FM- 1 -X--�_X--�_X�. PP NEW FIRE HYDRANT ASSEMBLY m A 8 W 0 0 D S & ROCK CHECK DAM = w (TYP.). SEE DETAIL (� 9 c C.9.1 Lau_I LOO -- O Fence X NEW 16" C-900 PVC WATER LINE (10' OFF EX. 10" FORCE MAN) Ex. Guardrail �..�- Kingsboro Rd. -SR 1225 (Variable Main t. R/W) ° ° ( ` ✓ _ L - _,— tom. L..L, i -� �_ .i .L i �� Ex. Guardrail 2- Trees - W O O D S Z �Lou P QQ5 Lij C0 �ccO 0 V QZO Z LL. LL_ U) Z 0 Cn W tr Lu Lu 0 U Lu w Ir w a In Co LU a \ �OCLEAR & GRUBBING +� \ x 197 SY. _ _ / Buffer Ex. Wetlands `s o \�� / r mNEW PERMANENT Ex. wetlands p + \ P, ! ` xz NEW TEMPORARY / o_ V o EASEMENT (59'x7') / / m / EASEMENT ROCK CHECK DAM � \ a / / (TYP.). SEE DETAIL(& 0 N + + `� ('7 s �, — ami • . —/ — — _ — _ 13+00+� — — — — — e, — — LU \+ 1+00 15+00 —16+ -To \ \ Loo= -i T 11+60 %— 77�APPROX.650 — — — — FM WL00S10 L� La6T f �LW LOO /F.M/ FMLm LODLOULWLOD 7LIN� �Lao Loi / �— — — TST-2. FM _ — — — — FM `°Ni-V)—Lou Z NEW 16" 45° / _ — — / (V — — L°u— W —�LBEND NEW 16" GV & BOX �Approximate Location \ — — NEW 16" GV &BOX CLEAR &GRUBBING W W-1OD-- Ex. 10' Force Moin LF OF 16 FUSIBLE I — — _ — 447 SY. Z =—_FM—WVC WATER LINE INSTALLED BY I DRILL PIT, & 110 LF J DIRECTIONAL DRILL I RECOVERY PIT, & 66 LF — — PP OF SILT FENCE // �... OF SILT FENCE 0 ..NEW 16 C-900 PVC = W w \\ +\ ✓ / Ex. Gate /� ' _ �) \\\\ (10' OFF EX. 10" FORCE MAIN) (� W Q A Ditch W 0 0 D S \\ \~\�_ W 0 0 D S \ Q US Hwy 64 (Variable -"j Ex. Power -25 KV ',�/ \� �K �> �\• 3 Phase Distribution A AQ,�n t. R/VV \ \ fV/ • � \ Ex. Power -715 KV Asphalt Pavement W 0 0 0 S �S ` transmission y 40' 20' 0 40' 80' 120' — SCALE 1" 40' 1 107 1 103 95 91 - 107 85 Approximate Location 20' Utility Easement 16" 11.250 BEND �\ \ \ of Ex. 10" Force Main lnv. 101.32' LIMIT OF DISTURBANCE �\ \ 10' WIDTH TOTAL W 0 0 D S — — — _ _—�L00���� — - - --CLOD Z 103 — LO —'�LOOt- NEW 16" 22.5° BEND LOp� D LOO,�_Lo, `��1-L LOD-�—L� 4 L NEW 16" C-900 P �V� � �-Loo��loo_ E � _ �—_ 9 c. 77 FM- -X--�_X--�_X�. PP NEW FIRE HYDRANT ASSEMBLY m A 8 W 0 0 D S & ROCK CHECK DAM = w (TYP.). SEE DETAIL (� 9 c C.9.1 Lau_I LOO -- O Fence X NEW 16" C-900 PVC WATER LINE (10' OFF EX. 10" FORCE MAN) Ex. Guardrail �..�- Kingsboro Rd. -SR 1225 (Variable Main t. R/W) ° ° ( ` ✓ _ L - _,— tom. L..L, i -� �_ .i .L i �� Ex. Guardrail 2- Trees - W O O D S Z �Lou P QQ5 Lij C0 �ccO 0 V QZO Z LL. LL_ U) Z 0 Cn W tr Lu Lu 0 U Lu w Ir w a In Co LU a \ �OCLEAR & GRUBBING +� \ x 197 SY. _ _ / Buffer Ex. Wetlands `s o \�� / r mNEW PERMANENT Ex. wetlands p + \ P, ! ` xz NEW TEMPORARY / o_ V o EASEMENT (59'x7') / / m / EASEMENT ROCK CHECK DAM � \ a / / (TYP.). SEE DETAIL(& 0 N + + `� ('7 s �, — ami • . —/ — — _ — _ 13+00+� — — — — — e, — — LU \+ 1+00 15+00 —16+ -To \ \ Loo= -i T 11+60 %— 77�APPROX.650 — — — — FM WL00S10 L� La6T f �LW LOO /F.M/ FMLm LODLOULWLOD 7LIN� �Lao Loi / �— — — TST-2. FM _ — — — — FM `°Ni-V)—Lou Z NEW 16" 45° / _ — — / (V — — L°u— W —�LBEND NEW 16" GV & BOX �Approximate Location \ — — NEW 16" GV &BOX CLEAR &GRUBBING W W-1OD-- Ex. 10' Force Moin LF OF 16 FUSIBLE I — — _ — 447 SY. Z =—_FM—WVC WATER LINE INSTALLED BY I DRILL PIT, & 110 LF J DIRECTIONAL DRILL I RECOVERY PIT, & 66 LF — — PP OF SILT FENCE // �... OF SILT FENCE 0 ..NEW 16 C-900 PVC = W w \\ +\ ✓ / Ex. Gate /� ' _ �) \\\\ (10' OFF EX. 10" FORCE MAIN) (� W Q A Ditch W 0 0 D S \\ \~\�_ W 0 0 D S \ Q US Hwy 64 (Variable -"j Ex. Power -25 KV ',�/ \� �K �> �\• 3 Phase Distribution A AQ,�n t. R/VV \ \ fV/ • � \ Ex. Power -715 KV Asphalt Pavement W 0 0 0 S �S ` transmission y 40' 20' 0 40' 80' 120' — SCALE 1" 40' 1 107 1 103 95 91 - 107 85 Approximate Location �\ \ \ of Ex. 10" Force Main lnv. 101.32' �\ \ Z 103 811__ \� NEW 16" C-900 PVC WATER LINE c0Z 9 c. 77 NEW 16" GV & BOX NEW 16" C-900 PVC WATER LINE 9�1 73 — 84LF OF 16" DIP WATER LINE W/ 41LF OF 28" STEEL ENCASEMENT, INSTALLED BY DRY BORE & JACK. 91 69 CONNECT NEW 16" WATER LINE TO EX. 16" WATER W/16" TAPPING SLEEVE & VALVE. -� 87 65 -_ APPRO.Y. 650 LF OF /6" FUS/BLE PVC BY O/RZ_CT/ON.4L OR/LL z \\ Existing Grade / \\ � / t i 85 1Z 81 77 un, Z O� J LU � O N N U O0 C' O O Co + T /Q W U) Z 041415 j S. '•FNGINE� Q`'•' egoist DESIGNED BY: WAL LNEW 16" C-900 DRAWN BY: PVC WATER LINE DRS CHECKED BY: NEW 16" GV & BOX 73 WAL - --- PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 69 65 i I 83 83 61 61 0+00 0+50 1+00 1+50 2+00 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 SCALE: HORZ.: 1" = 40' VERT.: 1'= 4' SHEET Co2ol 0 U) 0 _o - O^ W O O D S W1Op� N N LIMIT OF DISTURBANCE _F—Lo— Q �j 10' WIDTH TOTAL '�! COD �' �- LOD 0-'' ROCK CHECK DAM W . _ FMS - --Loo "�F- Lot) 77 (TYP.). SEE DETAIL 9 — — _ LOD IN LOD ---- - C 91 NEW FIRE HYDRANT ? ,Z — F -4f LOD- —1 o ASSEMBLY CLEAR & GRUBBING J LOD�# _...-�_LOD 1,229 SY. LOOS_-� LOD _ FM LOD �— LOO —= -7 (, � �__ LOD LOD LOD jL_ v, _ _ ��LOOLODLOD LO? L( ° FM FM LOD LOD LOD- o Ex. 10" Force Main — — CD CIA \` Q US HwJ' 64 (Varioble Main Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org O LL Q LL W. U. LOD L W � — — z� J = W UW W O O D S LIMIT OF DISTURBANCE 10' WIDTH TOTAL Qv O z <t LIMIT OF DISTURB d W 10' WIDTH TOTAL o a Q = o � 4��n LOD -----_ U --L (n nn __--CLOD— '-- LOD � LOD---- W =— _ Z � .-.__----. Q W J a LOD = W W O O D S UTILITY EASEMENT ti ,^LJ ^ Q N U W LOD------LOD— o,N o aO O D S D LOD - "-� LOD LOD LOD Z - -LOD LOD LOU - 0 _o - O^ W O O D S W1Op� N N LIMIT OF DISTURBANCE _F—Lo— Q �j 10' WIDTH TOTAL '�! COD �' �- LOD 0-'' ROCK CHECK DAM W . _ FMS - --Loo "�F- Lot) 77 (TYP.). SEE DETAIL 9 — — _ LOD IN LOD ---- - C 91 NEW FIRE HYDRANT ? ,Z — F -4f LOD- —1 o ASSEMBLY CLEAR & GRUBBING J LOD�# _...-�_LOD 1,229 SY. LOOS_-� LOD _ FM LOD �— LOO —= -7 (, � �__ LOD LOD LOD jL_ v, _ _ ��LOOLODLOD LO? L( ° FM FM LOD LOD LOD- o Ex. 10" Force Main — — CD CIA \` Q US HwJ' 64 (Varioble Main Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org O LL Q LL W. U. LOD L W � — — z� J = W UW W O O D S LIMIT OF DISTURBANCE 10' WIDTH TOTAL 111119r r O O z <t LIMIT OF DISTURB d W 10' WIDTH TOTAL Lij Q = NEW 16" C-900 I— (n 4��n LOD -----_ --+O �A --L (n nn __--CLOD— '-- LOD � LOD---- W =— _ Z � .-.__----. Q W J W LOD = W W O O D S UTILITY EASEMENT ti ,^LJ ^ O N n- W LOD------LOD— W 0 0 D S D LOD - "-� LOD LOD LOD Z - -LOD LOD LOU 111119r r O O z <t LIMIT OF DISTURB d W 10' WIDTH TOTAL Lij Q = NEW 16" C-900 I— (n 4��n ' r� L v , --+O �A --L (n nn __--CLOD— '-- LOD � LOD---- W =— _ Z � .-.__----. Q W J W _ = W W O O D S UTILITY EASEMENT ti ,^LJ ^ O N n- W Ex. Utility Easement of 0 N NEW 16" C-900 PVC WATER LINE (5' OFF UTILITY EASEMENT) W O O D S NEW FIRE HYDRANT ASSEMBLY Asphalt Pavement _NEW 16" C-900 PVC WATER LINE (10' OFF EX. 10" FORCE MAN) y >_'_'__i--LOp -T 290 LOD L08 -----_L�- LamL_ LO -LOD LOD. LOO FM FM Ex. Sewer ARV -LOD --'� -LOD LOD----_-_ -W LOD--CLOD _---_ — — NEW 16" GATE �— — — VALVE & BOX W 0 0 D S NEW 16" 11.250 BEND US Hwy 64 (Variable Maint. R/W) 40' 20' 0 40' 80' 120' SCALE: 1" - 40' ROCK CHECK DAM a NEW 20' UTILITY (TYP.). SEE DETAIL � F EASEMENT Asphalt Pavement W 0 0 D S NEW 16" C-900 PVC WATER LINE NEW 20' UTILITY EASEMENT CLEAR & GRUBBING (TOFF UTILITY EASEMENT) CE 874 SY. d7 �p �� Dom �.___gl}-- D 'EOL'�-nn LBB --=O'er —'�00 ---LO L IY --�'p L Lee- LOO- W L��-LOO----'--LOp LOD' LOD LOD LOD LOD L06 L00 — LOD L00 LOD LOD---�— LOU � N W 0 0 D S `) �pd US Hwy 64 (Variable Main t. R/W) W O O D S CLEAR & GRUBBING 1,231 SY. — LODE NEW 16" 11.250 BEND O N NEW 16" 11.250 BEND Asphalt Pavement _0 Z o �Qu QQ� C)Lu C0 ccO 1.- U _j 0 <zcr z U- 1.. 1L O N � Ljj LOD W '�LCOD L Q I LOD co Ljj z LDDC W 0 0 D S ~— W O O D S CLEAR & GRUBBING O O 324 SY. NEW FIRE HYDRANT ASSEMBLY Lid N /�� Q U L S7'kQ EAR W------mD (n D W LOD LOD LOD LOD LOD LOD W W L( J � = W W o o D s W z O 00 W z <t O � C NEW 16" C-900 PVC WATER LINE O NEW 2-16" 45° (5' OFF UTILITY EASEMENT) LL] BENDS C Q W LLJN _ Noy NEW 20' UTILITY EASEMENT ti ,^LJ ^ O N n- W `( _-®--L.a-�'eW _��.. i W —' Ld D LOD - "-� LOD LOD LOD Z - -LOD LOD LOU - LIJ � W OODS U (n o L �Z'L JJZ" ROCK CHECK DAM a NEW 20' UTILITY (TYP.). SEE DETAIL � F EASEMENT Asphalt Pavement W 0 0 D S NEW 16" C-900 PVC WATER LINE NEW 20' UTILITY EASEMENT CLEAR & GRUBBING (TOFF UTILITY EASEMENT) CE 874 SY. d7 �p �� Dom �.___gl}-- D 'EOL'�-nn LBB --=O'er —'�00 ---LO L IY --�'p L Lee- LOO- W L��-LOO----'--LOp LOD' LOD LOD LOD LOD L06 L00 — LOD L00 LOD LOD---�— LOU � N W 0 0 D S `) �pd US Hwy 64 (Variable Main t. R/W) W O O D S CLEAR & GRUBBING 1,231 SY. — LODE NEW 16" 11.250 BEND O N NEW 16" 11.250 BEND Asphalt Pavement _0 Z o �Qu QQ� C)Lu C0 ccO 1.- U _j 0 <zcr z U- 1.. 1L O N � Ljj LOD W '�LCOD L Q I LOD co Ljj z LDDC W 0 0 D S ~— W O O D S CLEAR & GRUBBING O O 324 SY. NEW FIRE HYDRANT ASSEMBLY Lid N /�� Q U L S7'kQ EAR W------mD (n D W LOD LOD LOD LOD LOD LOD W W L( J � = W W o o D s W z O 00 W F - Z O Lu CO 0 W O 0 W z J 0 a U LC 0 Z i Z Z) O U Lu Do n 0 Lu 0 0 W g¢� Q O �05 Z U) W Z3 X ZW U) o w Cr 0 -� Z Y still,, H CAj W O Z O J CJ CC W Lo F- F_ O 00 Cma.. o ZD N W � Z 041415 %yl�'•FkG �; DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.:1" = 40' VERT.: 1'= 4' SHEET C.2.2 z <t � C N V N N O Z d m � U J ^o C N � LLJN Noy J ti ,^LJ ^ O N N N W F - Z O Lu CO 0 W O 0 W z J 0 a U LC 0 Z i Z Z) O U Lu Do n 0 Lu 0 0 W g¢� Q O �05 Z U) W Z3 X ZW U) o w Cr 0 -� Z Y still,, H CAj W O Z O J CJ CC W Lo F- F_ O 00 Cma.. o ZD N W � Z 041415 %yl�'•FkG �; DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.:1" = 40' VERT.: 1'= 4' SHEET C.2.2 Q) O O + N r� Ln N Q L v ' d uj J ui 0U O O + d- I- Q0 LLJ W Q = F- (n in LU 7 Z — F- = W U (n Q �I O LIMIT OF DISTURBANCE 10' WIDTH TOTAL LOD— z W 0 0 D S W 0 0 D S LIMIT OF DISTURBANCE 10' WIDTH TOTAL W O O D S —LOD— NEW OD---NEW 16" 11.250 BEND CLEAR & GRUBBING 1,192 SY. US Hwy 64 (Variable Maint. R/W) NEW FIRE HYDRANT ASSEMBLY NEW 16" C-900 PVC WATER LINE NEW 16" GATE VALVE (5' OFF UTILITY EASEMENT) & BOX —L L� GR soB— teB--69 L.. W L --L-4- LOD LOD- LOD LOD--- --� LOD- '_.LOD -L--'-LOD-. — ODi-`--- - - - —_ W 0 0 D S - ;.r -c, - - ,---. - - - - - . - - -. - - -, : 1 NEW 16" C-900 PVC WATER LINE (5' OFF UTILITY EASEMENT) Asphalt Pavement W 0 0 D S NEW 20' UTILITY EASEMENT W 0 0 D S ROCK CHECK DAM 9 (TYP.). SEE DETAIL c.s.� CLEAR CLEAR & GRUBBING 1,226 SY. NEW 20' UTILITY EASEMENT US Hwy 64 (Variable Maint. R/W) ° O + c� W `L = LIMIT OF DISTURBANCE 10, WIDTH TOTAL c� Q �n LOD__ �_` W 0 0 D S _—� o LOD W L NEW 20' UTILITY _Lo0 EASEMENT J _LOD L9 �LOD w 0 o D S _�— ��LOD_— CLEAR & GRUBBING W o LOD ZV ,Lij ^ 663 SY. COD LODL ___�-L�_` h NEW 16" C-900 PVC WATER LINE T, L (5' OFF UTILITY EASEMENT) LOD LTJ -_CLOD LOD LOD co CC W O O D S =_ Loo � _ LOD N Q v - N-p Asphalt Pavement o � Lij N � 4 US HWy 64 (Vari o o able Main t. Rjw> O O N o 'QsPhalt Pavement Asphalt Pavement NEW FIRE HYDRANT ASSEMBLY ROCK CHECK DAM _ c.s.i (TYP.). SEE DETAIL CLEAR & GRUBBING 309 SY c" / �oo / 00 5 / 0 NEW 16" 45' BEND O � • O o°/ 15 OO r tf 010 / RadtDod / G / O + "�J- �_ Q0 W `z W v / OD -L W T L -lJ` J F-- = W U W O O + Z z QQM LLj CO �ccO ~ U QZO Z LL LL Lc) W Ld Q = F-- cn .9B t6B' "gyp ^ LBB —LOD LOD W -W--I-- Z LOD LLJJ = LLJ U (n 40' 20' 0 40' 80' 120' SCALE: 1" = 40' e J If Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org Gn z O w z O 0 W M 2 O 0 W 0 0 W z Z J O cc U 2 O z z O U W DO 2 O U CC] C3 0 w Y Q OL aC oc F- `L F 0 L z� W Z p J + NT CC CC co H < O U H CL o co M r Ln Lu z POS 6 041415 91 Z tj(6. Via; FNGI... Qfa A. DESIGNED BY: z DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: ^ U N N O Z M U C ti ^� N U N � K a W H d�� _ a� O Noa o ��J ^ O N O 1— z O 0 W M 2 O 0 W 0 0 W z Z J O cc U 2 O z z O U W DO 2 O U CC] C3 0 w Y Q OL aC oc F- `L F 0 L z� W Z p J + NT CC CC co H < O U H CL o co M r Ln Lu z POS 6 041415 91 Z tj(6. Via; FNGI... Qfa A. DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.:1" = 40' VERT.: 1' = 4' SHEET C2.3 QU I / � W O O D S I Ex. Wetlonds—�' TEMPORARY EASEMENT I I (12'x70') I I / O I-�SG'Bufter DRILL PIT, & 110 LF SO�Buffer + OF SILT FENCE I I RECOVERY PIT, & 66 LF 00 N LIMIT OF DISTURBANCE NEW 16" C-900 PVC WATER LINE I I LOFFFENCE 10'WIDTH TOTAL NEW 16" GV &BOX ICLEAR &GRUBBING (5 OFF UTILITY EASEMENT)6" GV & BOX Q U 636 SY. -aD, TST-3 1 T_00 If ST--LOc YOD 7 D L D LOB- LeB : - \ �. .7�'t/Y!– I. I�e.,,- WW W _ OO ' LOO —LOD LOD W (y41) iflD LOD LOD—LOD LOD LOD LOD LOD LOD LOD—� J (n— _ LLJ W 0 0 D S W _ APPROX.195 LF OF 16" FUSIBLE PVC WATER LINE INSTALLED BY DIRECTIONAL DRILL +% CSX Rai/road Main — — c 'v CLEAR & GRUBBING 310 SY.. ti 0 NEW 16" C-900 PVC WATER LINE O (5' OFF UTILITY EASEMENT) 4 O ROCK CHECK DAM 9 Z � r(TYP.). SEE DETAIL NEW 20' UTILITY 0-) i cs' EASEMENT . W W I •OD— L .00 94t LOD W W .OD 1OD LOD LOD LOD LOD W LOD J F-- - W 0 0 D S = W h_cr 1 N ULd I- Q 1 \ \ FUTURE SPURS TRACKS \ BY OTHERS N O \ 79 LF OF 28" STEEL ENCASEMENT N O W/ 79 LF OF 16" DIP WATER LINE \ INSTALLED BY OPEN TRENCH. 00 L0 W NEW FIRE HYDRANT Z + ASSEMBLYNEW 20' UTILITY CO W NEW 16" GATE NEW 16" C-900 PVC WATER LINE LIMIT OF DISTURBANCE Q = VALVE & BOX (5' OFF UTILITY EASEMENT) EASEMENT 10' WIDTH TOTAL W W qrz LeB L-0 L \ OD LF1B+00 re6 --•coo Looms{ —L I I O LOD lLll_*flfl �D 1fl�a'flfl SOB Lea --1- 00 Loo toB•-105.100-LBB teD _ W W W W )D LOD- LyJ = LOD LOD LOD LOD L00 LOD LOD LOD LOO LOO LOD LOD LOD LOD LOD LOD LOD LOD W LOD LOD LOD LOD W LOD LOD LOD LODLOO LOD Ld OO --- zf— rl 1 W401-211 - - - - - Z — - L! Y1 W_ = W U (n NEW 16" GATE N F' VALVE &BOX "- -- -- _ 0 W O DDS a o ('q Tree Row Q i Shrubs Row \I Tree Row CSX Railroad Main C r� — Notify NC811 Three Full Working Days Before Digging 40' 20' 0 40' 80' 120' I� Dial 811 or 1-800-632-4949, or visit www.nc8ll.org mmi I I SCALE: 1" = 40' 7 - -- - - - - -- -- r - I i I , I 104 104 112 r - APPRO.I: 195 LF OF 16" FUS/BLE PVC BY O/RZ_CT/ONAL O/F/LL - \ \ 100 � Existing Grade � 100 108 96 ---96 104 NEW 16" C-900 PVC _z NEW 16" C-900 PVC WATER LINE \ / WATER LINE 92 NEW 16" GV & BOX / NEW 16" GV &BOX 92 100 --- i j 88 96 tiY U Existing Grade ----- ----- U ------- ----- ----- -iT�--- ---------- -- � - 1 c NEW 16" C-900 PVC WATER LINE NEW 16" GATE 38 -10 40 -2 NEW 16" GATE VALVE & BOX VALVE & BOX 79 LF OF 28" STEEL ENCASEMENT W/ 79 LF OF 16" DIP WATER LINE INSTALLED BY OPEN TRENCH. NEW 16" C-900 PVC WATER LINE 112 we z O co w O U W m 0 W C'3 In W F Z O U w ca m O w 0 LU �-) Q-) DRAWN BY: DRS z PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 00 Q N v rm 94+00 94+50 95+00 95+50 96+00 96+50 97+00 97+50 98+00 0 m c W Q\ N N OZ N 4 0� IU Dj O O .� C N N ` � W = H b N I / � W O O D S I Ex. Wetlonds—�' TEMPORARY EASEMENT I I (12'x70') I I / O I-�SG'Bufter DRILL PIT, & 110 LF SO�Buffer + OF SILT FENCE I I RECOVERY PIT, & 66 LF 00 N LIMIT OF DISTURBANCE NEW 16" C-900 PVC WATER LINE I I LOFFFENCE 10'WIDTH TOTAL NEW 16" GV &BOX ICLEAR &GRUBBING (5 OFF UTILITY EASEMENT)6" GV & BOX Q U 636 SY. -aD, TST-3 1 T_00 If ST--LOc YOD 7 D L D LOB- LeB : - \ �. .7�'t/Y!– I. I�e.,,- WW W _ OO ' LOO —LOD LOD W (y41) iflD LOD LOD—LOD LOD LOD LOD LOD LOD LOD—� J (n— _ LLJ W 0 0 D S W _ APPROX.195 LF OF 16" FUSIBLE PVC WATER LINE INSTALLED BY DIRECTIONAL DRILL +% CSX Rai/road Main — — c 'v CLEAR & GRUBBING 310 SY.. ti 0 NEW 16" C-900 PVC WATER LINE O (5' OFF UTILITY EASEMENT) 4 O ROCK CHECK DAM 9 Z � r(TYP.). SEE DETAIL NEW 20' UTILITY 0-) i cs' EASEMENT . W W I •OD— L .00 94t LOD W W .OD 1OD LOD LOD LOD LOD W LOD J F-- - W 0 0 D S = W h_cr 1 N ULd I- Q 1 \ \ FUTURE SPURS TRACKS \ BY OTHERS N O \ 79 LF OF 28" STEEL ENCASEMENT N O W/ 79 LF OF 16" DIP WATER LINE \ INSTALLED BY OPEN TRENCH. 00 L0 W NEW FIRE HYDRANT Z + ASSEMBLYNEW 20' UTILITY CO W NEW 16" GATE NEW 16" C-900 PVC WATER LINE LIMIT OF DISTURBANCE Q = VALVE & BOX (5' OFF UTILITY EASEMENT) EASEMENT 10' WIDTH TOTAL W W qrz LeB L-0 L \ OD LF1B+00 re6 --•coo Looms{ —L I I O LOD lLll_*flfl �D 1fl�a'flfl SOB Lea --1- 00 Loo toB•-105.100-LBB teD _ W W W W )D LOD- LyJ = LOD LOD LOD LOD L00 LOD LOD LOD LOO LOO LOD LOD LOD LOD LOD LOD LOD LOD W LOD LOD LOD LOD W LOD LOD LOD LODLOO LOD Ld OO --- zf— rl 1 W401-211 - - - - - Z — - L! Y1 W_ = W U (n NEW 16" GATE N F' VALVE &BOX "- -- -- _ 0 W O DDS a o ('q Tree Row Q i Shrubs Row \I Tree Row CSX Railroad Main C r� — Notify NC811 Three Full Working Days Before Digging 40' 20' 0 40' 80' 120' I� Dial 811 or 1-800-632-4949, or visit www.nc8ll.org mmi I I SCALE: 1" = 40' 7 - -- - - - - -- -- r - I i I , I 104 104 112 r - APPRO.I: 195 LF OF 16" FUS/BLE PVC BY O/RZ_CT/ONAL O/F/LL - \ \ 100 � Existing Grade � 100 108 96 ---96 104 NEW 16" C-900 PVC _z NEW 16" C-900 PVC WATER LINE \ / WATER LINE 92 NEW 16" GV & BOX / NEW 16" GV &BOX 92 100 --- i j 88 96 tiY U Existing Grade ----- ----- U ------- ----- ----- -iT�--- ---------- -- � - 1 c NEW 16" C-900 PVC WATER LINE NEW 16" GATE 38 -10 40 -2 NEW 16" GATE VALVE & BOX VALVE & BOX 79 LF OF 28" STEEL ENCASEMENT W/ 79 LF OF 16" DIP WATER LINE INSTALLED BY OPEN TRENCH. NEW 16" C-900 PVC WATER LINE 112 we z O co w O U W m 0 W C'3 In W F Z O U w ca m O w 0 LU W O Z o J + CD C) U) U 0 CL CL O O CD+ let T co Q W F— Z N 041415 :FNG IIA Q`O� IAM A. 104 100 96 92 — ---- - DESIGNED BY: wAL DRAWN BY: DRS z PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1"= 40' VERT.: 1'= 4' Q rm 94+00 94+50 95+00 95+50 96+00 96+50 97+00 97+50 98+00 m n U N N OZ C N N ` � W = H �z O V Y J O y N 1.0 0 M 2 W O Z o J + CD C) U) U 0 CL CL O O CD+ let T co Q W F— Z N 041415 :FNG IIA Q`O� IAM A. 104 100 96 92 — ---- - DESIGNED BY: wAL DRAWN BY: DRS CHECKED BY: wAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1"= 40' VERT.: 1'= 4' SHEET 80--- — ---- - — -� 80 88 L. --- 88 -- 87+00 87+50 88+00 88+50 89+00 89+50 90+00 90+50 91+00 91+50 94+00 94+50 95+00 95+50 96+00 96+50 97+00 97+50 98+00 C..214 34LF OF 16" DIP WATER LINE W/t�l 34LF OF 28" STEEL ENCASEMENT,IN. WALL STALLED TBY DRESS 2Y BOREINSTALLED& JACK. xEX. 4" WATER LINE TO BE ABANDONED LIMIT OF DISTURBANCE 9I 10' WIDTH TOTAL NEW 20' UTILITY e ROCK CHECK DAM EASEMENT c.s.i (TYP.) SEE DETAIL NEW 16" 450 BEND y LoD toe 10�¢�0--beD----{ D9�DD / 1 11 gas W W w LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 0 GDGD 0 Tree Row Shrubs Row Shrubs Row u CSX Railroad Main BORE PIT NEW 16" 1-900 & 1-22.50 BENDS RECOVERY PIT NEW FIRE HYDRANT ASSEMBLY �W/ 6' OF 15" RCP NEW 16" GATE NEW 16" C-900 PVC WATER VALVE &BOX LINE (5' OFF EOP) NEW 16" 22.5° BEND pp _------------ltaztm-------- DD` W — —---- w '-- LOB LOB 600 LOB L09 rhe rf Harts Chapel Rd. - SR 1217 Asphalt Pavement /F:/1� AArrinf Q/IA/) oW 0 0 D S ° c� M Sunpoint Line Grovel Drive F II I I I I W O 0 D S O LIMIT OF DISTURBANCE W 10' WIDTH TOTAL w PiLO- -_—__ — _ — cc --- --- ---- --- i�n�. -- - -W �— in — — — — — — — — — i LOO LOD —�, W — --W -- V) LOD --- LOD Lee LOD LOB LOD Lee LOD LOO DO z Harts Chapel Rd. - SR 1217 J Asphalt Pavement W W W (60' Main t. R/W) W =W vim— -- -- -- -- -- — N ti:V Lm W O O D S I I X � o N O ti00I �Ex. Wetlands N w I. W 0 0 D S PP '^ � w LOO O 3. -too Loo c rih U ! w J S1 LOD� o -, —�- C3, Y W O O D S 1 DO x _ EX. 4" WATER LINE N TO BE ABANDONED QU 3 rn a M c Lu Q V NEW 16" C-900 PVC WATER LINE (5' OFF EOP) — — — — — — — O O W Ld PP _ _-4 142 M DO Le= res a J F 0 EX. 4" WATER LINE a G TO BE ABANDONED W O O D S Ex. Tree '3 Ex. Wetlands O Q Z W O O D S O d z O Q CC w O N D Q U ASSEMBLY I— c~n --LO (TYP.) SEE DETAIL I— F- + W LLI —ww W z_= O o � J W PSP{ v) =W W U Z Y Tree Row �.._ —cn Lva — — zovLs6 — — — goo ta o LOD LOD O —LOD LOD 34LF OF 16" DIP WATER LINE W/t�l 34LF OF 28" STEEL ENCASEMENT,IN. WALL STALLED TBY DRESS 2Y BOREINSTALLED& JACK. xEX. 4" WATER LINE TO BE ABANDONED LIMIT OF DISTURBANCE 9I 10' WIDTH TOTAL NEW 20' UTILITY e ROCK CHECK DAM EASEMENT c.s.i (TYP.) SEE DETAIL NEW 16" 450 BEND y LoD toe 10�¢�0--beD----{ D9�DD / 1 11 gas W W w LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 0 GDGD 0 Tree Row Shrubs Row Shrubs Row u CSX Railroad Main BORE PIT NEW 16" 1-900 & 1-22.50 BENDS RECOVERY PIT NEW FIRE HYDRANT ASSEMBLY �W/ 6' OF 15" RCP NEW 16" GATE NEW 16" C-900 PVC WATER VALVE &BOX LINE (5' OFF EOP) NEW 16" 22.5° BEND pp _------------ltaztm-------- DD` W — —---- w '-- LOB LOB 600 LOB L09 rhe rf Harts Chapel Rd. - SR 1217 Asphalt Pavement /F:/1� AArrinf Q/IA/) oW 0 0 D S ° c� M Sunpoint Line Grovel Drive F II I I I I W O 0 D S O LIMIT OF DISTURBANCE W 10' WIDTH TOTAL w PiLO- -_—__ — _ — cc --- --- ---- --- i�n�. -- - -W �— in — — — — — — — — — i LOO LOD —�, W — --W -- V) LOD --- LOD Lee LOD LOB LOD Lee LOD LOO DO z Harts Chapel Rd. - SR 1217 J Asphalt Pavement W W W (60' Main t. R/W) W =W vim— -- -- -- -- -- — N ti:V Lm W O O D S I I X � o N O ti00I �Ex. Wetlands N w I. W 0 0 D S PP '^ � w LOO O 3. -too Loo c rih U ! w J S1 LOD� o -, —�- C3, Y W O O D S 1 DO x _ EX. 4" WATER LINE N TO BE ABANDONED QU 3 rn a M c Lu Q V NEW 16" C-900 PVC WATER LINE (5' OFF EOP) — — — — — — — O O W Ld PP _ _-4 142 M DO Le= res a J F 0 EX. 4" WATER LINE a G TO BE ABANDONED W O O D S Ex. Tree '3 EX. 4" WATER LINE TO BE ABANDONED CSX Railroad Main C S / \ 'p M I I Ex. Wetlonds___"� \\ W O O D S \ ' LIMIT OF DISTURBANCE WI IMPACT \ 10' WIDTH TOTAL (0.002 AC) \ NEW 16" C-900 PVC WATER LINE (5' OFF EOP)--- — — o w o o D s D—�9oE00 w DD Lon W O O D S MATCH cid 1 I II SEE LINE STA• 138+ SHEET 00 NEW 16" GATE 3 C. 2.6 VALVE & BOX I ROCK CHECK DAM NEW FIRE HYDRANT (TYP.) SEE DETAILe ASSEMBLY W/ 6' OF c.s.i 15" RCP Ex. 8" Water Line NEW PERNAMENT o — EASEMENT (568 SFJ W _ _ 22.5 BENDS _ 2- 1 11 -- � Ex. Ditch Asphalt _ Pavement II — ulvert- -- W —' `— _ W SR 1217 Chap W o` Q�. NEW 16" 22.5° BEND Harts el Rd• - — — _ W I (60' Nlaint. RAW) _ _ _ _ PP c��° — i — _ NEW 2-16" 11.25° BENDS_—_ W =1 W IEX. 4" WATER �— — w o o D s LINE TO REMAIN I CUT & CAP EX. 4" I Ex. 4" Water Line WATER LINE �- - W GODS IHouse CsC oilr W O O D S n - . )--)- P I D O I Z O LU Ir Ex. Wetlands I Q Z W O O D S z0 J 00 z Q CC w O iw U) W CHECK DAM NEW FIRE HYDRANT ASSEMBLY O c~n eROCK c.s.l (TYP.) SEE DETAIL W/ 6' OF 15" RCP F- + L LLI C W 00 O o �o �LL CN r W PSP{ v) W Z Y = W —cn Lva — — zovLs6 — — — goo ta o LOD LOD O —LOD LOD LOB'moo-D-'. W W W 1 T N LOO � N __ O z I— �i g. M J (01 W W = w EX. 4" WATER LINE TO BE ABANDONED CSX Railroad Main C S / \ 'p M I I Ex. Wetlonds___"� \\ W O O D S \ ' LIMIT OF DISTURBANCE WI IMPACT \ 10' WIDTH TOTAL (0.002 AC) \ NEW 16" C-900 PVC WATER LINE (5' OFF EOP)--- — — o w o o D s D—�9oE00 w DD Lon W O O D S MATCH cid 1 I II SEE LINE STA• 138+ SHEET 00 NEW 16" GATE 3 C. 2.6 VALVE & BOX I ROCK CHECK DAM NEW FIRE HYDRANT (TYP.) SEE DETAILe ASSEMBLY W/ 6' OF c.s.i 15" RCP Ex. 8" Water Line NEW PERNAMENT o — EASEMENT (568 SFJ W _ _ 22.5 BENDS _ 2- 1 11 -- � Ex. Ditch Asphalt _ Pavement II — ulvert- -- W —' `— _ W SR 1217 Chap W o` Q�. NEW 16" 22.5° BEND Harts el Rd• - — — _ W I (60' Nlaint. RAW) _ _ _ _ PP c��° — i — _ NEW 2-16" 11.25° BENDS_—_ W =1 W IEX. 4" WATER �— — w o o D s LINE TO REMAIN I CUT & CAP EX. 4" I Ex. 4" Water Line WATER LINE �- - W GODS IHouse CsC oilr W O O D S n - . )--)- P I D O I Z O LU Ir DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' VERT.:1' = 4' SHEET Notify NC811 Three Full Working Days Before Digging40' 20' 0 40' 80' 120' Z) iEC._2.5 Dial 811 or 1-800-632-4949, or visit www.nc8ll.org ZI I SCALE 1" = 40' w o O z Q Z z0 J 00 z Q CC w iw U) W d ¢ C r U) c~n G N U •--' N N F- O L LLI C W O �o �LL Z N c Z Y = W C7 O N O Z O N N 3 � N W" O 2 W ca M DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' VERT.:1' = 4' SHEET Notify NC811 Three Full Working Days Before Digging40' 20' 0 40' 80' 120' Z) iEC._2.5 Dial 811 or 1-800-632-4949, or visit www.nc8ll.org ZI I SCALE 1" = 40' w o O Q Z z0 J 00 z Q CC w U) W d ¢ L) U) c~n LLI zW F- LLI C W O O O W m f- C0 = O r Z Y w H Z C7 z Z 0 W ca M W 0 0 W •OPS H CA1?0 , • • 1EX'_L 041415 ItAVA-zap DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' VERT.:1' = 4' SHEET Notify NC811 Three Full Working Days Before Digging40' 20' 0 40' 80' 120' Z) iEC._2.5 Dial 811 or 1-800-632-4949, or visit www.nc8ll.org ZI I SCALE 1" = 40' Q) �OOd-Q- L O U - �I- LIMIT OF DISTURBANCE LINE (5' OFF EOP) O10' WIDTH TOTAL PP N Ex. Ditch = — _ _ — _ _ch � Z Loo W _Loo W =L� Har is Mill Run Rd. — r' r _ SR 1337 �1 W X60 Mair? t. R/ W>_ -______W AsPho/t Pavement D \ �� WIYI 0 Ex. 8" Water Line / U � W r Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org O K 0) L0o PP Z Z I i 30 House I Shrub I I Ex. Tree I I O Ex. Tree LIMIT OF I DISTURBANCE 10' WIDTH TOTAL I 0- Tree I"' 0 s' U I I I I 1 House I I W 0 0 D S NEW 16" C-900 PVC WATER LINE (5' OFF R/W) / / / / / S3(2011) 40' 20' 0 40' 80' SCALE: 1" 40' House I NEW 16" C-900 PVC WATER LINE (5' OFF EOP) -Harts Mill Run Rd. - SR 1337 <60' Main t. R/W>—W I I 0 Shrub Shrub I Ex. Wetlands I�I o Ex. Trel I I to Iy "0 I I � I C9 U obi 0 0 0 s Asphalt Pavement O O -t W r W Q = L L -I Z F-- W _ �Ld �G II Ex. Tree 0 Ex. Tree Ex. Tree O o L OQ') Ex. 8" Water Cine c RECOVERY PIT E NEW 16" 450 BEND a a Ex. Tree NEW FIRE HYDRANT BORE PIT r ASSEMBLY Ex. Tree. _---- .— — — —' ---- I-- LM -11: NEW 16" 450 BEND —LOD—WLOD NEW 16" GATE VALVE & BOX --� I Ex. 8" water Cine I o 43LF OF 16" DIP WATER LINE W/ 43LF OF 28" STEEL ENCASEMENT, o MIN. WALL THICKNESS 0.312" I `m Ex. 8" Water tine INSTALLED BY DRY BORE & JACK. 40' I I � I I I I � I I II I LIMIT OF DISTURBANCE NEW 16" C-900 PVC WA' 10' WIDTH TOTAL LINE (5' OFF EOP) PP NEW 16" 2-450 BENDS\--;� ---- r----------I� — eB Eee tee LOD Lea tae LOD �-� Harts Mill Run Rd. - SR 1337 W l60' Main t. RI W) I — Ex. 8" Water Line I II i II I W 0 0 D S 1 I 11 42Q111 I0 1JP 11 II ROCK CHECK DAM I c.a.i (TYP.) SEE DETAIL NEW 16" C-900 PVC WATER rLINE (5' OFF R/W) 1 W 0 0 D S LOD LOD LOD--vz==–t ` I✓ I II O Ex. Tree DRAWN BY: I I O ° � Trailer I 0- M I"' 2488 - GX C/-) t9 ROCK CHECK DAM II I `x ` W N c.e.l (TYP.) SEE DETAIL Ex. Tree w I NEW FIRE HYDRANT House N N X I ASSEMBLY W/ 6' ° ° House I I I OF 15" RCP ° PP Z z �o® W J Qry�Q� cr— F- 0(rz O .J O v Qzcr _Z LL- U - O O 0) F— L0 LLJ W \ Q (n LOD = W = zF- --T W W =W U (f) Q I � I I I I House i o I I Ex. Tree C 3 0 01 1 I o y x I Ex. Tree > = Ex. Tree I ,e Ex. Tree ° U ~ I PP m ° 1�— N 3 W 3— — — o I , Ex. Tree o Ex. Tree o x m — — — — — — — — Asphalt Pavement O O WAL DRAWN BY: O r-_ � N 0- M I"' 2488 - GX C/-) W— W ;o LeB W N zV) = U N N O= =W U Cn — U Q z O CO) LU Ir ��purnp � PjH CggO•• 0. ESS 041415 Z :F;VGINE�c.QS� •ryrrnr�r�r DESIGNED BY: WAL DRAWN BY: z Z CHECKED BY: WAL 0- M 2488 - GX DATE: ^ 0 2 N U N N O= U U N N CJ w - T N y o O 0 & z r< 0 M OU oZoof W y N p rn W w Z)m W Z LU Q (U LL. w Z N � z 0 LU m T -T– ��purnp � PjH CggO•• 0. ESS 041415 Z :F;VGINE�c.QS� •ryrrnr�r�r DESIGNED BY: WAL DRAWN BY: z Z CHECKED BY: WAL PROJECT NO.: J 2488 - GX DATE: FEBRUARY 2018 0 U 0 z 0 M OU oZoof W a.o ® z 0L.Li M Z Y p rn W w Z)m W Z LU Q (U LL. w Z O o r Q 0 F- O 00 Cn z 0 w m g 0 LU LU ��purnp � PjH CggO•• 0. ESS 041415 Z :F;VGINE�c.QS� •ryrrnr�r�r DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1"= 40' VERT.: 1' = 4' SHEET C12..6 3 FUTURE ACCESS ROAD " BY OTHERS O O + 91LF OF 16" DIP WATER LINE W/ 0 Q0 91LF OF 28" STEEL ENCASEMENT, N MIN. WALL THICKNESS 0.312" —INSTALLED BY TRENCH. — o Q L 0 LLf W WI W ' -' — z_= LOE) LOB LOB J c =w W W U Cn —/ — — CQ G / ROCK CHECK DAM / (TYPJ SEE DETAIL e PP�j PP NADs�o1i� Ex. 8" Water Line PP LIMIT OF DISTURBANCE NEW 16" C-900 PVC WATER 10' WIDTH TOTAL LINE (5' OFF EOP) \ \ _ (DShrub —you --- ma — W — --=11111— --- ___ AR OB Lot) I AD LeB Harts Mill Run Rd. - SR 7337 Asphalt Pavement Ex. 8" Water Line �w — — (60' Mamt. R/W)w — — Asphalt Pavement NADZ 11� Ex. Tree NEW FIRE HYDRANT ASSEMBLY W/ 6' ° OF 15" RCP U Harts Mill Run Rd. - SR 1337 W (60' Main t. R/W) W Cb N ? Ex. 16" Water Line �U Ci /; pp NEW 16" C-900 PVC WATER LINE (5' OFF EOP) 34LF OF 16" DIP WATER LINE W/ 34LF OF 28" STEEL ENCASEMENT, NEW 16" 2-45° BENDS /� / WV MIN. WALL THICKNESS 0.312" INSTALLED BY DRY BORE & JACK. BORE PIT--\ /. PERMANENT EASEMENT ROCK CHECK DAM (10'x43') / (TYPJ SEE DETAIL i i tF](---------- NEW 16" 11.25° BEND PP WV / CONNECT NEW 16 WATER LINE TO EX. 16" WATER W/16" TAPPING SLEEVE & VALVE. CONTRACTOR TO VERIFY LOCATION OF EX. 16" WATER _ _LINE. NEW 16" 2-22.50 LIMIT OF DISTURBANCE 10' WIDTH TOTAL z O + W CDLj~ =� — — I— W O = Wl U`i Q = _ J W un o O ® N L_ — V) o tee— -teO W — � N _ O Z f ~ J W Q I = w - — 0 (n Q / ROCK CHECK DAM / (TYPJ SEE DETAIL e PP�j PP NADs�o1i� Ex. 8" Water Line PP LIMIT OF DISTURBANCE NEW 16" C-900 PVC WATER 10' WIDTH TOTAL LINE (5' OFF EOP) \ \ _ (DShrub —you --- ma — W — --=11111— --- ___ AR OB Lot) I AD LeB Harts Mill Run Rd. - SR 7337 Asphalt Pavement Ex. 8" Water Line �w — — (60' Mamt. R/W)w — — Asphalt Pavement NADZ 11� Ex. Tree NEW FIRE HYDRANT ASSEMBLY W/ 6' ° OF 15" RCP U Harts Mill Run Rd. - SR 1337 W (60' Main t. R/W) W Cb N ? Ex. 16" Water Line �U Ci /; pp NEW 16" C-900 PVC WATER LINE (5' OFF EOP) 34LF OF 16" DIP WATER LINE W/ 34LF OF 28" STEEL ENCASEMENT, NEW 16" 2-45° BENDS /� / WV MIN. WALL THICKNESS 0.312" INSTALLED BY DRY BORE & JACK. BORE PIT--\ /. PERMANENT EASEMENT ROCK CHECK DAM (10'x43') / (TYPJ SEE DETAIL i i tF](---------- NEW 16" 11.25° BEND PP WV / CONNECT NEW 16 WATER LINE TO EX. 16" WATER W/16" TAPPING SLEEVE & VALVE. CONTRACTOR TO VERIFY LOCATION OF EX. 16" WATER _ _LINE. NEW 16" 2-22.50 LIMIT OF DISTURBANCE 10' WIDTH TOTAL BENDSNorthwoods Country Rd. <60' Maint. R/WJ �FH Ex. 5" Water Line ■ z O 00 W Q =� — — I— V O = Wl U`i Les W z =— �. J W W o O ® N L_ - - =W U (n — - - I � N CQ G O BENDSNorthwoods Country Rd. <60' Maint. R/WJ �FH Ex. 5" Water Line ■ Z o CD �Qcc cc C) H_j 0 0 QZCC O Z LL_ U. CD z O Lo > W z m w c G r U N N O = m U`i c cV LL I LbN � � o O ® N L_ c O ��J in I � N O 0 f t Q I Z o CD �Qcc cc C) H_j 0 0 QZCC O Z LL_ U. CD z O Lo > W z v W DO O U W C'3 O LU r! Z O Lu co O U W 0 0 W J Q Z LL O LLL z U W Z J c:1 cr Z W LU Q C)F- C) + d O T 3;: ~ LU Z 041415 INQS�= rAM A. �P•• •nnn%%�` DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 . QX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' VERT.: 1 ° = 4' SHEET 40' 20' 0 40' 80' 120' Notify NC811 Three Full Working Days Before Digging6C. ^ . Dial 811 or 1-800-632-4949, or visit www.nc811.org G SCALE 1" - 40' z m w c G r U N N O = m U`i c cV LL LbN � � . Z O �+ O ® N L_ c O ��J in 3 N O Z z v W DO O U W C'3 O LU r! Z O Lu co O U W 0 0 W J Q Z LL O LLL z U W Z J c:1 cr Z W LU Q C)F- C) + d O T 3;: ~ LU Z 041415 INQS�= rAM A. �P•• •nnn%%�` DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 . QX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' VERT.: 1 ° = 4' SHEET 40' 20' 0 40' 80' 120' Notify NC811 Three Full Working Days Before Digging6C. ^ . Dial 811 or 1-800-632-4949, or visit www.nc811.org G SCALE 1" - 40' Z� o Q U I , Ex. Power - 115 KV— Transmission 52LF OF 16" DIP WATER LINE W/ 52LF OF 28" STEEL ENCASEMENT, MIN. WALL THICKNESS 0.312" INSTALLED BY DRY BORE & JACK. RECOVEIRY PIT CONNECT NEW 16" WATER LINE TO EX. WATER TAPPING SLEEVE & VALVE. CONTRACTOR TO VERIFY LOCATION OF EX. 16" WATER LINE. z I FH PP WV Ex. 16" Water CIT & CAP EX. 4" WATER LINE INSET 'A' WV WV h Ex. Power - 25 KV 3 Phase Distribution KEEP 3' MIN. SEPARATION LIMIT OF DISTURBANCE PERMANENT EASEMENT 10' WIDTH TOTAL OORILSILTL TITFENC 0 LF (15'x20') NEW FIRE HYDRANT NEW 16" GV & BOXY TEMPORARY EASEMENT ASSEMBLY 'r- 2-20" TREE TO BE 120 LF OF SHRUB TO TEMPORARY CONSTRUCTION BE REMOVED REMOVED EASEMENT R/W 6'Wide Shrub Row i.,{.pp—_�� �, ao, ao, _ M T--- — — — — — — — — — — — — — — — — — — — — — — — — — w NEW 2-45 116" BENDS Harts Chapel Rd. -SR 9297 Asphalt Pavement BORE PIT (trj 0' Main t. R/W) M M M II EX. 4" WATER LINE TO BE II ABANDONED. PORTION UNDER NCDOT R/W TO BE FILLED W/ GROUT. PP NEW 16" C-900 PVC WATE LINE TOFF R/W. (TYP.) PROPOSED DRAINAGE, UTILITY & ACCESS EASEMENT NEW METER VAULT O NEW 16" GV & BOX SEE DETAIL a- -o Q N a N U (TYP.) SEE DETAIL NEW FIRE HYDRANT ^ U o` OZ Lj O) poop C W Ld ` N u'J - d Q c U S N n� © (n o0, 001 1� , —a0, 00,— O _._gy— ^^i—_._.ao,___... _moi___ ... a0, ...—... uo, _—... ��._—... Doi. m — — — — — — — — ...—..——.�.._..— ._..._.. — — — — — — — — — — — — - ...—_.—. - rZet -oN� I , Ex. Power - 115 KV— Transmission 52LF OF 16" DIP WATER LINE W/ 52LF OF 28" STEEL ENCASEMENT, MIN. WALL THICKNESS 0.312" INSTALLED BY DRY BORE & JACK. RECOVEIRY PIT CONNECT NEW 16" WATER LINE TO EX. WATER TAPPING SLEEVE & VALVE. CONTRACTOR TO VERIFY LOCATION OF EX. 16" WATER LINE. z I FH PP WV Ex. 16" Water CIT & CAP EX. 4" WATER LINE INSET 'A' WV WV h Ex. Power - 25 KV 3 Phase Distribution KEEP 3' MIN. SEPARATION LIMIT OF DISTURBANCE PERMANENT EASEMENT 10' WIDTH TOTAL OORILSILTL TITFENC 0 LF (15'x20') NEW FIRE HYDRANT NEW 16" GV & BOXY TEMPORARY EASEMENT ASSEMBLY 'r- 2-20" TREE TO BE 120 LF OF SHRUB TO TEMPORARY CONSTRUCTION BE REMOVED REMOVED EASEMENT R/W 6'Wide Shrub Row i.,{.pp—_�� �, ao, ao, _ M T--- — — — — — — — — — — — — — — — — — — — — — — — — — w NEW 2-45 116" BENDS Harts Chapel Rd. -SR 9297 Asphalt Pavement BORE PIT (trj 0' Main t. R/W) M M M II EX. 4" WATER LINE TO BE II ABANDONED. PORTION UNDER NCDOT R/W TO BE FILLED W/ GROUT. PP NEW 16" C-900 PVC WATE LINE TOFF R/W. (TYP.) PROPOSED DRAINAGE, UTILITY & ACCESS EASEMENT NEW METER VAULT O NEW 16" GV & BOX SEE DETAIL SCALE: O Q ROCK CHECK DAM cs.i + (TYP.) SEE DETAIL NEW FIRE HYDRANT ^ U o` OZ Lj 9 ASSEMBLY poop C Ld ` N u'J - d W O O D S Q = S N n� © (n o0, 001 1� , —a0, 00,— O _._gy— ^^i—_._.ao,___... _moi___ ... a0, ...—... uo, _—... ��._—... Doi. m — — — — — — — — ...—..——.�.._..— ._..._.. — — — — — — — — — — — — - ...—_.—. - — — — — — — — — — —— — — — — — — — , Z=NEW 90' 16" BEND & I— Harts Rd. -SR 1217 NEW 16" GV & BOX Asphalt Pavement /Chapel (V 0' Main t. R/W) M—= �1 W M M M U — — — — f FUTURE PROPERTY LINE 98 j —I \ Existing Grade 94 I ` �Z Me • NEW 16" C-900 PVC WATER LINE NEW 16" GV & BOX APPROW 245 LF OF 46" FUS/BLE PVC WATER L/NE /NSTALLEO 9r O/RECT/ONAZ OR/LL. 2_ M � / Ex. 48" CMP Inv. 81.56' /I I' r — /�r z NEW 16" GV & BOX NEW 16" C-900 PVC WATER LINE APPROX. 245 LF OF 16" FUSIBLE / PVC WATER LINE INSTALLED BY /DIRECTIONAL DRILL. \\ W 0005 TST-9`\ �I — — I4�CMP • 94 all F6031119 M j O RECOVERY PIT, & 66 LF + OF SILT FENCE O11 ~ i NEW 16" C-900 PVC WATER W NEW 16" GV & BOX LINE TOFF R/W. (TYP.) Q W f U) +0 TST-10 —..i PP 9 (�(� 00, _no,_R/W_W (n 001 ,--9-tQ8 —OD, _� � J � = W 001-001 LLJ M M (n z z � LU W QQ� CD �JLLJ C0 O JOv QZO Z Z O cn w M z DATE: FEBRUARY 2018 SCALE: Q HORZ.: 1" = 40' v � C C ^ U N OZ N N m poop C Z ` N u'J - d UjN � K Z 0p POP - N o © L SCALE: 1" - 40' ^ O y N w , , / / APPROX. 245 LF OF 16" FUSIBLE / PVC WATER LINE INSTALLED BY /DIRECTIONAL DRILL. \\ W 0005 TST-9`\ �I — — I4�CMP • 94 all F6031119 M j O RECOVERY PIT, & 66 LF + OF SILT FENCE O11 ~ i NEW 16" C-900 PVC WATER W NEW 16" GV & BOX LINE TOFF R/W. (TYP.) Q W f U) +0 TST-10 —..i PP 9 (�(� 00, _no,_R/W_W (n 001 ,--9-tQ8 —OD, _� � J � = W 001-001 LLJ M M (n z z � LU W QQ� CD �JLLJ C0 O JOv QZO Z Z O cn w M z DATE: FEBRUARY 2018 SCALE: Q HORZ.: 1" = 40' v � C C ^ U N OZ N N m poop C Z ` N u'J - d UjN � K Z 0p POP - N o © L SCALE: 1" - 40' ^ O y N w F - Z O V LU m 0 LU C'3 0 LU Y Q Z Q C � Z LL G7 F LLL Z LL Q U) ~ O - z `1 1R W 0 Z J O cr-O >Cc a_ - _! ED LU CL Q W = Z U F— Z Q 0 _ O w m O 0 CD w 041415 = I%d�':FNGINE� QS�. ,IAM'811' A -sW DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX 78 DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 40' g3 (Z011� VERT.: 1' = 4' NAD • 74 SHEET 40' 20' 0 40' 80' 120' Notify NC811 Three Full Working Days Before Digging C28 7Q Dial 811 or 1-800-632-4949, or visit www.ncBll.org SCALE: 1" - 40' i I i Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW ARV 10 Ex. Century Link SEE DETAIL T r r r T— FM FM ROCK CHECK DAM g (TYP.) SEE DETAIL Ex. 16" Water Line Ex. 10" Force Main Asphalt Pavement 0 co W N FM FM __coos-®—Boa-�:ooiou._—i—...—...� .. ....._ —E P — — — PP P — CONNECT NEW 10" FORCE MAIN ' WITH NEW VALVE VAULT. ' •� SEE INSET "B" & DETAIL 11/C.7.1 Ex. 10" Force CONTRACTOR TO VERIFY LOCATION fiMain AND DEPTH OF EX. 10" FORCE MAIN. I N v Zi O Q)20' I 'Q Ex. Power 25 KV c Q C) •� - Ex. Power 115 KV � , a (0 Q I 20' Utility Easement i e� Ex. 16" Water Line LIMIT OF DISTURBANCE O 10' WIDTH TOTAL O W— W Q W Alt.. US Hwy 64 l60' Main t. R/ W> (n c=n FM,+no EGO too FMon tea LM 7+00 FM W � taB — —— _00 PP — P P PP P NEW 10" C-900 FORCE MAIN Ex. Power -25 KV LI J (5' OFF EOP) 3 Phase Distribution U) Ex. Power -115 KV Q Transmission 75 NEW ARV 10 110 SEE DETAIL (& 110 Ex. Grade O 106---___._-----------------------------------------�---------------------------------------------- rn w�106 I z z Q W' y C/) 102 z = 102 Approximate Location of Ex. 10" Force Main NEW 10" C-900 FORCE MAIN = W 98 cn 98 CONNECT NEW 10" FORCE MAIN Q WITH NEW VALVE VAULT. SEE INSET "B" 94 - 94 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 40' 20' 0 40' 80' 120' SCALE: 1" = 40' 0— O W W- -� Q W —,eat CJ') (n 19 FM eaa iea -too _tee eae ee ee- Z = PP E P E- J = W ROCK CHECK DAM e C J LiJ (TYP.) SEE DETAIL cs.t Q —75 • 1 102 l •: to Asphalt Pavement PP — — — — — P E Ex. Power -25 KV ij 3 Phase Distribution JN Ex. Power -115 KV h�u Transmission LIMIT OF DISTURBANCE 10' WIDTH TOTAL 0 z ZO �w~. U QQcc � cc JOv QZccO Z V- 1 Ex. 10" Force Main ___,P NEW 10" FORCE MAIN m I NEW 10" CHECK i NEW 10" VALVE PLUG VALVE NEW 10"x10"- TEE j NEW 10" I — J CHECK VALVE NEW 10" PLUG VALVE A m I 4 1 Ex. 10" Force APPROX. 175 LF OF 10" FUSIBLE PVC FORCE MAIN INSTALLED BY DIRECTIONAL DRILL Ex. Century Link Telephone op 24x. Location CP tion Ex. 16" Water Line -i NEW 10" 45° BEND NEW 10" PLUG VALVE eNEW 6' FLAT TOP CONCRETE MANHOLE W/ALUMINUM ACCESS HATCH. SEE DETAIL 11/C.7.1 INSET "B" SCALE 1"=5' W W W O W NEW 10" 11.25" BEND O N Alt. US Hwy 64 (60' Maint. R/W) — 7-ST-7LOR Lee Los / Q FM FIS 9+0 2 LOD LW — — -L°°-- — —'� — — —'.°u- — quo —sse Sao Sao — -- - >• F -- o------ ------ ----7 - — E------Oo E PP:19➢. DRi' 1�— W WPP P PP P c� C \ 1 Z ` J NEW 10" C-900 FORCE MAIN � NEW 10" 11.250 BEND U)(5' OFF EOP) \ Ex. Wetlands-,," NEW 10" PV & BOX N I = W W DRILL PIT, & 110 LF \� 1 UCn OF SILT FENCE N N 1 Q i— Ex. Wetlands Buffer-114�\l 150• I 50, 1 1 1 NI O O I-- — — — — — — — — — — W -------- Ex. Grade V) —__-- W cn = W U W NEW 10" C-900 FORCE MAIN Q � NEW 10" PLUG VALVE & BOX 90 I 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 APPROW 975 LF OF 10" FUS/BLE � o PIlC BY O/RECT/ONAL OR/LL WAL � U O N L V Z O N WAL N Bj — — — — — — — — — — — — — --Q �a U Approx. Location �LL of 24" RCP (n LLJa FEBRUARY 2018 W Q W U L6 HORZ.:1"= 49 E �o�No VERT.: 1' = 4' J (_ _ 94 y C.3.1 z Lo �� UW i I i Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW ARV 10 Ex. Century Link SEE DETAIL T r r r T— FM FM ROCK CHECK DAM g (TYP.) SEE DETAIL Ex. 16" Water Line Ex. 10" Force Main Asphalt Pavement 0 co W N FM FM __coos-®—Boa-�:ooiou._—i—...—...� .. ....._ —E P — — — PP P — CONNECT NEW 10" FORCE MAIN ' WITH NEW VALVE VAULT. ' •� SEE INSET "B" & DETAIL 11/C.7.1 Ex. 10" Force CONTRACTOR TO VERIFY LOCATION fiMain AND DEPTH OF EX. 10" FORCE MAIN. I N v Zi O Q)20' I 'Q Ex. Power 25 KV c Q C) •� - Ex. Power 115 KV � , a (0 Q I 20' Utility Easement i e� Ex. 16" Water Line LIMIT OF DISTURBANCE O 10' WIDTH TOTAL O W— W Q W Alt.. US Hwy 64 l60' Main t. R/ W> (n c=n FM,+no EGO too FMon tea LM 7+00 FM W � taB — —— _00 PP — P P PP P NEW 10" C-900 FORCE MAIN Ex. Power -25 KV LI J (5' OFF EOP) 3 Phase Distribution U) Ex. Power -115 KV Q Transmission 75 NEW ARV 10 110 SEE DETAIL (& 110 Ex. Grade O 106---___._-----------------------------------------�---------------------------------------------- rn w�106 I z z Q W' y C/) 102 z = 102 Approximate Location of Ex. 10" Force Main NEW 10" C-900 FORCE MAIN = W 98 cn 98 CONNECT NEW 10" FORCE MAIN Q WITH NEW VALVE VAULT. SEE INSET "B" 94 - 94 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 40' 20' 0 40' 80' 120' SCALE: 1" = 40' 0— O W W- -� Q W —,eat CJ') (n 19 FM eaa iea -too _tee eae ee ee- Z = PP E P E- J = W ROCK CHECK DAM e C J LiJ (TYP.) SEE DETAIL cs.t Q —75 • 1 102 l •: to Asphalt Pavement PP — — — — — P E Ex. Power -25 KV ij 3 Phase Distribution JN Ex. Power -115 KV h�u Transmission LIMIT OF DISTURBANCE 10' WIDTH TOTAL 0 z ZO �w~. U QQcc � cc JOv QZccO Z V- 1 Ex. 10" Force Main ___,P NEW 10" FORCE MAIN m I NEW 10" CHECK i NEW 10" VALVE PLUG VALVE NEW 10"x10"- TEE j NEW 10" I — J CHECK VALVE NEW 10" PLUG VALVE A m I 4 1 Ex. 10" Force APPROX. 175 LF OF 10" FUSIBLE PVC FORCE MAIN INSTALLED BY DIRECTIONAL DRILL Ex. Century Link Telephone op 24x. Location CP tion Ex. 16" Water Line -i NEW 10" 45° BEND NEW 10" PLUG VALVE eNEW 6' FLAT TOP CONCRETE MANHOLE W/ALUMINUM ACCESS HATCH. SEE DETAIL 11/C.7.1 INSET "B" SCALE 1"=5' W W W O W NEW 10" 11.25" BEND O N Alt. US Hwy 64 (60' Maint. R/W) — 7-ST-7LOR Lee Los / Q FM FIS 9+0 2 LOD LW — — -L°°-- — —'� — — —'.°u- — quo —sse Sao Sao — -- - >• F -- o------ ------ ----7 - — E------Oo E PP:19➢. DRi' 1�— W WPP P PP P c� C \ 1 Z ` J NEW 10" C-900 FORCE MAIN � NEW 10" 11.250 BEND U)(5' OFF EOP) \ Ex. Wetlands-,," NEW 10" PV & BOX N I = W W DRILL PIT, & 110 LF \� 1 UCn OF SILT FENCE N N 1 Q i— Ex. Wetlands Buffer-114�\l 150• I 50, 1 1 1 NI O O I-- — — — — — — — — — — W -------- Ex. Grade V) —__-- W cn = W U W NEW 10" C-900 FORCE MAIN Q � NEW 10" PLUG VALVE & BOX 90 I 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 APPROW 975 LF OF 10" FUS/BLE PIlC BY O/RECT/ONAL OR/LL WAL O O N + V Z O N WAL N Bj — — — — — — — — — — — — — --Q �a U Approx. Location �LL of 24" RCP (n FEBRUARY 2018 W SCALE: W Lv HORZ.:1"= 49 E II VERT.: 1' = 4' J (_ _ 94 y C.3.1 z W rn UW O V) U_ r, Q h N 19+00 19+50 20+00 Z O W tr 90 zM DESIGNED BY: WAL DRAWN BY: N r+ V Z N N C? WAL PROJECT NO.: �a U �LL DATE: FEBRUARY 2018 9 8 SCALE: HORZ.:1"= 49 E LU VERT.: 1' = 4' SHEET 94 y C.3.1 z Felegge rn O U_ r, h N d 3 N LU 0 m z z 0 a U S z Z 0 LU M 2 0 w cs O w z O Y Cr tL Z Q I 1--z CF- O H M x zw co o F_ o -t Z 2 W pin nnq,� , Tj H .... •,, + PAF ESS /4x5: .'� 24144 5 s: ?: .FNG 'AN A . n�n«� 106 V DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: 102 WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 9 8 SCALE: HORZ.:1"= 49 VERT.: 1' = 4' SHEET 94 90 C.3.1 Y Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc81;_.org O O LIMIT OF DISTURBANCE 10' WIDTH TOTAL Ex. 16" Water Ex. Century Link O W W W W W W — _ _ _ I1 O N I NEW 10" 11.250 BEND WW O _ _ Q U Asphalt Pavement Alt, US Hwy64 C60' Main t. R/ W> ~ w 08 LBO LOD LOB Q W \ W `pD FM I FM FMoQel LL] W `�� oo Loo _oo— — Ti!T —. —4 ces roa +go `— oo Lao AFM ITM — — — — — — — ��' —FPP 0PPE >-- — .. -- _ --. wUM_ oW P E P P EPP——�INEW 10" PV & BOX Ex. Power -25 KV W 10" C-900 FORCE MAIN v 10 NEW ARV 3 Phase Distribution (5 OFF EOP) E �,�. SEE DETAIL ROCK CHECK DAM 9 LiJ Q RECOVERY PIT, & 66 LF (TYP.) SEE DETAIL Cs 1 = W OF SILT FENCE Ex. Power -115 KV U)w° U cn 7; I11 I Transmission I 106 106 x 10' WIDTH TOTAL O � m O� O C G 102 07 Z_ _ 0 N r� W Q N N � p_ o U 98� ro �' LJJ r:� O U cn � N 94 - = U W 7; U w y d N U) N 90 W~ T JF 0 m Q � U i O OW _ 102 j _— U) F- i-Lnn 331+0n a4+00 � �taNti Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc81;_.org O O LIMIT OF DISTURBANCE 10' WIDTH TOTAL Ex. 16" Water Ex. Century Link O W W W W W W — _ _ _ I1 O N I NEW 10" 11.250 BEND WW O _ _ Q U Asphalt Pavement Alt, US Hwy64 C60' Main t. R/ W> ~ w 08 LBO LOD LOB Q W \ W `pD FM I FM FMoQel LL] W `�� oo Loo _oo— — Ti!T —. —4 ces roa +go `— oo Lao AFM ITM — — — — — — — ��' —FPP 0PPE >-- — .. -- _ --. wUM_ oW P E P P EPP——�INEW 10" PV & BOX Ex. Power -25 KV W 10" C-900 FORCE MAIN v 10 NEW ARV 3 Phase Distribution (5 OFF EOP) E �,�. SEE DETAIL ROCK CHECK DAM 9 LiJ Q RECOVERY PIT, & 66 LF (TYP.) SEE DETAIL Cs 1 = W OF SILT FENCE Ex. Power -115 KV U)w° U cn 7; I11 I Transmission I 106 106 o0 10' WIDTH TOTAL O � m O� O C G 102 07 Z_ _ 0 N r� W Q U N �W ZN 98� Will a LJJ z= cn cn J — 94 - = U W 7; U Asphalt Pavement y d N U) N 90 W~ T JF 0 m 20+00 NEW ARV SEE DETAIL O 0 t— Ex. Grade "�1 _____-------------------------------- W NEW 10" PLUG VALVE & BOX —�L------- a Q = ---------- W C)r)- -- g J F— = W Li NEW � cn NEW 10" C-900 FORCE MAIN Q APPROX.175 LF OF 10" FUSIBLE PVC FORCE MAIN INSTALLED BY DIRECTIONAL DRILL 20+50 21+00 21+50 40' 20' 0 40' 80' 120' SCALE: 1" m 40' 22+00 LIMIT OF DISTURBANCE 22+50 23+00 -- 23+50 24+00 24+50 25+00 25+50 26+00--- 26+50 V) z O 55 W Nd H 90 0 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 w m g O W C7 0 w ti 0 N z Z Ex. Century Link Telephone O O Ex. 16" Water LineI Q O Q O 106 o0 10' WIDTH TOTAL z �r � m O� 102 C G U Z N N Z_ _ 0 W cnW W Upop N LL ZN C-5 � a LJJ v�- cn oc — Q 106 0�^J 7; U Asphalt Pavement y d N U) N W~ T JF 0 m O -- OW _ 102 j _— U) F- Nd H 90 0 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 w m g O W C7 0 w ti 0 N z Z Ex. Century Link Telephone O O Ex. 16" Water LineI Q O Q O 106 o0 10' WIDTH TOTAL m¢ + W O� 102 W n m I T Z_ _ 0 W cnW W W --W —W—r 98 Q W W w = W r7 W cn oc — Q W 7; U Asphalt Pavement O cn OW _ z U) F- i-Lnn 331+0n a4+00 FM F4 i FM O w — — O_ J �j 04 PP CD _I W PPE z E p Z; E WP = W Ex.Power-25 KV �c CHECK DAM (n 3 Phase Distribution eROCK (TYP.) SEE DETAIL Q Ex. Power -115 KV hW Transmission 106 o0 n --__._ m¢ + W O� 102 W n m I T Z_ _ W cnW 1. 041415 I `� Z � � 98 Q W W w = W ••• , N cn oc o Q 94 7; U LU W ---_ 98 z n --__._ m¢ + O� o W � W � _ W —_ __ m I T Z_ _ W Q 1. 041415 I `� W � TBM "BARBARA" Q W W Q ••• , N oc o w �- W U cn O OW _ z w F- G7 Q U W Y LU W ---_ 98 z n --__._ m¢ � O� o W � W � _ W —_ __ 10 OV, ,. FESS ' .y9 ' Z Z_ _ PP E E p E Q 1. 041415 J O � TBM "BARBARA" Q V, ��C�rAM .. NEW 10" C-900 FORCE MAIN N' 797,191.55 903.3340 Q ••• , (5' OFF EOP) ELEV. oc z w �- W U cn O OW z w F- 0 c O o O_ J �j 04 CD W z Fa - Z; cn Alt. US Hwy 64 t 60 ` Main t. RI W> LU W ---_ 98 z n --__._ 384-QQPM � O� 37t0068 F .00 FM _ FM Fca�---zno---tioo---ov--- w i _= _ _--- __ — — W � W � _ W —_ __ 10 OV, ,. FESS ' .y9 ' ... ..._ —_= — — — _ — _ --_--_---------- — — — — — PP Z_ _ PP E E p E 1. 041415 P E P TBM "BARBARA" U (n U) V, ��C�rAM .. NEW 10" C-900 FORCE MAIN N' 797,191.55 903.3340 Q ••• , (5' OFF EOP) ELEV. Ex. Grade — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ _ NEW 10" C-900 FORCE MAIN I 106 DESIGNED BY: WAL I O DRAWN BY: DRS O + CHECKED BY: 10 2 '"'� PROJECT NO.: 2488 - GX I— DATE: U) I— FEBRUARY 2018 W LU W ---_ 98 z n --__._ J = U W W 94 cn cQ G 90 90 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 SCALE: HORL:1" = 40' VERT.: V= 4' SHEET C.3.2 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org Ex. Century Link 7-elephone-I 102 O O 0__ �U~j (n w— + W— N N � rrj Q00 U w Q = Q Q = C/ -) W W L00_ i m_ Lij — Z= E p— J � = W U W = cn _j w = 7�; — z I LIMIT OF DISTURBANCE' 10' WIDTH TOTAL Ex. 16" Water FM -- LOCL Y— ---E -- P Ex. Power -25 KV 3 Phase Distribution Ex. Power -115 KV Tronsmission Asphalt Pavement —1 — FM Alt. US Hwy 64 (60' Main t. R/ W) 16t00 too EBB 4Z4-00 ffi 84-00 kes FM —LOU Loo — — iao — ,— Loo MoD SOD —Lou NEW 10" C-900 FORCE MAIN (5' OFF EOP) PP P O U ROCK CHECK DAM c�N C•9.1 (TYP.) SEE DETAIL N3 I I I I Q► — — — — — — — — — — — — — — — — — o I O ► O — - + — c� — — --- — N F— WW W W W Q = I— (n O7 FM L J = LOS FM _ — FM– —T Loo Loo — —`°° — — — z t— PP —Loo Loo LOD Loo — — Loo — — — — J — E PP E P = W P U cn Q CD Z o �m� wV Q¢� 0[: LH ��O 00 Qz0 Z w L.L I I �_O + 102 90_ f— 90 W— — Ex. GradeW ------- _ _ — ---__98 O 86�; �U~j (n w— — _ Ex. Grade --- _ ----__ O N 86 In w CHECKED BY: _ 67 WAL J rrj w Q = Q Q = W V) c/) U' 94 82c f) W cn 82 W W Z = _j w = a NEW 10" C-900 FORCE MAIN — I-- =w ~ U W (n J NEW 10" C-900 FORCE MAIN z J ! W w 90 78 = w 78 =w 42+00 42+50 43+00 43+50 44+00 44+50 45+00 Ucn UU' S I G� 86 74 74 45+50 46+00 46+50 47+00 47+50 48+00 48+50 49+00 49+00 49+50 50+00 50+50 51+00 51+50 52+00 I I I I I 40' 20' 0 40' 80' 120' I E I SCALE — 40' — — — — — O I 0 4'o LIMIT OF DISTURBANCE Q Q Q Ex. 16" Water Line 00 10' WIDTH TOTAL — — — — — _ — _ + — — — — W — W— _W W W -� LoxO / W Alt. US Hwy 64 (60'Maint. R/W) NEW 10" 450BEND Q Asphalt Pavement APPROX.200 LF OF 10" FUSIBLE = Sa4won .00 Lee FORCE MAIN INSTALLED BY (n i __--�----------- m FM — cn FM JFM _ _.._...— _—. SEE SHEET C.3.4 10 LOD— W _ — LOD — — LOD — — LOD — — �ODLOD — — LOD — — LODTNEW LM L9B---�t00— — — LOD L00L00 �D� LOD lOD L00 L00 �_ DIRECTIONAL DRILLPP--- PP ---- -----E —P J E PE P E pWEx. Ppwer-25 KV�� W 10 C-900 FORCE MAIN ,Z e ROCK CHECK DAM 3 Phase Distribution c.a1 (TYP.) SEE DETAIL 'V _ (5 OFF EOP) � E Gj U' Ex. Power -115 KV o o NEW 10" GV & BOX Transmission n W i Q / NEW 10" 45°BEND rte' �6� v / Woo Ds L O O '+ 86 70 In W W Q = V) () 82 66 z W Ld W = W 78 62 � ( U) n —_- I— 52 70 S4 58+00 - - - - -58+50 59+00 59+50 Z 0 > w m H Z 7) O U LU m 0 w 0 (J LU 041415 j ;IAM A"L, :�`�. . too 71 --_� DESIGNED BY: WAL DRAWN BY: O DRS CHECKED BY: O 67 WAL CO rrj PROJECT NO.: Q U DATE: FEBRUARY 2018 c/) 1- W W W Z = _j =w U W (n I— 60+00 Z 0 > w m H Z 7) O U LU m 0 w 0 (J LU 041415 j ;IAM A"L, :�`�. . too 71 --_� DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: 67 WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 63 1 SCALE: HORZ.: I* = 40' VERT.: '= 4' I 59 i I i _L 55 SHEET C.3.3 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org LIMIT OF DISTURBANCE Ex. 10x1O 10' WIDTH TOTAL Culvert ------------------------- FN------------------ -- —FN W " WV PCG. --�WFOC PPr--------- Post -j--7`---61/-��0 —� VV\ l ' Ex. Power -25 KV m 3 Phase Distribution moi° -/ e E PERMANENT EASEMENT r-._ ___ __ . r -Ex. 16" Water Line _ .. ..- .-.. /I Ex.Building To W 0 0 D S TOE___APPROX. 200 LF OF 10" FUSIBLE / / Be Remove PVC FORCE MAIN DIRECTIONAL DRILLINSTAB INSTALLED BY f — /FOENEW 10" C-900 _TOB— _ jl / / / I i I // roe —FORCE MAIN NEW MH -1 ---- / SEE SHEET C.4.1 \ I , , Abtlndoned� ---------------- roE __- o- - \\� \� 1 \\ WetJ• \SEE SHEENEW T C.5.210N /�,�\ Qp 40' 20' 0 40' 80' 120' SCALE: 1" " 40' 71 67 \ 0 v \ 0 \ Q 0tr) 63 r� 10"x10" QU r\ � PLUG VALVErNEW d o U W � 59 Will z_= 10" FORCEW/ALUMINUM ACCESS MAIN ATCH.EE Q OJ U a>O O LN O i 4 d N N Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org LIMIT OF DISTURBANCE Ex. 10x1O 10' WIDTH TOTAL Culvert ------------------------- FN------------------ -- —FN W " WV PCG. --�WFOC PPr--------- Post -j--7`---61/-��0 —� VV\ l ' Ex. Power -25 KV m 3 Phase Distribution moi° -/ e E PERMANENT EASEMENT r-._ ___ __ . r -Ex. 16" Water Line _ .. ..- .-.. /I Ex.Building To W 0 0 D S TOE___APPROX. 200 LF OF 10" FUSIBLE / / Be Remove PVC FORCE MAIN DIRECTIONAL DRILLINSTAB INSTALLED BY f — /FOENEW 10" C-900 _TOB— _ jl / / / I i I // roe —FORCE MAIN NEW MH -1 ---- / SEE SHEET C.4.1 \ I , , Abtlndoned� ---------------- roE __- o- - \\� \� 1 \\ WetJ• \SEE SHEENEW T C.5.210N /�,�\ Qp 40' 20' 0 40' 80' 120' SCALE: 1" " 40' 71 67 1� IME 1 35 .4PPROW 200 Z OF /0" FUS/BZE P1/0 BY O/RE0720NV PR/ZZ Existing Grade V) 1 1 / 1 / z 61+50 62+00 CONCRETE MANHOLE SEE INSET "D" CONCRETE MANHOLE SEE INSET "C" / / / / / ANEW 10"x10" TEE NEW 10" PLUG VALVE & BOX 62+50 63+00 63+50 NEW 10" C-900 FORCE MAIN NEW ARV SEE DETAIL I NEW 14" FORCE MAIN— (CONTRACT 3) Alt. US Hwy 64 (60' Main t. RI W) Ex. Guardrail SEE INSET "D" & DETAIL 12/C.7.1 I / 3 NEW ARV 10 SEE DETAIL NEW WATER SERVICE / SEE SHEET C.5.1 1 i 1 Ex. 6" Water Line W E TL A N D NEW 2-10" 45" BENDS \ `Ex. 48" RCP \ NEW GRADE NEW FLOWMETER J SEE SHEET C.5.3 NEW VALVE VAUI SEE SHEET C.5.3 64+00 64+50 65-00 65+50 66+00 / / / / / / J / / Lock Ness Ln. \ 0 REDUCER \ 0 \ NEW 10"x10" 0tr) 63 r� 10"x10" QU NEW 10"NEW � PLUG VALVErNEW �C ~ \ W � 59 Will z_= 10" FORCEW/ALUMINUM ACCESS MAIN ATCH.EE = W DETAIL 9/C.8.1 U W 55 4 d N N �r 5) NEW 10" C-900 FORCE MAIN NEW 10" PLUG VALVE & BOX 47 1� IME 1 35 .4PPROW 200 Z OF /0" FUS/BZE P1/0 BY O/RE0720NV PR/ZZ Existing Grade V) 1 1 / 1 / z 61+50 62+00 CONCRETE MANHOLE SEE INSET "D" CONCRETE MANHOLE SEE INSET "C" / / / / / ANEW 10"x10" TEE NEW 10" PLUG VALVE & BOX 62+50 63+00 63+50 NEW 10" C-900 FORCE MAIN NEW ARV SEE DETAIL I NEW 14" FORCE MAIN— (CONTRACT 3) Alt. US Hwy 64 (60' Main t. RI W) Ex. Guardrail SEE INSET "D" & DETAIL 12/C.7.1 I / 3 NEW ARV 10 SEE DETAIL NEW WATER SERVICE / SEE SHEET C.5.1 1 i 1 Ex. 6" Water Line W E TL A N D NEW 2-10" 45" BENDS \ `Ex. 48" RCP \ NEW GRADE NEW FLOWMETER J SEE SHEET C.5.3 NEW VALVE VAUI SEE SHEET C.5.3 64+00 64+50 65-00 65+50 66+00 / / / / / / J / / Lock Ness Ln. INSET "C" SCALE: 1"=5' NEW 10" PLUG VALVE -a Flaw NEW & FLAT TOP CONCRETE MANHOLE W/ALUMINUM ACCES: HATCH. SEE DETAIL 10/C.8.1 _FUTURE 14" FORCE MAIN NEW 14" PLUG ti INSET "D" SCALE: 1"=5' IL 0 (' 000 wM F— > O w r Ex. Grade It 11� rn rn n Ln N N d- -,t z z 66+50 0+00 NEW NEW 10" FORCE REDUCER MAIN NEW 10"x10" PLUG TEE NEW 10"x10" go Flow NEW 10"NEW PLUG VALVErNEW NE10" PLUG VALVE 6' FLAT TOP ONCRETE MANHOLE 10" FORCEW/ALUMINUM ACCESS MAIN ATCH.EE OL DETAIL 9/C.8.1 INSET "C" SCALE: 1"=5' NEW 10" PLUG VALVE -a Flaw NEW & FLAT TOP CONCRETE MANHOLE W/ALUMINUM ACCES: HATCH. SEE DETAIL 10/C.8.1 _FUTURE 14" FORCE MAIN NEW 14" PLUG ti INSET "D" SCALE: 1"=5' IL 0 (' 000 wM F— > O w r Ex. Grade It 11� rn rn n Ln N N d- -,t z z 66+50 0+00 NEW 14"x10" REDUCER NEW 10" PLUG VALVE NEW 10"x10" TEE _NEW ARV SEE DETAIL 10/C.7.1 0 Z o � LU QQ� C)ccO _i 0 0 QZp z_LL L.L 71 CONCRETE MANHOLE SEE INSET "C" 67 NEW 60 LF OF 10" C-900 FORCE MAIN 63 'Wei CD Z Q w H W 0 U coU w w EL 0 w w Cr GI a Z J 0 U x Y cc EL z Z_ z Q O Q W Ov F- w w O H CD z w Ir a _ o VO p w N LIJ C) m W w tCD Z:) Z z Y z Z O LU C13 M O LU C7 im LU ,,.Well" •.•pPtH OAq"' SEAM'•�� 041415 3 6. forG VA "'• 4I P .• •.,pAM4 60"4 •• 51 I DESIGNED BY: -j WAL DRAWN BY: DRS 47 """` PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 43 SCALE: HORZ.: 1" = 40' VERT.: 1" = 4' 39 SHEET 35 C.3.4 0+50 a GcCnm N U .-. N N OL d 4 C N N �r W y � N F'— Y cc EL z Z_ z Q O Q W Ov F- w w O H CD z w Ir a _ o VO p w N LIJ C) m W w tCD Z:) Z z Y z Z O LU C13 M O LU C7 im LU ,,.Well" •.•pPtH OAq"' SEAM'•�� 041415 3 6. forG VA "'• 4I P .• •.,pAM4 60"4 •• 51 I DESIGNED BY: -j WAL DRAWN BY: DRS 47 """` PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 43 SCALE: HORZ.: 1" = 40' VERT.: 1" = 4' 39 SHEET 35 C.3.4 0+50 1 FM 1 O \ � Worn \ IPP Post w \ PP \� T 1 0 \\ NEW PUMP 1STATI SEE SHEET C.5.2 FOC \ Po 4X3 NEW 10" FORCE MAIN \SEE SHEET C.3.4 \ \. \ i i Notify NC811 Three Full Working Days Before Digging W OO DS\ 11 o \\ II! NEW 75.49 OF 30" DIP Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW WETWELL\I ' I GRAVITY SEWER O 52% (� RIM ELEV. 63.59' I I NEW 82.10 OF 30 PVC c U INV. IN 42.00' GRAVITY SEWER Q 0.09% ; > o_ o Ex. 4" Water Main $ I � NEW MH -2 (WATERTIGHT a \ \ LID W/ VENT) a ON w RIM ELEV. 61.21 Q N a \ \\ \\ \ INV. IN 42.86' ; A INV. OUT 42.66 W O O D S rn STREAM CROSSING S1 > st 1r00 Z s N �I o � N � (PERENNIAL) IMPACT LENGTH- 16 FT. m > Ex. Abandoned Well NEW 224 LF OF SILT FENCE Ex. 4" Water Main NEW MH -1 �\ "\ OUTSIDE DROP S / c J RIM ELEV. 63.88' INV. IN 42.59'/ // BUFFER IMPACT B1 Ex. 4" Water Main -1 \ o INV. OUT 42.39' / TOTAL ZONE 1 IMPACT- 2,202 SQ.FT. Ex. Buffer wl, I �\ \ w / / �TOTAL ZONE 2 IMPACT- 1,735 SQ.FT. / v \ \wl o\ \ NEW 377.92 OF 30" PVC N GRAVITY SEWER 0.09% 3 NEW 225.92 OF 30 PVC GRAVITY SEWER @ 0.09% Ex. Floodplain —, J / / \ \ \ BUFFER IMPACT B2 BUFFER IMPACT B3 TOTAL ZONE 1 IMPACT- 0 SQ.FT N TOTAL ZONE 1 IMPACT- 1,335 SQ.FT. Ex. WingwoU / 11 I_�' / '/ \�\\ \ x TOTAL ZONE 2 IMPACT= 1,210 SQ.FT. TOTAL ZONE 2 IMPACT= 4,941 SQ.FT. - NEW MH -5 \ \ 1 (WATERTIGHT LID _ xO ) 0 NEW MH -3 (WATERTIGHT - - - - - RIM ELEV 63.12' y \�. ° gcee5 e LID W/ VENT). OUTSIDE DROP W 0 o D S", - - ------=_/ \ ° to INV. IN 50.29'v RIM ELEV. 60.01O NEW 539 LF OF \ ti 0 NEW MH -4 NEW PERMANENT EASEMENT INV. OUT 50.09 \ I \ L' ^� INV. IN 49.20' RIM ELEV. 62.02 o Ex. 10'xIO'Culvert \ 1 / SILT FENCE \ \ \ \ ° INV. OUT 43.20 NEW 366.33 OF 30" PVC Ex. Buried 30' WIDE (15' EACH SIDE OF + / 24" CMP INV. IN 49.73 ry N \� \ GRAVITY SEWER @ 0.09% N INV. OUT 49.53' o GRAVITY SEWER LINE). / \ CLEAR & GRUBBING �m d 4,107 SY. Ex. Washout II m m o Q U \ \ \ 1 =\ -- _ - - •� \ \ 1 \k� 1 O ° �. Ex. TOB I o~ 0o i— \ 50'` 2 ° o (�� ��°� mQi� J NEW 402.02 OF 30" PVC' M * 0°° (n I-. - \ \ \ ?i \r \ m\• \ �• I ��-� '� 3 ° II ° o'��� GRAVITY SEWER @ 0.09% ���._,w 13+ y W s+ ".�IS M\ ° II 12+00 --- z w� �+ II Ex. - 1 1 I 00 \ �o w I 11+� \ / 8 0 `�� Val,, N \ / — — — — C/L Cree _ (yJ LIMITED OF DISTURBANCE - h - / G 30 FT. WIDTH / ZONE t NEW 1,109 LF OF Q Worn mm T1 W 0 0 D 5 I \\ `��� \ \ // , �\ \` -_-- J SILT FENCE _ \\ Ex. 16" Water Main \ PostWVIJ \ PP r \ \ FHa, \ NEW 10" FORCE MAIN �' \ - -- - -� \ // \ SEE SHEET C.3.3 \ - I \\\ /� - _ ZONE 7 // \ / \ \ Ex. Wetlands 7 \ x. Power 25 KV 1\ % 1 `. \ / ,i —.— — _ — —. _ 3 Phase Distribution 1 \ ------ - _ _ _ / \ /_ . ZONE 2 . \ Ex. Power 775 KV 1 \ \ / / - /BUFFER IMPACT B4 Transmission \ \\- / / - - - - - - _ f o \ / TOTAL ZONE 1 IMPACT- 0 SQ.FT. \ \ \\ TAL \\ \ \\ \ \\ < \ ` \ W 0 0 D SSwale Ex. TOE E.Y.E/ W o0o D S ZONE i IMPACT- 2,053 SQ.FT. \ \ NAD 83 (2011) \ \ \`.1 \ \ \\ \\\ \ .1�I e `� 50' 25' 0 50' 100' 150' SCALE: 1" = 50' N � _j � 0- 00 W Vi 0 - 82.10 LF 30" 40 d o 65 O �^ 357.92 LF 30" PVC @ 0.09% woE x0+E zoo- :200X — _._. — — — —IT - N d - �> N V Q > > > z z_ i L6o m^. 0 1 cV LL N z PVC @ 0.097 z ? 0.09% OF GRAVITY SEWER cn 50 O y N 3 5 y 1 FM 1 O \ � Worn \ IPP Post w \ PP \� T 1 0 \\ NEW PUMP 1STATI SEE SHEET C.5.2 FOC \ Po 4X3 NEW 10" FORCE MAIN \SEE SHEET C.3.4 \ \. \ i i Notify NC811 Three Full Working Days Before Digging W OO DS\ 11 o \\ II! NEW 75.49 OF 30" DIP Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW WETWELL\I ' I GRAVITY SEWER O 52% (� RIM ELEV. 63.59' I I NEW 82.10 OF 30 PVC c U INV. IN 42.00' GRAVITY SEWER Q 0.09% ; > o_ o Ex. 4" Water Main $ I � NEW MH -2 (WATERTIGHT a \ \ LID W/ VENT) a ON w RIM ELEV. 61.21 Q N a \ \\ \\ \ INV. IN 42.86' ; A INV. OUT 42.66 W O O D S rn STREAM CROSSING S1 > st 1r00 Z s N �I o � N � (PERENNIAL) IMPACT LENGTH- 16 FT. m > Ex. Abandoned Well NEW 224 LF OF SILT FENCE Ex. 4" Water Main NEW MH -1 �\ "\ OUTSIDE DROP S / c J RIM ELEV. 63.88' INV. IN 42.59'/ // BUFFER IMPACT B1 Ex. 4" Water Main -1 \ o INV. OUT 42.39' / TOTAL ZONE 1 IMPACT- 2,202 SQ.FT. Ex. Buffer wl, I �\ \ w / / �TOTAL ZONE 2 IMPACT- 1,735 SQ.FT. / v \ \wl o\ \ NEW 377.92 OF 30" PVC N GRAVITY SEWER 0.09% 3 NEW 225.92 OF 30 PVC GRAVITY SEWER @ 0.09% Ex. Floodplain —, J / / \ \ \ BUFFER IMPACT B2 BUFFER IMPACT B3 TOTAL ZONE 1 IMPACT- 0 SQ.FT N TOTAL ZONE 1 IMPACT- 1,335 SQ.FT. Ex. WingwoU / 11 I_�' / '/ \�\\ \ x TOTAL ZONE 2 IMPACT= 1,210 SQ.FT. TOTAL ZONE 2 IMPACT= 4,941 SQ.FT. - NEW MH -5 \ \ 1 (WATERTIGHT LID _ xO ) 0 NEW MH -3 (WATERTIGHT - - - - - RIM ELEV 63.12' y \�. ° gcee5 e LID W/ VENT). OUTSIDE DROP W 0 o D S", - - ------=_/ \ ° to INV. IN 50.29'v RIM ELEV. 60.01O NEW 539 LF OF \ ti 0 NEW MH -4 NEW PERMANENT EASEMENT INV. OUT 50.09 \ I \ L' ^� INV. IN 49.20' RIM ELEV. 62.02 o Ex. 10'xIO'Culvert \ 1 / SILT FENCE \ \ \ \ ° INV. OUT 43.20 NEW 366.33 OF 30" PVC Ex. Buried 30' WIDE (15' EACH SIDE OF + / 24" CMP INV. IN 49.73 ry N \� \ GRAVITY SEWER @ 0.09% N INV. OUT 49.53' o GRAVITY SEWER LINE). / \ CLEAR & GRUBBING �m d 4,107 SY. Ex. Washout II m m o Q U \ \ \ 1 =\ -- _ - - •� \ \ 1 \k� 1 O ° �. Ex. TOB I o~ 0o i— \ 50'` 2 ° o (�� ��°� mQi� J NEW 402.02 OF 30" PVC' M * 0°° (n I-. - \ \ \ ?i \r \ m\• \ �• I ��-� '� 3 ° II ° o'��� GRAVITY SEWER @ 0.09% ���._,w 13+ y W s+ ".�IS M\ ° II 12+00 --- z w� �+ II Ex. - 1 1 I 00 \ �o w I 11+� \ / 8 0 `�� Val,, N \ / — — — — C/L Cree _ (yJ LIMITED OF DISTURBANCE - h - / G 30 FT. WIDTH / ZONE t NEW 1,109 LF OF Q Worn mm T1 W 0 0 D 5 I \\ `��� \ \ // , �\ \` -_-- J SILT FENCE _ \\ Ex. 16" Water Main \ PostWVIJ \ PP r \ \ FHa, \ NEW 10" FORCE MAIN �' \ - -- - -� \ // \ SEE SHEET C.3.3 \ - I \\\ /� - _ ZONE 7 // \ / \ \ Ex. Wetlands 7 \ x. Power 25 KV 1\ % 1 `. \ / ,i —.— — _ — —. _ 3 Phase Distribution 1 \ ------ - _ _ _ / \ /_ . ZONE 2 . \ Ex. Power 775 KV 1 \ \ / / - /BUFFER IMPACT B4 Transmission \ \\- / / - - - - - - _ f o \ / TOTAL ZONE 1 IMPACT- 0 SQ.FT. \ \ \\ TAL \\ \ \\ \ \\ < \ ` \ W 0 0 D SSwale Ex. TOE E.Y.E/ W o0o D S ZONE i IMPACT- 2,053 SQ.FT. \ \ NAD 83 (2011) \ \ \`.1 \ \ \\ \\\ \ .1�I e `� 50' 25' 0 50' 100' 150' SCALE: 1" = 50' 60 _55- 5 0 - ----- I i I 75.49 LF 30" 45 DIP @ 0.52/• NOTE: \ THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J,ALL DATED NOVEMBER 03,2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM OF THIS PROJECT IS 60.0'. NOTE: IF SELECTED, ADD ALTA MECHANICAL BAR SCREEN, THE UNIT WILL BE CONSTRUCTED BETWEEN THE WET WELL AND MH -1. NEW 10" FORCE MAIN 7000 _j � 0- 00 W Vi 0 - 82.10 LF 30" 40 SEE SHEET C.3.404 W O N W O, N �0W O�tW 65 O �^ 357.92 LF 30" PVC @ 0.09% woE x0+E zoo- :200X — _._. — — — —IT - 60 _55- 5 0 - ----- I i I 75.49 LF 30" 45 DIP @ 0.52/• NOTE: \ THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J,ALL DATED NOVEMBER 03,2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM OF THIS PROJECT IS 60.0'. NOTE: IF SELECTED, ADD ALTA MECHANICAL BAR SCREEN, THE UNIT WILL BE CONSTRUCTED BETWEEN THE WET WELL AND MH -1. NEW 10" FORCE MAIN 0 -_o 0,0)(� - rn rn O M I O N 82.10 LF 30" 40 SEE SHEET C.3.404 N Ln ^ OO 0i 0i LO Ln `r PVC @ 0.09% � 357.92 LF 30" PVC @ 0.09% _ N d - �> N V N l") > > > z z_ c �o z z ? 225.92 LF 30" NEW 20 LF OF 30" DIP @ z cV LL N z PVC @ 0.097 z ? 0.09% OF GRAVITY SEWER cn 50 O y N 3 5 y �( QW O> L0 O • l0 > > O 0) W �—W O> ILt—O O � G)W 00 — 3: t6W 0) -Op a > j N W>� _ F Z O_ to- � W O+ \unW > Ex Grade �o E o t :j�D:O /W, q)w - S + r`U \0LoLd 0, DC7 \ xoo + E 1 j 366.33 LF 30" PVC @ 0.09% 402.02 LF 30" PVC @ 0.09% 11 1 _ —, zo �W~ QrA Qcr_ LLJ C0 cr z t- 0 Qz0 zLL LL CD z O w Cc w z LU 0 U W W 0C W IL C3 Cc w M 0 -_o 0,0)(� - rn rn O M I O N 82.10 LF 30" 40 O N Ln ^ OO 0i 0i LO Ln `r PVC @ 0.09% � 357.92 LF 30" PVC @ 0.09% _ N `r N d - �> N V N l") > > > z z_ c �o z z ? 225.92 LF 30" NEW 20 LF OF 30" DIP @ z cV LL N z PVC @ 0.097 _ —, zo �W~ QrA Qcr_ LLJ C0 cr z t- 0 Qz0 zLL LL CD z O w Cc w z LU 0 U W W 0C W IL C3 Cc w M 0 -_o 0,0)(� O N 40 O r7� N � U _ N `r N d - �> N V N l") U c �o >> NEW 20 LF OF 30" DIP @ z cV LL N z z z z ? 0.09% OF GRAVITY SEWER cn 50 O y N 3 5 y u, N -- -- - 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 _ —, zo �W~ QrA Qcr_ LLJ C0 cr z t- 0 Qz0 zLL LL CD z O w Cc w z LU 0 U W W 0C W IL C3 Cc w M Z O 0 LU M n 0 W 0 0 W z z J 0 z 9 z D 8 LLIm 2 O w 0 LU Y Q d Z Q FS Q C z M w z w cn 0 W J 0 z Y cr_ o W LO W c r } F— I_- U) OO O O 0 M Q LU cf)Z 70 / _ J / 041415 % 1 6-Ut$1,;�_ 'yl< .FIVGINE� Q5� + � N Q 65 CHECKED BY: Q U WAL F__55 N V N l") U c �o LJ W W cV LL N LJJF. 3 J cn 50 O y N F- y u, N 0 45 Z O 0 LU M n 0 W 0 0 W z z J 0 z 9 z D 8 LLIm 2 O w 0 LU Y Q d Z Q FS Q C z M w z w cn 0 W J 0 z Y cr_ o W LO W c r } F— I_- U) OO O O 0 M Q LU cf)Z 70 / _ J / 041415 % 1 6-Ut$1,;�_ 'yl< .FIVGINE� Q5� + � N AAf 65 CHECKED BY: Q U O J / _ J / 60L + � N DRS CHECKED BY: Q U WAL F__55 (n I— LJ W W J cn 50 = W F- U) 45 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.:1" = 50' VERT.: 1"= 5' SHEET C04al p Ex. 4" Water Main 3 / V \ {� W Ex. 4" Water Main r, Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org / I TEMPORARY CONSTRUCTION ENTRANCE. SEE �DETAIL cs.1 ; i u� BUFFER IMPACT BS // FUTURE ACCESS ROAD TOTAL ZONE 1 IMPACT- 871 SQ.FT. / / BY OTHERS TOTAL ZONE 2 IMPACT- 1,668 SQ.FT. \ \ 00 / \ \ 1777 °X NEW MH -7 (WATERTIGHT / \�.. \ \ \ \ _ I3 00 w` P� / / /' LID W/ VENT) OUTSIDE DROP \ \ \ �� G ° / / i / / NV. NRIM L 55.40' S7' / INV. IN 51.18' ( NEW 370.74 OF 18" PVC 0 \ \ \ I 1 i / / INV. OUT 50.98 GRAVITY SEWER a 0.35% NEW 225.92 OF 30" PVC u M GRAVITY SEWER 0 0.09% / / NEW PERMANENT EASEMENT N 30 WIDE (15 EACH SIDE OF CLEAR &GRUBBING / GRAVITY SEWER LINE). 4,308 SY. 0 NEW MH -6 / I \ 4 BUFFER IMPACT B6 ° _11___77 � P �� \ RIM ELEV. 67.10 / NEW 352.59 OF 18" PVC — — — — — — — — \ \ / \ \ �I INV. IN 50.70' TOTAL ZONE 1 IMPACT- 99 SQ.FT. Ex. Wetlands GRAVITY SEWER 0 0.35% \� 1y1- I / INV. OUT 50.50' TOTAL ZONE 2 IMPACT- 1,624 SQ.FT. - tp� o \ \\ I•� l J `\ NEW 314.39 OF 30" DIP Ex. Floodplain ���' I / \,I "Gb / GRAVITY SEWER Q 0.09%20+00 LIMITED OF DISTURBANCE _ 30 FT. WIDTH \ I i ' / ` \ \ % Ex. roe 0 / \ \ _ _ / C/t �:.. _._— = — ( NEW MH -8 (WATERTIGHT 1 Ex. Butrer�1 1 ,k \ /��. 0 /n\\\ \�\ — // \ / o , I \ LID W/ VENT) \ _W2 IMPACT / ��� \ RIM ELEV. 71.98' \ \ // / %i \ \ \ / / / \ (0.2 AC) %�� Ex. roe l \ INV. IN 57.03' / Ex. Tog ��j \ ' \\ \ // / \ \ \INV. OUT 56.83' 10' _._../ o / Ex. Wetlands BUFFER IMPACT B8/ \ \ / TOTAL ZONE 1 IMPACT- 547 SQ.FT. TOTAL ZONE 2 IMPACT- 3,854 SQ.FT. STREAM CROSSING S2 Ex. Wetlands (PERENNIAL) / IMPACT LENGTH- 70 FT. I� \ ° FUTURE 2 9'x7 \ I\ BUFFER IMPACT 87 ; ° RCBC BY OTHERS i / \ h� J \ TOTAL ZONE 1 IMPACT= 2743 SQ.FT. NOTE* \ \ TOTAL ZONE 2 IMPACT- 628 SQ.FT. THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 NEW 181 LF OF SILT FENCE �� AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM NEW 213.57 OF 18" DIP �� \\ OF THIS PROJECT IS 60.0'. GRAVITY SEWER 0.35/. 50' 25' 0 50' 100' 150' NEW MH -16 \ \\ \\ \ SCALE 1 50 / INV. OUT 51.92' \ \ \ \ \ \ I _ FUTURE ACCESS ROAD 80 BY OTHERS 75 70 I 2 U N W > 3 > "00NW 65 1 0 �9: V'W-0 i =p + E o � J M tr C7 D.09% --- ---' 0 \ o (ri \ (O ~ r 4) Ld Ex. It \ It F- a0 co \ W Lo _ OD 00 m W - z - LO �; _T 4)W W =p+ Eo - �JN-E0 _W q) �\ QWQ (p � _._. 314.39 LF 30" DIP 0 0.091 17+00 -- 17+50 352.59 LF 18" PVC 0 0.41% 0 LO I z rn7 o� L0 ZZ 18+00 18+50 19+00 19+50 370.74 LF 18" PVC 0 0.351 n n 0LOO �r z? i U \ r Q O 75 �r � o o �- - W Z 0 4 m (D U U I— — N a \ w \ Q O � N b U ami :2 ::i ONOf C9 65 p Ex. 4" Water Main 3 / V \ {� W Ex. 4" Water Main r, Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org / I TEMPORARY CONSTRUCTION ENTRANCE. SEE �DETAIL cs.1 ; i u� BUFFER IMPACT BS // FUTURE ACCESS ROAD TOTAL ZONE 1 IMPACT- 871 SQ.FT. / / BY OTHERS TOTAL ZONE 2 IMPACT- 1,668 SQ.FT. \ \ 00 / \ \ 1777 °X NEW MH -7 (WATERTIGHT / \�.. \ \ \ \ _ I3 00 w` P� / / /' LID W/ VENT) OUTSIDE DROP \ \ \ �� G ° / / i / / NV. NRIM L 55.40' S7' / INV. IN 51.18' ( NEW 370.74 OF 18" PVC 0 \ \ \ I 1 i / / INV. OUT 50.98 GRAVITY SEWER a 0.35% NEW 225.92 OF 30" PVC u M GRAVITY SEWER 0 0.09% / / NEW PERMANENT EASEMENT N 30 WIDE (15 EACH SIDE OF CLEAR &GRUBBING / GRAVITY SEWER LINE). 4,308 SY. 0 NEW MH -6 / I \ 4 BUFFER IMPACT B6 ° _11___77 � P �� \ RIM ELEV. 67.10 / NEW 352.59 OF 18" PVC — — — — — — — — \ \ / \ \ �I INV. IN 50.70' TOTAL ZONE 1 IMPACT- 99 SQ.FT. Ex. Wetlands GRAVITY SEWER 0 0.35% \� 1y1- I / INV. OUT 50.50' TOTAL ZONE 2 IMPACT- 1,624 SQ.FT. - tp� o \ \\ I•� l J `\ NEW 314.39 OF 30" DIP Ex. Floodplain ���' I / \,I "Gb / GRAVITY SEWER Q 0.09%20+00 LIMITED OF DISTURBANCE _ 30 FT. WIDTH \ I i ' / ` \ \ % Ex. roe 0 / \ \ _ _ / C/t �:.. _._— = — ( NEW MH -8 (WATERTIGHT 1 Ex. Butrer�1 1 ,k \ /��. 0 /n\\\ \�\ — // \ / o , I \ LID W/ VENT) \ _W2 IMPACT / ��� \ RIM ELEV. 71.98' \ \ // / %i \ \ \ / / / \ (0.2 AC) %�� Ex. roe l \ INV. IN 57.03' / Ex. Tog ��j \ ' \\ \ // / \ \ \INV. OUT 56.83' 10' _._../ o / Ex. Wetlands BUFFER IMPACT B8/ \ \ / TOTAL ZONE 1 IMPACT- 547 SQ.FT. TOTAL ZONE 2 IMPACT- 3,854 SQ.FT. STREAM CROSSING S2 Ex. Wetlands (PERENNIAL) / IMPACT LENGTH- 70 FT. I� \ ° FUTURE 2 9'x7 \ I\ BUFFER IMPACT 87 ; ° RCBC BY OTHERS i / \ h� J \ TOTAL ZONE 1 IMPACT= 2743 SQ.FT. NOTE* \ \ TOTAL ZONE 2 IMPACT- 628 SQ.FT. THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 NEW 181 LF OF SILT FENCE �� AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM NEW 213.57 OF 18" DIP �� \\ OF THIS PROJECT IS 60.0'. GRAVITY SEWER 0.35/. 50' 25' 0 50' 100' 150' NEW MH -16 \ \\ \\ \ SCALE 1 50 / INV. OUT 51.92' \ \ \ \ \ \ I _ FUTURE ACCESS ROAD 80 BY OTHERS 75 70 I 2 U N W > 3 > "00NW 65 1 0 �9: V'W-0 i =p + E o � J M tr C7 D.09% --- ---' 0 \ o (ri \ (O ~ r 4) Ld Ex. It \ It F- a0 co \ W Lo _ OD 00 m W - z - LO �; _T 4)W W =p+ Eo - �JN-E0 _W q) �\ QWQ (p � _._. 314.39 LF 30" DIP 0 0.091 17+00 -- 17+50 352.59 LF 18" PVC 0 0.41% 0 LO I z rn7 o� L0 ZZ 18+00 18+50 19+00 19+50 370.74 LF 18" PVC 0 0.351 n n 0LOO �r z? .e 75 65 U) w -- -- 60 W W z= = w -55-- I— V) I Q 50 45 ------------ ---- .._. i I \ r _ O 75 .� N �- - W Z 0 4 m (D Q U I— — .e 75 65 U) w -- -- 60 W W z= = w -55-- I— V) I Q 50 45 ------------ ---- .._. 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 Ltol 1 3 5 24+00 V -. Z o � Lu QQ5 LLJ CO �cr-O H- U QZO z U_ LL m Z O U) w Im Y 9 z 0 U Lo N^ r- j i I OU W � W 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 Ltol 1 3 5 24+00 V -. Z o � Lu QQ5 LLJ CO �cr-O H- U QZO z U_ LL m Z O U) w Im Y 9 z 0 U Lo N^ r- j 80Lu I OU W � W o v W o W ( o v =0Eo Motto 75 .� 114 fr W W O M N a 0 F- CD LOLO T � Ch M Q H cn W Z 041415 I W Z 0 4 m (D •,�1� .F!bGIHE� PQS,c LLJ \ ? W^ W \ ^�9U-)LJ F-_ O \ =OD+� :2 ::i ONOf C9 65 / 60 \ Ex. Grade / DESIGNED BY: 55 c ui WAL DRAWN BY: DRS 213.57 LF 18" DIP 0.35"/. ? - CHECKED BY: ------ - - N 50 - __._ WAL 00—, PROJECT NO.: L - - - 2488 - GX L DATE: - -- - - z FEBRUARY 2018 45 SCALE: I- — - ---' - -- --- - -�---- - - _ -- -- VERT.: 1" = 5' 40 SHEET i CA42 3 5 0+00 0+50 1+00 1+50 V I 1 �' 1 - —� / I / Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org \ \ NEW MH -12 (WATERTIGHT \ \ LID W/ VENT) w o O O S W5 IMPACT \ RIM ELEV. 73.03 (0.06 AC)\\� INV. IN 62.09' BUFFER IMPACT 614 INV. OUT 61.89' NEW 244.78 OF 18" PVC TOTAL ZONE 1 IMPACT- 0 SQ.FT. \ o GRAVITY SEWER @ 0.35% TOTAL ZONE 2 IMPACT= 738 SQ.FT. \ £x. Wetlands ew Ex. Swale \ W 0 0 D S is Ex. Wetlands x / Ex. TOB O \ 8� x BUFFER IMPACT B9 W4 IMPACT Ary TOTAL ZONE 1 IMPACT= 45 SQ.FT. (0.04 AC) \ 1 N VC TOTAL ZONE 2 IMPACT- 1,572 SQ.FT. W o o p S NEW 288.42 OF 18" PVC \ �... �� VGRAVITY SEWER Q 0.35% o / / ''� \ o � /�(0 � IL NEW 370.74 LF 18" PVC I' GRAVITY SEWER 0.35% / \ Zo \ 6? \\ \ \ I \ BUFFER IMPACT 610 LIMITED OF DISTURBANCE CLEAR & GRUBBING / \ \c \ NF r \ TOTAL ZONE 1 IMPACT= 0 SQ.FT.30 FT. WIDTH 4,334 SY. NEW MH -11 TOTAL ZONE 2 IMPACT- 425 SQ.FT. \ lq Ex. Wetlands l C� z" \� . NEW MH -9 (WATERTIGHT NEW PERMANENT EASEMENT RIM ELEV. 75.83' LID W/ VENT) 30 WIDE (15 EACH SIDE OF INV. IN 60.89 . V. O.o� / ^ \ — _ \ �\ / RIM ELEV. 71.95 GRAVITY SEWER LINE)INOUT 6069' Lx / / _j � INV. IN 58.52' INV. OUT 58.32' NEW MH -10 / / j. \ \ \ C/) \ \ NEW 261.72 OF 18" PVC RIM ELEV. 74.94 NEW 301.30 OF 18 PVC / \ \ o INV. IN 59.64 GRAVITY SEWER 0 0.357 / / / \ �� \ \ GRAVITY SEWER Q 0.357 INV. OUT 59.44'\> W3 IMPACT — � "�-- m, w--�-3 +00 / (0.05 AC) \ \ z +00 `-� — 1 �\ \ \ \ \ 27+00,___- _ F� - . 30 / o ' r ` ` BUFFER IMPACT B15 \ \ o IX �; _ 29+00 � � / �-� / ` � TOTAL ZONE 1 IMPACT- 0 SQ.FT.,,,, \ f / L. iy \ \ \ _ _ \\ z8+Op ... i l // /y /� ,. // /BUFFER IMPACT B13 TOTAL ZONE 2 IMPACT= 2,533 SQ.FT TAL SL T1 LF FENCE -- — — - -- '� / L /£x. euffei / TOTAL ZONE 21 IMPACT -0668 SQ.FT. / IN,_ / wale/ / \ BUFFER (IMPACT 12 \ \1,G— —`C/L eek_=..�--`���/ /, �I --'\ / / �� TOTAL ZONE 11MPACT= 0 SQ.FT. ----- \ \ ' \ ✓ / ,� i TOTAL ZONE 2 IMPACT- 560 SQ.FT. \ \ BUFFER IMPACT B11 \ /\ TOTAL ZONE 1 IMPACT= 0 SQ.FT./ `pp \ \ ` TOTAL ZONE 2 IMPACT- 1,142 SQ.FT. J / 50' 25' 0 50' 100' 1501 SCALE: 1" = 50' all 75 70 x r7 L DRAWN BY: DRS m PROJECT NO.: 2488 - GX 0 I� N W 65 - N D E o � o SCD � a �n � o 0 Q o c a w F - (n L6o�o.a> - - _ NQ — ww I 1 �' 1 - —� / I / Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org \ \ NEW MH -12 (WATERTIGHT \ \ LID W/ VENT) w o O O S W5 IMPACT \ RIM ELEV. 73.03 (0.06 AC)\\� INV. IN 62.09' BUFFER IMPACT 614 INV. OUT 61.89' NEW 244.78 OF 18" PVC TOTAL ZONE 1 IMPACT- 0 SQ.FT. \ o GRAVITY SEWER @ 0.35% TOTAL ZONE 2 IMPACT= 738 SQ.FT. \ £x. Wetlands ew Ex. Swale \ W 0 0 D S is Ex. Wetlands x / Ex. TOB O \ 8� x BUFFER IMPACT B9 W4 IMPACT Ary TOTAL ZONE 1 IMPACT= 45 SQ.FT. (0.04 AC) \ 1 N VC TOTAL ZONE 2 IMPACT- 1,572 SQ.FT. W o o p S NEW 288.42 OF 18" PVC \ �... �� VGRAVITY SEWER Q 0.35% o / / ''� \ o � /�(0 � IL NEW 370.74 LF 18" PVC I' GRAVITY SEWER 0.35% / \ Zo \ 6? \\ \ \ I \ BUFFER IMPACT 610 LIMITED OF DISTURBANCE CLEAR & GRUBBING / \ \c \ NF r \ TOTAL ZONE 1 IMPACT= 0 SQ.FT.30 FT. WIDTH 4,334 SY. NEW MH -11 TOTAL ZONE 2 IMPACT- 425 SQ.FT. \ lq Ex. Wetlands l C� z" \� . NEW MH -9 (WATERTIGHT NEW PERMANENT EASEMENT RIM ELEV. 75.83' LID W/ VENT) 30 WIDE (15 EACH SIDE OF INV. IN 60.89 . V. O.o� / ^ \ — _ \ �\ / RIM ELEV. 71.95 GRAVITY SEWER LINE)INOUT 6069' Lx / / _j � INV. IN 58.52' INV. OUT 58.32' NEW MH -10 / / j. \ \ \ C/) \ \ NEW 261.72 OF 18" PVC RIM ELEV. 74.94 NEW 301.30 OF 18 PVC / \ \ o INV. IN 59.64 GRAVITY SEWER 0 0.357 / / / \ �� \ \ GRAVITY SEWER Q 0.357 INV. OUT 59.44'\> W3 IMPACT — � "�-- m, w--�-3 +00 / (0.05 AC) \ \ z +00 `-� — 1 �\ \ \ \ \ 27+00,___- _ F� - . 30 / o ' r ` ` BUFFER IMPACT B15 \ \ o IX �; _ 29+00 � � / �-� / ` � TOTAL ZONE 1 IMPACT- 0 SQ.FT.,,,, \ f / L. iy \ \ \ _ _ \\ z8+Op ... i l // /y /� ,. // /BUFFER IMPACT B13 TOTAL ZONE 2 IMPACT= 2,533 SQ.FT TAL SL T1 LF FENCE -- — — - -- '� / L /£x. euffei / TOTAL ZONE 21 IMPACT -0668 SQ.FT. / IN,_ / wale/ / \ BUFFER (IMPACT 12 \ \1,G— —`C/L eek_=..�--`���/ /, �I --'\ / / �� TOTAL ZONE 11MPACT= 0 SQ.FT. ----- \ \ ' \ ✓ / ,� i TOTAL ZONE 2 IMPACT- 560 SQ.FT. \ \ BUFFER IMPACT B11 \ /\ TOTAL ZONE 1 IMPACT= 0 SQ.FT./ `pp \ \ ` TOTAL ZONE 2 IMPACT- 1,142 SQ.FT. J / 50' 25' 0 50' 100' 1501 SCALE: 1" = 50' all 75 70 1 80 r7 —_ 50 - _ 45 DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX 0 I� N W 65 - D E o 75 SCD �n � Q U F - (n 60 - - _ w — ww z= J cn 55 W � H — - 75 i 50 i 45 r) W eD n 0) rn h 0) N I� ff)N W O F^ LO . N NW PO FZ r, Or H m Q m W y + E O Q W �.. ._ i HW r j t N o �- �N)2'U' //\ 1M NW >� NW 2002 i /-----�\ / j/ \\ /�/ \\ N�o6 Wcu U N tr U O -O (n F__ 244.78 LF 18" PVC Q 0.35% W 288.42 LF 18" PVC @ 0.35'/. W W 301.30 LF 18" PVC @ 0.35% z J U) 261.72LF 18" PVC 0.357 370.74 LF 18" PVC 0.35'/• OR c�rn o = LLJ W �� o 0 ;; I— _. d- (0 Z z Q 04 m Lo LO U) 06 00 ;> z zz 27+00 27+50 Zz 28.00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 V z zz ��� wV Q¢� ®�Z _J o u Qz0 zL.L LL It CO 1 80 r7 —_ 50 - _ 45 DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 I� N W 40 r7 W r7co D E o 75 SCD �n LnLO rn� N Zz 70 65 •11 CI F_ z O Lu m O U Lu O w PAU Y Q EL Z a g cr M z U w =3 ~ zw co W O ~ J z Y $,,,, N C, cr j O w M }) 4 F— U) O F- V c5 N z � Z 041415 e AIN A • 55 I DESIGNED BY: WAL —_ 50 - _ 45 DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: V = 50' VERT.: 1'= 5' 40 SHEET C.4.3 36+50 ------- � o a U Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org 50' 25' 0 50' 100' 150' SCALE: 1" = 50' F-iI 80 F_ WAL DRAWN BY: 2 DRS F - - -- - - -- - rn Lo wi- r, 75 d - _ "t - - -- ¢w r > 2488 - GX DATE: (c; FEBRUARY 2018 _ O 0 ,.4- 00 >�r6_ M > N ��riw � Ow 70 �rw q) >� +E O =�` { cn F_- _ _ W 65 W z_= W J v) = W W 6 0 � (n Q 55 50 45 /N 35 36+00 / / BUFFER IMPACT B16 / TOTAL ZONE 1 IMPACT- 330 SQ.FT. / TOTAL ZONE 2 IMPACT- 1,922 SQ.FT. ' I /^\ NEW 244.78 OF 18" PVC / // // NEW MH -13 GRAVITY SEWER Q 0.351 /�/ �/ RIM ELEV. N63.5384 //I Ex. Wetlands \ \ Ex. Wetlands -\, \\ ` 0 INV. OUT 62.95' / / I 1Q0 NEW 183.42 OF 18" PVC Ex. roej GRAVITY SEWER @2 0.35% LIMITED OF DISTURBANCE 30 FT. WIDTH / NEW MH -14 NEW 286.33 OF 18" PVC - \ ----35+00 / U? ~ 0 RIM ELEV. 76.14 GRAVITY SEWER @ 0.35% / CtegK W �.��� o INV. IN 64.00' z = \\ / 38+�Op ` \INV. OUT 63.80' Iry /a,, o (n \\ ` \ // o Ex. Swale I / / —� ''\. \ — — \ L.:_ ... _... _ \\\ 9x0, �I /iO2ce Ex. Wetlands w 3 / 0V) ZONE 2 6IMPACT 09 AC) \\ \\ NEW 531 LF OF \\ \ ZONE t /� �� \� 00 \ / / .\ �/ \�, \ I o STREAM CROSSING S3 SILT FENCE \__._.% _ - (PERENNIAL) CLEAR & GRUBBING — ^ \ IMPACT LENGTH- 17 FT. ,M \ NEW PERMANENT EASEMENT 1,831 SY. NEW 197 LF OF i 'I 30' WIDE (15' EACH SIDE OF ZONE t \ \ \ \ / GRAVITY SEWER LINE).` SILT FENCE ZONE 2 _ Ex. I/I--Ex. TOE \ \ \\ \ / �/ NEW MH -15 (WATERTIGHT LID W/ VENT) \ RIM ELEV. 77.96' / / f—Ex. Buffer `\ \ INV. OUT 65.00' BUFFER IMPACT B17 \ \ \ \ \ TOTAL ZONE 1 IMPACT- 2,724 SQ.FT. \ \ TOTAL ZONE 2 IMPACT= 4.212 SQ.FT. cp1x�/ Vi Lu + co a xE ° �n[if 0 / Ex. Grade \v/ 183.42 LF 18" PVC @ 0.35/ Lf) L0 N n Z 36+50 37+00 37+50 38+00 00 OD 0. 6 d" to > z z? 38+50 II I 286.33 LF 18" PVC @ 0.35/ " 0 0 Ln 0 Z 39+00 39+50 40+00 40+50 41+00 41+50 0 Z z � Lu U QQ5 UJ Lu C/3 �C[:O 0 0 Qz0 zLL_ U. z O 0 Lu m m 0 Lu 0 0 Lu z z 0 U z z O W m O w 0 0 w Y Q a z a o c z U) W Z) I' z Lu cnW 0 m H- cn Z Y Iz W w0 U) Z w O 0 cc coo 00 00 Q VJ Lu z 041415 DESIGNED BY: F_ WAL DRAWN BY: 2 DRS F - - -- - - -- - rn Lo wi- r, PROJECT NO.: d - _ "t - - -- ¢w r > 2488 - GX DATE: (c; FEBRUARY 2018 ,.4- 00 >�r6_ M > N ��riw � Ow =o + E o 0^ �rw q) >� +E O =�` Vi Lu + co a xE ° �n[if 0 / Ex. Grade \v/ 183.42 LF 18" PVC @ 0.35/ Lf) L0 N n Z 36+50 37+00 37+50 38+00 00 OD 0. 6 d" to > z z? 38+50 II I 286.33 LF 18" PVC @ 0.35/ " 0 0 Ln 0 Z 39+00 39+50 40+00 40+50 41+00 41+50 0 Z z � Lu U QQ5 UJ Lu C/3 �C[:O 0 0 Qz0 zLL_ U. z O 0 Lu m m 0 Lu 0 0 Lu z z 0 U z z O W m O w 0 0 w Y Q a z a o c z U) W Z) I' z Lu cnW 0 m H- cn Z Y Iz W w0 U) Z w O 0 cc coo 00 00 Q VJ Lu z 041415 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.:1' = 50' VERT.: 1'= 5' SHEET C.4.4 V) Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org E Alt. US Hwy 64 C60' Main t. R/ W> Asphalt Pavement i TOB_ _ _ 4x3T7— —' FOC Ditch _\ _ TOB _ Warn — — — ------ — — Guy � Post _ � Past Worn Guy c),Guy PP FOC W 0 0 D S' FOC PP J � m N " L 4 U o t -4 N Ex. rs--�' 1 \ / i Ex. TOE--\ \ l d \ \ j / \ \ j \ Ex. Wetlands \\ Buffer ! j \ EX. I Pad SPRINT SUB STATION W 0 0 D S � o DRAWN BY: Q U CHECKED BY: r � WAL C GN U N N 2488 - GX Z -U 00000O ��o d- o LIJ r = Now-O in o N " O y d� 3 N N L-U O a \� Q- Old Building O O N U -6n Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org E Alt. US Hwy 64 C60' Main t. R/ W> Asphalt Pavement i TOB_ _ _ 4x3T7— —' FOC Ditch _\ _ TOB _ Warn — — — ------ — — Guy � Post _ � Past Worn Guy c),Guy PP FOC W 0 0 D S' FOC PP J � m N " L 4 U o t -4 N Ex. rs--�' 1 \ / i Ex. TOE--\ \ l d \ \ j / \ \ j \ Ex. Wetlands \\ Buffer ! j \ EX. I Pad SPRINT SUB STATION W 0 0 D S TEXISTING ABANDONED WELL EXISTING BUILDING TO BE REMOVED W 0 0 D S W OI!0DS KINGSBORO PUMP STATION EXISTING PLAN 20' 10' 0' 20' 40' 60' SCALE: 1" = 20' SCALE: 1" = 20' e'Grave/Drive - w -- E 0 p� Alt. US Hwy 64 l60' Maint. R/W Asphalt Pavement TOB _4x3-1�1- FOC V Ditch j J --- -'— �—am z Guy — L - --------- — - � _1 � a 0 Warn 77 OC E Post Guy GUY PP OC 'o FOC PP -T-1 / L a � U a Ex. Concrete ; Pod 8' .O Gravel Drive ^^ 0 \\ 8�, E)B 90 FM X -- X ---X — x66 XX —1 \ �X 0 � 1 L—J X 1 \ 0 222 LF OF SILT FENCE --- ` W I x ❑ x \ \ - - F- ---------- - ----- \ i --- — I Q TEMP. CONSTRUCTION X ! / l 550 l --J ss X \ \ I ENTRANCE. SEE DETAIL � ---- • \ ! \\ \ X NEW YARD INLET —65 x— �--X X X X——X x ---X ------- �� 6¢-=------- \ • 63 — -- --- NEW 40 LF OF ___--_.-----------�� � \ ` HDPE @ 0.3x -----62 ----- ----- \\� \ \ FENCE OF SILT ---------- \ \\ 60 \ NEW RIPRAP ---59 -- 0 -- LOU / ----- - - - - - - - - - - - LOD LOD D LOD SILT FENCE OUTLET✓�// / / \ Ilb LIMIT OF 1 o 194 LF OF SILT CLEAR & GRUB DISTURBANCE FENCE 889 SY. KINGSBORO PUMP STATION GRADING PLAN SCALE= 1" = 20' V Z o �t� wV LJJ Q¢CC: �CcO .J O v Qz0 z LL z O W w a z WAL DRAWN BY: Q DRS CHECKED BY: r � WAL C GN U N N 2488 - GX Z -U 00000O ��o C C7 V N a LIJ r = Now-O in o " O y d� 3 N N L-U O \� Old Building -_- -�-------1--- ---.- - TEXISTING ABANDONED WELL EXISTING BUILDING TO BE REMOVED W 0 0 D S W OI!0DS KINGSBORO PUMP STATION EXISTING PLAN 20' 10' 0' 20' 40' 60' SCALE: 1" = 20' SCALE: 1" = 20' e'Grave/Drive - w -- E 0 p� Alt. US Hwy 64 l60' Maint. R/W Asphalt Pavement TOB _4x3-1�1- FOC V Ditch j J --- -'— �—am z Guy — L - --------- — - � _1 � a 0 Warn 77 OC E Post Guy GUY PP OC 'o FOC PP -T-1 / L a � U a Ex. Concrete ; Pod 8' .O Gravel Drive ^^ 0 \\ 8�, E)B 90 FM X -- X ---X — x66 XX —1 \ �X 0 � 1 L—J X 1 \ 0 222 LF OF SILT FENCE --- ` W I x ❑ x \ \ - - F- ---------- - ----- \ i --- — I Q TEMP. CONSTRUCTION X ! / l 550 l --J ss X \ \ I ENTRANCE. SEE DETAIL � ---- • \ ! \\ \ X NEW YARD INLET —65 x— �--X X X X——X x ---X ------- �� 6¢-=------- \ • 63 — -- --- NEW 40 LF OF ___--_.-----------�� � \ ` HDPE @ 0.3x -----62 ----- ----- \\� \ \ FENCE OF SILT ---------- \ \\ 60 \ NEW RIPRAP ---59 -- 0 -- LOU / ----- - - - - - - - - - - - LOD LOD D LOD SILT FENCE OUTLET✓�// / / \ Ilb LIMIT OF 1 o 194 LF OF SILT CLEAR & GRUB DISTURBANCE FENCE 889 SY. KINGSBORO PUMP STATION GRADING PLAN SCALE= 1" = 20' V Z o �t� wV LJJ Q¢CC: �CcO .J O v Qz0 z LL z O W w a z WAL DRAWN BY: Q DRS CHECKED BY: r � WAL C GN U N N 2488 - GX Z -U 00000O ��o C C7 V N a LIJ r = Now-O in o " O y d� 3 N N L-U O z 0 V LU M 2 O W 0 W Z M 0 LU M M 0 LU 0 W Y Q tZ � Q C c L co F L z � Y O H CD (nZ � Q � Z OQ m :3 z 0 z Y w 041415 r' P DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: 1'=10' C.5.1 Qv Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org L— L-NEW 10" GV & BOX NEW 10" 45" BEND APPROX. 200 LF OF 10" FUSIBLE PVC FORCE MAIN INSTALLED BY DIRECTIONAL DRILL. SEE SHEET C.3.4 GY OOOS NEWVALVEVALVE VAULT EOP NEW 10" 45° BEND —1-----------1------ NEW 10"x10" TEE & FM NEW 2-10" GV EX. BUILDING TO BE REMOVE 10' 5' 0 10' 20' 30' SCALE: 1" = 10' FOC cvY GUY cvY �AFN PCs/- SPRINT OST SPRINT SUB STATION GYOOOS NEW 10" FORCE MAIN -------------- SEE SHEET C�3.4 ------ 133'-3" -------------------------- ------------------------- ----------------� xi I ' i R=24' I - Ln Ln I I N I I i i 147'-1" I I I � I I OPRECAST 12' 0"x12' 0" I.D. CONCRETE WET WELL W/ PROTECTIVE LINING 20'-0" (SEE DETAIL SHEET C.5.3) NEW 30" GRAVITY SEWER 9 13 SEE SHEET C.4.1 11 0 Ln O JIB CRANE (SEE DETAIL SHEET C.5.4) 12'-0" � i 20'-0" x 12'-0" x 12'-0" I.D. PRECAST I x 14 CONCRETE VALVE VAULTlob 10 (SEE DETAIL C.5.3) = 15 1 3 0 0 AM - 5' S' o 10' 6'x5' CONCRETE PAD x 4" THICK I N a ® --- (1" ABOVE GROUND) W/ EMERGENCY NEW MANHOLE 1 SEE SHEET C.4.1 i � BYPASS CONNECTION I I I I O10" ELECTROMAGNETIC FLOW METER (FL) 5 EX. ABANDONED (SEE DETAIL C.5.4) WELL I © STANDARD AIR RELEASE MANHOLE (SEE DETAIL C.5.3) I - - ---- --- ---- - ----------- \I------- --- - ---- --n -- - 0 14' DOUBLE GATE N R=12' 2 - ® (SEE DETAIL G.8.2) CE I 15' N 1" RPZ BACKFLOW ASSEMBLY W/ G�ot�e/Dive W P� 914RN POST T TPEO rPEo I NEW 14" CAP NEW VALVE VAULT NEW 14"x10" REDUCER, NEW 10"xTEE & NEW 2-10"" GV --- 7 10 9 12 C 0 d x o o 5 xLO LO O ABOVE GROUND HEATED ENCLOSURE\I/Ld 150'-5" 10 NON - FREEZE YARD HYDRANT CONTROL BUILDING PAD 170'-10" 11 ELEV. 65.5' i R=24 12 LIGHT POLE � GYDOOS 13 EENERATOR I x x x x x x x x L----- ----------------------------------------- — — — — — — — — — — — — - 14 MECHANICAL BAR SCREEN (ADD ALT. 1) T 8 SEE SHEET C.5.6 140'-0" 15 COMPACTOR DUMPSTER PAD (ADD ALT. 2) SEE SHEET C.5.5 16 BOLLARDS (TYP. OF 7) KINGSBORO PUMP STATION SITE PLAN SCALE: 1'' = 10' R=20' R=20' NEW 10" 45° BEND NEW 10" 450 BEND R=20' FUTURE 14" FORCE MAIN R=20' EX. 6" WATER LINE z z �00 u3 V QQ5 Lu C0 z —.1100 Qzrr 0 Z u_ CONTRACTOR TO VERIFY LOCATION OF EX. WATER LINE AND CONNECT NEW WATER SERVICE. NEW GRAVEL DRIVE (5,677 SF) z O cn > w z � o WAIL DRAWN BY: zi (5) o � irv O N U Z o 2488 - GX >�o FEBRUARY 2018 N D W iu d a O h t o m Q- Oy y N .n N LJJ 8 �e 0 F- Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org L— L-NEW 10" GV & BOX NEW 10" 45" BEND APPROX. 200 LF OF 10" FUSIBLE PVC FORCE MAIN INSTALLED BY DIRECTIONAL DRILL. SEE SHEET C.3.4 GY OOOS NEWVALVEVALVE VAULT EOP NEW 10" 45° BEND —1-----------1------ NEW 10"x10" TEE & FM NEW 2-10" GV EX. BUILDING TO BE REMOVE 10' 5' 0 10' 20' 30' SCALE: 1" = 10' FOC cvY GUY cvY �AFN PCs/- SPRINT OST SPRINT SUB STATION GYOOOS NEW 10" FORCE MAIN -------------- SEE SHEET C�3.4 ------ 133'-3" -------------------------- ------------------------- ----------------� xi I ' i R=24' I - Ln Ln I I N I I i i 147'-1" I I I � I I OPRECAST 12' 0"x12' 0" I.D. CONCRETE WET WELL W/ PROTECTIVE LINING 20'-0" (SEE DETAIL SHEET C.5.3) NEW 30" GRAVITY SEWER 9 13 SEE SHEET C.4.1 11 0 Ln O JIB CRANE (SEE DETAIL SHEET C.5.4) 12'-0" � i 20'-0" x 12'-0" x 12'-0" I.D. PRECAST I x 14 CONCRETE VALVE VAULTlob 10 (SEE DETAIL C.5.3) = 15 1 3 0 0 AM - 5' S' o 10' 6'x5' CONCRETE PAD x 4" THICK I N a ® --- (1" ABOVE GROUND) W/ EMERGENCY NEW MANHOLE 1 SEE SHEET C.4.1 i � BYPASS CONNECTION I I I I O10" ELECTROMAGNETIC FLOW METER (FL) 5 EX. ABANDONED (SEE DETAIL C.5.4) WELL I © STANDARD AIR RELEASE MANHOLE (SEE DETAIL C.5.3) I - - ---- --- ---- - ----------- \I------- --- - ---- --n -- - 0 14' DOUBLE GATE N R=12' 2 - ® (SEE DETAIL G.8.2) CE I 15' N 1" RPZ BACKFLOW ASSEMBLY W/ G�ot�e/Dive W P� 914RN POST T TPEO rPEo I NEW 14" CAP NEW VALVE VAULT NEW 14"x10" REDUCER, NEW 10"xTEE & NEW 2-10"" GV --- 7 10 9 12 C 0 d x o o 5 xLO LO O ABOVE GROUND HEATED ENCLOSURE\I/Ld 150'-5" 10 NON - FREEZE YARD HYDRANT CONTROL BUILDING PAD 170'-10" 11 ELEV. 65.5' i R=24 12 LIGHT POLE � GYDOOS 13 EENERATOR I x x x x x x x x L----- ----------------------------------------- — — — — — — — — — — — — - 14 MECHANICAL BAR SCREEN (ADD ALT. 1) T 8 SEE SHEET C.5.6 140'-0" 15 COMPACTOR DUMPSTER PAD (ADD ALT. 2) SEE SHEET C.5.5 16 BOLLARDS (TYP. OF 7) KINGSBORO PUMP STATION SITE PLAN SCALE: 1'' = 10' R=20' R=20' NEW 10" 45° BEND NEW 10" 450 BEND R=20' FUTURE 14" FORCE MAIN R=20' EX. 6" WATER LINE z z �00 u3 V QQ5 Lu C0 z —.1100 Qzrr 0 Z u_ CONTRACTOR TO VERIFY LOCATION OF EX. WATER LINE AND CONNECT NEW WATER SERVICE. NEW GRAVEL DRIVE (5,677 SF) z O cn > w z z WAIL DRAWN BY: zi DRS CHECKED BY: M irv O N U Z ti N N [7 2488 - GX >�o FEBRUARY 2018 N D W iu d 4-2 = m z m a� O h t o m Oy y N .n N LJJ 8 DESIGNED BY: z WAIL DRAWN BY: zi DRS CHECKED BY: irv PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 O z �e 0 F- Z O Q Z 0-Q0 cQ � 2 J m o w tl 0 O u.i Lu 0 H- Q ? m (/1 Lu M z ZY Y z z 0 Lu m 2 0 C7 C) `.SPA NAl? ,•' 0 y9:, SES ? 04141 3 G La . 41a, ':;yt�'.FyGINE�c Qy� ��'• ;IAMB A,.a P`• DESIGNED BY: WAIL DRAWN BY: DRS CHECKED BY: WAIL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: 1"=10' C.5.2 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org O PRECAST 12'-0" I.D. CONCRETE Z-� o 50 WET WELL W/ PROTECTIVE LINING 51 u LOW LEVEL (TYP. OF 3) Q) a) O 4'-0" x 10'-6" ALUM TRIPLE DOOR, CLEAR u� a 54 OPENING OF V-0" x 3'-6" EACH, ACCESS � o STATION HATCH W/ PERMANENT BEAM SUPPORTS N U 57 BETWEEN DOORS AND SAFETY GRATE ALARM GA #250-D OR APPROVED EQUAL 58 CENTERED OVER PUMPS 59 12"x6" TEE (FL) 60 6" D.I. SPOOL PIPE (PE) 20 L� Q,\ PUMP W/ LIFTING RAILS, 62 WORM GEAR & HAND WHEEL 4 DISCHARGE ELBOWS, CONTROLS, AND 63 U L6 N O 6" - 900 BEND (MJ) i O o N o Q) O 10" - 90° BEND (FL) (TYP. OF 2) 68 6" MJ COUPLING W/ RETAINING GLANDS 22 10"-90° BEND (FL) O 4" BLACKFLOW VALVE (TYP. OF 2) N 0 VENT PIPE W/ S.S. INSECT N ti Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org O PRECAST 12'-0" I.D. CONCRETE 17 PRESSURE GAUGE (TYP. OF 2) 50 WET WELL W/ PROTECTIVE LINING 51 6" x 10" ECCENTRIC INCREASER (FL) LOW LEVEL (TYP. OF 3) 18 4" 0 VENT PIPE W/ S.S. INSECT O 4'-0" x 10'-6" ALUM TRIPLE DOOR, CLEAR 53 SCREEN 54 OPENING OF V-0" x 3'-6" EACH, ACCESS 55 1" CHAMFER ALL SIDES STATION HATCH W/ PERMANENT BEAM SUPPORTS 19 10" CHECK VALVE (FL) MP. OF 2) 57 BETWEEN DOORS AND SAFETY GRATE ALARM GA #250-D OR APPROVED EQUAL 58 CENTERED OVER PUMPS 59 12"x6" TEE (FL) 60 6" D.I. SPOOL PIPE (PE) 20 10" PLUG VALVE (FL) W/ OSUBMERSIBLE PUMP W/ LIFTING RAILS, 62 WORM GEAR & HAND WHEEL EEV. DISCHARGE ELBOWS, CONTROLS, AND 63 (TYP. OF 2) ® ACCESSORIES. SEE SPECIFICATIONS. 65 6" - 900 BEND (MJ) 66 CONCRETE THRUST BLOCKING (TYP.) 21 FLOOR DRAIN W/ BACK WATER VALVE ® 10" - 90° BEND (FL) (TYP. OF 2) 68 6" MJ COUPLING W/ RETAINING GLANDS 22 10"-90° BEND (FL) O 4" BLACKFLOW VALVE (TYP. OF 2) ©6" 0 VENT PIPE W/ S.S. INSECT 23 10" x 10" CROSS (FL) W/ TAPPING BOSS SCREEN 24 O 6'-0" x 10'-0" ALUM TRIPLE DOOR, O 10" BLIND FLANGE CLEAR OPENING OF T-4" x 6'-0" EACH, ACCESS HATCH W/ PERMANENT BEAM ® 30 D.I. SEWER PIPE SUPPORTS BETWEEN DOORS AND SAFETY GRATE CENTERED OVER VALVES. O TOP SLAB REINF. W/#5 AT 12"+/- O.C.E.W. HATCH HINGE ON EAST SIDE, SAFETY GRATES EXTRA 245 @3" O.C. EACH SIDE OF OPENING HINGES ON WEST SIDE, EACH HATCH OPENS AND EXTRA 345 @ 3" O.C. BETWEEN OPENING INDEPENDENTLY (SEE STRUCTURAL PLAN ON SHEET C.5.4) 25 O T-0" x T -W SINGLE LEAF, 1#4" ALUM 10 JIB CRANE (SEE DETAIL SHEET C.5.4) DIAMOND PLATE ACCESS HATCH W/ SAFETY GRATE. ACCESS HINGES ON NORTH 11 CAST W/ NEOPRENE RUBBER BOOT SIDE, SAFETY GRATE HINGES ON WEST SIDE FOR WATERTIGHT SEAL (TYP.) 26 O ALUMINUM VERTICAL LADDER, WALL 12 10 D. I. WALL PIPE (FL x FL) MOUNTED. HALLIDAY, BILCO OR APPROVED EQUAL (SEE DETAIL) 13 10" MJ COUPLING W/ RETAINING GLANDS (TYP. OF 3) 27 10" M.J. GATE VALVE W/ VALVE BOX 14 4" MJ COUPLING W/ RETAINING GLANDS CTYP. OF 3) 28 10"x6" TEE, 900 BEND W/ 6" QUICK CONNECT COUPLING 15 4" D.I. DRAIN. SLOPE TO WETWELL EMERGENCY BYPASS TEE MIN. SLOPE @ 0.80% 29 6" M.J. GATE VALVE 16 12'-0" x 12'-0" I.D. PRECAST W/ VALVE BOX CONCRETE VALVE VAULT 30 6" BAUER QUICK DISCONNECT 49 PROVIDE 2"x 1#4" S.S STRAP AND ANCHOR TO WALL @ 36" O.C. 50 10" FLANGE COUPLING ADAPTOR 51 6" x 10" ECCENTRIC INCREASER (FL) LOW LEVEL (TYP. OF 3) 52 MANUFACTURER'S STANDARD SELF- HIGH WATER SEALING PUMP BASE (TYP. OF 3) 53 LEVEL PROBE (SEE SPECIFICATIONS) 54 12" #67 STONE BASE 55 1" CHAMFER ALL SIDES STATION (TYP. ALL STRUCTURES) 56 4" D.I. P -TRAP 57 CONCRETE PIPE SUPPORT W/ ALARM 2 - #4 STIRRUPS (TYP.) 58 4" D.I. WYE 59 12"x6" TEE (FL) 60 6" D.I. SPOOL PIPE (PE) 61 6" PLUG VALVE (FL) W/ WORM ELEV. GEAR AND HANDWHEEL OPERATOR 62 6" WYE BODY SURGE RELIEF EEV. VALVE (FL) SEE SPECIFICATIONS 63 6" D.I.P. (FL x FL) ® 6" D.I. PIPE (FL X PE) 65 6" - 900 BEND (MJ) 66 CONCRETE THRUST BLOCKING (TYP.) 67 6" D.I. PIPE (PE x PE) 39.75 MIN. SLOPE @ 0.60% 68 6" MJ COUPLING W/ RETAINING GLANDS 69 6" DUCKBILL CHECK VALVE 31 CONCRETE PAD 6'x5'x4" THICK (1" ABOVE GROUND) 32 T-0" x T-0" I.D. PRECAST CONCRETE VAULT 33 10" DISMANTLING JOINT (FL) STAR FLANGE SERIES 3200 OR EQUAL 34 10" ELECTROMAGNETIC FLOWMETER (FL) 35 STANDARD AIR RELEASE MANHOLE (SEE DETAIL) 36 H -TEC MODEL 986 S.S. COMBINATION ARV W/2" THREADED INLET OR EQUAL 37 2'-5" x 2'-5" SINGLE LEAF, 1#4" ALUM DIAMOND PLATE ACCESS HATCH W/ SAFETY GRATE, ACCESS HINGES ON NORTF SIDE, SAFETY GRATE HINGES ON WEST SIDE 38 10" D.I. FORCE MAIN 39 CONDUIT FROM CONTROL PANEL (SEE ELECTRICAL PLANS) ® S.S. CABLE HOLDER & MOUNTING BRACKET FOR LEVEL PROBE 41 POWER CABLE (SEE ELECTRICAL PLAN) 42 BACK-UP FLOATS, TYP. (SEE SPECIFICATIONS) 43 CONCRETE GROUT (SLOPE TO PUMP SUCTION) ® S.S. CABLE HOOK 45 3" STAINLESS STEEL GUIDE RAIL 46 STAINLESS STEEL LIFTING CHAIN 47 10" D.I. FORCE MAIN RISER (FL x PE) ® INTERMEDIATE GUIDE BRACKET (TYP. OF 3) NOTES: 1. ALL BOLTED CONNECTIONS SHALL BE MADE USING S.S. BOLTS, WASHERS AND NUTS. 2. CONTRACTOR SHALL VERIFY DIMENSIONS WITH PUMP AND VALVE MANUFACTURERS' DIMENSIONS. COORDINATE ACCESS HATCH DIMENSIONS TO ENSURE PROPER CLEARANCES. 3. INTERIOR CORROSION PROTECTION - THE INTERIOR SURFACE OF THE WET WELL, AND AIR RELEASE MANHOLES ALONG THE SEWER FORCE MAIN SHALL BE THOROUGHLY CLEANED OF ALL OILS, LATENCE, DIRT, LOOSE CONCRETE, ETC. ALL VOIDS OR SURFACE BLEMISHES SHALL BE FILLED OR REPAIRED USING CALCIUM ALUMINATE (MORTAR). THE JOINTS OF PRE -CAST UNITS SHALL RECEIVE THREE (3) COATS OF MORTAR SO AS TO ACHIEVE A SMOOTH SURFACE AT EACH JOINT. AFTER THE INTERIOR PATCHING HAS THOROUGHLY DRIED, THE ENTIRE SURFACE OF THE STRUCTURE INTERIOR SHALL RECEIVE SHER-FLEX WITH A TOTAL DRY FILM THICKNESS OF 8 TO 12 MILS, AND NICKS AND SCRATCHES SHALL BE TOUCHED UP PRIOR TO ACCEPTANCE. IF MATERIAL OTHER THAN SHERWIN WILLIAMS SEWER -COTE OR SHER-FLEX IS PROPOSED, IT SHALL BE APPROVED BY THE ENGINEER PRIOR TO USE. 4. EXTERIOR JOINTS OF ALL PRE -CAST CONCRETE SHALL BE WRAPPED PER THE SPECIFICATIONS. 5. SHERWIN-WILLIAMS SEWER -COTE OR SHER-FLEX APPLIED TO THE OUTSIDE OF ALL TONGUE AND GROOVE JOINTS. PRIOR TO BACKFILLING THE WET WELL STRUCTURE, THE ENTIRE SURFACE SHALL RECEIVE ONE (1) COAT. THE MATERIAL USED FOR EXTERIOR COATING SHALL MEET THE REQUIREMENTS OF CORPS OF ENGINEERS SPECIFICATION C-200. THE EXTERIOR COATING SHALL BE APPLIED AS TO ACHIEVE A DRY FILM THICKNESS OF NOT LESS THAN 10.0 MILS. THE EXTERIOR SURFACE SHALL BE CLEAN AND DRY PRIOR TO APPLICATION OF THE COATING. 6. 100 YEAR FLOOD ELEVATION = 60.0' (MSL), STATION IS NOT IN 100 YR FLOOD. PUMP STATION ELEVATIONS SCHEDULE PUMP WET WELLCAPACITY T.D.H. MOTOR OF BOTTOM OF FINISHED LOW LEVEL PUMP OFF LEAD PUMP LAG PUMP HIGH WATER 30" INV. IN STATION INSIDE DIMN. (GPM) (FT.) (HP) STATION STATION STATION GRADE ALARM ELEVATION ON ELEV. ON ELEV. ALARM ELEVATION NAME (FT.) y d N � N ELEV.(FT) ELEV.(FT) (FT) ELEV. (FT) (FT) EEV. (FT) KINGSBORO 12x12 500 178 75 65.5 33.75 65.0 36.75 37.75 39.75 40.50 41.50 42.00 SIZES OF CONCRETE OPENINGS TO BE VERIFIED BY THE CONTRACTOR BEFORE TOP SLAB CONSTRUCTION I a --n" BACKUP n ON°T 136.25I 37.25 I 40.50 (FT) *** KINGSBORO PUMP STATION LAYOUT PLAN SCALE: 1'' = 5' L------------------------- n 0 Z_ o �W~ QQcc: C)Lu CO crO _l ov `t Z o _Z w L.L m z O Tn w m F - z O w m O w C3 W z n Q v cc F O z 9 •74 Y Q z a o a F- z rA w D w z � W cr P O Z5 0 z Y less, H C. Z O ~ Z O F- CL W U) d cd O F - 1Y O O } M Q U) J 0 Z Y 041415 • z. �4. za18 tA DESIGNED BY: z DRAWN BY: DRS CHECKED BY: m WAL C G^ O U Z N N M U�^ DATE: C N N Wd U• cD O � o ^ J y d N � N O m = F_ F - z O w m O w C3 W z n Q v cc F O z 9 •74 Y Q z a o a F- z rA w D w z � W cr P O Z5 0 z Y less, H C. Z O ~ Z O F- CL W U) d cd O F - 1Y O O } M Q U) J 0 Z Y 041415 • z. �4. za18 tA DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1 " = 20' VERT.: 1'= 2' SHEET C.5.3 N N Z Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org PUMP STATION - FRONT VIEW NOT TO SCALE LT FL11P6: ELEVATION JIB CRANE AND BASE C.5.4 NOT TO SCALE RUBBER WASHER CONTROL ROD STEEL WASHER" CLEAR RETENTION PLATE g o U DRESSER J \ COUPLING ELEVATION PIPE HOIST STOP NOTE: 1. SEE SITE PIAN FOR AB CRANE LAGTNIN. 2 NB CRANE SHONTI TYPICAL FOR SIZE. LOADING AND RANGE RE(XIIRED. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF JIB C"NE SELECTED FOR RENEWAND APPROVAL COORDINATE ALL MOUNRNG AND FOUNDATION REQUIREMENTS WH SELECTED MANIFACTURER. 126VANCHOR BOLT (TYP OF 12) BABE PLATE OUTLINE PLAN CONTROL ROD DIA. NOMINAL PIPE SIZE 6"-8" N STANDARD PIPE 0.50" FLANGE I% BOLT 2 P/SIDE DIA. CONTROL ROD 0.75" NOMINAL PIPE SIZE 6"-8" 10"-16" PLATE THICKNESS 0.50" 0.75" PLATES PER FLANGE SIDE 2 P/SIDE 2 P SIDE CONTROL ROD DIAMETER 0.75" 0.75" SECTION a• z oTssEr —PIPE FLANGE DIAMETER RETENTION PLATE 1. BOLTS: ASTM A-307 GALV. 2, RETENTION PLATE: ASTM A36 STEEL, HOT DIPPED GALV. THRUST RETENTION PLATE NOT TO SCALE TYP WELD ALL AROUND 13 �a A 69 14 TOP VAULT = 26.50' — FINISHED GRADE = 26.0' I - v in END PLATE W/ ANCHORS 4 + I x I K T1, INTO WALL A 2' 6"3' 6" 3'-6" PROVIDE MIN. Y4" FILLET PLATE" x 3" x 6" P. WELD x 4' LANGLE END ONG )@ EACH WELDED TO PIPE FLANGE (2" LONG EACH SIDE) 10" DI PIPE 10" DI PIPE (TYP.) NOTE: ALL PIPE HANGER COMPONENTS SHALL BE STAINLESS STEEL PIPE HANGER DETAIL - 10'' DIP NOT TO SCALE 5'x5' PRECAST CONCRETE VAULT --- --- 4 D.I. DRAIN I I HATCH =0" ACCESS SLOPE I I — — 1 10" D.I. FORCE MAIN - I � II III I O L J 10" STAR FLANGE 10" ELECTROMAGNETIC FLOWMETER ALUMINUM VERTICAL LADDER 5 FLOW METER VAULT C.5.4 NOT TO SCALE Y2"x8"x9" 8" END PLATE 2" 4' 2- 4 - -Y4" x 5" EMBEDMENT ADHESIVE ANCHORS (HILTIHIT-HY-150 OR EQUAL) MIN. ALLOWABLE SHEAR LOAD = 5.0 K/EA ANCHOR i T -0"x3'-0" ACCESS HATCH FINISH GRADE 5'x5' PRECAST CONCRETE VAULT INT . 1. INR L FLOOR DRAIN W/ i i CONCRETE PIPE BACK WATER VALVE i SUPPORT 1 I � /-----------------------------\� 12" #67 STONE BASE ------------ 4" D.I. DRAIN SLOPE 17'-0" *** SIZES OF CONCRETE OPENINGS TO BE VERIFIED BY THE CONTRACTOR BEFORE TOP SLAB CONSTRUCTION #4 0 12"+/- O.C. (TYP., U.O.N. ON PLAN) #5 @ 12"+/- O.C. (TYP., U.O. ON PLAN) i0 y' m u N TYPICAL SLAB SECTION A -A PUMP STATION STRUCTURAL PLAN NOT TO SCALE V Z O_ Louth QaZ) Dcco H 0 QZcc o Z u - LL U) z O U) W cc z r ib N T -0"x3'-0" ACCESS HATCH FINISH GRADE 5'x5' PRECAST CONCRETE VAULT INT . 1. INR L FLOOR DRAIN W/ i i CONCRETE PIPE BACK WATER VALVE i SUPPORT 1 I � /-----------------------------\� 12" #67 STONE BASE ------------ 4" D.I. DRAIN SLOPE 17'-0" *** SIZES OF CONCRETE OPENINGS TO BE VERIFIED BY THE CONTRACTOR BEFORE TOP SLAB CONSTRUCTION #4 0 12"+/- O.C. (TYP., U.O.N. ON PLAN) #5 @ 12"+/- O.C. (TYP., U.O. ON PLAN) i0 y' m u N TYPICAL SLAB SECTION A -A PUMP STATION STRUCTURAL PLAN NOT TO SCALE V Z O_ Louth QaZ) Dcco H 0 QZcc o Z u - LL U) z O U) W cc Z O U W CO 2 O W C3 0 W 04415 C z.1� TvrQ.:._ %y1� :FNGINE� Q5 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.5.4 z r ib h N U ^ N C) Z N M U POW -^_ �LL Z tJ N m a W F— d Nome ri = O L U H1( ^ J O N N u'l N W O H Z O U W CO 2 O W C3 0 W 04415 C z.1� TvrQ.:._ %y1� :FNGINE� Q5 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.5.4 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org E P Alt. US Hwy 64 (60' Moint. R/W) Asphalt Pavement Warn ro L — —Post_ r — — — — -- 4x3-0- _..._..._...—. Ditch _FOC_ \ ' - - -- ....-._.FOC-._--... - -= -Warn-3 i 3 1/2" MIN 3/4" 10 EXTRUDED ALUM ADAPTER Gu Y Post � Y PP 2 -Gu 03 J (USED ONLY WITH ALUM ro FOC Ex. Concrete Pod $'Grave/Drive O x EXTRUDED ALUM N 5 9Ox 12 g Qv o C PIPE POST Q) o E 'IPE POST O o U O U N �\ CAST ALUM a Q 3 .`` BASE FLANGE l-1/2"0 SST BOLTSrj Oy d O N a z i ANCHORS (MIN 3" x x 9 — �N'aN - - I O Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org E P Alt. US Hwy 64 (60' Moint. R/W) Asphalt Pavement Warn ro L — —Post_ r — — — — -- 4x3-0- _..._..._...—. Ditch _FOC_ \ ' - - -- ....-._.FOC-._--... - -= -Warn-3 i 3 1/2" MIN 3/4" 10 EXTRUDED ALUM ADAPTER Gu Y Post � Y PP 2 -Gu PP T ❑ J (USED ONLY WITH ALUM - ----�--- --- -.r-- FOC Ex. Concrete Pod $'Grave/Drive O x EXTRUDED ALUM M 5 9Ox 12 ) ) TOEBOARD C PIPE POST 1/2" ALUM STEEL 1 1/2"x1/8" ALUM 'IPE POST N U o W O O D 5 y-----fs�F�80---------6$ �\ CAST ALUM SASE FLANGE Q 3 .`` BASE FLANGE l-1/2"0 SST BOLTSrj Oy x X_X—x—x—x x HOLES z i ANCHORS (MIN 3" x x 9 — WALKING SURFACE - - I O i ©.0 .0 4 x 11 i / ANCHORS (MIN 3" 1" WATER SERVICE O 65.50 O WETWELL SET SCREWS ELEVATION I MH N0. 2 PLAN ALUM BASE _ MH NO.1 TOP STA. 0+75.49 i 0 E 0 w 8 66+0 x PLATE 4 DETAIL - — - - - 3/4" 3 1/2" MIN 3/4" 10 EXTRUDED ALUM ADAPTER MIN MIN (USED ONLY WITH ALUM ------) M � x EXTRUDED ALUM M 5 9Ox 12 ) ) TOEBOARD C PIPE POST 1/2" ALUM STEEL 1 1/2"x1/8" ALUM 'IPE POST N CLAMP 1LUM STEEL , L CAST ALUM SASE FLANGE ALL HANDRAILS .`` BASE FLANGE l-1/2"0 SST BOLTSrj Oy 4-1/2"0 SST EXP HOLES z i ANCHORS (MIN 3" x x x—x — WALKING SURFACE - - I 4-1/2"0 SST EXP / ANCHORS (MIN 3" 3/8"0 SST I WETWELL SET SCREWS ELEVATION MH N0. 2 PLAN ALUM BASE END STATION 66+28 (10" FM)- PLATE 4 DETAIL - BEGIN STATION 0+00 (30" GS) / 11 C01 STA. 1-57.59 / ADD ALTERNATIVE 1 & ALTERNATIVE 2 / \ \ / 40' 20' 0 40' 80' 120' SCALE: 1" e 40' SURFACE MOUNTED TO METAL SITE PLAN SURFACE MOUNTED TO CONCRETE 5" MIN 6'-0" MAX SCALE: 1" e 40' 3/4" 3 1/2" MIN 3/4" EDGE OF CONCRETE EXTRUDED ALUM ADAPTER MIN MIN (USED ONLY WITH ALUM RAILING M � BASE FLANGE) EXTRUDED ALUM M i 1/2" ALUM STEEL TOEBOARD C PIPE POST 1/2" ALUM STEEL 1 1/2"x1/8" ALUM 'IPE POST N CLAMP 1LUM STEEL , L CAST ALUM SASE FLANGE ALL HANDRAILS .`` BASE FLANGE l-1/2"0 SST BOLTSrj Oy 4-1/2"0 SST EXP HOLES z i ANCHORS (MIN 3" N EMBEDMENT) WALKING SURFACE - - I 4-1/2"0 SST EXP ANCHORS (MIN 3" 3/8"0 SST I SET SCREWS ELEVATION SURFACE MOUNTED TO CONCRETE 5" MIN 6'-0" MAX 3/4" 3 1/2" MIN 3/4" EDGE OF CONCRETE 1 1/2" ALUM PIPE MIN MIN RAILING M � C G Opop" M ti N N M U C N o N N h TOEBOARD-TYPICAL , L Lu ALL HANDRAILS .`` + 9/16"0 Oy M HOLES a---------- WALKING SURFACE - - I 4-1/2"0 SST EXP ANCHORS (MIN 3" EMBEDMENT) ELEVATION "' PLAN ALUM BASE PLATE 4 DETAIL - TYPICAL HANDRAIL 11 C01 NO SCALE 10 SUBMERSIBLE PUMP STATION (SEE SHEET C.5.3) 20 VALVE VAULT (SEE SHEET C.5.3) 03 JIB CRANE W/ ELECTRIC HOIST (SEE SHEET C.5.4) ® ELECTRICAL CONTROLS (SEE SHEET NO. E1& E2) 05 BYPASS PUMP CONNECTION © GENERATOR 07 UTILITY POWER POLE ® TERMINAL CABINET Q9 FLOW METER VAULT (SEE SHEET C.5.3) Q MECHANICAL BAR SCREEN (SEE SHEET C.5.6) 11 ARV. 1© SITE LIGHT POLE FINISH FLOOR -FORM 2'-0"= DISH WHERE REQUIRED 450 WYE AND 450 BEND FOR VENT — LINE IF READ. FLOOR DRAIN, JOSAM 3000, JAY R SMITH 2005, ZURN Z-415 OR EQUAL DEEP SEAL "P" TRAP NOTE: INTERIOR FLOOR DRAIN AND CLEANOUTS TO HAVE NICKEL BRONZE TOPS. EXTERIOR FLOOR DRAINS AND CLEANOUTS TO HAVE LACQUERED CAST IRON TOPS. DETAIL - FLOOR DRAIN C01 % NO SCALE VWTAIE 4" THREADED BRASS PLUG FLUSH WITH CONCRETE FINISHED------- GRADE INISHED --GRADE 4" CAST IRON (450) EIGHTH BEND SEE PLANS FOR PIPE SIZE ELEVATION 4" x 18" x 18" CONC. PAD OR CONC. WALK DETAIL - CLEAN OUT NO SCALE EL 65.50 1 11 I 12" TYP 11'-0" x 12'-0" SLOPED SECTION 6x6 10/10 WWF AT MID -DEPTH OF SLAB 3000 PSI CONCRETE LOW POINT AT DRAIN 00 F EL 52.33 2-#5 BARS CONTINUOUS AROUND PERIMETER LUG LUG FOOTING AT 6" MIN. COMPACTED PERIMETER STONE BASE, TYP NONE PROVIDE 1/2" EXP JT MATERIAL BETWEEN SLAB AND WALL DETAIL -CONCRETE DUMPSTER PAD NO SCALE SERIES G1 D AND Gl E SLIDE GATE STANDARD FEATURES: • ONE-PIECE 6061-T6 EXTRUDED ALUMINUM FRAME WEIGHING 4 LBS./FT. (6 KG./METER) • DUAL SLOT DESIGN • ONE-PIECE POLYMER GUIDE • 1/4" (7 MM) THICK 6081-T6 ALUMINUM GATE REINFORCED AS REQUIRED TO DEFLECT NO MORE THAN 1 /360th OF SPAN • LOW COEFFICIENT OF FRICTION • DEEP SEATING FOR OPTIMUM TRACKING *STANDARD 16" (406 MM) ALUMINUM HANDWHEEL • POLYMER BEARING PADS • 01 112" (038 MM) STAINLESS STEEL ACME ROD • BRASS LIFTING NUT •STAINLESS STEEL HARDWARE THROUGHOUT • NON -OZONE DEPLETING BITUMINOUS COATING • OPTIONAL CLEAR STEM COVER •3 YEAR GUARANTEE 0 zo �M� wV ryQ¢CC ■. J H CC 0 ~0 azo Z LL RISING STEM ENCLOSED BEARING ACME PADS THREAD " TOP ROD 36" OF (914 MM) WALL CHANNEL DEPTH CHANNEL WIDTH (REFER TO SHEET 7 SERIES G1 D (WALL MOUNTED) (406 MM) HANDWHEEL TOP OF GATE OVERALL ° HEIGHT GATE HEIGHT (REFER TO ° SHEET C.5.6) BOTTOM OF --- CHANNEL CHANNEL 4" VVI DTH (102 MM) (REFER TO SHEET C.5.6) CHANNEL WIDTH BOTTOM ^�\ (REFER TO OF BOTTOM SHEET C.5.6) CHANNEL DETAIL - TYPICAL SLIDE GATE NO SCALE U) z 0 U) Lu z 0 U Lu M M 0 w 0 0 Lu z 0 w m O U w 0 Lu Y CC IL z Q C ir a LL U) LL � ~ o LL Z LL o F cc mCD 0 - z Y CD J H Lu off Z Lu T W 1/1: (n Q a Q Q m Q U_ Z Lu ry 041 41 5 _ • 'Z i� ZG�✓�; �2 "'.IAM A. ;.•� DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: V = 40' VERT.: 1' = 4' SHEET C.5.5 z Q M � C G Opop" N U L ti N N M U C N o N N w � z' � O L Oy N N Lu z 0 U Lu M M 0 w 0 0 Lu z 0 w m O U w 0 Lu Y CC IL z Q C ir a LL U) LL � ~ o LL Z LL o F cc mCD 0 - z Y CD J H Lu off Z Lu T W 1/1: (n Q a Q Q m Q U_ Z Lu ry 041 41 5 _ • 'Z i� ZG�✓�; �2 "'.IAM A. ;.•� DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: V = 40' VERT.: 1' = 4' SHEET C.5.5 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org sT RT sn STArALSS AiAuzJ{RB A4t! di,555TL moo 1 1� WEI R FRpIA / FLOIXt �� 2'x7x0255lRiMEiS RI ` V \ RFH I�ATk STI.N F 22-5 � x x X W �H i go- rwrcRlrIXrcsF 6 TYPICAL SIDEWALK CO2 NOT TO SCALE 4'-0" (OR AS INDICATED) 1/8" RADIUS FINISHED EXPANSION JOINTS 40'-0" OC MAX (BOTH SIDES) —JOINT SEALER GRADE CONTROL JOINTS 5'-0" OC MAX /// 1/8" TO 1/4" t" - ` x x x- JOINT FILLER 1 2' 2" CLR W2.9 X W2.9 (6X6) WWF TRANSVERSE EXPANSION TYP JOINT IN SIDEWALK SECTION VIEW JOINT DETAIL 7 TYPICAL SIDEWALK CO2 NOT TO SCALE 3._8.. 20 GAUGE PRE -GALVANIZED PERFORATED STEEL PLATE EL 46.24 (3/32" HOLE / 3/16" STAG / 23% OPEN) 3x3x3/8 ANGLE 2" X 1/4" TK 0 3'-6" SUPPORTS FRAME GALV FLAT BAR WELDED. BOLT TO WELDED TO BAR s WALL WITH 1/2"0 �0 ADHESIVE ANCHORS EL 42.21 AT 8" OC GALV ANGLE EMBEDDED IN FRAME ANGLE BOTTOM SLAB 2 1/2 x 2 112 x 3/16" --" SEE DETAIL 1 GALV STEEL ANGLE FASTENED TO CONCRETE SECTION A—A WITH 1/2" SST ANCHORS 3/8"x2" GALV STEEL 1 3/8" OC (1" MAX OPNG BETWEEN BARS) AI 3'-8" FLOW PLAN 3'-6" WELD PLATE TO FRAME, TYP ALL AROUND 20 GAUG,= PRE -GALVANIZED PERFORATED STEEL PLATE (3/32" HOLE / 3/16" STAG A / 23% 0 EN) .. N 3x /8 ANGLE SUPPORTS FRAME WELDED. BOLT TO WALL WITH 112"0 ADHESIVE ANCHORS AT 8" OC PRECAST CONCRETE BOX FIN GRADE EL 64.83 ROUTE 4" PVC DRAIN DOWN WALL, ACROSS BENCH AND TURN DOWN INTO CHANNEL - OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.25-, 30" DI PIPE MECHANICAL BAR SCREEN ALUM GUARDRAIL AROUND OPENING i 4" PVC DRAIN, INV 60.63, OVERSIZE HOLE AND FILL WITH NON -SHRINK GROUT PROVIDE PIPE STRAP TO WALL AT 8'-0" OC MAX. 4" PVC 90° BEND, TYP SCREEN--\ 15o —gyp �e� , � I I 3/8"x2" GALV BAR 1 3/8" OC (1" MAX OPNG BETWEEN BARS) -1"x4"x1" GALV ANCHORS (2) REQ'D DETAIL 1 1'-5'/RII 4'-1%4" 4'-011 3'-4%411 A SECTION CO2 SCALE: 1" = 4' SST SOCKET N WITH BOLTED CONNECTION 1 5/8"0 ALUMINUM - HANDLE 6'-0" 1/8" THICK SST RAKE HEAD MADE TO SUIT BARSCREEN DETAIL 2 — RAKE DETAIL - MANUAL BAR SCREEN CO2 J NO SCALE MOTOR CHUTE CONVEYOR WITH ALUM. LA HOPPER BY SAFETY SCREEN MFR. (ADD ALT 2) EL 65.50 �- 4" THICK SIDEWALK PAD EQUIPMENT PAD FOR CONVEYOR AS REQD 74- I CLASS B CONCRETE N FILL, TOP EL 46.24 36" SLIDE GATE, TYP OF 2 -OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.15 EL 42.15 24" SLI[ WEIR GATE, TYP OF ALUM GUARDRAIL AROUND OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.25 30" DI PIPE ROUTE 4" PVC DRAIN-// 3611 SLIDE GATE, DOWN WALL, ACROSS TYP OF 2 BENCH AND TURN 4" PVC 900 DOWN INTO CHANNEL BEND, TYP 4" PVC DRAINFROM DUMPSTER PAD, INV 60.63, OVERSIZE HOLE AND FILL WITH NON -SHRINK GROUT PRECAST CONCRETE BOX 24" RIK& 12" k DESIGNED BY: z ro DRAWN BY: ro Q N CHECKED BY: g o U Q PROJECT NO.: � o o� DATE: � o U FEBRUARY 2018 .c a W N Q U o, Q) Q) Na-\ 3'-8" FLOW PLAN 3'-6" WELD PLATE TO FRAME, TYP ALL AROUND 20 GAUG,= PRE -GALVANIZED PERFORATED STEEL PLATE (3/32" HOLE / 3/16" STAG A / 23% 0 EN) .. N 3x /8 ANGLE SUPPORTS FRAME WELDED. BOLT TO WALL WITH 112"0 ADHESIVE ANCHORS AT 8" OC PRECAST CONCRETE BOX FIN GRADE EL 64.83 ROUTE 4" PVC DRAIN DOWN WALL, ACROSS BENCH AND TURN DOWN INTO CHANNEL - OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.25-, 30" DI PIPE MECHANICAL BAR SCREEN ALUM GUARDRAIL AROUND OPENING i 4" PVC DRAIN, INV 60.63, OVERSIZE HOLE AND FILL WITH NON -SHRINK GROUT PROVIDE PIPE STRAP TO WALL AT 8'-0" OC MAX. 4" PVC 90° BEND, TYP SCREEN--\ 15o —gyp �e� , � I I 3/8"x2" GALV BAR 1 3/8" OC (1" MAX OPNG BETWEEN BARS) -1"x4"x1" GALV ANCHORS (2) REQ'D DETAIL 1 1'-5'/RII 4'-1%4" 4'-011 3'-4%411 A SECTION CO2 SCALE: 1" = 4' SST SOCKET N WITH BOLTED CONNECTION 1 5/8"0 ALUMINUM - HANDLE 6'-0" 1/8" THICK SST RAKE HEAD MADE TO SUIT BARSCREEN DETAIL 2 — RAKE DETAIL - MANUAL BAR SCREEN CO2 J NO SCALE MOTOR CHUTE CONVEYOR WITH ALUM. LA HOPPER BY SAFETY SCREEN MFR. (ADD ALT 2) EL 65.50 �- 4" THICK SIDEWALK PAD EQUIPMENT PAD FOR CONVEYOR AS REQD 74- I CLASS B CONCRETE N FILL, TOP EL 46.24 36" SLIDE GATE, TYP OF 2 -OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.15 EL 42.15 24" SLI[ WEIR GATE, TYP OF ALUM GUARDRAIL AROUND OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.25 30" DI PIPE ROUTE 4" PVC DRAIN-// 3611 SLIDE GATE, DOWN WALL, ACROSS TYP OF 2 BENCH AND TURN 4" PVC 900 DOWN INTO CHANNEL BEND, TYP 4" PVC DRAINFROM DUMPSTER PAD, INV 60.63, OVERSIZE HOLE AND FILL WITH NON -SHRINK GROUT PRECAST CONCRETE BOX 24" RIK& 12" ALUM. LADDER WITH SAFETY CLIMB RAIL 24" SLIDE GATE, TYP OF 2 OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.15 A CO2 30" DI PIPE CLASS B CONCRETE FILL B ALUMINUM GRATING SEE DETAIL 8/C.8.2 G02 WEIR BOTTOM PLAN SCALE: 1" = 5' V Z m � jP 0 CCry <ry� =5 CC J muicn °Co H0 z cc < 0 Z u- 'STER OTHERS) U) z 0 cn > w z M 0 0 Lu m m 00 Lu 0 LU z 0 U w m 0 U w CD 0 w Y E- z a 0 � m z w z w w w a0C F J m 0 M Y DESIGNED BY: z WAL DRAWN BY: Q DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 D azm N owl a o Z N M LL ZN � .. rE W = 0 4/ 0000 000 P a, y ❑O ❑ N ❑ O ❑ o L U [10 0 N o� o o� o00 0 0 Q a I �- Q Q ' I MANUAL BYPASS > o < o` BAR SCREEN o , :o o a a ® 0 M a if MECHANICAL p o, �.:o BAR SCREEN N a a nu ALUM. LADDER WITH SAFETY CLIMB RAIL 24" SLIDE GATE, TYP OF 2 OVERCAST HOLE AND PROVIDE BOOT TYPE CONNECTION, INV 42.15 A CO2 30" DI PIPE CLASS B CONCRETE FILL B ALUMINUM GRATING SEE DETAIL 8/C.8.2 G02 WEIR BOTTOM PLAN SCALE: 1" = 5' V Z m � jP 0 CCry <ry� =5 CC J muicn °Co H0 z cc < 0 Z u- 'STER OTHERS) U) z 0 cn > w z M 0 0 Lu m m 00 Lu 0 LU z 0 U w m 0 U w CD 0 w Y E- z a 0 � m z w z w w w a0C F J m 0 M Y z O_ f- z O U) H U_ W =5cn a- co O F. c 0 o , m Q U) J C'3 Z Y 041415 .41,=,c -A PJ P• DESIGNED BY: z WAL DRAWN BY: Q DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 N O Z N M LL ZN � .. rE W = a, y O� h o L U 0 N N N 0 L Li z O_ f- z O U) H U_ W =5cn a- co O F. c 0 o , m Q U) J C'3 Z Y 041415 .41,=,c -A PJ P• SCALE: AS NOTED SHEET C.5.6 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.5.6 GRADE NOTE: 1. WATER LINE SHALL PASS OVER OR UNDER EXISTING SANITARY SEWER AS SHOWN OR NOTED ON DRAWINGS. 2. DUCTILE IRON PIPE REQUIRED FOR BOTH NEW WATER LINE AND EXISTING SANITARY SEWER EXTENDING 10'-0" FROM CROSSING IN ALL DIRECTIONS IF EITHER OF THE FOLLOWING CONDITIONS EXIST: a. WATER LINE IS BELOW SANITARY SEWER. b. WATER LINE IS ABOVE SANITARY SEWER BUT LESS THAN 18" SEPARATION IS PROVIDED BETWEEN BARRELS OF WATER LINE AND SANITARY SEWER PIPES. WATER MAIN & SEWER CROSSING NOT TO SCALE EBAA MEGALUG SERIES 2000PV (TYP.) MECHANICAL JOINT / DUCTILE IRON FITTING DIRECT BURY 0- - D.I.P. OR PVC FUSIBLE PVC _ w � z ¢ CONNECTION DETAIL - DIRECT BURY PIPE TO FUSIBLE PVC HDD 4" MIN. VALVE PAVED AREA F-- 6" (- GRASSED AREA Z SEE DETAIL g MINIMUM 3000 P.S.I. M CONCRETE I VALVE I NOT TO SCALE LENGTH OF RESTRAINED PIPE PER SECTION 3.4.6.9.1 M.J. 45^ BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE i LENGTH OF RESTRAINED PIPE PER SECTION 3.4.6.9.1 ONE JOINT OF DIP M.J. 45^ BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE )..* -STORM DRAIN 24" MIN. COVER M.J. 45^ BEND (DIP) OR J L --DIP M.J. 45^ BEND (DIP) OR CONCRETE THRUST CONCRETE THRUST BLOCKING BLOCKING NOTES: C.6.1 NOT TO SCALE 1. PLACE CONCRETE BLOCKING SUCH THAT IT WILL NOT INTERFERE WITH REMOVAL OF BOLTS. 2. PIPE DIAMETER GREATER THAN 12" SEE ENGINEERING SPECIFICATIONS VARIES (SEE MANUFACTURER) REDUCED PRESSURE PRINCIPLE OR 3. PIPE LENGTHS SHALL BE AS REQUIRED TO CONSTRUCT CROSSING. BACKFLOW ASSEMBLY 4. ALL JOINTS TO BE RESTRAINED IN ACCORDANCE WITH MANUAL. VARIES (SEE MANUFACTURER) DOUBLE CHECK VALVE ASSEMBLY r6WATER MAIN AND STORM CROSSING CLASS 1 OR CLASS 2 ASSE 1060 INSULATED C.6.1 NOT TO SCALE WEATHERPROOF ENCLOSURE 4 GFCI ANCHORED TO CONCRETE 6 CL. ELECTRICAL _ OR APPROVED FIBERGLASS MIN • RECEPTACLE o Ld MOUNTING PAD o A 12" 6„ STEEL ENCASEMENT PIPE I -STEEL PIPE SUPPORT ASSEMBLY THREADED UNION MIN. N REQUIRED AS SHOWN PER JOINT BALL VALVE OF CARRIER PIPE ELECTRICAL a o� DRAINPORT- PROVIDE � Z POSITIVE DRAINAGE OUT z HEAT TAPE - N OVER ENTIRE A x 3/8" STEEL OF ENCLOSURE (MINIMUM w n TWICE THE SIZE OF RPZ) R DEVICE PLATE STRAP CARRIER PIPE In / \ = MIN. ' v 1" CLEAR - IT ' CASING END SEAL IIL Of II�IfI n u ut n `m ni Hill 2-3/4!'x 4" BOLTS U-iI� alT II I�III� _ -II _° �IIL, �- m W/ HEX NUTS EA. CASING SECTION MIN. 2" Z SIDE OF PIPE SUPPORT NOT TO SCALE TYP. 4" 3000 PSI CONCRETE SLAB. MINIMUM A x 3/8" STEEL DIMENSIONS PER BOX 6" OPENING ANNULAR PLATE STRAP MANUFACTURER SPECIFICATIONS STEEL ENCASEMENT �► PIPE SKID 1„ FLOW FLOW a NOTES: 1. REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY SHALL COMPLY WITH ASSE 1013 & AW WA C511. 2. DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY SHALL COMPLY WITH ASSE 1015 & AV WA C510. A X 3/8" THK. ' STEEL PLATE 3. BACKFLOW PREVENTION ASSEMBLY SHALL BE INSTALLED WITHIN SFT OF THE METER BOX. NOTES: /> c� 4. BACKFLOW PREVENTION ASSEMBLY SHALL BE CENTERED ON CONCRETE OR APPROVED FIBERGLASS MOUNTING PAD j. W'= 8" FOR PIPES 14" AND UNDER CARRIER PIPE AND CENTERED WITHIN ENCLOSURE. "A:'= 12" FOR PIPES 16" AND OVER 5. MINIMUM INSULATED CLASS I OR CLASS II, ASSE 1060 WEATHERPROOF ENCLOSURE REQUIRED (HEATING OPTIONAL). 2. ENTIRE PIPE SUPPORT ASSEMBLY TO 6. 120V GFCI ELECTRICAL RECEPTACLE TO BE INSTALLED IN ACCORDANCE WITH THE NC ELECTRICAL CODE FOR OUTDOOR OPERATION. BE FUSION BONDED PVC. o END ELEVATION N V 7, PIPE MATERIAL SHALL BE PVC (SCH. BOOR BETTER), COPPER (TYPE K) OR BRASS (ASTM B43)- NOT TO SCALE 8. INSTALLATION SHALL BE IN COMPLIANCE WITH ALL APPLICABLE TOWN ORDINANCES AND SPECIFICATIONS IN ADDITION -� lv TO THE NC PLUMBING CODE. .ti 9. PROPERTY OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE AND OPERATION OF BACKFLOW ASSEMBLY AND COMPLIANCE Uo 4 \ U WITH REPORTING AND TESTING REQUIREMENTS. C3 � cj_ g 1" RPZ BACKFLOW ASSEMBLY STEEL ENCASEMENT PIPE Lo mom' a- o a N I- C.g,j NOT TO SCALE C.6.1 NOT TO SCALE NOTES: 1. HYDRANT TO BE PLUMB. IF ADJUSTMENT IS NECESSARY AFTER PRESSURE TEST, RETESTING WILL BE REQUIRED 2. VALVE BOX SHALL NOT BE INSTALLED IN SLOPE SECTION. 3. MINIMUM OF 2'f" FROM TOP OF SLOPE TO FIRE HYDRANT OR EXTENDED TO RIGHT-OF-WAY, WHICHEVER IS GREATER. PLACE 2'x2'x6" CONCRETE PAD 2'-6" MIN. IF VALVE IS LOCATED IN A PAVED AREA. IF NOT, A PRECAST CONCRETE COLLAR MAY BE USED. 18" MIN. 24" MAX. (SEE NOTES) 6" GATE VALVE HYDRANT TEE 2' MIN. 6"DIP COVER PIPE STREET FIRE HYDRANT 'LIMPER NOZZLE TO BE PER- PENDICULAR TO STREET PROVIDE # 57 CRUSHED STONE AROUND WEEP c HOLES vD D" I- p C� I- r_rwr_o" ennlcaG= oen 01 noo rno nc TO BE POURED SO THAT CONC. TO PROVIDE NO FITTINGS OR FLANGES DRAINAGE FROM ARE COVERED HYD. DRAIN FIRE HYDRANT ASSEMBLY C.6.1 NOT TO SCALE NOTES: ONE POST TO BE INSTALLED FOR EACH VALVE. WITNESS POST TO BE INSTALLED AT THE RIGHT OF WAY. NO POST REQUIRED FOR FIRE HYDRANT ISOLATION VALVES. 3.5" DIA. CYLINDRICAL POLYMERIC MARKER POST TOP COLOR: ROYAL BLUE POST COLOR: WHITE VALVE BOX AND COVER 2' MIN. 0 co INDICATE DISTANCE TO CENTERLINE OF VALVE BOX W V A A T L E V R E // \\ VALVE MARKER FOR MAINLINE VALVES C.6.1 NOT TO SCALE STEPS 2'-6" x 2'-6" ALUM. HATCH COVER W/ PAD LOCK b z rc&v� 3 A6" METER S 6" NOTE- PLAN VIEW L METER VAULT FLOOR SLAB TO BE GROUTED TO SLOPE TO LOW CORNER RECESSES W/ /," PER FOOT SLOPE_ 2. STEEL RODS AND BOLTS SHALL BE 3'a' HOT DIPPED GALVANIZED. 2'-6" x 2'-0" ALUM. HATCH COVER W/ PAD LOCK �- V-2" x T-2" CONCRETE PAD TO BE POURED 12" 4 SO THAT NO FITTINGS OR FLANGES ARE VALVE _-_ COVERED. THIS WILL APPLY TO ALL VALVES WATER \�� 0.250" AT ALL LOCATIONS. MAIN 6" METER NOTES: 0.344" 1. VALVE BOX SHALL NOT BE INSTALLED 0.344'0.344" IN CURB AND GUTTER. 16" D.I.P. 2. VALVE BOX SHALL BE IN ACCORDANCE DETAIL 28" WITH MANUAL. PRECAST CONCRETE COLLAR -BONG. THRUST 3. VALVE BOX SHALL BE CENTERED AND BLOCKING"LINK O �' PLUMBED OVER VALVE. STANDARD VALVE BOX INSTALLATION NOT TO SCALE LENGTH OF RESTRAINED PIPE PER SECTION 3.4.6.9.1 M.J. 45^ BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE i LENGTH OF RESTRAINED PIPE PER SECTION 3.4.6.9.1 ONE JOINT OF DIP M.J. 45^ BEND (DIP) W/ MECHANICAL RESTRAINT DEVICE )..* -STORM DRAIN 24" MIN. COVER M.J. 45^ BEND (DIP) OR J L --DIP M.J. 45^ BEND (DIP) OR CONCRETE THRUST CONCRETE THRUST BLOCKING BLOCKING NOTES: C.6.1 NOT TO SCALE 1. PLACE CONCRETE BLOCKING SUCH THAT IT WILL NOT INTERFERE WITH REMOVAL OF BOLTS. 2. PIPE DIAMETER GREATER THAN 12" SEE ENGINEERING SPECIFICATIONS VARIES (SEE MANUFACTURER) REDUCED PRESSURE PRINCIPLE OR 3. PIPE LENGTHS SHALL BE AS REQUIRED TO CONSTRUCT CROSSING. BACKFLOW ASSEMBLY 4. ALL JOINTS TO BE RESTRAINED IN ACCORDANCE WITH MANUAL. VARIES (SEE MANUFACTURER) DOUBLE CHECK VALVE ASSEMBLY r6WATER MAIN AND STORM CROSSING CLASS 1 OR CLASS 2 ASSE 1060 INSULATED C.6.1 NOT TO SCALE WEATHERPROOF ENCLOSURE 4 GFCI ANCHORED TO CONCRETE 6 CL. ELECTRICAL _ OR APPROVED FIBERGLASS MIN • RECEPTACLE o Ld MOUNTING PAD o A 12" 6„ STEEL ENCASEMENT PIPE I -STEEL PIPE SUPPORT ASSEMBLY THREADED UNION MIN. N REQUIRED AS SHOWN PER JOINT BALL VALVE OF CARRIER PIPE ELECTRICAL a o� DRAINPORT- PROVIDE � Z POSITIVE DRAINAGE OUT z HEAT TAPE - N OVER ENTIRE A x 3/8" STEEL OF ENCLOSURE (MINIMUM w n TWICE THE SIZE OF RPZ) R DEVICE PLATE STRAP CARRIER PIPE In / \ = MIN. ' v 1" CLEAR - IT ' CASING END SEAL IIL Of II�IfI n u ut n `m ni Hill 2-3/4!'x 4" BOLTS U-iI� alT II I�III� _ -II _° �IIL, �- m W/ HEX NUTS EA. CASING SECTION MIN. 2" Z SIDE OF PIPE SUPPORT NOT TO SCALE TYP. 4" 3000 PSI CONCRETE SLAB. MINIMUM A x 3/8" STEEL DIMENSIONS PER BOX 6" OPENING ANNULAR PLATE STRAP MANUFACTURER SPECIFICATIONS STEEL ENCASEMENT �► PIPE SKID 1„ FLOW FLOW a NOTES: 1. REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY SHALL COMPLY WITH ASSE 1013 & AW WA C511. 2. DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY SHALL COMPLY WITH ASSE 1015 & AV WA C510. A X 3/8" THK. ' STEEL PLATE 3. BACKFLOW PREVENTION ASSEMBLY SHALL BE INSTALLED WITHIN SFT OF THE METER BOX. NOTES: /> c� 4. BACKFLOW PREVENTION ASSEMBLY SHALL BE CENTERED ON CONCRETE OR APPROVED FIBERGLASS MOUNTING PAD j. W'= 8" FOR PIPES 14" AND UNDER CARRIER PIPE AND CENTERED WITHIN ENCLOSURE. "A:'= 12" FOR PIPES 16" AND OVER 5. MINIMUM INSULATED CLASS I OR CLASS II, ASSE 1060 WEATHERPROOF ENCLOSURE REQUIRED (HEATING OPTIONAL). 2. ENTIRE PIPE SUPPORT ASSEMBLY TO 6. 120V GFCI ELECTRICAL RECEPTACLE TO BE INSTALLED IN ACCORDANCE WITH THE NC ELECTRICAL CODE FOR OUTDOOR OPERATION. BE FUSION BONDED PVC. o END ELEVATION N V 7, PIPE MATERIAL SHALL BE PVC (SCH. BOOR BETTER), COPPER (TYPE K) OR BRASS (ASTM B43)- NOT TO SCALE 8. INSTALLATION SHALL BE IN COMPLIANCE WITH ALL APPLICABLE TOWN ORDINANCES AND SPECIFICATIONS IN ADDITION -� lv TO THE NC PLUMBING CODE. .ti 9. PROPERTY OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE AND OPERATION OF BACKFLOW ASSEMBLY AND COMPLIANCE Uo 4 \ U WITH REPORTING AND TESTING REQUIREMENTS. C3 � cj_ g 1" RPZ BACKFLOW ASSEMBLY STEEL ENCASEMENT PIPE Lo mom' a- o a N I- C.g,j NOT TO SCALE C.6.1 NOT TO SCALE NOTES: 1. HYDRANT TO BE PLUMB. IF ADJUSTMENT IS NECESSARY AFTER PRESSURE TEST, RETESTING WILL BE REQUIRED 2. VALVE BOX SHALL NOT BE INSTALLED IN SLOPE SECTION. 3. MINIMUM OF 2'f" FROM TOP OF SLOPE TO FIRE HYDRANT OR EXTENDED TO RIGHT-OF-WAY, WHICHEVER IS GREATER. PLACE 2'x2'x6" CONCRETE PAD 2'-6" MIN. IF VALVE IS LOCATED IN A PAVED AREA. IF NOT, A PRECAST CONCRETE COLLAR MAY BE USED. 18" MIN. 24" MAX. (SEE NOTES) 6" GATE VALVE HYDRANT TEE 2' MIN. 6"DIP COVER PIPE STREET FIRE HYDRANT 'LIMPER NOZZLE TO BE PER- PENDICULAR TO STREET PROVIDE # 57 CRUSHED STONE AROUND WEEP c HOLES vD D" I- p C� I- r_rwr_o" ennlcaG= oen 01 noo rno nc TO BE POURED SO THAT CONC. TO PROVIDE NO FITTINGS OR FLANGES DRAINAGE FROM ARE COVERED HYD. DRAIN FIRE HYDRANT ASSEMBLY C.6.1 NOT TO SCALE NOTES: ONE POST TO BE INSTALLED FOR EACH VALVE. WITNESS POST TO BE INSTALLED AT THE RIGHT OF WAY. NO POST REQUIRED FOR FIRE HYDRANT ISOLATION VALVES. 3.5" DIA. CYLINDRICAL POLYMERIC MARKER POST TOP COLOR: ROYAL BLUE POST COLOR: WHITE VALVE BOX AND COVER 2' MIN. 0 co INDICATE DISTANCE TO CENTERLINE OF VALVE BOX W V A A T L E V R E // \\ VALVE MARKER FOR MAINLINE VALVES C.6.1 NOT TO SCALE STEPS 2'-6" x 2'-6" ALUM. HATCH COVER W/ PAD LOCK b z rc&v� 3 A6" METER S 6" NOTE- PLAN VIEW L METER VAULT FLOOR SLAB TO BE GROUTED TO SLOPE TO LOW CORNER RECESSES W/ /," PER FOOT SLOPE_ 2. STEEL RODS AND BOLTS SHALL BE 3'a' HOT DIPPED GALVANIZED. 2'-6" x 2'-0" ALUM. HATCH COVER W/ PAD LOCK VARIES a1 VARIES PAVEMENT O 3 EX. GROUND �I 2' MIN. r BORE CROSSINGS NOMIMAL WATER SIZE ENCASEMENT SIZE 6" GATE gg VALVE TA\ 4 NONE VALVE _-_ 6 WATER \�� 0.250" COAT EXTERIOR MAIN 6" METER WITH HITUMASTIC 0.344" ASSEMBLY WATERPROOFING 0.344'0.344" MATERIAL 16" D.I.P. 0.344" 28" 0.344" 0.344" -BONG. THRUST N � N BLOCKING"LINK O �' SEAL" - -- - TYPE WALL PIPE SUPPORT (TYP.)SEAL (TYP.) 1 x x 4" RECESS Z" (1YP. OF 41 OF 8"-"57 STONE BASE SECTION VIEW 11 METER VAULT C.6.1 NOT TO SCALE VARIES a1 VARIES PAVEMENT O 3 EX. GROUND �I 2' MIN. r BORE CROSSINGS NOMIMAL WATER SIZE ENCASEMENT SIZE MINIMUM WALL THICKNESS NCDOT CROSSING MINIMUM WALL THICKNESS RAILWAY CROSSING 4 NONE --- _-_ 6 16" 0.250" 0.344" 8 18" 0.344" 0.344" DATE: 20" 0.344'0.344" E12 24"0.344' 0.344" 28" 0.344" 0.344" NEW WATER MAIN BORE NOT TO SCALE SIPHON BREAK V Z z >.W~ QQm ALu Cn CCO H U < ;z 0 z_ u_ LL NOTES: HOSE BIBB SHALL ACCOMMODATE z STD. Y4' GARDEN HOSE. co 15"x15"x4" THICK CONCRETE PAD z_ DRAIN PORT O Fn 1 CU. FT. OF #57 WASHED STONE NON -FREEZE YARD HYDRANT NOT TO SCALE N z O H z 0 Lu m m O O Lu C7 C3 W z O U LLJ m O Lu O Lu Y Q � z Q O U) LLIz cn 0 W z m O Lu m O J C 0 z Y nn J H Lu W Q i 041415 FNGI.... , rA'•�,,� •.1M A rrrrrnrr+lNr� DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL OZ N U N N 2488 GX DATE: N ZN N W F CDw N � N O �' TW y H z 0 Lu m m O O Lu C7 C3 W z O U LLJ m O Lu O Lu Y Q � z Q O U) LLIz cn 0 W z m O Lu m O J C 0 z Y nn J H Lu W Q i 041415 FNGI.... , rA'•�,,� •.1M A rrrrrnrr+lNr� DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.6.1 N ti SEE FLAT TOP MANHOLE MIN. %" X Y2" LAG BOLTS W/ DETAIL CONCRETE ENCASEMENT ° a. LEAD SHIELD ANCHORS (POSITION 4" DIP FLG-FLG VENT PIPE (3000 PSI MIX) AS SHOWN, 4 REQUIRED) INSECT SCREEN BETWEEN 4 4 2 0" v e ° FLANGES 4" FLG-FLG-PE z Z 0 � LI ��� VENT EL. AS ° � H LLJ ECCENTRIC 0 TAPER UNIT((P��O�go oQ WALL PIPE SHOWN ON PLANS ° o U Q QD 2'-0" MIN. a CC L_uj a O O o C]d o 100 YR. FLOOD EL. (VARIES) z z ---- --- F¢ _z o g O O a° .. FLAT SLAB TOP SECTION o J p ALL LIFT HOLE WHICH WATER -TIGHT MANHOLE WATER -TIGHT MANHOLE N p < � U)o o o MIN. Q Z CC 0 W 5' DIA COMPLETELY PENETRATE RING AND COVER CAST PLAN RING & COVER CAST IN RIM EL. AS \ j 10" z THE MANHOLE SHALL BE IN CONC SLAB CONCRETE SLAB I SHOWN ON PLANS o , FILLED WITH NONSHRINKING 2-116" THICK HYDROPHILIC 0 -RING JOINT OR GROUT. POLYVINYL GASKET BETWEEN f ° O -RINGS (FOR LINER ONLY) BUTYL RUBBER JOINT COVER AND FRAME SEAT IL FLAT SLAB TOP SECTION FIN. GRADE 6" RISER \V����\����� CONCRETE - - - - - - - - - LINER DIA. 5" 5" MANHOLE RISER SECTION\�� BASE UNIT \ BRICK & MORTAR INVERT 2 yMIN. ° z OR PRECAST INVERT �e PIPE PRECAST CONCRETE MANHOLE SECTION L STAINLESS STEEL CLAMP Q MEETING SPECIFICATIONS 12" BEDDING RISER SECTIONCL m MANHOLE BASE p F. FLEXIBLE SLEEVE C N O Z m 77n„_$ U >^ NOTES: N 1. MANHOLES GREATER THAN 10' IN DEPTH SHALL UTILIZE A W 6" EXTENDED BASE MANHOLE. m FLAT TOP PRECAST CONCRETE MANHOLE WITH CD 2 STANDARD PRECAST MANHOLE2 4 TYPICAL MANHOLE CONNECTION WATERTIGHT MANHOLE RING AND COVER 3 WATERTIGHT RING AND COVER AND VENT C N N Q NOT TO SCALE C.7.1 NOT TO SCALE 3 N C.7.1 NOT TO SCALE C.7.1 NOT TO SCALE 0 NEW STANDARD 6' FLAT TOP MANHOLE 1' W/ ALUMINUM ACCESS HATCH NOTES: FINISHED GRADE 1. INSTALLATION OF SDR 26 PVC SHALL BE IN ACCORDANCE WITH FINISHED GRADE GRADE >\\pie oiDiiDi� DEPTH AS SHOWN THE LATEST REVISION OF ASTM D2321. PIPE MAY NOT ENTER MANHOLE THROUGH PIPE ON PLANS NEW S.S. ABOVE Z CONE SECTION OR DIA+2' TRANSITION WATER LINE (ONE IL JOINT COUPLING REPLACE EX. WATER JOINT D.I.P. REQ'D.) cc �� i� i REPAIR SLEEVE ( ) LINE W/ONE JOINT FIN. GRADE o ° ° o p WYE FITTING D.I.P. IF REQ'D. 12" MIN. _ { ' z �rn9 o� r O NEW 10" { J'' ¢ b z 00° o O °n °n ii Z NEW CHECK VALVE NEW10" �'i\ ��w e ncKFILL '{� I- 0 > ^. EX. WATERLINE REQUIRE ENTMS OF NOTES 2 & 3) 10'k10" PLUG NEW 10" NEW 10^ 45 BEND LL g ooh` TEE VALVE FORCEMAIN \� U) w PIPE NEW S.S. BELOW WATERLINE WARNING AND z F- SECTION o (ONE JOINT DIP IF REQ'D.) r Z IDENTIFICATION TAPE aj NOTES: Z JQ O J HITMIN. LU Z]1. SANITARY SEWER (GRAVITY OR FORCE MAIN) SHALL PASS OVER OR UNDER EXISTING O INITIAL SELECT ,` 24" - �` a 90, €° - ° WATERLINE AS SHOWN OR NOTED ON DRAWINGS V LJJ IZ cn X12 WBACKFILL No. 57 STONE MINIMUM �� {� °°� " O - ° BEND o :. ° • . 6"'� oa . • °o o 2. DUCTILE IRON PIPE REQUIRED FOR BOTH NEW SANITARY SEWER AND EXISTING WATERLINE EXTENDING 10'-O" FROM CROSSING IN ALL DIRECTIONS IF EITHER OF THE g O Z Lu W_ W GRANULAR EMBEDMENT ^ O r �. ZONE #57 STONE BEDDING HAUNCHING s e. e• • e ee .o�•�• D D FOLLOWING CONDITIONS EXIST: W ir � O ?� / ° 4" MIN. °° °°O °O ° {` FOUNDATION ((MAv {` o jo 0 00 0 STONEBNSSE �'oo0 ag0o C�ogO �°000��oo0a�C�co c n n_ n 0. n A. WATERLINE IS BELOW SANITARY SEWER. 0 U.1 m CD W NOT BE REQUIRED). PIPE GRADE n ,,.n_ CONC ENCASEMENT Z SECTION "A -A" y < 3000 PSI B. WATERLINE IS ABOVE SANITARY SEWER BUT LESS THAN 1'-6" SEPARATION IS Y STONE TO BE THOROUGHLYNOTES: 8" STONE BASE PROVIDED BETWEEN BARRELS OF WATERLINE AND SANITARY SEWER PIPES. NEW STANDARD S' COMPACTED UNDER PIPE. 3. IN LIEU OF REPLACING WATER OR SEWER LINE, EITHER THE WATER MAIN OR THE SEWER Z FLAT TOP 1. TO BE CONSTRUCTED FOR DROPS OVER 30". LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE WHICH EXTENDS 10 FT. ON BOTH O MANHOLE Wi SIDES OF THE CROSSING. MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER w ALUMINUM ACCESS HATCH 2. PVC FITTINGS MAY BE USED FOR THE DROP IF THE MAIN LINE IS PVC. PIPE SHALL BE OF MATERIALS APPROVED BY THE REGULATORY AGENCY FOR USE IN m FINISHED GRADE WATER MAIN CONSTRUCTION. p 3. APPROVED PRECAST DROP MANHOLES MAY BE USED. Lu C1 4. DIP MAY BE USED IN LIEU OF PVC W/CONCRETE ENCASEMENT w TRENCH SECTION DETAIL - PVC SANITARY SEWER CROSSING EX. WATERLINE SDR -32.5 GRAVITY SEWER MAIN OUTSIDE DROP MANHOLE ,.,•��������"Aft- .•#0s... °.... �` C. NOT TO SCALE C.7.1 NOT TO SCALE C.7.1 NOT TO SCALE POFeSsj y9 " NEW 10" ��• SE CHECK 041415 - NEW 10^ NEW VALVE NEW 10" 10'k10" STANDARD MANHOLE z•1 -�I =� +'g,T"•:F/VGINE.�'^`O' EX. 10' PLUG PLUG Ex. 10" TEE FORCE MAIN FIN GRADE IN PAVED RING AND COVER -� FORCE MAIN VALVE VgLVE f OR MAINTAINED AREAS (SEE NOTE) '•� qM ..... i i O STANDARD PRECAST llf, A � CONCRETE MANHOLE W/ 1T'MIN. 1111==1111; -:-_ FLAT SLAB TOP SECTION NEW STANDARD NFLAT TOP NEW STANDARD4' FLAT TOP - ___= MANHOLE W/ ALUMINUM MANHOLE W/ALUMINUM G' -II ACCESS HATCH ACCESS HATCH iz" GRADE ADJUSTMENT D �. ° FIN. GRADE IN FINISHED GRADE FINISHED GRADE 140.57 STONE MINIMUM IF NECESSARY UNMAINTAINED 12" MIN ° AREAS 2'-0" MAX 04 INLET VALVE ACCESSIBLE--,.,. ' 11119 FIIII=.:1111= SECTION "B -B" THROUGH MANHOLE RING z WITH VALVE WRENCH AIR RELEASE 2 W VALVE = O MANHOLE VAULT DETAIL (TRAFFIC RATED) SEWER (C900 W/2" in U I IBI I 5� INSET � TAPPED TEE OR APPROVED EQUAL) NEW NEW 10" NEW 10" NEW DESIGNED BY: WAL c _, 2" SCHEDULE 8D 10"x10" PLUG NEW 10" TEE VALVE FORCE MAIN y NEW 10" PLUG 10"x10" �— FORCE MAIN TEE C.7.1 NOT TO SCALE DRAWN BY: N g" P PIPING /� �) 1� -� i DRS (TYP) 2" BALL VALVE �i CHECKED BY: D WAL HARCO DUCTILE IRON SEWER ------- __ -. — L PIPE SUPPORT 12"MI14. i2^MIN. PROJECT NO.: TRANSITION FITTING OR EQUIVALENT / it iz" 6.. 12" 2488-GX DATE: — -- No. 57 STONE MINIMUM MINIMUM No. 67 STONE FEBRUARY 2018 NO. 57 STONE s" s o" s-0" s^ SCALE: 4'-0" DIA AS NOTED DIP PIPE PVC PIPE NOTES: 1. WHERE MANHOLE COVER IS NOT FLUSH WITH GRADE, RING AND COVER CAST IN SLAB SHALL BE USED INSTEAD OF THE STANDARD RING AND COVER. SHEET 2. MANHOLE SHALL BE COATED WITH ONE COAT OF BITUMASTIC BLACK PAINT. CONCRETE MANHOLE (TRAFFIC RATED) CONCRETE MANHOLE (TRAFFIC RATED) 9 PVC -DIP SEWER TRANSITION rlbAIR/VACUUM RELEASE VALVE DETAIL INSET IICII 12 INSET I'D'' Cm7nl- CC 7.1 NOT TO SCALEC.7.1 NOT TO SCALE C.7.1 NOT TO SCALE NOT TO SCALE N ti Z 0 Q Li �n G . G ai LQ w O c U N �� O Q) Ni � i �co �\f Q_oan LANE CLOSURE ON A TWO-LANE LOW-VOLUME ROAD (ONE FLAGGER OPERATION) /AD WORK � AHEAD \✓ (200') 500" ONELANE ROAD \HEAD ILX50' - 100'A (200')500' ', I, \ A (200')500- SPEED BUFFER LIMIT (FT) V-4" MATCH EX. GRAVEL 151, 35 200 EXISTING SUR FACE 45 350 24" 55 400 30" Z\ 0 BUFFER TO TAPER 100' MAX A 500' (200') 7 500'(200') ONE LAN ROAD HEAD 500'(200') /ROAD —� WORK , AHEAD NOTES: 1. A SINGLE FLAGGER MAY BE ADEQUATE FOR LOW VOLUME APPLICATIONS. WHERE ONE FLAGGER IS USED, SUCH AS FOR SHORT WORK AREAS ON STRAIGHT ROADWAYS, THE FLAGGER MUST BE VISIBLE TO APPROACHING TRAFFIC FROM BOTH DIRECTIONS. 2. FOR OPERATIONS OF 60_MINUTE_S_OR-LESS, THE "ROAD WORK AHEAD" SIGN MAY BE OMITTED 3. FOR TWO-LANE, LOW - SPEED (35 MPH OR LESS) URBAN STREETS, A 200 FOOT SIGN SPACING MAY BE USED. 4. ALL WORK ZONE SIGNAGE SHALL CONFORM TO MUTCD AND NCDOT SPECIFICATIONS. LANE CLOSURE ON A TWO-LANE LOW-VOLUME ROAD (TWO FLAGGER OPERATION) ROAD WORK \AHEAD \ (200')500- /ONE LANEv _ _ ___ _ END ROAD ROAD % - WORK AHEAD/ T (200') 500' (OPTIONAL) 400' (200') 500" 200'100' TO Zx 300' Izuu/ auu- 500'(200') END ROAD � \ WORK ---- /> (OPTIONAL) , 500' (200'),. SPEED BUFFER ONE LAN LIMIT (FT) ROAD — -- — 35 200 \AHEAD 45 350 III���III 500• (200') 55 400 ROAD WORK \AHEA/ NOTES: 1. FOR OPERATIONS OF 60 MINUTES OR LESS, THE "ROAD WORK AHEAD" SIGN MAY BE OMITTED. 2. FOR TWO-LANE, LOW - SPEED (35 MPH OR LESS) URBAN STREETS, A 200 FOOT SIGN SPACING MAY BE USED. 3. GENERALLY, THE USE OF "END ROAD WORK" SIGNS IS OPTIONAL FOR SHORT DURATION WORK SITES. HOWEVER, IF THE WORK SITE, ITSELF, IS LONG, OR THE BEGINNING AND END OF THE WORK SITE ARE NOT VISIBLE TO A DRIVER PASSING THROUGH IT, THEN "END OF WORK - SIGNS SHOULD BE USED. 4. ALL WORK ZONE SIGNAGE SHALL CONFORM TO MUTCD AND NCDOT SPECIFICATIONS. TRAFFIC CONTROL DETAIL NOT TO SCALE MIN. TOR MATCH EX. ASPHALT THICKNESS, WHICHEVER IS EXISTING SURFACE GREATER. CRUSHED STONE s COMPACTED FILL 4 TRACER WIRE L- CARRIER PIPE ROAD CROSSING DETAIL r MIN. 2" OR MATCH EX. ASPHALT EXISTING SURFACE I THICKNESS, WHICHEVER IS GREATER. ACTED FILL TRACER WIRE '— CARRIER PIPE ASPHALT DRIVE REPAIR DETAIL X MIN. 8" CABC OR 12" V-4" MATCH EX. GRAVEL 151, V-7" THICKNESS, ICH EXISTING SUR FACE GREATER. EVER IS GREATER. -� 24" 2'-6" 8'-6„ 30" _BUFFER 9'-1" 36" 3'-8" TO TAPER Q 100' MAX 10'-5" 48" Izuu/ auu- 500'(200') END ROAD � \ WORK ---- /> (OPTIONAL) , 500' (200'),. SPEED BUFFER ONE LAN LIMIT (FT) ROAD — -- — 35 200 \AHEAD 45 350 III���III 500• (200') 55 400 ROAD WORK \AHEA/ NOTES: 1. FOR OPERATIONS OF 60 MINUTES OR LESS, THE "ROAD WORK AHEAD" SIGN MAY BE OMITTED. 2. FOR TWO-LANE, LOW - SPEED (35 MPH OR LESS) URBAN STREETS, A 200 FOOT SIGN SPACING MAY BE USED. 3. GENERALLY, THE USE OF "END ROAD WORK" SIGNS IS OPTIONAL FOR SHORT DURATION WORK SITES. HOWEVER, IF THE WORK SITE, ITSELF, IS LONG, OR THE BEGINNING AND END OF THE WORK SITE ARE NOT VISIBLE TO A DRIVER PASSING THROUGH IT, THEN "END OF WORK - SIGNS SHOULD BE USED. 4. ALL WORK ZONE SIGNAGE SHALL CONFORM TO MUTCD AND NCDOT SPECIFICATIONS. TRAFFIC CONTROL DETAIL NOT TO SCALE MIN. TOR MATCH EX. ASPHALT THICKNESS, WHICHEVER IS EXISTING SURFACE GREATER. CRUSHED STONE s COMPACTED FILL 4 TRACER WIRE L- CARRIER PIPE ROAD CROSSING DETAIL r MIN. 2" OR MATCH EX. ASPHALT EXISTING SURFACE I THICKNESS, WHICHEVER IS GREATER. ACTED FILL TRACER WIRE '— CARRIER PIPE ASPHALT DRIVE REPAIR DETAIL L CARRIER PIPE GRAVEL DRIVE REPAIR DETAIL MIN. 4" OR MATCH EX. CONCRETE THICKNESS PLUS ONE INCH, WHICH EVER IS GREATER. I- — STONE BASE COMPACTED FILL TRACER WIRE �— CARRIER PIPE CONCRETE DRIVE REPAIR DETAIL 2" S9.56 OR S9.5C SURFACE COURSE 4" B25.OB OR B25.00 BASE COURSE D X MIN. 8" CABC OR 12" V-4" MATCH EX. GRAVEL 151, V-7" THICKNESS, ICH EXISTING SUR FACE GREATER. EVER IS GREATER. -� 24" 2'-6" 8'-6„ 30" 3'-1" 9'-1" 36" 3'-8" �� 42" 4'-5" 10'-5" 48" �w 11'-0" C) PIPE LINE OVER CULVERT OF SANITARY SEWER 4o COMPACTED FILL FENCE REQ'D inU N �n N /�Y/b \Y�y TRACER WIRE L CARRIER PIPE GRAVEL DRIVE REPAIR DETAIL MIN. 4" OR MATCH EX. CONCRETE THICKNESS PLUS ONE INCH, WHICH EVER IS GREATER. I- — STONE BASE COMPACTED FILL TRACER WIRE �— CARRIER PIPE CONCRETE DRIVE REPAIR DETAIL 2" S9.56 OR S9.5C SURFACE COURSE 4" B25.OB OR B25.00 BASE COURSE D X W 12" V-4" 7-4- '-4"15" 151, V-7" T-7- 18" 1'-10" 7'-10' 24" 2'-6" 8'-6„ 30" 3'-1" 9'-1" 36" 3'-8" 9'-8" 42" 4'-5" 10'-5" 48" 5'-0" 11'-0" NCDOT ROAD OPEN CUT DETAIL NOTE: C.8.1 NOT TO SCALE ALL OPEN CUTS ALONG SOIL ROADWAYS SHALL BE BACKFILLED WITH APPROVED SUITABLE MATERIAL AND PROPERLY TAMPED IN ACCORDANCE WITH SPECIFICATIONS. TYPICAL TRENCH SURFACE REPAIR 2 DETAIL (NON DOT ROADS) C.8.1 NOT TO SCALE FINAL BACKFILL TAMPED IN 12" LAYERS U, F O Z w N a w INITIAL BACKFILL o TAMPED IN 6" J LAYERS 0 O PIPE BEDDING SEED AND MULCH PER EROSION CONTROL AND SEDIMENTATION PLANS AND SPECS WIDTH-- O.D. + 24" MIN O.D. + 48" MAX —UNDISTURBED EARTH SELECT COMPACTED BACKFILL —#12 COPPER TRACER WIRE (FOR PRESSURE PIPE) —PIPE BEDDING, CLASS I #57 OR #67 WASHED STONE COMPACTED TO 90% STANDARD PROCTOR DENSITY PIPE GRADE NOTES: 1. FOR DEEP TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING. 2. STONE BEDDING FOR PVC FORCE MAINS SHALL BE REQUIRED WHERE UNSUITABLE SUBSURFACE CONDITIONS EXIST AS DIRECTED BY THE ENGINEER. 3. NO ROCKS OR BOULDERS 4" OR LARGER SHALL BE USED IN INITIAL BACKFILL. 4. SELECT BACKFILL MATERIAL SHALL BE USED IN ALL LOCATIONS WHERE EXCAVATED MATERIAL IS DETERMINED, BY THE ENGINEER/CONSTRUCTION OBSERVER, TO BE UNSUITABLE FOR BACK FILLING. 5. ALL TRENCHING AND EXCAVATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NORTH CAROLINA OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR THE CONSTRUCTION INDUSTRY MANUAL. TYPICAL PIPE TRENCH AND PIPE BEDDING DETAIL, FOR PRESSURE PIPE NOT TO SCALE VARIES 4'-0" F7SiiY 14'-0" T-0" 4'-0" SLOPE AT 1/4:12 SLOPE AT 1/4:12 3:1 MA SLOPE 72:1 �-- 12:1 SLOPEX 3:1 \ Scop MAX E FILL SECTION CUT SECTION 8" AGGREGATE BASE COURSE COMPACTED SUB -GRADE TYPICAL GRAVEL DRIVE DETAIL NOT TO SCALE CUT BACK EXIST SURFACE COURSE 6" MIN FROM BASE SLOPE EXIST SURFACE COURSE EXISTING TACK Cl EXIST BASE COURSE NEW ASPHALT PAVEMENT i < EXIST BASE 12' MIN ASPHALT CONCRETE SURFACE COURSE TYPE TACK COAT H -BINDER COURSE L[eiC7ilx _C7\1�►6Y�1Z�1�L'T.Y� TYPICAL PAVEMENT JUNCTION NOT TO SCALE CD Z o >w0H W QQ= Lu �CcZ _J ~O 0 aZo z U— 14 LF MIN_ SILT FENCE REQ'D GRADE NEW PIPE LINE NEW PIPE UNE AS NOTED STATE ROAD - - ------ AS NOTED N U Z N N M CULVERT CULVERT PLAN *24" MIN. PROFILE W CONDITION 1 18" MIN FOR CROSSING C) PIPE LINE OVER CULVERT OF SANITARY SEWER 14 LF MIN. SILT n FENCE REQ'D N m 3 N �n N AS NOTED NEW PIPE LINE GRADE CULVERT ------ -- AS NOTED TOP OF STATE ROAD CULVERT NEW PIPE LINE "24" MIN PLAN PROFILE CONDITION 2 'ADD CONCRETE ENCASEMENT PIPE LINE UNDER CULVERT PER PIPE CROSSING DETAIL FOR CULVERT CROSSING PROVIDE RESTRAINED JOINT D.I. PIPE u? MIN. FROM WINGWALL CULVERT NEW PIPE LINE GRADE CONC. ENCASEMENT 10•x_ 10' SEE DETAIL ` - — ---- -- --STATE ROAD-- AS NOTED I� 10 TONS CLASS B .1-"�–CULVERT 4.0' MIN. NEW PIPE LINE RIP RAP REQ'D NLESS THERVASE PLAN PROFILE NO CONDITION 3 R J.D.I. PIPE LINE AROUND END OF CULVERT INSTALLATION OF PIPE LINE AT CULVERT NOT TO SCALE NOTES: 1. ENCASEMENT REQUIRED FOR SPACE GREATER THAN 12" FF --- Z O UJ m M O 0 W C7 0 W Z O W m O 0 w 0 0 w Y cc Q O- Z Q 0 C' 1 Z' rj) H 0 W Z V7. O W jr O C3' Z `1 T U) J F– W Q W Z W 0 Z(„/_' SEAM 041415 3. G. za A,_; `chGINS,c 5. I •,,SAM At,0... 110, ti VARIES - SEE SITE PLAN 3'-0" PIPE 3'-0" do MIN. COVER FLOWABLE FILL FULL 6" O.D 6" MIN. COVER TRENCH WIDTH EQUAL EQUAL a' (SEE NOTE ) VARIES 4' SLOPE AT 1/4:12 SLOPE AT 1/4:12 EXIST_ PROPOSED PIPE PIPELINE a DESIGNED BY: WAL IT MIN. 41 6 � _ _ _ A MIN „ DRAWN BY: 3:1 3:1 MAX — 6" MIN — — — 12" MAX. DRS 12'1 SLOPE 1 \ 12'1 SLOPE _,_1 12" MAX 3'• �i / \/ ', CHECKED BY: WAL PROJECT NO.: CUT SECTION � '�v �FILL SECTION _EXIST _ —__ _ . _ PROPOSED 2488 GX PIPE I PIPELINE TACK COAT DATE: 2.0" S9.5B ASPHALT FEBRUARY 2018 CONCRETE SURFACE 6" AGGREGATE BASE COURSE COURSE 12" MIN. 1" THICK SCALE: 4" BITUMINOUS COMPACTED SUB -GRADE COMPRESSIBLE BINDER COURSE JOINT FILLER AS NOTED PROPOSED PIPELINE MATERIAL PROPOSED PIPELINE OVER EXIST PIPE UNDER EXIST PIPE SHEET g TYPICAL ROADWAY - ASPHALT DETAIL g TYPICAL PIPE CROSSING C.8,1 C.8.1 NOT TO SCALE C.8.1 NOT TO SCALE M O N U Z N N M U U' N W ! �z "> C) t o n O N m 3 N �n N _u 0 FF --- Z O UJ m M O 0 W C7 0 W Z O W m O 0 w 0 0 w Y cc Q O- Z Q 0 C' 1 Z' rj) H 0 W Z V7. O W jr O C3' Z `1 T U) J F– W Q W Z W 0 Z(„/_' SEAM 041415 3. G. za A,_; `chGINS,c 5. I •,,SAM At,0... 110, ti VARIES - SEE SITE PLAN 3'-0" PIPE 3'-0" do MIN. COVER FLOWABLE FILL FULL 6" O.D 6" MIN. COVER TRENCH WIDTH EQUAL EQUAL a' (SEE NOTE ) VARIES 4' SLOPE AT 1/4:12 SLOPE AT 1/4:12 EXIST_ PROPOSED PIPE PIPELINE a DESIGNED BY: WAL IT MIN. 41 6 � _ _ _ A MIN „ DRAWN BY: 3:1 3:1 MAX — 6" MIN — — — 12" MAX. DRS 12'1 SLOPE 1 \ 12'1 SLOPE _,_1 12" MAX 3'• �i / \/ ', CHECKED BY: WAL PROJECT NO.: CUT SECTION � '�v �FILL SECTION _EXIST _ —__ _ . _ PROPOSED 2488 GX PIPE I PIPELINE TACK COAT DATE: 2.0" S9.5B ASPHALT FEBRUARY 2018 CONCRETE SURFACE 6" AGGREGATE BASE COURSE COURSE 12" MIN. 1" THICK SCALE: 4" BITUMINOUS COMPACTED SUB -GRADE COMPRESSIBLE BINDER COURSE JOINT FILLER AS NOTED PROPOSED PIPELINE MATERIAL PROPOSED PIPELINE OVER EXIST PIPE UNDER EXIST PIPE SHEET g TYPICAL ROADWAY - ASPHALT DETAIL g TYPICAL PIPE CROSSING C.8,1 C.8.1 NOT TO SCALE C.8.1 NOT TO SCALE G Q U N � �a U� O U U w Q- N U 'bn , cc ,ccaC, \� cl-640n #57 WASHED STONE 2" x 2" STEEL POSTS 1/2"x1/2" WIRE MESH--� (V SECTION 2" x 2" STEEL POSTS CATCH BASIN 1/2"xl/2" WIRE MESH #57 WASHED STONE PLAN 1. DRIVE POSTS INTO THE GROUND TO A DEPTH OF 1.5'. 2. WIRE MESH SHALL BE HARDWARE CLOTH (23 GAUGE MIN.) AND SHALL HAVE 1/4" MESH OPENINGS. BURY FABRIC 1' AND EXTEND TO THE TOP OF THE POSTS. 3. SEDIMENT CONTROL STONE SHALL BE #57 STONE. HEIGHT OF STONE AT WIRE MESH SHALL BE 12 INCHES. 4. FASTEN FABRIC SECURELY AT THE CORNER POSTS. FO FLUws, KUUK scare VKU 1 tU i IUN MAY BE NEEDED PER STANDARD DETAIL INLET PROTECTION C.9.1 NOT TO SCALE NOTES: 1. 3:1 SIDE SLOPES UNLESS OTHERWISE NOTED ON PLANS. 2. PERMANENT - GRASS LINED 3. TEMPORARY - STRAW W/ NET OR DITCH LINER 4 TYPICAL DITCH C.g.1 NOT TO SCALE CLC V I.11 1 V IV NOTCH AND FOLD FABRIC OVER HORIZONTAL POST 8' OF #57 WASHED-� STONE m NOTES: 1. INSTALL SILT FENCE PER STD. SILT FENCE DETAIL. N 2. LOCATE REINFORCED OUTLET AT LOW POINTS OF SILT FENCE BARRIER. 3. PLACE RIP RAP WITH CARE. DO NOT TEAR SILT FENCE FABRIC. SECTION STEEL POST WOVEN WIRE FABRIC HORIZONTAL POST SILT FENCE FABRIC CLASS 'BF RIP RAP (TYP) REINFORCED SILT FENCE OUTLET NOT TO SCALE ORIGINAL DITCH BOTTOM GRADE • • r r r _ + 1 r +1 r 1 .r�,i• 1 r '�L�•Ii•��,•.I�i N�rI. j • ,.�FTr .. •Iii-:�-• • �Iir •!y�•Ii ��•I�N�•�i •!� • ,1 FILTER FABRIC) CLASS'B' EROSION CONTROL CROSS SECTION ( PROFILE VIEW OF ROADSIDE DITCH ) ROCK CHECK DAMS IENT STORAGE 100, �O O RADIUS TO ACCOMODATE LARGE TRUCKS NCDOT #5 OR #57 WASHED STONE Z is SEDIMENT TRAP BOTTOM DIMENSIONS 15'x 2', SIDE SLOPES 1.5:1, VOLUME 264 FT3 24' CLASS'B' EROSION CONTROL STONE FILTER FABRIC 21• MI\ /� NATURAL GROUND N ` EL VARIES nbb , �CPCg MIN. 3.5' 2.5' DEPTH o 1.5:1 SIDE SLOPE SEDIMENT o o STORAGE �O 2.0' STONE SECTION ( AS SEEN LOOKING DOWN STREAM ) TST - TEMPORARY SEDIMENT TRAP DETAIL TYPICAL FOR ROADSIDE DITCHES NOT TO SCALE NOTES: 1. CHECK BASIN AFTER EVERY RAINFALL WHICH CAUSES FLOW IN ROADSIDE DITCH. 2. REPLACE STONES WHICH ARE DISLODGED. 3. REPAIR ERODED ABUTMENTS WITH STONE. 4. WHEN BASIN IS '% FULL CLEAN OUT SEDIMENT AND DISPOSE OF MATERIAL BY SPREADING AND SEEDING OR INCORPORATING INTO BACKFILLING OPERATIONS. 5. AFTER THE SITE IS STABILIZED, THE BASIN MUST BE REMOVED AND MATERIAL DISPOSED OF IN ACCORDANCE WITH THE SEDIMENT EROSION CONTROL POLLUTION ACT. 6. PAYMENT SHALL BE INCLUDED IN THE UNIT BID PRICE FOR OTHER ITEMS UNLESS SPECIFICLY REQUESTED BY THE ENGINEER. SEE BASIS OF PAYMENT FOR PAYMENT TERMS. 7. ALL TEMPORARY SEDIMENT TRAPS SHOWN ON PLANS SHALL BE SIZED ACCORDING TO THIS DETAIL. TEMPORARY SEDIMENT TRAP NOT TO SCALE 100' MIN. EXISTING 70' MIN. 30' MIN NEW CONSTRUCTION -- --"� ROADWAY 6" MIN. 12" MIN. SECTION NOTES: 1. ENTRANCE APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABLIZED. 2. CONSTRUCTION ENTRANCE SHALL BE PLACED FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 3. PERIODIC TOP DRESSING AND ROUTINE MAINTENANCE SHALL BE PROVIDED ON ENTRANCE AS REQUIRED. CONTRACTOR SHALL STOCKPILE FRESH STONE ON SITE. 4. ANY MATERIAL THAT MAKES IT TO EXISTING PUBLIC ROADWAY SHALL BE REMOVED AND CLEANED IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE 8'-0" MAX 8'-0" MAX 14 GAUGE WIRE MESH BACKING APPROVED FILTERING FABRIC APPROVED UV Z PLACE #5 STONE RESISTANT SILT g I FILTER AGAINST FILTERING FABRICo FENCING WHERE SECURED TO WIRE 9 REQUIRED OR AS �13DIRECTED BY THE AT 6" O.C. ENGINEER. I I I 14 GAUGE WIRE I I I I I I I MESH BACKING I I I I F� 9" I I (6"x6" MAX OPNG.) I I I I Q O I I I I SECURE WITH I I 11 N Z I I ANCHOR TRENCH, I I NO. 8 STAPLE I I I I w I I CARRY WIRE AND I I I I 1 I w I I FABRIC 8" MIN. INTO LJ t.33LJ-_ LJ TRENCH, BACKFILL SOIL AND COMPACT LB/FT STEEL POSTS NOTES: 1. FOR AREAS OF EARTH BACKFILL, POSTS SHALL BE SET AT DEPTHS OF 4'-0" MIN. AND ANCHOR TRENCH IS TO BE 12"x12" WITH FILL TO BE COMPACTED. 2. PROVIDE ADEQUATE EXCAVATION AHEAD OF SILT FENCE TO ACT AS A VELOCITY BREAK AND SILT TRAP. 3. CONTRACTOR SHALL MAINTAIN AND REMOVE BUILT UP SEDIMENT ON FENCE AT PERIODIC INTERVALS OR AS DIRECTED BY INSPECTOR. 4. CONTRACTOR MAY USE ALTERNATE MATERIAL OR METHOD UPON APPROVAL FROM ENGINEER. g SILT FENCE C,9,1 NOT TO SCALE AREA TO BE DISTURBED CLASS I RIP -RAF FLOW FLOW "^ 57 SHED STONE FLOW NO. 57 STONE FLOOD STORAGE ZONE � O4- SEDIMENT - STORAGE ZONE MAXIMUM SEDIMENT DEPTH (CLEAN OUT LEVEL) EXISTING SLOPE NOTES 1. HEIGHT AND WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. 2. KEY RIP RAP INTO THE DAM FOR STABILIZATION. 3. DO NOT PLACE CHECK DAMS IN LIVE STREAMS. 'ISI PLAVIEW L --CLASS I RIP -RAP TER GEOTEXTILE RIP -RAP HEADWALL ROADWAY SHOULDER �'> FLOW PLANTING DATES � PIPE INVERT _ _ SEEDING SCHEDULE 1. TEMPORARY SEEDING PLANTING DATES GRASS TYPE POUNDS /ACRE DEC.1 - APR. 15 RYE (GRAIN) 120 KOBE LESPEDEZA 50 APR. 15 AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 1 RYE (GRAIN) 120 LIME 3,000 FERTILIZER 10-10-10 800 MULCH STRAW 4,000 1. PERMANENT SEEDING PLANTING DATES GRASS TYPE POUNDS / ACRE FEB. 15 - APR. 30 TALL FESCUE 200 & PENSACOLA BAHIAGRASS 50 SEP.1 - OCT. 30 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 LIME 4,000 FERTILIZER 10-10-10 1,000 MULCH STRAW 4,000 ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB / ACRE. SEEDING SCHEDULE C.9.1 NOT TO SCALE V _Z o >w LijLu U QQcc: CLUCO cr0Z ~ U ¢ZO z u_ v7 Z O w cr z Z w m 0 0 w y w Lu a 0 w w Q a ..��- 0 O \ INVERT i FLOW )` FLOW- PIPE / Z RIP RAP HEADWALL NO. 5 WASHED STONE 1' THICK x 3' HIGH } �pY1 z I � I / SEDIMENT ' I I I I' I I ' I I I O STORAGE I I 0 AREA W NOTF. 1. SEE GRAVEL & RIP RAP FILTER } BERM BASIN DETAIL TO PROTECT F EXISTING PIPE INVERTS THAT DRAIN Z 10 ACRES OR LESS O U W m O U W C9 0 W SECTION 6 ARC FILTER C.9.1 NOT TO SCALE CLASS B RIPRAP f 15, 1/2' 1' OF STORMWATER PIPE OUTLET TO FLAT AREA 12" OF #5 OR #57 2' MAX AT NO WELL DEFINED CHANNEL WASHED STONE o 2 CENTER 4 _ 8• , FILTER CLOTH SIDE VIEW NOTF. 1. SPACE CHECK DAMS IN A CHANNEL SO THAT THE CREST OF DOWNSTREAM DAM IS AT ELEVATION OF THE TOE OF UPSTREAM DAM. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION L B CHECK DAM SPACING g ROCK CHECK DAM \112 NOT TO SCALE PIPE OUTLET TO WELL DEFINED CHANNEL PLAN PLAN La SECTION A -A FILTER BLANKE SECTION A -A NOTES: 1. La IS THE LENGTH OF THE RIP -RAP APRON. (MIN. TRENCH WIDTH 6') 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". (12" MIN.) 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP -RAP AND SOIL FOUNDATION. CULVERT OUTLET TO 10 RIP -RAP PROTECTION DETAIL C.9.1 NOT TO SCALE m Y Q fL Z a o H Z w W X a LU Z O7 W jr 0 ~ J U) (3 Z Y U) ZEJ Lu J Z O U z O cr Z Q z 0 H Z W W U) +p w l 1 n++r PTH CAgO� �pFESS 0.•.y'9 041415 a 3.GLo18 F!VG IIA Qg�: AM 1 A�+v++• DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.9.1 ti N U t O Q, Q U 0 i O U c `-c X U V N O Q U Q E N U a _Q Q\ o U L6 Q)a.q) ��-NC) �co ('i -'j-cl- CLO a CN #57 WASHED STONE 2" x 2" STEEL POSTS 1/2"xt/2" WIRE MESH - N SECTION NOTES; 2" x 2" STEEL POSTS CATCH BASIN 1/2"x1/2" WIRE MESH #57 WASHED STONE 1. DRIVE POSTS INTO THE GROUND TO A DEPTH OF 1.5'. 2. WIRE MESH SHALL BE HARDWARE CLOTH (23 GAUGE MIN.) AND SHALL HAVE 1/4" MESH OPENINGS. BURY FABRIC 1' AND EXTEND TO THE TOP OF THE POSTS. 3. SEDIMENT CONTROL STONE SHALL BE #57 STONE. HEIGHT OF STONE AT WIRE MESH SHALL BE 12 INCHES. 4. FASTEN FABRIC SECURELY AT THE CORNER POSTS. INLET PROTECTION C.9.1 NOT TO SCALE i PLAN FOR DITCHES WITH HIGH VOLUME FLOWS, ROCK SLOPE PROTECTION MAY BE NEEDED PER STANDARD DETAIL NOTES: 1. 3:1 SIDE SLOPES UNLESS OTHERWISE NOTED ON PLANS. 2. PERMANENT - GRASS LINED 3. TEMPORARY - STRAW W/ NET OR DITCH LINER 4 TYPICAL DITCH 11C 91 NOT TO SCALE CLCVHI IVIN NOTCH AND FOLD FABRIC OVER HORIZONTAL POST 8" OF #57 WASHED STONE m NOTES: 1. INSTALL SILT FENCE PER STD. SILT FENCE DETAIL. a 2. LOCATE REINFORCED OUTLET AT LOW POINTS OF SILT FENCE BARRIER. 3. PLACE RIP RAP WITH CARE. DO NOT TEAR SILT FENCE FABRIC. SECTION STEEL POST WOVEN WIRE FABRIC HORIZONTAL POST SILT FENCE FABRIC CLASS 'B' RIP RAP (TYP) REINFORCED SILT FENCE OUTLET NOT TO SCALE ORIGINAL DITCH BOTTOM GRADE NEWLY EXCAVATED BASIN, EXCAVATE 1.5' BELOW EXIST. DITCH GRADE RA1 FILTER FABRIC) CLASS'B' EROSION CONTROL STONE CROSS SECTION ( PROFILE VIEW OF ROADSIDE DITCH ) ROCK CHECK DAM-,, 2' SEDIMENT STORAGE SEDIMENT TRAP BOTTOM DIMENSIONS 15'x 2', SIDE SLOPES 1.5:1, VOLUME 264 FT3 1 1 • 1 1 � PIPE INVERT Z 24' DRS f`�1cR'�^��i+n mit+• U M w CLASS W EROSION CONTROL STONE _ N N FILTER FABRIC /c (.I U . NATURAL GROUND 21" MIN. � .. 60, N u EL. VARIES d • • mow•%i r"�r'�i,�•I�• G 1.0' RA1 FILTER FABRIC) CLASS'B' EROSION CONTROL STONE CROSS SECTION ( PROFILE VIEW OF ROADSIDE DITCH ) ROCK CHECK DAM-,, 2' SEDIMENT STORAGE SEDIMENT TRAP BOTTOM DIMENSIONS 15'x 2', SIDE SLOPES 1.5:1, VOLUME 264 FT3 BERM BASIN DETAIL TO PROTECT z PIPE INVERT Z 24' DRS f`�1cR'�^��i+n mit+• U M w CLASS W EROSION CONTROL STONE _ N N FILTER FABRIC /c (.I U . NATURAL GROUND 21" MIN. � .. 60, N u EL. VARIES d E tp Z - moompW G 1.0' O t _ m G MIN. OHO a 1 J r 3.5' y 2.5' DEPTH o 0 1.5:1 SIDE SLOPE TLJJ y SEDIM NT STORAGE 1 2.0' 1 STONE SECTION ( AS SEEN LOOKING DOWN STREAM) TST - TEMPORARY SEDIMENT TRAP DETAIL TYPICAL FOR ROADSIDE DITCHES NOT TO SCALE NOTES: 1. CHECK BASIN AFTER EVERY RAINFALL WHICH CAUSES FLOW IN ROADSIDE DITCH. 2. REPLACE STONES WHICH ARE DISLODGED. 3. REPAIR ERODED ABUTMENTS WITH STONE. 4. WHEN BASIN IS % FULL CLEAN OUT SEDIMENT AND DISPOSE OF MATERIAL BY SPREADING AND SEEDING OR INCORPORATING INTO BACKFILLING OPERATIONS. 5. AFTER THE SITE IS STABILIZED, THE BASIN MUST BE REMOVED AND MATERIAL DISPOSED OF IN ACCORDANCE WITH THE SEDIMENT EROSION CONTROL POLLUTION ACT, 6. PAYMENT SHALL BE INCLUDED IN THE UNIT BID PRICE FOR OTHER ITEMS UNLESS SPECIFICLY REQUESTED BY THE ENGINEER. SEE BASIS OF PAYMENT FOR PAYMENT TERMS. 7. ALL TEMPORARY SEDIMENT TAPS SHOWN ON PLANS SHALL BE SIZED ACCORDING TO THIS DETAIL. 2--� TEMPORARY' SEDIMENT TRAP g,1 NOT TO SCALE RADIUS TO ACCOMODATE LARGE TRUCKS NCDOT #5 OR #57 WASHED STONE Z io 100' MIN. EXISTING 70'MIN. 30' MIN. NEW CONSTRUCTION ROADWAY 100 ;j, 6" MIN. 12" MIN. SECTION NOTES: 1. ENTRANCE APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABLIZED. 2. CONSTRUCTION ENTRANCE SHALL BE PLACED FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 3. PERIODIC TOP DRESSING AND ROUTINE MAINTENANCE SHALL BE PROVIDED ON ENTRANCE AS REQUIRED. CONTRACTOR SHALL STOCKPILE FRESH STONE ON SITE. 4. ANY MATERIAL THAT MAKES IT TO EXISTING PUBLIC ROADWAY SHALL BE REMOVED AND CLEANED IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE LA AUGE WIRE H BACKING ROVED ERING FABRIC APPROVED UVZ CE #5 STONE RESISTANT SILT ER AGAINST FILTERING FABRICCING WHERE SECURED TO WIRE UIRED OR AS ECTED BY THE AT 8" O.C. INEER. 1 1 14 GAUGE WIRE I I I I W 7 1� p• I I MESH BACKING I I ♦f I I (6"x6" MAX OPNG.) 1 1 1 1 9 0 1 1 I I SECURE WITH I I I I iN Z I I ANCHOR TRENCH, 1 1 NO. 8 STAPLE I I I I w I I CARRY WIRE AND I I II I I N 11 FABRIC 8" MIN. INTO LJ t.33 LJ LJ TRENCH, BACKFILL SOIL AND COMPACT LB/FT STEEL POSTS NOTES: 1. FOR AREAS OF EARTH BACKFILL, POSTS SHALL BE SET AT DEPTHS OF 4'-0" MIN. AND ANCHOR TRENCH IS TO BE 12"x12" WITH FILL TO BE COMPACTED. 2. PROVIDE ADEQUATE EXCAVATION AHEAD OF SILT FENCE TO ACT AS A VELOCITY BREAK AND SILT TRAP. 3. CONTRACTOR SHALL MAINTAIN AND REMOVE BUILT UP SEDIMENT ON FENCE AT PERIODIC INTERVALS OR AS DIRECTED BY INSPECTOR. 4. CONTRACTOR MAY USE ALTERNATE MATERIAL OR METHOD UPON APPROVAL FROM ENGINEER. g SILT FENCE C.9.1 NOT TO SCALE CLASS I FLC FLOW AREA TO BE NO. 57 WASHED DISTURBED STONE FLOOD STORAGE ZONE TzO� SEDIMENT � STORAGE ZONE MAXIMUM SEDIMENT DEPTH (CLEAN OUT LEVEL) EXISTING SLOPE NOT ES 1. HEIGHT AND WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. 2. KEY RIP RAP INTO THE DAM FOR STABILIZATION. 3. DO NOT PLACE CHECK DAMS IN LIVE STREAMS. I PLAN VIEW CLASS B RIPAP OF STORMWATER 12" OF #5 OR #57-• WASHED STONE C!E FILTER CLOTH) SIMV( 57 SHED STONE FLOW ROADWAY SHOULDER 7 FLOW } BERM BASIN DETAIL TO PROTECT z PIPE INVERT Z Q DRS f`�1cR'�^��i+n mit+• U M w PROJECT NO.: r N U _ N N O Z m (.I U . r 8 �J ZN • N u CLASS B RIPAP OF STORMWATER 12" OF #5 OR #57-• WASHED STONE C!E FILTER CLOTH) SIMV( 57 SHED STONE FLOW ROADWAY SHOULDER 7 FLOW } BERM BASIN DETAIL TO PROTECT z PIPE INVERT Z 1/2'-1' 4 2'M AX AT 2 CENTER �1 NOTF. 1. SPACE CHECK DAMS IN A CHANNEL SO THAT THE CREST OF DOWNSTREAM DAM IS AT ELEVATION OF THE TOE OF UPSTREAM DAM. L = THE DISTANCE SUCH �UAr Dnuirc A Aran D ADE 9 ROCK CHECK DAM C.9.1 NOT TO SCALE i SEEDING SCHEDULE SEED: THE MIXTURE OF SEED IN ALL DISTURBED AREAS INCLUDING NCDOT RIGHTS-OF-WAY SHALL BE THE FOLLOWING: 1. SEPT 1 - APRIL 1 NCDOT ONLY 75 POUNDS/ACRE KENTUCKY 31 FESCUE 50 POUNDS/ACRE BAHIAGRASS (WILMINGTON, IF AVAILABLE, PENSACOLA OTHERWISE) 2. APRIL 1 - SEPT 1 NCDOT ONLY 75 POUNDS/ACRE BAHIAGRASS (WILMINGTON, IF AVAILABLE, PENSACOLA OTHERWISE) 50 POUNDS/ACRE KENTUCKY 31 FESCUE 35 POUNDS/ACRE BROWNTOP MILLET OR SORGHUM SUDAN HYBRIDS 3. WHERE A "TURF" TYPE GRASSED AREA IS REQUIRED THE FOLLOWING MIXTURE SHALL BE USED: 20 POUNDS/ACRE COMMON BERMUDAGRASS (UNHULLED) 70 POUNDS/ACRE KENTUCKY 31 FESCUE A. IF SEEDING OCCURS BETWEEN THE MONTHS OF NOVEMBER AND FEBRUARY, RYE GRAIN SHALL BE PROVIDED IN ADDITION TO THE ABOVE AT A RATE OF 25 POUNDS/ACRE. ALL SEEDED AREAS SHALL BE CULTIPACKED TO FIRM SEED BED AND COVER SEED. SHOULD THE PERMANENT SEED NOT GERMINATE AND PRODUCE A STAND OF GRASS, THE AREAS SO EFFECTED SHALL BE RESEEDED UNTIL A PERMANENT STAND IS ESTABLISHED. �3 SEEDING SCHEDULE C.9.1 NOT TO SCALE V Z Z >0WO U ry�ryQ LL_ Cc J F- �cl-z O U QZcrO Z LL_ LL jjjj cc INVERT / FLOW FLOW-► PIPE / Z RIP RAP HEADWALL NO. 5 WASHED STONE l' THICK x 3' HIGH ��G N z VO o Lu AV / m I 0 SSEDIMENT Lu TORAGE I I I I II I 0 AREA w 6 NOTF. 1. SEE GRAVEL & RIP RAP FILTER } BERM BASIN DETAIL TO PROTECT z EXISTING PIPE INVERTS THAT DRAIN Z Q DRS CHECKED BY: U M w PROJECT NO.: r N U _ N N O Z m (.I U . r 8 �J ZN = N u d E tp Z - moompW y O t _ m G C) a 1 J r y � N 0 m TLJJ y jjjj cc INVERT / FLOW FLOW-► PIPE / Z RIP RAP HEADWALL NO. 5 WASHED STONE l' THICK x 3' HIGH ��G N z VO o Lu AV / m I 0 SSEDIMENT Lu TORAGE I I I I II I 0 AREA w 6 NOTF. 1. SEE GRAVEL & RIP RAP FILTER } BERM BASIN DETAIL TO PROTECT F - EXISTING PIPE INVERTS THAT DRAIN Z 10 ACRES OR LESS DRS CHECKED BY: U w PROJECT NO.: m 2 DATE: O FEBRUARY 2018 Lu c7 O W ARCI FILTER NOT TO SCALE PIPE OUTLET TO FLAT AREA NO WELL DEFINED CHANNEL u� PIPE OUTLET TO WELL DEFINED CHANNEL PLAN PLAN La'1 LaM. d SECTION A -A FILTER BLANKE SECTION A -A NOTES: 1. La IS THE LENGTH OF THE RIP -RAP APRON. (MIN. TRENCH WIDTH 6') 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". (12" MIN.) 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP -RAP AND SOIL FOUNDATION. CULVERT OUTLET TO RIP -RAP PROTECTION DETAIL NOT TO SCALE Q a Z Q O -cn cr �w cj) I. 0 W Z co w Q caJ 0 Z Y n,ur C.n J LL! 0 J 0 Z 0 Z w Lli0 z Z 0 H Q Z LLI Lu Fj) •1 041/415q C •�i1�:.°!VGINE "Q`°.: r \1 IF + •. AM A. '+411 16%, DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.9.1