HomeMy WebLinkAboutNC0036277_Compliance Inspection (BIMS Report)_20180320United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCO036277 111 12 I 18/03/16 I17 18 I S i 19 LG] i 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 2.0 70 Id I 71 I.. I 72 I �, I 73 �74 751 I I I 1 1 1 I80
I—I u
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
08:55AM 18/03/16
14/01/01
McDowell Creek WWTP
4901 Neck Rd
Exit Time/Date
Permit Expiration Date
Huntersville NC 28078
12:25PM 18/03/16
18/12/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Darrell Victor Dewitt/ORC/704-547-0680/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jacqueline A Jarrell,5100 Brookshire Blvd Charlotte NC 282163371/Operations
Chief/704-336-5433/ No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Wes Bell MRO WQ//704-663-1699 Ext.2192/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
3/20/2018
Page#
A14CC681 AF27425...
NPDES yr/mo/day Inspection Type
NC0036277 111 121 18/03/16 1 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On-site Representatives:
The following Charlotte Water personnel were in attendance during the inspection: Mr. Darrell
DeWitt/ORC, Mr. Joseph Lockler/Operations Manager, Mr. Anthony Spinelli/Backup ORC, and Mr.
Doug Wise/Water Quality Program Specialist.
Page#
Permit: NCO036277 Owner - Facility: McDowell Creek WWTP
Inspection Date: 03/16/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
E
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The last compliance evaluation inspection was performed at the facility on 5/11/16 by DWR
staff.
The sludge drying beds would be used during emergencies.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Monitoring Reports (eDMRs) were reviewed for the period January 2017 through
December
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
0
Comment: The records reviewed during the inspection were organized and well maintained. Discharge
Monitoring Reports (eDMRs) were reviewed for the period January 2017 through
December
2017. No effluent limit violations were reported and all monitoring frequencies were correct.
Page# 3
Permit: NCO036277 Owner - Facility: McDowell Creek WWTP
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
Inspection Date: 03/16/2018 Inspection Type: Compliance Evaluation
❑
Is sample collected above side streams?
0
❑
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
0
❑
❑
❑
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: Influent and effluent analyses (including field) are performed under the Charlotte Water
time of the inspection.
Environmental Laboratory Services Certification #192. Prism Laboratories (low level
mercury and phenols) ETT (toxicity), and R&A Labs (toxicity) have also been contracted to
provide analytical support.
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
0
❑
❑
❑
Comment: The subject permit requires BOD and TSS composite samples. Periodic aliquot
verifications are performed and documented. The composite sampler was collecting over
100 mis. per aliquot and the internal temperature was less than four degrees Celsius at the
time of the inspection.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes No NA NE
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
E ❑ ❑ ❑
Comment: The subject permit requires composite and grab effluent samples. Periodic aliquot
verifications are performed and documented. The composite sampler was collecting over
100 mis. per aliquot and the internal temperature was less than four degrees Celsius at the
time of the inspection.
Page# 4
Permit: NCO036277 Owner - Facility: McDowell Creek WWTP
Inspection Date: 03/16/2018 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The wastewater treatment facilitv aDDeared to be Droaerly operated and well maintained
The ORC and staff incorporate a comprehensive process control program with all
measurements being properly documented and maintained on-site. In-depth operation and
maintenance records were also being maintained on-site. The facility is equipped with a
SCADA System that is accessible at nine separate locations throughout the wastewater
facility.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Grit Removal
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# Is disposal of grit in compliance?
Comment: Screeninqs and qrit are disposed at the CMS Landfill located in Cabarrus Cou
Yes No NA NE
Yes No NA NE
Page# 5
Permit: NCO036277
Inspection Date: 03/16/2018
Owner - Facility: McDowell Creek WWTP
Inspection Type: Compliance Evaluation
Flow Measurement - Influent
Yes No NA NE
# Is flow meter used for reporting?
❑
0
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter is calibrated twice per year and was last calibrated on 10/13/17 by Expert
Services International. LLC.
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The influent pump station is connected to the SCADA System and also equipped with an
audible/visual alarm system. The audible/visual alarm system is tested quarterly.
Equalization Basins
Is the basin aerated?
❑
❑
0
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Are audible and visual alarms operable?
❑
❑
0
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Comment: The facilitv is eauiDDed with a 1.3 million aallon flow eaualization day tank and two storm flow
equalization basins. The day tank and influent pump station are connected to an odor
control system.
Primary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Page# 6
Permit: NCO036277 Owner - Facility:
Inspection Date: 03/16/2018 Inspection Type:
McDowell Creek WWTP
Compliance Evaluation
Mode of operation
Ext. Air
❑
Primary Clarifier
Yes No NA NE
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the sludge blanket level acceptable?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately 1/, of the sidewall depth)
0
❑
❑
❑
Comment: The facility was currently using two of five primary clarifiers.
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
❑
❑
Type of aeration system
Diffused
❑
❑
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
❑ ❑
0
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
0 ❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
0 ❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
0 ❑
❑
❑
Comment: Aqueous lime is added (primary effluent) to maintain appropriate alkalinity/pH levels.
Nutrient Removal
Yes No NA NE
# Is total nitrogen removal required?
0 ❑
❑
❑
# Is total phosphorous removal required?
0 ❑
❑
❑
Type
Biological
❑
# Is chemical feed required to sustain process?
0 ❑
❑
❑
Is nutrient removal process operating properly?
0 ❑
❑
❑
Comment: Acetic acid and/or cola syrup (sugar water) are added as an alternative carbon source.
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Yes No NA NE
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
Page# 7
Permit: NC0036277 Owner - Facility: McDowell Creek WWTP
Inspection Date: 03/16/2018 Inspection Type: Compliance Evaluation
Chemical Feed Yes No NA NE
Is the site free of excessive leaking? 0 ❑ ❑ ❑
Comment:
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
0
❑
❑
❑
Comment: The facility was currently using two of four secondary clarifiers.
Pumps -RAS -WAS
Yes No NA NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
0
❑
❑
❑
Comment:
Filtration (High Rate Tertiary)
Yes No NA NE
Type of operation:
Down flow
Is the filter media present?
0 ❑
❑
❑
Is the filter surface free of clogging?
❑
❑
❑
Is the filter free of growth?
❑
❑
❑
Is the air scour operational?
❑
❑
❑
Is the scouring acceptable?
❑
❑
❑
Is the clear well free of excessive solids and filter media?
❑
❑
❑
Comment:
Page# 8
Permit: NCO036277
Inspection Date: 03/16/2018
Owner - Facility: McDowell Creek WWTP
Inspection Type: Compliance Evaluation
# Is flow meter used for reporting?
0
❑
Disinfection - UV
Yes No NA NE
Are extra UV bulbs available on site?
0
❑
❑
❑
Are UV bulbs clean?
0
❑
❑
❑
Is UV intensity adequate?
0
❑
❑
❑
Is transmittance at or above designed level?
0
❑
❑
❑
Is there a backup system on site?
0
❑
❑
❑
Is effluent clear and free of solids?
0
❑
❑
❑
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter is calibrated twice Der vear and was last calibrated on 10/13/17 by EXDert
Services International, LLC.
Yes No NA NE
Type of operation:
Fixed cover
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: The effluent appeared clear with no floatable solids or foam. The receiving stream did not
appear to be negatively impacted. An abundant population of fish was observed at the
confluence of the effluent discharge and receiving stream.
Anaerobic Digester
Yes No NA NE
Type of operation:
Fixed cover
Is the capacity adequate?
0
❑
❑
❑
# Is gas stored on site?
❑
❑
❑
Is the digester(s) free of tilting covers?
❑
❑
❑
Is the gas burner operational?
❑
❑
❑
Is the digester heated?
❑
❑
❑
Is the temperature maintained constantly?
❑
❑
❑
Is tankage available for properly waste sludge?
❑
❑
❑
Page# 9
Permit: NCO036277
Inspection Date: 03/16/2018
Anaerobic Digester
Owner - Facility: McDowell Creek WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The facility is equipped with five digesters (4 — primary and 1- storage/floating
cover).
Is automatically activated standby power available?
0
❑
Digesters 3 & 4 have been recently rehabbed. The rehabilitation of Digesters 1 & 2 is
❑
Is the generator tested by interrupting primary power source?
S
projected to begin in May 2018.
❑
❑
Is the generator tested under load?
0
Solids Handling Equipment
Yes No NA NE
Is the equipment operational?
0
❑
❑
❑
Is the chemical feed equipment operational?
0
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
❑
❑
❑
0
Is the site free of sludge buildup on belts and/or rollers of filter press?
❑
❑
❑
0
Is the site free of excessive moisture in belt filter press sludge cake?
0
❑
❑
❑
The facility has an approved sludge management plan?
0
❑
❑
❑
Comment: The facilitv is eauioDed with 2 — belt filter Dresses and 2 - aravity belt thickeners. No
dewatering was occurring at the time of the inspection. The filtrate from the dewatering
units is collected into a filtrate equalization tank and returned back to the head of the
treatment system.
Dewatered bio -solids are land applied by a contracted company (Synagro) under the
authority of Permit No. WQ0000057.
Standby Power
Yes No NA NE
Is automatically activated standby power available?
0
❑
❑
❑
Is the generator tested by interrupting primary power source?
S
❑
❑
❑
Is the generator tested under load?
0
❑
❑
❑
Was generator tested & operational during the inspection?
❑
❑
❑
0
Do the generator(s) have adequate capacity to operate the entire wastewater site?
0
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
0
❑
❑
❑
Is the generator fuel level monitored?
0
❑
❑
❑
Comment: The facility is equipped with two standby generators that are placed under load monthly.
The generators are also activated prior to storm events. The generators are serviced by a
contracted company (Cummings) on a quarterly basis.