HomeMy WebLinkAbout20090312 Ver 1_401 Application_20090309ry`
CLH design, p.a.
Regency Park, 400 Regency Forest Drive, Suite 120
Cary, North Carolina 27918
Phone: (919) 319-6716 Fax.- (919) 319-7,516
Email- clhdesign@clhdesignpa.com
LETTER OF TRANSMITTAL 0 9- 0 3 1 2 25-Mar-09
To: Annette Lucas,P.E.
Company: NCDENR- DWQ
Address: 2321 Crabtree Blvd, Suite 250
City, State Zip: Raleigh, NC 27604
Phone: 919-733-1786
Fax: 919-733-6893
Method: UPS Ground
Subject: Wake County Continuum of Care CLH Project Number: 08-106-Prmt
E
E Prints
Reports ? Originals
? Copy of Letter ? Specifications ® Applications
? Submittals E Other: Fee
We are sending you the following items:
No. of Copies Date
Description
• 1 3-19-09 Set of Plans
• 1 3-25-09 Calculations, BMP Supplement and impact maps
• 1 3-25-09 PCN
Additional Remarks:
Please find enclosed our application for buffer impact approval for the above referenced project. As
discussed at our meeting on 2/19109 we are unable to obtain diffuse flow to the buffer and must build a
BMP prior to discharging to Crabtree Creek. We will make ourselves available to answer any questions or
provide addition information during your review.
Please feel free to contact me if you have any questions at 919-459-6056
Thank you,
Jason Kennedy
Signed • 4@@@8W1LqD1r'
"'R 2 ii 2009
DENR - WATER QUAL14
WETQA SAND STpRm;4TER B
RANCH
cc: File
08-106/Permit
Permit Number
(to be provided by DWQ)
?W 2pE W A rF9O
NCDEHR c
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WETLAND SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information.
1: RJECT RFORNATI
Project name Wake County Continuum of Care
Contact name Jason Kennedy
Phone number 919.456.6056
Date March 25, 2009
Drainage area number N/a
'll:: ?.? ?NFOIITIC?N
Site Characteristics
Drainage area 380,714.40 ftz
Impervious area 194,277.60 ftz
Percent impervious 51.0% %
Design rainfall depth 1.00 inch
Peak Flow Calculations
1-yr, 24-hr rainfall depth 3.00 in
1-yr, 24-hr intensity 3.00 in/hr
Pre-development 1-yr, 24-hr runoff ft3/sec
Post-development 1-yr, 24-hr runoff ft3/sec
Pre/Post 1-yr, 24-hr peak control ft3/sec
Storage Volume: Non-SA Waters
Minimum required volume 16,157.00 ft3
Volume provided (temporary pool volume) Design volume may be insufficient. Provide calculations
16,157.00 ft3 showing that it is greater than or equal to the Simple
Method volume.
Storage Volume: SA Waters Parameters
1.5" runoff volume ft3
Pre-development 1-yr, 24-hr runoff volume ft3
Post-development 1-yr, 24-hr runoff volume ft 3
Minimum volume required ft3
Volume provided ft3
Outlet Design
Depth of temporary pool/ponding depth (Dp?antJ 12.00 in OK
Drawdown time 3.20 days OK
Diameter of orifice 2.00 in Drawdown orifice diameter may be insufficient. Please
provide adequate supporting calculations.
Coefficient of discharge (CD) used in orifice diameter
0.60 (unitless)
calculation
Driving head (Ho) used in the orifice diameter calculation 1.00 ft OK
e..-... 011VAn4 ler..a__., n_... nuninn
Permit Number
(to be provided by DWQ)
Surface Areas of Wetland Zones
Surface Area of Entire Wetland
Shallow Land
The shallow land percentage is:
Shallow Water
The shallow water percentage is:
Deep Pool
Forebay portion of deep pool (pretreatment)
The forebay surface area percentage is:
Non-forebay portion of deep pool
The non-forebay deep pool surface area percentage is:
Total of wetland zone areas
Add or subtract the following area from the zones
Topographic Zone Elevations
Temporary Pool
Shallow Land (top)
Permanent Pool
Shallow Water (top)
Deep Pool (top)
Most shallow point of deep pool's bottom
Deepest point of deep pool's bottom
Design must meet one of the following two options:
This design meets Option #1,
Deep pool is 6inches below SLWT, If yes:
SLWT (Seasonally Low Water Table)
This design meets Option #2,
Has a clay liner
If yes:
Depth of topsoil above clay liner
Topographic Zone Depths
Temporary Pool
Shallow Land
Permanent Pool
Shallow Water
Deep Pool (shallowest)
Deep Pool (deepest)
Planting Plan
Are cattails included in the planting plan?
Number of Plants recommended in Shallow Water Area:
Herbaceous Wcubic-inch container)
Number of Plants recommended in Shallow Land Area:
Herbaceous (4'cubic-inch container), OR
Shrubs (1 gallon or larger), OR
Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch)
Number of Plants provided in Shallow Water Area:
Herbaceous Wcubic-inch container)
Number of Plants provided in Shallow Land Area:
Herbaceous Wcubic-inch container)
Shrubs (1 gallon or larger)
Trees (3 gallon or larger) and
Grass-like Herbaceous (4+ cubic-inch)
17,972.00 ftz OK
6,061.00 ftz OK
0.34%
7,230.00 ftz OK
0.40%
1,924.00 ftz OK
0.11 %
1,653.00 ftz OK
0.09%
16,868.00 ft2 Enter data into the shaded cells in this section.
-1,104.00 ftz
208.00 fmsl
207.00 fmsl
206.50 fmsl
205.00 fmsl
203.00 fmsl
(Y or N)
fmsl
Y
6.00 in
12.00 in OK
6.00 in OK
18.00 in OK
42.00 in Insufficient deep pool depth.
N (Y or N) OK
1,850
1,550
248
31 and 1,240
232 Higher density is recommended.
217 More recommended if not planting shrubs or trees.
123 More recommended if not planting herb. and/or trees.
31 OK
0 More recommended if planting trees.
Form SW401-Wetland-Rev.4-2/10/09 Parts I and U. Project Design Summary, Page 2 of 3
Permit Number
(to be provided by DWQ)
Additional Information
Can the design volume be contained?
Does volume in excess of the design volume flow evenly
distributed through a vegetated filter?
What is the length of the vegetated filter?
Are calculations for supporting the design volume provided in the
application?
Is BMP sized to handle all runoff from ultimate build-out?
Is the BMP located in a recorded drainage easement with a
recorded access easement to a public Right of Way (ROW)?
The length to width ratio is:
Approximate wetland length
Approximate wetland width
Approximate surface area using length and width provided
Will the wetland be stabilized within 14 days of construction?
Y (Y or N) OK
N (Y or N) Excess volume must pass through filter.
0.00 ft
Y (Y or N) OK
Y (Y or N) OK
N (Y or N) Insufficient ROW location.
2.63 :1 OK
226.00 ft
86.00 ft
19,436.00 ft2 This approx. surface area is within this number of square
feet of the entire wetland surface area reported above:
Y (Y or N) OK
Form SW401-Wetland-Rev.4-2/10/09 Parts I and II. Project Design Summary, Page 3 of 3
09-0312
0 Qc
M ° Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
F[01 Section 404 Permit El Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ® Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1 f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
? Yes No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Wake County Continuum of Care
2b. County: Wake County
2c. Nearest municipality / town: City of Raleigh a
2d. Subdivision name: N/A L Lj
2e. NCDOT only, T.I.P. or state
project no: N/A __UV T5 2009
3. Owner Information DENR - WATER WALITY
WETLANDS AND STORffiWA
3a. Name(s) on Recorded Deed: County of Wake
3b. Deed Book and Page No. DB-2005 Pg. 1650
3c. Responsible Party (for LLC if
applicable):
Philip D. Stout
3d. Street address: 336 Fayetteville Street.
3e. City, state, zip: Raleigh, NC 27602
3f. Telephone no.: 919-856-6357
3g. Fax no.: 919-856-5305
3h. Email address: pstout@co.wake.nc.us
Page I of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Jason Kennedy
5b. Business name
(if applicable): CLH Design, P.A.
5c. Street address: 400 Regency Forest
5d. City, state, zip: Cary, NC 27511
5e. Telephone no.: 919-617-6716
5f. Fax no.: 919-319-7516
5g. Email address: jkennedy@clhdesignpa.com
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 1724401187
1 b. Site coordinates (in decimal degrees): Latitude: 35.4715 Longitude: - 78.3494
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 18.924 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Crabtree Creek
2b. Water Quality Classification of nearest receiving water: C:NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Undeveloped, mostly wooded site with some severe slopes and an on-site stream subject to Neuse Buffer rules. General
land use in vicinity varies from high density residental to mixed office
3b. List the total estimated acreage of all existing wetlands on the property:
N.A.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
Crabtree Creek: 600 LF. Other: 500 LF.
3d. Explain the purpose of the proposed project:
Mental Health medical treatment facility
3e. Describe the overall project in detail, including the type of equipment to be used:
New commercial construction, associated parking, utilities, and roadway improvments to Sunnybrook and Merrell Drive
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
? Yes ®No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ® No
? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ® Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404 width (linear
Temporary (T) (INT)? ,
other) (feet) feet)
S1 ?P?T ?PER ?Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID
Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland
b (acres)
num
er of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
B1 ®P ? T Storm
Outfall Crabtree Creek ? Yes
® No 600 400
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts 600 400
6i. Comments: Buffer impact for outfall of stormwater BMP. Diffuse flow to the buffer is not possible due to topography.
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Development plan includes no other impacts to the buffers. Proposed impact is require DWQ BMP manual and Neuse Buffer
Rules.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
With the exception of the stormwater outfall, the site development plan does not create any additional impacts to the buffer.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ? No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: Diffuse flow to the buffer is not possible given the topography of the site ? Yes ® No
and the buffer. A stormwater wetland is proposed to provide 30% nutrient reduction
and will discharge directly to crabtree creek. .
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? (20.0) %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project is excempt from City of Raleigh
Stormwater Regulations. However, a report has been prepared which outlines the design and performance of the
stormwater wetland.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
® Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? City of Raleigh
® Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
apply (check all that apply): ? USMP
? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a. Which of the following state-implemented stormwater management programs apply El HQW
? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Sanitary Sewage generated from the proposed facilities will be conveyed to the City of Raleigh Sewer main located to the
east of the site running along Crabtree Creek.
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ® El Yes No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
N/A
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
City of Raleigh Planning Department
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Flood plan as shown on project survey.
Jason Kennedy % i
A 3-25-09
Applicant/Agent's Printed Name UAgen s Signature Date
is
(Agent's sy if an aut horization letter from the applicant
is rovided.
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
9TSl,-sTS W6 :XQJ
9TZ9-61E (6T6 :auogd
919za aupo.193 W-ION "Quo
OZT a7rng
9A.FJa }saaod .fouaffag 00th
Yd 'NDIS3a HD
f?
I
m
aJ
T? N 4
-? C7
w
dVW lDbdWl 21333(18 MAIN 3sn3N
901-90 -"ON 1031Obd
60OZ•SZ•£ 91YO
dM DVdWl
321d:) 30 wnnNI1N0:) AINnOD DIVM
,OZ = „ L :31VDS
F
CV
co
O
O
0
a