January 25, 2016
Mrs. King
c -
t
Utilities and Planning
Superintendent
Edward Caron p
I want to respond to the letter written dated July 30, 2015 about Holly Ridge
WWTP permit no. WQ0019907.
910.937 7523 Tel
910.455.5607 Fox
ONWASA has been working on rehab of the Summerhouse WWTP. At this time
the Plant is about 95% ready to be put in operation. We are running the Plant with
clean water to find out what works and what doesn't. During this
be ocess e have
e
found several things that need to be fixed and many parts had
Loving is the Contractor that built the new Head Works and has done many of the
major repairs needed at the plant; they are completing the start-up on the
equipment that has been installed. We anticipate TAL v a a Ory other
ASA
should be able to complete the start-up of new equipment
repairs needed in the next couple of months.
The force main from the Jenkins Street Pump Station has be n completed and s
ready to pump wastewater to Summerhouse. The flow from the Jenkins Street
Pump Station from January 2015 to January 2016 averaged about 137,000 GPD;
this will reduce the flow to Holly Ridge WWTP around 50%.
If you have any other question please contact me at ecaronkonwasa.com or (9 10)
937-7523
Sincerely,
Edward Caron
Utilities and Planning Superintendent