HomeMy WebLinkAbout20070812 Ver 2_APGI Discharge Sampling_20090319RE: [Fwd: APGI Discharge Sampling]
Subject: RE: [Fwd: APGI Discharge Sampling]
From: "Ellis, H. Gene" <Gene. Elli s@alcoa. com>
Date: Thu, 19 Mar 2009 09:37:08 -0400
To: "John Dorney" <john.dorney@ncmail.net>, "Griffin, 111, Thomas N."
<tomgri ffin@parkerpoe. com>
CC: "Pete Caldwell" <peter.caldwell@ncmail.net>, "Roger Edwards" <Roger.Edwards@ncmail.net>,
"Jon Risgaard" <Jon.Risgaard@ncmail.net>, "Wendy Bley (E-mail)" <bleylva@aol.com>, "Bromby,
Craig A." <cbromby@hunton.com>, "Case, Charles D." <ccase@hunton.com>, "Ellis, H. Gene"
<Gene.Ellis@alcoa.com>
John and Tom,
On March 11, discharge at Narrows Powerhouse ceased at 11 a.m. and did not come on
again until after 2 p.m. Although sampling occurred immediately after shut-down
(between 11 a.m. and noon), there was no discharge at the time of sampling. As a
result, APGI will resample the Narrows Powerhouse discharge, probably on Monday
March 30 before 11 a.m. (subject to generating units operating, which we
anticipate at this point). We will keep folks informed about the generating
schedule.
Do DWQ and Stanly County want to sample again also?
Gene
-----Original Message-----
From: John Dorney [mailto:john.dorney@ncmail.net]
Sent: Monday, March 16, 2009 4:04 PM
To: Ellis, H. Gene
Cc: Pete Caldwell; Roger Edwards; Jon Risgaard; Griffin, III, Thomas N.
Subject: [Fwd: APGI Discharge Sampling]
Gene - what were the conditions of the turbines with respect to hydropower
operation when the water sample was taken below the NArrows dam last week (and the
other dams for that matter too)? See Tom Griffin's email below for details.
thankx
John Dorney
Wetland Program Development Unit
Parkview Building
2321 Crabtree Blvd.
Raleigh, NC 27604
(o) 919-733-9646
/E-mail correspondence to and from this address may be subject to the North
Carolina Public Records Law and may be disclosed to third parties./
1 of 1 3/19/2009 2:21 PM