Loading...
HomeMy WebLinkAboutMore Information Received - 1/25/2016Member Governments Holly Ridge Jacksonville ONWAS North Topsail Beach Onslow County Richlands Onslow Water & sewer Authority Swansboro January 25, 2016 Mrs. King c - t Utilities and Planning Superintendent Edward Caron p I want to respond to the letter written dated July 30, 2015 about Holly Ridge WWTP permit no. WQ0019907. 910.937 7523 Tel 910.455.5607 Fox ONWASA has been working on rehab of the Summerhouse WWTP. At this time the Plant is about 95% ready to be put in operation. We are running the Plant with clean water to find out what works and what doesn't. During this be ocess e have e found several things that need to be fixed and many parts had Loving is the Contractor that built the new Head Works and has done many of the major repairs needed at the plant; they are completing the start-up on the equipment that has been installed. We anticipate TAL v a a Ory other ASA should be able to complete the start-up of new equipment repairs needed in the next couple of months. The force main from the Jenkins Street Pump Station has be n completed and s ready to pump wastewater to Summerhouse. The flow from the Jenkins Street Pump Station from January 2015 to January 2016 averaged about 137,000 GPD; this will reduce the flow to Holly Ridge WWTP around 50%. If you have any other question please contact me at ecaronkonwasa.com or (9 10) 937-7523 Sincerely, Edward Caron Utilities and Planning Superintendent 228 Georgetown Road, P.O. Box 1415 -Jacksonville, NC 28540 -Tel 910.455.0722 -Fax 910.347.0793 ° www.onwasa.com