Loading...
HomeMy WebLinkAboutNC0021709_Compliance Evaluation Inspection_20180312 Town o f fieffs zon Water t1eource4,- 1233 Highway 16 South P.O. Box 67 Jefferson, NC 28640 336.246.2165 "PrOtP,CtiAlg the,Nem) R Over 13a4-1.417 Cathy Howell,Town Manager Tim Church, Director March 12, 2018 North Carolina Division of Environmental Quality RECEIVED/DENR/owR 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 BAR 1 2018 ATTN: Ms. Sherri V. Knight, P.E., Regional Supervisor Water Resources Permitting Section Subject: Town of Jefferson WWTP, Ashe County NPDES Permit NC0021709 Compliance Evaluation / Pretreatment Inspection Reports Dear Ms. Knight: On February 20, 2018, Paul DiMatteo and Jim Gonsiewski of the Winston-Salem Regional Office conducted a Compliance Evaluation of the Jefferson Wastewater Treatment System and a Pretreatment Compliance Inspection of the Town's Industrial Pretreatment Program. Their professional conduct and response to a procedural question I raised regarding pretreatment sampling was helpful and much appreciated. This correspondence is intended to address "Required Action" items mentioned in the Compliance Evaluation Inspection Report. At the time of the inspection, the plant's influent and effluent composite samplers were not functioning properly. On February 21, 2018, the electrical supply line and conduit along with the cable furnishing a 4-20 milli amp signal between the effluent sampler and effluent flow meter were replaced using new materials. The sampler is now operating satisfactorily in a flow-proportional mode. On March 5, 2018 our influent sampler was returned to us from ISCO. Repairs were completed that now allow accurate sample volumes to be collected matching the information programmed into the PLC. The influent sampler is functioning properly in the permitted headworks location of the plant. It is understood that future malfunctions to samplers which may affect the accuracy of submitted data should be reported to the Division as they occur. jeffarns@centurylink.net 1 The inspection report included a procedure for the calibration of laboratory thermometers. That procedure has been implemented using an NIST thermometer. That information is being entered into the laboratory log. The "Action Item" listed in the Pretreatment Compliance Inspection Report was in regard to the annual Pretreatment Program Annual Report due on March 1, 2018. That report was mailed to the PERCS Unit on February 23, 2018. While the items were not included in the Pretreatment Compliance Inspection Report, it is worth mentioning that the updated Headworks Short Term Monitoring Plan due on May 1, 2018 has been completed and mailed to the PERCS Unit and the Headworks Analysis (HWA) revisions request made necessary by the renewal of NPDES Permit NC0021709 will be furnished to Michael Whittenburg at McGill Associates. This revision has a deadline of August 1, 2018. Should additional information be required, please call me at (336) 246-2165 or contact me by email at ieffwns@centurvlink.net. Thank you to you and your staff for your assistance to the Town of Jefferson Water Resources as we continue to protect the waters of the New River Basin. Respectfully, 71,A, __44..4p Tim Church, Water Resources Director Town of Jefferson CC: Cathy Howell,Jefferson Town Manager Vivien Zhong, PERCS Unit