Loading...
HomeMy WebLinkAboutSite Plans/Maps - 8/12/20120 a 01 a HOLLY RIDG I- WWTP DISCHARGE- ALL WASTEWATE INTO MANHOLE LOCATED AT THE CORNER OF JENKINS S -r. AND CRA fl ST. �`�-� `� lel 'f� ^'^ LEGEND EE LIFT STATION 0, I ww---p N r�-Z11-1 7 W WilL MIAER 1,000 2,000 . .. . ... I ... ............. . GeV a I MUNIA ffff�Mll i la m clo0qol- j 7' 0 ,I m R] PUMP AND HAUL, ILE I �- I I N K - SANITARY SEWER FORUEM EMERGENCY STANDBY GENERATOR MOUNTED ON CONCRETE PAC FL.E- °ICAL. EQUIPMENT kAc° - — end/ ;OVER PER _-vslNER g� APPROVED DESIGN (2) " 45' MJ BEND ROTATE AS REQUIRED OLLARD (TYP.) 1 (SEE DETAIL SHEET 04) ADJUST BOLLARD LOCATION TO PROVIDE PROPER CLEARANCE FOUR GENERATOR ACCESS DOORS. E x 5'L (LD.) PRECAST CONCRETE VALVE VAULT Wj ' x 3' ALUMNUM ACCESS HATCH i NEW ' I. PUMP STA TI WET WELL (PRECAST) / 36" x " ALU�I:NU ACCESS HATCH PORTABLE HOIST FOUNDATION SEE DETAIL THIS SHEET , GRAVITY SEWIER 6" COMPACTED ABC ISH 4—PS STk 1+57.85 N° 27000 .39 E: 24549 6,02 1W" YARD HYDRANT (SEE DETAIL SHEET Dl) 1"B RPZ NTH HOT BOX ENCLOSURE 1" WATER SERVICEf (SEE DETAIL SKEET D2) (SEE DETAIL SHEET D1) RD -1 WHITE PICKET WAY SEE SKEET C2 MA CELE VENT WDIP L V 12' WIDE PAVED EARTHEN BERM AND SCREENING ISH 1 12' AY AFRO VEGETATIONTO BE PROVIDED 6" AROUND E PUMP STATION SITE SEE SHEET SHEET (DESIGN Y OTHERS) C C2 10, 0 10' 20' SUMMERHOUSE ON EVERETT BAY OWWOmmommomm"mm"I AD QTA AUTF MAN SCALE; 110' (Hri,) SCALE: 1"'=1 ' I 4p# 1 1/2" (TYP.) PE FG.] PLATE Cot- � f I PLATE COL. E ANCHOR BASE PLATE w/ (4) GALV'D 5/8"0 ANCHOR BOLTS EMBED " ( ft) IN TO FTG. & 4" H OOK [A>,=AS A07ORA 2 -HOIST CRANE BASEPLATE COW SCALE; 1 1 /2 1' D DAVIT CRANE COLS ASE PLATE (Y CRANE FGQ) (7) #7 BARS E. SPA. EA. WAY , (g'gg 4 � T.O. CONC�EL (MATCH T,OW T LL [REF. PLAN] 4 P OFFSET HOIST BASEffi - ®" TOWARDS WETWELL 68, 03" CLRW rt FTG. (WF) 4 "— " _ [COORD. CRANE MFG] E; i 1 a� a I 4' SCALE: 1 W'= 4' (Vert.) F"IbWbY3P .» pry rv- �ypq� daBgam/ M m 4 fi _. im 10" D.I. GRAVITY SEWER MODELTHERN s IJ N TH BASE PLA (SEE DETAIL THIS SHEE NQIL 1 INSIDE OF WETWELL AND VALVE VAULT INCLUDING ALL PIPING SHALL BE FACTORY EPDXY COATED MIN, 6 MIL SURFACE DRY. EPDXY SEALER PRIME COATING AND FINISH COATING SHALL BE NSP 100 AND NSP 120, 2 CONTRACTOR TO ENSURE THAT THE PUMP STATION EXCAVATION IS KEPT DEWATERED DURING CONSTRUCTION TO PREVENT FLOTATION OF THE PS STRUCTURE PRI TO BACKFILLJING. THE EMERGENCY STANDBY GENERATOR IS SIZED TO OPERATE ONE PUMP ONLY. THE LAG PUMP SHALL BE LOCKED OUT WHEN OPERATING UNDER EMERGENCY POWER. N.T S. ALL CONTROL PANELS AND GENERATOR PANELS SHALL BE DEAD—FRONT AND PAD—LOCKABLE. , MIN. 36" x 0" LOCKABLE ALUMINUM ACCESS HATCH 300 PSF MIN, LOADING RATE TOP SLAB= 11.25' S�S, CABLE HOLDER SASS JUNCTION O I. 18- ABOVE SLA, 80 W/ "SEAL S°' FOR PUMP LEAD CONDUITS (SEE DETAIL SHEET E6) I " SCHEDULE 80 P RE NT PIPE PRE—CAST REINFORCED CONCRETETO GROUND ELEV=11.00' rm SLOPS ��' s III II I I I PUMP DESIGN CRITERIA PUMP TYPE- CENTRIFUGAL NON—CLOG Mr,ERSIBLE WASTEWATER PUMP CAPACITY: NUMBER O: PUMPS: 2 FAIRBANKS'"` J MOTOR:IMPELLER DIA; 10.4375" I# STARTER: FULL VOLTAGE NON—REVERSING SPEED� 1155 RPM 1+00 4.D` O 40' UO' SCALE, 1"=40' (Horiz,) PUMP STATION #4 INFLUENT PROFILE SCALE: 1"=40' HORIZ. , 1"=4.' VE T, PIPE LENGTH FROM MH 4—PS TO JIOETWELL CALCULATED FROM CENTER OF MH 4—PS TO EDGE OF WETWELL CL WELL ��.S. CABLE HOLDS OUTSIDE SWING AR S.S. CHAIN HOOK CHECK VALVE " MIN, 6" PLUG VALVE CONCRETE THRUST COLLAR 6"x6" TEE W1 BLOCKING SPOOL PIECE 90- N / BLOCKING INGE THIS IDE GUIDE BARS POWER CABLE MIN Ia PRECAST REINFORCED CONCRETE T WELL 90, BE4D LIQUID LEVEL 10" DJ, GRAM SANITARY OAT SEWER LINE SWITCHES INVERT IN= -3,00' e LAG PUMP ONS --3.50' LEAD PUMP ON -4,00' -� I SUBMERSIBLE WASTEWATER PUMPS I GROUT PUMPS OFF 6, 0' Iq F— (A LEAD/LAG SEQUENCES} 60, + O -s� w.�— m.._ 12 —K — _—. — WET"NELL RIPS; 11.25; 10 — — — _ INVERT IN,__ 3,00 6" PVC FORCEMAIN 4 __ ------ - 2 .. _--..____ _ __._ _ _._.._ --__- __ _------INSTALL FORCEMAIN AT ELEVATION R IED TO AVOID HIGH SPOT F"IbWbY3P .» pry rv- �ypq� daBgam/ M m 4 fi _. im 10" D.I. GRAVITY SEWER MODELTHERN s IJ N TH BASE PLA (SEE DETAIL THIS SHEE NQIL 1 INSIDE OF WETWELL AND VALVE VAULT INCLUDING ALL PIPING SHALL BE FACTORY EPDXY COATED MIN, 6 MIL SURFACE DRY. EPDXY SEALER PRIME COATING AND FINISH COATING SHALL BE NSP 100 AND NSP 120, 2 CONTRACTOR TO ENSURE THAT THE PUMP STATION EXCAVATION IS KEPT DEWATERED DURING CONSTRUCTION TO PREVENT FLOTATION OF THE PS STRUCTURE PRI TO BACKFILLJING. THE EMERGENCY STANDBY GENERATOR IS SIZED TO OPERATE ONE PUMP ONLY. THE LAG PUMP SHALL BE LOCKED OUT WHEN OPERATING UNDER EMERGENCY POWER. N.T S. ALL CONTROL PANELS AND GENERATOR PANELS SHALL BE DEAD—FRONT AND PAD—LOCKABLE. , MIN. 36" x 0" LOCKABLE ALUMINUM ACCESS HATCH 300 PSF MIN, LOADING RATE TOP SLAB= 11.25' S�S, CABLE HOLDER SASS JUNCTION O I. 18- ABOVE SLA, 80 W/ "SEAL S°' FOR PUMP LEAD CONDUITS (SEE DETAIL SHEET E6) I " SCHEDULE 80 P RE NT PIPE PRE—CAST REINFORCED CONCRETETO GROUND ELEV=11.00' rm SLOPS ��' s III II I I I PUMP DESIGN CRITERIA PUMP TYPE- CENTRIFUGAL NON—CLOG Mr,ERSIBLE WASTEWATER PUMP CAPACITY: NUMBER O: PUMPS: 2 FAIRBANKS'"` J MOTOR:IMPELLER DIA; 10.4375" I# STARTER: FULL VOLTAGE NON—REVERSING SPEED� 1155 RPM 1+00 4.D` O 40' UO' SCALE, 1"=40' (Horiz,) PUMP STATION #4 INFLUENT PROFILE SCALE: 1"=40' HORIZ. , 1"=4.' VE T, PIPE LENGTH FROM MH 4—PS TO JIOETWELL CALCULATED FROM CENTER OF MH 4—PS TO EDGE OF WETWELL CL WELL ��.S. CABLE HOLDS OUTSIDE SWING AR S.S. CHAIN HOOK CHECK VALVE " MIN, 6" PLUG VALVE CONCRETE THRUST COLLAR 6"x6" TEE W1 BLOCKING SPOOL PIECE 90- N / BLOCKING INGE THIS IDE GUIDE BARS POWER CABLE MIN Ia PRECAST REINFORCED CONCRETE T WELL 90, BE4D 6" FLANGE COUPLING ADAPTER PRECAST CONCRETE VALVE VAULT 5'W X 51 (MIN.) INSIDE DIMENSIONS [DEPTH AS REQUIRED i I 'x3' LOCKABLE ALUMINUM ACCESS HATCH 300 PSF SIN, UPPER GUIDE tJ#'s1`w BACKT WALL SLEEVE ft 'I i�F :� S�_ra 4U FV%, �I� � L SHALL BE FASTENED TO WALL' S.S. PIPE CLAMPS. DISCHARGE SHALL S. S. INCLUDE UNION, CHECK VALVE, AND BALL V,%! ''E t,cp GUIDE TOP ELEVATION 11 a 25'in »� BAR DEPTH AS REQUIRED TO u�-" � � FINISHEDGRADE 11:00" ELIMINATE t #1CtiFmCttV ': BETWEEN S A r- , S CONNECTION TO ta { IN R 1 y ; OUTSIDE SWINARM G CHECK VALVE, (TYP OF 2) g= ,' MIN, CV c` PLUG VALVE (TYR L PRESSURE GAUGE (TYP OF 2) I c TRANSITION COUPLING " DI TO 6" PVC 6"X* INCREASE CONCRETE RUST COLLA (TYP. OF 2)� a...... _� FLOOR SMALL SLOPE SUMP PIT FLANGE COUPLING ADAPTER (TYP. OF 2) SUMP PIT MIN, 15"05"x12" DEPTH 0 GPM SUMP PUMP MIN, 6- #57 STONE TAPS AND PRESSURE GAUGES HIGH LEVEL ALAR SHALL E INSTALLED ON ON = —100' DISGH A GF SIDE OF F �- 6" DIP CHECK i,' L, L 4"x6" ECCENTRIC INCREASER DISCHARGE CONNECTION WETV&LL SHALL HAVE 12" WIDE (MIN.) EXTENDED BASE FFE—Q.5ty WViIN, 110" 57 STONE �-- I LLJ J) �-IROJECT 1,10: 0 DATE, JULf 2006 L',RA N BY: _ TJJ _ a`ALE: AS :aHOiNi 110.- GS10 `WI Wrml I 62 OF 80 i� LIQUID LEVEL 10" DJ, GRAM SANITARY OAT SEWER LINE SWITCHES INVERT IN= -3,00' LAG PUMP ONS --3.50' LEAD PUMP ON -4,00' -� SUBMERSIBLE WASTEWATER PUMPS GROUT PUMPS OFF 6, 0' (ALSO ALTERNATES LEAD/LAG SEQUENCES} 60, 6" FLANGE COUPLING ADAPTER PRECAST CONCRETE VALVE VAULT 5'W X 51 (MIN.) INSIDE DIMENSIONS [DEPTH AS REQUIRED i I 'x3' LOCKABLE ALUMINUM ACCESS HATCH 300 PSF SIN, UPPER GUIDE tJ#'s1`w BACKT WALL SLEEVE ft 'I i�F :� S�_ra 4U FV%, �I� � L SHALL BE FASTENED TO WALL' S.S. PIPE CLAMPS. DISCHARGE SHALL S. S. INCLUDE UNION, CHECK VALVE, AND BALL V,%! ''E t,cp GUIDE TOP ELEVATION 11 a 25'in »� BAR DEPTH AS REQUIRED TO u�-" � � FINISHEDGRADE 11:00" ELIMINATE t #1CtiFmCttV ': BETWEEN S A r- , S CONNECTION TO ta { IN R 1 y ; OUTSIDE SWINARM G CHECK VALVE, (TYP OF 2) g= ,' MIN, CV c` PLUG VALVE (TYR L PRESSURE GAUGE (TYP OF 2) I c TRANSITION COUPLING " DI TO 6" PVC 6"X* INCREASE CONCRETE RUST COLLA (TYP. OF 2)� a...... _� FLOOR SMALL SLOPE SUMP PIT FLANGE COUPLING ADAPTER (TYP. OF 2) SUMP PIT MIN, 15"05"x12" DEPTH 0 GPM SUMP PUMP MIN, 6- #57 STONE TAPS AND PRESSURE GAUGES HIGH LEVEL ALAR SHALL E INSTALLED ON ON = —100' DISGH A GF SIDE OF F �- 6" DIP CHECK i,' L, L 4"x6" ECCENTRIC INCREASER DISCHARGE CONNECTION WETV&LL SHALL HAVE 12" WIDE (MIN.) EXTENDED BASE FFE—Q.5ty WViIN, 110" 57 STONE �-- I LLJ J) �-IROJECT 1,10: 0 DATE, JULf 2006 L',RA N BY: _ TJJ _ a`ALE: AS :aHOiNi 110.- GS10 `WI Wrml I 62 OF 80 i�