Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00251_Compliance Evaluation Inspection_20180309
ROY COOPER Governor MICHAEL S.REGAN Secretary Water Resources LINDA CULPEPPER Environmental Quality Interim Director March 9,2018 Town of Stoneville Attn: Ken Gamble, Town Administrator P.O. Box 71 Stoneville, NC 27048REOEI�E®I®EN�®WR Subject: Compliance Evaluation Inspection MAR ` 1 2018 Permittee: Town of Stoneville Facility: Town of Stoneville Wastewater Collection System Water ReS$ect on Permit#: WQCS00251 perm►tting Rockingham County Dear Mr. Gamble: Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Resources (DWR or the Division) conducted a compliance evaluation inspection (CEI) of the Town of Stoneville's wastewater collection system (WWCS) on March 8, 2018. The assistance and cooperation of Mark Malloy, Anthony Smith, and Chad Manual was greatly appreciated. An inspection checklist is attached for your records and inspection findings are summarized below. Site/System Review 1. The following system components were inspected: a. The Church Street pump station (PS)was evaluated. No discrepancies/violations were noted. b. The Lemon Street PS was evaluated. No discrepancies/violations were noted. 2. As you are aware,your permit contains numerous requirements with which the Town of Stoneville must comply. Your compliance status with each of these requirements is summarized below: Part I, Performance Standards a. Part I, Paragraph 2: The wastewater collection system shall be effectively managed, maintained and operated at all times so that there is no sanitary sewer overflow (SSO) to land or surface waters, nor any contamination of groundwater. In the event that the wastewater collection system fails to perform satisfactorily,including the creation of nuisance conditions,the Permittee shall take immediate corrective actions, including actions that may be required by the Division of Water Resources, formerly Division of Water Quality, or the Division, such as the construction of additional or replacement sewer lines and/or equipment. uEng Co pares`"-4-..- State of North Carolina I Environmental Quality 450 W.Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105 Phone 336-776-9800 FAX.336-776-9797 Observations: In full consideration of all observations made during the inspection, the Town of Stoneville is hereby deemed compliant with this permit condition. Compliance Status: Compliant b. Part I, Paragraph 3: The Permittee shall establish by ordinance its legal authority to require that new sewers be properly constructed; to ensure proper inspection and testing of sewer mains and service laterals;to address flows from satellite systems and to take enforcement action as required by Condition 1(4). Observations: The Town's sewer use ordinance (SUO) was reviewed and found to meet minimum requirements. Compliance Status: Compliant c. Part I, Paragraph 4: The Permittee shall develop and implement an educational fats, oils and grease program targeted at both residential and non-residential users. The Permittee shall also develop and implement an enforceable fats, oils and grease (FOG) program for non-residential users under which the Permittee can take enforcement against users who have not properly installed, operated and maintained grease traps or grease interceptors as directed or otherwise violated the terms of the local ordinance pertaining to fats, oils and grease. Observations: As far as the Town's grease enforcement program, they have identified four grease traps and they are inspected semi-annually. The Town's FOG educational program meets requirements. Grease education materials are distributed to all residents twice per year. They were last distributed in June and October,2017. Compliance Status: Compliant d. Part I, Paragraph 5: The Permittee shall adopt and implement a Capital Improvement Plan (CIP) to designate funding for reinvestment into the wastewater collection system infrastructure.The CIP should address the short-term needs and long-term "master plan" concepts. The CIP should typically cover a three to five year period and include a goal statement, a description of the project area, a description of the existing facility, known deficiencies (over a reasonable period) and forecasted future needs. Cost analysis is integral to the CIP. Observations: The CIP was reviewed and found to meet all requirements. It covers the period 2017 through 2022. Compliance Status: Compliant e. Part I, Paragraph 6: Existing overflow piping from manholes and pump stations,excluding piping to approved equalization structures, known or discovered after permit issuance shall be immediately removed or permanently capped. Plugged emergency pumping connections are allowable for portable pumping or rerouting without intentionally bypassing the wastewater treatment facility. Observations: No such overflows were identified during the inspection. Compliance Status: Compliant f. Part I, Paragraph 7: The Permittee shall maintain a contingency plan (PSCP)for pump failure at each pump station. If one of the pumps in a pump station containing multiple pumps fails, the process of repairing or replacing the pump shall be initiated immediately and the new parts or pump shall be installed as soon as possible. If the pump in a simplex pump station fails, it shall be replaced immediately. Observations: The Town has a PSCP that meets requirements and it is posted at all PSs. Compliance Status: Compliant g. Part I, Paragraph 8: Each pump station shall be clearly and conspicuously posted with a pump station identifier and an emergency contact telephone number at which an individual who can initiate or perform emergency service for the wastewater collection system 24 hours per day,seven days per week can be contacted. This emergency contact telephone number shall be coupled with instructions that the emergency contact should be called if the visual alarm illuminates, if the audible alarm sounds, or if an emergency is apparent. Observations: All PSs inspected had the required signage. Compliance Status: Compliant h. Part I, Paragraph 9: Pump station sites,equipment and components shall have restricted access, per 15A NCAC 2H .0219(h)(7). Observations: All PSs inspected were sufficiently secured to provide restricted access. Compliance Status: Compliant i. Part I, Paragraph 10: Pump stations that do not employ an automatic polling feature (i.e. routine contact with pump stations from a central location to check operational status of the communication system)shall have both audible and visual (NV)high water alarms. The alarms shall be weather- proof and placed in a clear and conspicuous location. Permits issued for the construction of pump stations that included high water alarms in the description must maintain the alarms even if simple telemetry (i.e. notification of an alarm condition initiated by the pump station control feature) is installed. Observations: All PSs have both audible and visual alarms, as well as cellular SCADA systems. Compliance Status: Compliant j. Part I, Paragraph 11: For all newly constructed, modified and rehabilitated pump stations, all equipment and components located within the pump station shall be corrosion-resistant and components in close proximity of the pump station shall be sealed within a corrosion-resistant coating or encasement. Observations: None of the inspected components had what would be considered excessive corrosion. It is assumed that the Town would require such materials in the design of all such equipment/components. Compliance Status: Compliant k. Part I, Paragraph 12: All construction and rehabilitation of the wastewater collection system (i.e., permitted or deemed permitted) shall be scheduled to minimize the interruption of service by the existing utilities. Construction and rehabilitation shall not result in the violation of Condition 1.2. of this permit. Observations: No conditions that demonstrate noncompliance with this permit condition were observed during the inspection. Compliance Status: Compliant Part II, Operation and Maintenance Requirements I. Part II, Paragraph 1: Upon classification of the collection system by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall designate and employ a certified operator to be in responsible charge(ORC)and one or more certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The ORC shall visit the system within 24 hours of knowledge of a bypass,spill,or overflow of wastewater from the system, unless visited by the Back-Up ORC, and shall comply with all other conditions of 15A NCAC 8G .0204. Observations: The Town has designated Mark Malloy as ORC and Ken Gamble as BORC. Both are properly certified. Compliance Status: Compliant m. Part II, Paragraph 2: The Permittee shall develop and adhere to a schedule for reviewing all inspection, maintenance, operational and complaint logs. If the review process results in the identification of any recurring problem in the wastewater collection system,that cannot be resolved in a short time period, the Permittee shall establish a plan for addressing the problem(s). Observations: Mr. Malloy reviews all paperwork and signs and dates it as it is generated. Compliance Status: Compliant n. Part II,Paragraph 3: The Permittee shall develop and adhere to a schedule for testing emergency and standby equipment. Observations: All PSs have generators and they are run manually once per week under load. Some also run automatically at separate times. Compliance Status: Compliant o. Part II, Paragraph 4: The Permittee shall develop and implement a routine pump station inspection and maintenance program, which shall include, but not be limited to, the following maintenance activities: 1. Cleaning and removing debris from the pump station structure, outside perimeter, and wet well; 2. Inspecting and exercising all valves; 3. Inspecting and lubricating pumps and other mechanical equipment according to the manufacturer's recommendations; and 4. Verifying the proper operation of the alarms, telemetry system and auxiliary equipment. Observations: The logs that the Town uses for PS inspections cover all the above required items. Compliance Status: Compliant p. Part II, Paragraph 5: For each pump station without pump reliability (i.e. simplex pump stations serving more than a single building or pump stations not capable of pumping at a rate of 2.5 times the average daily flow rate with the largest pump out of service),at least one fully operational spare pump capable of pumping peak flow shall be maintained on hand. Observations: All PSs are at least duplex and have two pumps with the'required capacity. Compliance Status: Compliant q. Part II, Paragraph 6: The Permittee shall maintain on hand at least two percent of the number of pumps installed,but no less than two pumps,that discharge to a pressure sewer and serve a single building, unless the Permittee has the ability to purchase and install a replacement pump within 24 hours of first knowledge of the simplex pump failure or within the storage capacity provided in any sewer line extension permit. Observations: There are no such PSs within the Town's WWCS. Compliance Status: Not Applicable r. Part II, Paragraph 7: Rights-of-way (ROW) and/or easements shall be properly maintained to allow accessibility to the wastewater collection system unless the Permittee can demonstrate the ability to gain temporary access in an emergency situation where existing land-use conditions do not allow the establishment and maintenance of permanent access. In this case, the Permittee shall continue to observe the lines visually, utilize remote inspection methods(e.g.CCTV)and use the opportunity of drier conditions to perform further inspections and necessary maintenance. Observations: All rights-of-way are in good condition. 1 Compliance Status: Compliant s. Part II, Paragraph 8: The Permittee shall assess cleaning needs and develop and implement a program for appropriately cleaning, whether by hydraulic or mechanical methods, all sewer lines. At least 10 percent of the wastewater collection system, selected at the discretion of the ORC, shall be cleaned each year. Preventative cleaning is not required for sewer lines less than five years old unless inspection otherwise reveals the need for cleaning or cleaning is required by a sewer line extension permit. Observations: The Town has about 15.62 miles, or 82,474 feet, of gravity sewer, and therefore must clean 1.562 miles, or 8,247 feet of sewer annually. For 2017/2018 the Town cleaned 10,391 feet of sewer, exceeding their annual requirement by over 2,000 feet. Compliance Status: Compliant t. Part II, Paragraph 9: Adequate measures shall be taken to contain and properly dispose of materials associated with SSOs. The Permittee shall maintain a Response Action Plan that addresses the following minimum items: 1.Contact phone numbers for 24-hour response, including weekends and holidays; 2.Response time; 3.Equipment list and spare parts inventory; 4.Access to cleaning equipment; 5.Access to construction crews, contractors and/or engineers; 6.Source(s) of emergency funds; 7.Site sanitation and clean up materials; and 8.Post-SSO assessment. Observations: The Town's Spill Response Action Plan (SRAP)was reviewed. It meets all permit requirements. Compliance Status: Compliant u. Part II, Paragraph 10: The Permittee,or their authorized representative, shall conduct an on-site evaluation for all SSOs as soon as possible, but no more than two hours after first knowledge of the SSO. Observations: Mr. Boone noted no conditions during the inspection which demonstrate noncompliance with this permit condition. Compliance Status: Compliant v. Part II,Paragraph 11: In the event of a SSO or blockage within the wastewater collection system, the Permittee shall restore the system operation, remove visible solids and paper, sanitize any ground area and restore the surroundings. 1 Observations: No conditions were noted that demonstrate noncompliance with this permit condition. Compliance Status: Compliant Part III, Records w. Part III, Paragraph 1: Records shall be maintained to document compliance with Conditions 1(4), 11(2) - 11(4), 11(7) - 11(8), IV(3) and V(1)-V(4). Records shall be kept on file for a minimum of three years. Observations: All required records were present for the inspection. Compliance Status: Compliant x. Part III, Paragraph 2: The Permittee shall maintain adequate records pertaining to SSOs, and complaints for a minimum of three years. These records shall include, but are not limited to, the following information: 1.Date of SSO or complaint; 2.Volume of wastewater released as a result of the SSO and/or nature of complaint; 3.Location of the SSO and/or complaint; 4.Estimated duration of the SSO; 5.Individual from the Division who was informed about the SSO and/or complaint,when applicable; 6.Final destination of the SSO; 7.Corrective actions; 8.Known environmental/human health impacts resulting from the SSO; and 9.How the SSO was discovered. Observations: The Town now has a computer-based work order system that records all complaints. SSO files are kept on file in Public Works. Compliance Status: Compliant y. Part HI, Paragraph 3: The Permittee shall maintain an up-to-date, accurate, comprehensive map of its wastewater collection system that also notes the locations where other wastewater collection systems become tributary. If a comprehensive map of the collection system has not been established, a rough sketch shall be drawn. The Permittee shall map approximately 10 percent of its existing collection system each year for the next ten years, or until complete, whichever is sooner. The comprehensive map shall include, but is not limited to: pipe size, pipe material, pipe location, flow direction, approximate pipe age, number of active service taps, and each pump station identification, location and capacity. Observations: The Town's WWCS map shows all required information. Compliance Status: Compliant z. Part III, Paragraph 4: The Permittee shall maintain records of all of the modifications and extensions to the collection system permitted herein. The Permittee shall maintain a copy of the construction record drawings and specifications for modifications/extensions to the wastewater collection system for the life of the modification/extension. Information concerning the extension shall be incorporated into the map of the wastewater collection system within one year of the completion of construction. The system description contained within this permit shall be updated to include this modification/extension information upon permit renewal. Observations;All such construction record drawings and specifications are kept for the life of the system and all such extensions are added to the map within one year of construction completion. Compliance Status: Compliant Part IV, Monitoring and Reporting Requirements aa. Part IV, Paragraph 2: The Permittee shall verbally report to a Division of Water Resources staff member at the Winston-Salem Regional Office, at telephone number 336-776-9800 as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: 1.Any SSO and/or spill over 1,000 gallons; or 2.Any SSO and/or spill, regardless of volume,that reaches surface water. Observations: To the best of our knowledge,the Town has reported all SSOs as required by the permit. Compliance Status: Compliant bb. Part IV,Paragraph 3: The Permittee shall meet the annual reporting and notification requirements provided in North Carolina General Statute§143-215.1C. Observations: The daily flow for the Town is less than 200,000 gallons; therefore, submittal of an annual report is not required. Compliance Status: Compliant Part V, Inspections cc. Part V, Paragraph 1: The Permittee or the Permittee's designee shall inspect the wastewater collection system regularly to reduce the risk of malfunctions and deterioration, operator errors, and other issues that may cause or lead to the release of wastes to the environment, threaten human health or create nuisance conditions. The Permittee shall keep an inspection log or summary including, at a minimum, the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. Observations: The system is well maintained and all maintenance is properly and sufficiently documented. Compliance Status: Compliant dd. Part V, Paragraph 2: Pump stations without Supervisory Control and Data Acquisition (SCADA) systems or telemetry shall be inspected everyday(i.e.365 days per year). Pump stations equipped with SCADA systems or telemetry shall be inspected at least once per week. Observations: Currently, all PSs are inspected once per week on Fridays. All PSs have both audible and visible alarms and cellular-based SCADA systems. Compliance Status: Compliant ee. Part V, Paragraph 3: A general observation of the entire collection system shall be performed throughout the course of every year. Observations: Mr. Malloy performs and records the annual general observation of the entire system as required by the permit. Compliance Status: Compliant ff. Part V, Paragraph 4: Inspections of all high priority lines (i.e. aerial line, sub-waterway crossing, line contacting surface waters, siphon, line positioned parallel to stream banks that are subject to eroding in such a manner that may threaten the sewer line, or line designated as high-priority in a permit)shall be performed at least once per every six month period of time. New high priority lines installed or identified after permit issuance are incorporated by reference and subject to this permit condition until permit renewal where they shall be referenced in writing. Observations: High priority lines are inspected and the inspections are recorded as required. Compliance Status: Compliant Please be aware that in accordance with NC General Statute 143-215.6A, violations are subject to civil penalty assessments not to exceed$25,000 per day, per violation. Mark and his crew have done an excellent job of ensuring the town's collection system program is in compliance with all requirements. Please keep up the good work in operating and maintaining the Stoneville collection system. If you have any questions regarding the compliance inspection or this letter, please give Mr. Boone or me a call at(336) 776-9800. Thank you for your cooperation in this matter. Sincerely, iteux.2V-• 14,,:p- Sherri V. Knight, P.E. Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: 1. Inspection Report CC: WSRO-SWP Central Files PERCS Unit Town of Stoneville Attn: Mark Malloy, Operator in Responsible Charge P.O. Box 71 Stoneville, NC 27048 Compliance Inspection Report Permit: WQCS00251 Effective: 06/01/13 Expiration: 05/31/21 Owner: Town of Stoneville SOC: Effective: Expiration. Facility: Stoneville Collection System County. Rockingham PO Box 71 Region: Winston-Salem Stoneville NC 27048 Contact Person: Kenneth W Gamble Title: Phone 336-573-9393 • Directions to Facility: System Classifications: CSI, Primary ORC: Mark Allen Malloy Certification: 986923 Phone: 336-573-9393 Secondary ORC(s): On-Site Representative(s): Related Permits: NC002801I Town of Stoneville-Stoneville WWTP Inspection Date. 03/08/2018 Entry Time: 09 OOAM Exit Time: 11 OOAM Primary Inspector: Ron Boone Phone: 336-776-9690 /%7 2_ i / Secondary Inspector(s): I �, 5 Paul DiMatteo Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: • Compliant Not Compliant Question Areas: El Miscellaneous Questions El Performance Standards • Operation&Maint Reqmts ▪ Records II Monitoring&Rpting Reqmts II Inspections • Pump Station • Lines (See attachment summary) Page• 1 I Permit WQCS00251 Owner-Facility.Town of Stoneville Inspection Date• 03/08/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary Please refer to the attached inspection summary letter Page 2 Permit. WQCS00251 Owner-Facility:Town of Stoneville Inspection Date. 03/08/2018 Inspection Type•Collection System Inspect Non Sampling Reason for Visit. Routine Performance Standards Yes No NA NE Is Public Education Program for grease established and documented? • 0 0 0 What educational tools are used'? Flyers distributed twice per year and displayed in town hall. Is Sewer Use Ordinance/Legal Authority available'? • 0 0 0 Does it appear that the Sewer Use Ordinance is enforced'? • 0 0 0 Is Grease Trap Ordinance available'? • 0 0 0 Is Septic Tank Ordinance available(as applicable,i e annexation) 0 0 0 II List enforcement actions by permittee,if any,in the last 12 months Has an acceptable Capital Improvement Plan(CIP)been implemented? • 0 0 0 Does CIP address short term needs and long term\"master plant"concepts'? • 0 0 0 Does CIP cover three to five year period? • 0 0 0 Does CIP include Goal Statement? • 0 0 0 Does CIP include description of project area? • 0 0 0 Does CIP include description of existing facilities? • 0 0 0 Does CIP include known deficiencies? • 0 0 0 Does CIP include forecasted future needs? • 0 0 0 Is CIP designated only for wastewater collection and treatment? • 0 0 0 Approximate capital improvement budget for collection system? $3,165,000 00 Total annual revenue for wastewater collection and treatment's CIP Comments None Is system free of known points of bypass? • 0 0 0 If no,descnbe type of bypass and location Is a 24-hour notification sign posted at ALL pump stations? • 0 0 0 #Does the sign include Instructions for notification'? • 0 0 0 Pump station identifier? • 0 0 0 24-hour contact numbers • 0 0 0 If no,list deficient pump stations #Do ALL pump stations have an"auto polling"feature/SCADA? • 0 0 0 Number of pump stations 5 Number of pump stations that have SCADA 5 Number of pump stations that have simple telemetry 5 Number of pump stations that have only audible and visual alarms 5 Number of pump stations that do not meet permit requirements 0 Page 3 Permit WQCS00251 Owner-Facility:Town of Stoneville Inspection Date: 03/08/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit Routine #Does the permittee have a root control program? 0 0 0 U #If yes,date implemented? Describe Comment None Inspections Yes No NA NE Are maintenance records for sewer lines available? • ❑ 0 0 Are records available that document pump station inspections? • 0 0 0 Are SCADA or telemetry equipped pump stations inspected at least once a week? • 0 0 0 Are non-SCADA/telemetry equipped pump stations inspected every day? ❑ ❑ • 0 Are records available that document citizen complaints? • 0 0 0 #Do you have a system to conduct an annual observation of entire system? • 0 ❑ ❑ #Has there been an observation of remote areas in the last year? • ❑ ❑ ❑ Are records available that document inspections of high-prionty lines? • 0 0 0 Has there been visual inspections of high-priority lines in last six months? • 0 0 0 Comment None Operation&Maintenance Requirements Yes No NA NE Are all log books available? • 0 0 0 , Does supervisor review all log books on a regular basis? • 0 ❑ ❑ Does the supervisor have plans to address documented short-term problem areas? • 0 0 ❑ What is the schedule for reviewing inspection,maintenance,&operations logs and problem areas? As generated Are maintenance records for equipment available? • 0 0 0 Is a schedule maintained for testing emergency/standby equipment? • 0 ❑ ❑ What is the schedule for testing emergency/standby equipment? Weekly or more Do pump station logs include Inside and outside cleaning and debris removal? • 0 ❑ ❑ Inspecting and exercising all valves? • 0 ❑ ❑ Inspecting and lubncating pumps and other equipment? • 0 0 0 Inspecting alarms,telemetry and auxiliary equipment? • 0 ❑ 0 Is there at least one spare pump for each pump station w/o pump reliability? ❑ ❑ U 0 Are maintenance records for right-of-ways available? 111 0 ❑ 0 Are right-of-ways currently accessible in the event of an emergency? • 0 ❑ 0 Are system cleaning records available? • 0 ❑ 0 Has at least 10%of system been cleaned annually? • 0 ❑ 0 What areas are scheduled for cleaning in the next 12 months? Is a Spill Response Action Plan available? • 0 0 0 Page 4 - Permit. WQCS00251 Owner-Facility:Town of Stoneville Inspection Date. 03/08/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include 24-hour contact numbers • 0 0 0 Response time • 0 0 0 Equipment list and spare parts inventory • 0 0 0 Access to cleaning equipment • 0 0 0 Access to construction crews,contractors,and/or engineers • 0 0 0 Source of emergency funds • 0 0 0 Site sanitation and cleanup materials • 0 0 0 Post-overflow/spill assessment • 0 0 0 Is a Spill Response Action Plan available for all personnel? • 0 0 0 Is the spare parts inventory adequate? • 0 0 0 Comment None Records Yes No NA NE Are adequate records of all SSOs,spills and complaints available'? • 0 0 0 Are records of SSOs that are under the reportable threshold available'? • 0 0 ❑ Do spill records indicate repeated overflows(2 or more in 12 months)at same location'? 0 MI 0 0 If yes,is there a corrective action plan'? 0 0 IN 0 Is a map of the system available'? • 0 0 0 Does the map include Pipe sizes • 0 0 0 Pipe matenals • 0 0 0 Pipe location • 0 ❑ 0 Flow direction • 0 0 0 Approximate pipe age • 0 0 0 Number of service taps • 0 0 0 Pump stations and capacity • 0 0 0 If no,what percent is complete'? List any modifications and extensions that need to be added to the map #Does the permittee have a copy of their permit'? • 0 0 0 Comment None Monitoring and Reporting Requirements Yes No NA NE Are copies of required press releases and distribution lists available'? • 0 0 0 Are public notices and proof of publication available'? • 0 0 0 #Is an annual report being prepared in accordance with G S 143-215 1C'? El 0 II ❑ #Is permittee compliant with all compliance schedules in the permits'? 0 0 U 0 If no,which one(s)? Page• 5 I Permit: WQCS00251 Owner-Facility:Town of Stoneville Inspection Date: 03/08/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit: Routine Comment None CHURCH STR PS - Church Pump Station Yes No NA NE Pump station type Duplex Are pump station logs available? • 0 0 0 Is it accessible in all weather conditions? II 0 0 0 #Is general housekeeping acceptable? • 0 0 0 Are all pumps present? • 0 0 0 Are all pumps operable? • 0 0 ❑ Are wet wells free of excessive debris'? • 0 0 0 Are upstream manholes free of excessive debns/signs of overflow? • 0 0 0 Are floats/controls for pumps/alarms operable? • 0 0 0 Is"auto polling"feature/SCADA present? • 0 0 0 Is"auto polling"feature/SCADA operational? • 0 0 0 Is simple telemetry present? • ❑ ❑ ❑ Is simple telemetry operational? • ❑ ❑ 0 Are audio and visual alarms present? • 0 0 0 Are audio and visual alarms operable'? • 0 0 0 Is the Pump station inspected as required? • 0 0 0 Are backflow devices in place? • 0 0 0 Are backflow devices operable? II 0 0 0 Are air relief valves in place? • 0 0 0 Are air relief valves operable? • 0 0 ❑ # Is an emergency generator available? • 0 0 0 Can the emergency generator run the pumps? • 0 0 0 Is the pump station equipped for quick hook-up? 0 0 U 0 Is the generator operable? • ❑-❑ 0 #Is fuel in tank and sufficient? • 0 0 0 Is the generator inspected according to their schedule? • 0 0 0 Is a 24-hour notification sign posted? • 0 0 0 Does it include Instructions for notification? • ❑ 0 ❑ Pump station identifier? • 0 0 0 Emergency phone number • 0 0 0 Is public access limited? • 0 0 0 Is pump station free of overflow piping'? • 0 0 0 Page 6 ❑ w ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ a ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 . 00 ❑ ❑ ❑ ❑ ❑ M ❑ & ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ m m • ƒ ƒ / •• • • • • • • • • • • • • • • • • • • ❑ • • • • • • • 2 8 0 2 E (0 z a) a) 2 { § / 3 2 2 k - 11— 0 £ E o . § w § a t o 2 - @ % 2 co ; w c- 2 - C § ._ ■ '0 g CO g M _ $ o E C § k k ] f •k o > a) f 2 _ o e 2 G B a 0 CL F 7 QS C C \ ( co k 0 » § w / \ a 13 c w G 2 E2 6 2 01 P k ° o C k - E c ° k ° # 1 2 Zr) 0 m a) & < < c § © $ m w @ © A % co % o k k Co > a s § § % u) E 2 ( \ Is e 9 & k a f co @ CO © 0- 0 * s a $ $ § •m g e a k / 7 © # k / ± © © 7 2 - £ _ E E ƒ § a @ % f © e & a s@ t & = a 0 - 2 @ e e e Q = . 0 o E k W o 76e © s © m - 2 k a" L" 2 , § ° ® @@ e . 2 r k 2 W C Q a ° > , 2 e e . o A _ C $ 2 a 0a. g s o@ E 2 _ _ E ' > 2 2 2 - © © E a o o f a > § c e £ # E mi 2 > > E e E « ° 10 R ° c 2 \ E & 2 E § 5 - 2 C 2 a C § k E t @ a g E E 2 © 2 - a a ® e 9- k § 7 % © e E e = e = k e 2 $ 7 9 § a) » £ . E a e a) o g = g 2 p 7 G - © E ` a)CO k a 7 § [ 2 k k g g k g k k k k k % •-• 0 w 7 $ 7 § k k I 2 0 w = = 2 - 2 a) e a) e a) - - 2 2 _ 2 2 2 2 - • Ci 2 < O a a 0- < 2 * < < < < < 2 2 2 2 < < 2 < < < < ■ S i 2 a V Permit: WQCS00251 Owner-Facility:Town of Stoneville Inspection Date. 03/08/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit. Routine Is public access limited? • 0 0 ❑ Is pump station free of overflow piping? • 0 0 0 Is the pump station free of signs of overflow? • 0 0 0 Are run times comparable for multiple pumps? , yes Comment. None STONE STREET HPL#1 - S Lines/Right-of-Ways/Aerie)Lines Yes No NA NE Is right-of-way accessible for emergency'? 0 0 0 0 Is right-of-way free of sinkholes or depressions'? 0 0 0 0 Is line/right-of-way free of evidence of leakage'? 0 0 0 0 #Are there areas of exposed line's 0 0 0 0 #Is any exposed line constructed of ductile iron or other approved material? 0 0 0 0 Are water crossing and supports in good condition'? 0 0 0 0 #Is right-of-way free of non-utility motorized traffic? 0 0 0 0 Is line free of visible damage'? 0 0 0 0 #Are there siphons in this system'? 0 0 0 0 If yes,are they maintained and documented'? Comment STONE STREET HPL#2 - S Lines/Right-of-Ways/Aerie!Lines Yes No NA NE Is right-of-way accessible for emergency'? 0 0 0 0 Is right-of-way free of sinkholes or depressions'? 0 0 0 0 Is line/right-of-way free of evidence of leakage'? 0 0 0 ❑ #Are there areas of exposed line'? 0 0 0 0 #Is any exposed line constructed of ductile iron or other approved material'? 0 0 0 0 Are water crossing and supports in good condition'? 0 0 0 0 #Is right-of-way free of non-utility motorized traffic'? 0 0 0 0 Is line free of visible damage'? 0 0 0 0 #Are there siphons in this system'? 0 0 0 0 If yes,are they maintained and documented'? Comment Page 8