Loading...
HomeMy WebLinkAbout20180399 Ver 1_Stormwater- 3/20/2018_20180320March 19, 2018 NC DWQ, WBSCP Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Staybridge Suites DWQ Buffer Permit To Whom It May Concern, Please see online application PCN Form for the proposed Staybridge Suites Hotel located at 8001 ACC Boulevard, Raleigh, NC 27617. We are seeking written Buffer Rule approval only. Please let us know if you have any questions or concerns. Sincerely, ;Jonwry, P.E. Lowry Engineering jlowry@lowryeng.com 701.235.0199 Preliminary Stormwater Management Plan Staybridge Suites 107 Units/4.5 Story 8001 ACC Bouelvard Raleigh, NC 27617 Developer Information: Dakota Legacy Group 1202 Westrac Drive, 3rd Floor Fargo, ND 58103 LE Project # 16009.4 44 Lover ENGINEERING 1111 Westrac Drive Suite 108 . Fargo, ND • 58103 Prepared by: Jonathan Lowry, P.E. January 2018 Table of Contents Cover..............................................................................................................................1 Tableof Contents..........................................................................................................2 1 Location and Introduction.........................................................................................3 2 Summary of Raleigh, NC Requirements...................................................................3 3 Proposed Drainage Improvements...........................................................................3 4 Hydrology...................................................................................................................4 5 Water Quality..............................................................................................................4 6 Hydraulics and Pond Sizing......................................................................................4 7 Additional Stormwater Management.........................................................................5 Appendix A Project Site Information Map Appendix B Hydrology Table Appendix C Proposed Drainage Areas Map Appendix D Time of Concentration Calculations Appendix E Water Quality Calculations Appendix F Hydraulics Appendix G Pipe Map Appendix H HydroCAD Report Appendix I Hydrologic Soil Group Appendix J NOAA Precipitation Data Appendix K Stormwater Details Appendix L Aerial Sewer Crossing 21Page Location and Introduction The Staybridge Suites site is located in Raleigh, North Carolina at 8001 ACC Boulevard. The project vicinity map can be seen in Appendix A. The lot has a total area of 6.99 acres. Design calculations for water quality and detention will include the right-of-way area of the adjacent street to the east, ACC Boulevard, and up to the back of the existing curb on T.W. Alexander to the south which makes the total area analyzed 7.93 acres. ACC Boulevard is not currently built out however, the design for this site considers the built -out conditions as ACC Boulevard construction will occur prior to site improvements. Site improvements will consist of building construction, concrete driveway, asphalt parking lot, sanitary sewer service connection, domestic, fire, and irrigation water service connection, storm water quality and detention system, and an outlet control structure. 2 Summary of Raleigh, NC Requirements North Carolina's Department of Environment and Natural Resources (NCDENR) Stormwater BMP Manual provides water quality requirements for the City of Raleigh. The Archived Stormwater Design Manual 2009 — 2016 was used per the direction of Kevin Kidd from the City of Raleigh. The post -development nitrogen load must be reduced to 3.6 Ib/ac/yr by installing a nitrogen -reducing BMP and/or through offset payments to the Ecosystem Enhancement Program (EEP). Per the City of Raleigh Stormwater Management Design Manual, the site must detain the difference between the existing and proposed flows after development in the 2 -year and 10 -year storm events. The Rational method was used to determine the pre- and post- construction runoff rates for the 2 -year and 10 -year storm events. The Kirpich Equation was used to calculate the time of concentration. 3 Proposed Drainage Improvements Stormwater from the developed portion of the site will drain to the storage chambers beneath the parking lot through a series of inlets and discharge through an orifice into a level spreader and engineered filter strip. The stormwater from ACC Boulevard will not be routed through the storage chambers and filter strip however storage chambers and filter strip on our site are sized to account for and include this area for quality and quantity. The inlets and storm sewer were designed to the 10 -year storm event using Manning's Equation and the Continuity Equation. Appendix F includes sizing calculations for the storm sewer. An orifice structure will be included in ST -5 and will consist of a metal plate or concrete wall with holes cut in a manner so that peak flow rates at the 2 -year and 10 -year storm will be controlled. Hydraulics are discussed in further detail in Section 6 below. 4 Hydrology Per the City of Raleigh Stormwater Management Design Manual, the time of concentration was calculated using the Kirpich Equation. Per the Rational Method calculations that can be found in Appendix B, the 2 -year storm event flow rate under existing conditions is 11.35 cfs. The 10 -year flow rate for the existing site is 14.36 cfs. The proposed site was split into two main drainage basins: A and B. Basin A flows into the storage chambers and filter strip while Basin B flows directly off site. See Appendix 31Page C. Basin A was split into three sub -basins based on the path the water in these areas will take to the pond. Basin Al will flow into the roof drain connection ST -9. The water in Basin A2 will flow into inlet ST -3 where it will combine with the water from Basin Al and flow to ST -4. Basin A3 will flow into inlet ST -12 and flow to ST -4. In ST -4, all of the water from Basins Al, A2, and A3 will combine and flow to ST -5 and be directed to the storage chambers. Basin B was split into two sub -basins: B1 and B2. B1 flows from the site and into ACC Boulevard. From ACC Boulevard this water will flow back through our site through a street inlet and into the existing creek. Basin B2 covers the area that flow directly in the adjacent creek. A large portion of Basin B includes areas where the existing drainage patterns will not be disturbed. As stated above, Basin B1 flows directly into ACC Boulevard. As shown in Appendix B, this area produces a total runoff of 0.78 cfs in the 10 -year event. This will be allowed by The City because it is less than 3 cfs. A catch basin will not be required to be installed to capture this flow. The post developed calculated flow from Basin B1 & B2 for the 2 -year event is 9.42 cfs and for the 10 -year event is 11.91 cfs. The runoff from this area was subtracted from the existing 2 -year and 10 -year release rates to calculate the allowable release rate from the detention pond. Therefore, to not exceed the existing release rate for the entire site, the pond shall release water at a rate of 1.93 cfs or less in the 2 -year rainfall event (11.35 — 9.42 = 1.93 cfs) and 2.45 cfs or less in the 10 -year rainfall event (14.36 — 11.91 = 2.45 cfs). 5 Water Quality The site will utilize a level spreader with engineered filter strip to discharge the runoff through the existing riparian buffer as well as pay an offset fee for the excess nitrogen load that the filter strip cannot remove. According to the NCDENR Manual, filter strips provided 30% Total Nitrogen removal. Water from the orifice structure will discharge through a pipe into the forebay prior to entering the level spreader. The required length of the level spreader is 24.5' long because the site releases 2.45 cfs from the 10 -year event. To be conservative, we designed a 30' level spreader for the site. On the downstream side of the level spreader will be 3' of #57 stone followed by 30' of grass at an 8% grade or less. Per the Exhibit 3-2 from the City of Raleigh Stormwater Design Manual, the total TN export from our site is 7.3 lbs/ac/yr. This includes the future improvements planned for ACC Boulevard. The installation of the filter strip will reduce the export by 30%. To remove the remaining TN, an offset payment of $6,202.05 will be provided to the City. See Appendix E. 6 Hydraulics and Pond Sizinq The roof leader pipes (ST -1 to ST -2, and ST -8 to ST -11) on this site were sized to handle 2 cfs. All other pipes on site were sized to the 10 -year storm event using Manning's Equation. The pipes were sized for only the drainage areas that flow through them. The SCS TR -20 method with a Type II 24 -hr storm event was used in the 51Page HydroCAD modeling software to calculate the runoff volume. These calculations may be found in Appendix H. The storage chambers were designed so that all stormwater up to and including the 10 - year event can be properly controlled by the orifice structure located in ST -5. The orifice structure will include a metal plate or concrete wall with orifice holes cut in a manner so that peak flow rates at the 2 -year and 10 -year will not exceed existing discharge rates. Per Section 15A of the North Carolina Administrative Code Subchapter 2B.0233, when a stormwater management facility is installed to control nitrogen and attenuate flow before the conveyance discharges through the riparian buffer an exemption of the diffuse flow requirement may be allowed. The filter strip on our site provides 30% TN removal. Because there are no practical alternatives we will be discharging through the riparian buffer. See Appendix K for outlet structure and orifice plate detail. When peak flow rates are experience above the 10 -year levels, water will flow over the top of the orifice structure and into the outlet pipe. In the 2 -year event, the peak runoff release rate from the storage chamber is 1.81 cfs and the water reaches an elevation of 373.13 feet. In the 10 -year event, the peak runoff release rate from the storage chamber is 2.45 cfs and the water reaches an elevation of 376.01 feet. The top of the storage chamber is set at an elevation of 376.18' resulting in 0.17' of freeboard. The orifice that controls the 2 -year and 10 -year events is 5.4 inches wide and 5.3 inches high. As shown in Table 1 below, under proposed conditions the site generates 18.23 cfs of runoff in the 2 -year event, and 23.05 cfs of runoff in the 10 -year event. The orifice control structure holds back water in the storage chambers in order to only release it at or less than the rate that water flows from the site under existing conditions. Table 1. Summary of Existing and Proposed Flows leaving the site. For full calculations see Appendix B and H Site Flow Flow Destination Event (cfs) 2 YRT 10 YR Existing Generated Offsite 11.35 14.36 Proposed Generated Offsite 9.42 11.91 To Orifice 8.81 11.14 Total 18.23 23.05 Allowed Offsite 9.42 11.91 Through Orifice 1.81 2.45 Total 11.23 14.36 7 Additional Stormwater Management All disturbed areas will be seeded. Silt fence will be used along the tree conservation area to prevent any sediment from getting offsite and to protect the existing vegetation. Inlet protection devices will be used in all inlets that could receive stormwater discharge from our construction site. 51Page OWNER: CREEKWOOD HIGHWAY 70 ALEXANDER LLC LAND USE: COMMERICAL DURHAM, NC PROJECT SITE INFORMATION \ \ 1 \ I \ \ i I OWNER: EAGLES ENTERPRISE LLC \ LAND USE: VACANT 4 LO W RY ENGINEERING 1111 WESTRAC DRIVE -SUITE 108 FARGO, NORTH DAKOTA 58103 A / NT \ \ OWNER: WAKEMED PROPERTY SERVICES \ LAND USE: CHARITABLE HOSPITAL \ NOTES: 1. TOTAL AREA OF LOT - 6.99 ACRES 2. TOTAL AREA INCLUDED IN STORMWATER MANAGEMENT REPORT = 7.93 ACRES 3. ZONING = CX -7 -CU LOT BOUNDARY STAYBRIDGE SUITES 107 UNITS/4.5 STORY 8001 ACC BOULEVARD IGH, NORTH CAROLINA 27617 VICINITY MAP RALEIGH, NORTH CAROLINA DEL WEBS ARBORS DR SITE ACC BOULEVARD T.W. ALEXANDER DR GLENWOOD AVE r=i000 PRELIMINARY NOT FOR CONSTRUCTION LE JOB # 16009.4 PROJECT DATE: 06/22/2017 DRAWN BY: DJK APPROVED BY: JML SHEET: 1 OF 1 APPENDIX A ............ -...._...._...._...._........--- OWNER- PULTE I '• i NOME e = e e e e •••'''•.,.` CORPORATION I . . . . LAND USE: VACANT OWNER: PULTE HOME CORPORATION RESIDENTIAL LANDUSE: RESIDENTIAL DURHAM, NC •I I I DURHAM. NC ....:...................................... I I I III ,I I2Q I OpE EASEMENT ' 1 OWNER: BRIER CREEK ARBORS DRIVE RETAIL LLC a, LAND USE: VACANT 1 1 e� 1 A / NT \ \ OWNER: WAKEMED PROPERTY SERVICES \ LAND USE: CHARITABLE HOSPITAL \ NOTES: 1. TOTAL AREA OF LOT - 6.99 ACRES 2. TOTAL AREA INCLUDED IN STORMWATER MANAGEMENT REPORT = 7.93 ACRES 3. ZONING = CX -7 -CU LOT BOUNDARY STAYBRIDGE SUITES 107 UNITS/4.5 STORY 8001 ACC BOULEVARD IGH, NORTH CAROLINA 27617 VICINITY MAP RALEIGH, NORTH CAROLINA DEL WEBS ARBORS DR SITE ACC BOULEVARD T.W. ALEXANDER DR GLENWOOD AVE r=i000 PRELIMINARY NOT FOR CONSTRUCTION LE JOB # 16009.4 PROJECT DATE: 06/22/2017 DRAWN BY: DJK APPROVED BY: JML SHEET: 1 OF 1 APPENDIX A PROPERTY LEGAL DESCRIPTION: LOT NO. 121 PLAN NO.T W Alexander PARCEL ID: 0768398793 Place PH 16 STREET ADDRESS: 8001 ACC Boulevard, Raleigh, NC 27617 Please print: Property Owner: Property Owner: Heritage Inn of Raleigh, LLC The undersigned, registered property owners of the above noted property, do hereby authorize Jonathan Lowry (Contractor / Agent) of Lowry Engineering (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): 1202 Westrac Drive, 3rd Floor, Fargo, ND 58103 Telephone: 701.293.4077 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. w r Authorized gnature Authorized Signature Date:t 'r` %' ?`tf Date: 3 Hydrologic Soil Group—Wake County, North Carolina (8001 ACC Boulevard) 699890 699910 699930 699950 699970 699990 0 35° 55'14'N 0 c°3+ M _o c°3 0 O_ 35° 55'7'N 699890 699910 699930 6999550 659970 699990 3 v v Map Scale: 1:1,020 if printed on A portrait (8.5" x 11") sheet. rs N Mete 0 15 30 60 90 Feet 0 45 90 180 270 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 usDA Natural Resources Web Soil Survey 1 Conservation Service National Cooperative Soil Survey 700010 3 700030 35° 5514" N 0 93 0 0p� M o_ 93 0 M O M O m M 35° 557 N 700030 3 700010 6/6/2017 Page 1 of 4 Hydrologic Soil Group—Wake County, North Carolina (8001 ACC Boulevard) MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:15,800. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Wake County, North Carolina Survey Area Data: Version 15, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 27, 2014—May 6, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UUP Natural Resources Web Soil Survey 6/6/2017 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Wake County, North Carolina Hydrologic Soil Group 8001 ACC Boulevard Hydrologic Soil Group— Summary by Map Unit — Wake County, North Carolina (NC183) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CmA Chewacla sandy loam, 0 B/D 1.1 25.5% to 2 percent slopes, frequently flooded CrB Creedmoor sandy loam, D 0.9 19.9% 2 to 6 percent slopes CrC Creedmoor sandy loam, D 1.6 36.6% 6 to 10 percent slopes CrC2 Creedmoor sandy loam, D 0.8 18.0% 6 to 10 percent slopes, moderately eroded Totals for Area of Interest 4.4 100.0% usDA Natural Resources Web Soil Survey 6/6/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Wake County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher 8001 ACC Boulevard uSDA Natural Resources Web Soil Survey 6/6/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4