Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00364_Compliance Evaluation Inspection_20180302
ROY COOPER Governor MICHAEL S.REGAN Secretary `' j I LINDA CULPEPPER Interim Director Water Resources Environmental Quality March 2,2018 Rockingham County Attn:Lance Metzler, County Manager REOEgVp/OENR/OWR P.O.Box 101 Wentworth, NC 27375 MAR 15 2018 Water Resources Subject Compliance Evaluation Inspection Ertine ounce Section Permittee: Rockingham County Facility: Rockingham County Wastewater Collection System Permit#: WQCS00364 Rockingham County Dear Mr. Metzler: 1. Ron Boone, of the Winston-Salem Regional Office of the NC Division of Water Resources (DWR or the Division) conducted a compliance evaluation inspection (CEI) of the Rockingham County wastewater collection system (WWCS) on February 27, 2018.The assistance and cooperation of Eric Thompson, Operator in Responsible Charge(ORC),was greatly appreciated. An inspection checklist is attached for your records and inspection findings are summarized below. Si ISystem Review 2. The following system components were inspected: a. The two subwaterway crossing high priority lines (HPL) located on the Wentworth Elementary/Cherokee Camp Road outfall, were inspected and found to be in good condition No discrepancies were noted. b. The Wentworth Elementary School pump station (PS) was inspected and found to be in good condition. No discrepancies were noted. c. The Middle/High School PS was inspected and found to be in good condition. No discrepancies were noted. As you are aware,your permit contains numerous requirements with which Rockingham County must comply. Your compliance status with each of these requirements is summarized below: Part I Performance Standards - T�1c31 irAg Compares----, State of North Carolina j Environmental Quality 450 W Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105 Phone.336-776-9800\FAX 336-776-9797 a. Part I, Paragraph 2: The wastewater collection system shall be effectively managed, maintained and operated at all times so that there is no SSO to land or surface waters, nor any contamination of groundwater. In the event that the wastewater collection system fails to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective actions, including actions that may be required by the Division of Water Quality(Division), such as the construction of additional or replacement sewer lines and/or equipment. Observations: In full consideration of all observations made during the inspection, as reflected in paragraph 2 above, as well as in the following paragraphs, Rockingham County is hereby deemed compliant with this permit condition. Compliance Status: Compliant b. Part I, Paragraph 3: The Permittee shall establish by ordinance its legal authority to require new sewers be properly constructed; to ensure proper inspection and testing of sewer mains and service laterals;to address flows from satellite systems and to take enforcement action as required by Condition 1(4). Observations: The sewer use ordinance (SUO) meets all requirements. Compliance Status: Compliant c. Part I, Paragraph 4: The Permittee shall develop and implement an educational fats, oils and grease program targeted at both residential and non-residential users. The Permittee shall also develop and implement an enforceable fats, oils and grease program for non-residential users under which the Permittee can take enforcement against users who have not properly installed, operated and maintained grease traps or grease interceptors as directed or otherwise violated the terms of the local ordinance pertaining to fats, oils and grease. Observations: Fats, Oils and Grease (FOG) educational materials, in the form of a letter, were mailed to all residents in January and July,2017, as well as in January,2018.The county has also identified nine grease traps and they are inspected every six months. To date, no enforcement actions have been necessary. Compliance Status: Compliant d. Part I, Paragraph 5: The Permittee shall adopt and implement a Capital Improvement Plan (CIP) to designate funding for reinvestment into the wastewater collection system infrastructure.The CIP should address the short-term needs and long-term "master plan" concepts. The CIP should typically cover a three to five year period and include a goal statement, description of the project area, description of the existing facilities, known deficiencies (over a reasonable period) and forecasted future needs. Cost analysis is integral to the CIP. Observations: The CIP covers 2017/2022 and budgets $185K for reinvestment back into the collection system. Compliance Status: Compliant e. Part I, Paragraph 6: Existing overflow piping from manholes and pump stations,excluding piping to approved equalization structures, known or discovered after permit issuance shall be immediately removed or permanently capped. Plugged emergency pumping connections are allowable for portable pumping or rerouting without intentionally bypassing the wastewater treatment facility. Observations: No such overflows were identified during the inspection and Mr.Thompson stated that he believes that none exist. Compliance Status: Compliant f. Part I, Paragraph 7: The Permittee shall maintain a contingency plan for pump failure at each pump station. If one of the pumps in a pump station containing multiple pumps fails, the process of repairing or replacing the pump shall be initiated immediately and the new parts or pump shall be installed as soon as possible. If the pump in a simplex pump station fails, it shall be replaced immediately. Observations: The County's pump station contingency plan meets all requirements. Compliance Status: Compliant g. Part I, Paragraph 8: Each pump station shall be clearly and conspicuously posted with a pump station identifier and an emergency contact telephone number at which an individual who can initiate or perform emergency service for the wastewater collection system 24 hours per day,seven days per week can be contacted. This emergency contact telephone number shall be coupled with instructions that the emergency contact should be called if the visual alarm illuminates, if the audible alarm sounds, or if an emergency is apparent. Observations: All pump stations inspected had the required signage. Compliance Status: Compliant h. Part I,Paragraph 9: Pump station sites,equipment and components shall have restricted access, per 15A NCAC 2H .0219(h)(7). Observations: All pump stations inspected were sufficiently secured to provide restricted access. Compliance Status: Compliant i. Part I, Paragraph 10: Pump stations that do not employ an automatic polling feature (i.e. routine contact with pump stations from a central location to check operational status of the communication system)shall have both audible and visual high water alarms. The alarms shall be weather-proof and placed in a clear and conspicuous location. Permits issued for the construction of pump stations that included high water alarms in the description must maintain the alarms even if simple V telemetry (i.e. notification of an alarm condition initiated by the pump station control feature) is installed. Observations: The County has 14 duplex PSs, all of which have telemetry and audible/visual (NV) alarms. Some of the PSs also have SCADA systems.All PSs meet the permit requirements specified above. Compliance Status: Compliant j. Part I, Paragraph 11: For all newly constructed, modified and rehabilitated pump stations, all equipment and components located within the pump station shall be corrosion-resistant and components in close proximity .of the pump station shall be sealed within a corrosion-resistant coating or encasement. Observations: Mr. Boone noted no conditions during the inspection that demonstrate noncompliance with this permit condition. Compliance Status: Compliant k. Part I, Paragraph 12: All construction and rehabilitation of the wastewater collection system (i.e., permitted or deemed permitted) shall be scheduled to minimize the interruption of service by the existing utilities. Construction and rehabilitation shall not result in the violation of Condition 1.2. of this permit. Observations: No conditions that demonstrate noncompliance with this permit condition were noted during the inspection. Compliance Status: Compliant Part II, Operation and Maintenance Requirements I. Part II, Paragraph 1: Upon classification of the collection system by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall designate and employ a certified operator to be in responsible charge(ORC)and one or more certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The ORC shall visit the system within 24 hours of knowledge of a bypass,spill,or overflow of wastewater from the system, unless visited by the Back-Up ORC, and shall comply with all other conditions of 15A NCAC 8G .0204. Observations: Both the ORC, Eric Thompson (Grade 4), and backup ORC, Keith Tucker(Grade 2), have been properly designated as required. Please note the county can designate any number of backup ORCs as long as the individuals designated meet the minimum requirements. Compliance Status: Compliant m. Part II, Paragraph 2: The Permittee shall develop and adhere to a schedule for reviewing all inspection, maintenance, operational and complaint logs. If the review process results in the identification of any recurring problem in the wastewater collection system,that cannot be resolved in a short time period, the Permittee shall establish a plan for addressing the problem(s). Observations: Mr.Thompson reviews all such records as they are generated and then signs and dates the records. Compliance Status: Compliant n. Part II,Paragraph 3: The Permittee shall develop and adhere to a schedule for testing emergency and standby equipment. Observations: The County has generators at 12 of its 14 PSs. Some are mobile but most are permanent hard mounts. Each generator is tested every Wednesday. Compliance Status: Compliant o. Part II, Paragraph 4: The Permittee shall develop and implement a routine pump station inspection and maintenance program, which shall include, but not be limited to, the following maintenance activities: 1. Cleaning and removing debris from the pump station structure, outside perimeter, and wet well; 2. Inspecting and exercising all valves; 3. Inspecting and lubricating pumps and other mechanical equipment according to the manufacturer's recommendations; and 4. Verifying the proper operation of the alarms, telemetry system and auxiliary equipment. Observations: The pump station inspection/maintenance program includes all items required above.All PSs are inspected on Mondays, Wednesdays, and Fridays. Compliance Status: Compliant p. Part II, Paragraph 5: For each pump station without pump reliability (i.e. simplex pump stations serving more than a single building or pump stations not capable of pumping at a rate of 2.5 times the average daily flow rate with the largest pump out of service), at least one fully operational spare pump capable of pumping peak flow shall be maintained on hand. Observations: All PSs meet reliability requirements. Compliance Status: Not Evaluated q. Part II, Paragraph 6: The Permittee shall maintain on hand at least two percent of the number of pumps installed,but no less than two pumps,that discharge to a pressure sewer and serve a single building, unless the Permittee has the ability to purchase and install a replacement pump within 24 hours of first knowledge of the simplex pump failure or within the storage capacity provided in any sewer line extension permit. v Observations: This permit condition is not applicable. The simplex PSs installed within the county's system remain the responsibility of the individual building owners. Compliance Status: Not Applicable r. Part II, Paragraph 7: Rights-of-way and/or easements shall be properly maintained to allow accessibility to the wastewater collection system unless the Permittee can demonstrate the ability to gain temporary access in an emergency situation where existing land-use conditions do not allow the establishment and maintenance of permanent access. In this case, the Permittee shall continue to observe the lines visually, utilize remote inspection methods (e.g. CCTV) and use the opportunity of drier conditions to perform further inspections and necessary maintenance. Observations: All right-of-ways (ROW) evaluated during the inspection were sufficiently maintained and records are sufficient. Compliance Status: Compliant s. Part II, Paragraph 8: The Permittee shall assess cleaning needs and develop and implement a program for appropriately cleaning, whether by hydraulic or mechanical methods, all sewer lines. At least 10 percent of the wastewater collection system, selected at the discretion of the ORC, ,? shall be cleaned each year. Preventative cleaning is not required for sewer lines less than five years old unless inspection otherwise reveals the need for cleaning or cleaning is required by a sewer line extension permit. Observations: Line cleaning for this year hasn't been accomplished yet, but is in the planning phase. Compliance Status: Not Evaluated t. Part II, Paragraph 9: Adequate measures shall be taken to contain and properly dispose of materials associated with SSOs. The Permittee shall maintain a Response Action Plan that addresses the following minimum items: 1.Contact phone numbers for 24-hour response, including weekends and holidays; 2.Response time; 3.Equipment list and spare parts-inventory; 4.Access to cleaning equipment; 5.Access to construction crews, contractors and/or engineers; 6.Source(s) of emergency funds; 7.Site sanitation and clean up materials; and 8.Post-SSO assessment. Observations: The Sanitary Sewer Overflow (SSO) Response Action Plan (RAP) meets requirements. Compliance Status: Compliant u. Part II, Paragraph 10: The Permittee, or their authorized representative,shall conduct an on-site evaluation for all SSOs as soon as possible, but no more than two hours after first knowledge of the SSO. Observations: No conditions that demonstrate noncompliance with this permit condition were noted during the inspection. Compliance Status: Compliant v. Part II,Paragraph 11: In the event of a SSO or blockage within the wastewater collection system, the Permittee shall restore the system operation, remove visible solids and paper, sanitize any ground area and restore the surroundings. Observations: No conditions were noted that demonstrate noncompliance with this permit condition. Compliance Status: Compliant Part III, Records w. Part III, Paragraph 1: Records shall be maintained to document compliance with Conditions 1(4), 11(2) - 11(4), 11(7) - 11(8), IV(3) and V(1) -V(4). Records shall be kept on file for a minimum of three years. Observations: Sufficient records were available for all permit conditions noted above. Compliance Status: Compliant x. Part III, Paragraph 2: The Permittee shall maintain adequate records pertaining to SSOs, and complaints for a minimum of three years. These records shall include, but are not limited to, the following information: 1 Date of SSO or complaint, 2. Volume of wastewater released as a result of the SSO and/or nature of complaint; 3. Location of the SSO and/or complaint; 4. Estimated duration of the SSO; 5. Individual from the Division who was informed about the SSO and/or complaint, when applicable; 6. Final destination of the SSO; 7. Corrective actions; 8. Known environmental/human health impacts resulting from the SSO; and 9. How the SSO was discovered. Observations: All required SSO/Complaint records were readily available for inspection and were found to be complete, accurate and current. Compliance Status: Compliant y. Part Ill, Paragraph 3: The Permittee shall maintain an up-to-date, accurate, comprehensive map of its wastewater collection system that also notes the locations where other wastewater collection systems become tributary. If a comprehensive map of the collection system has not been established, a rough sketch shall be drawn. The Permittee shall map approximately 10 percent of its existing collection system each year for the next ten years, or until complete, whichever is sooner. The comprehensive map shall include, but is not limited to: pipe size, pipe material, pipe location, flow direction, approximate pipe age, number of active service taps, and each pump station identification, location and capacity. Observations: The maps meet all permit requirements. Compliance Status: Compliant z. Part Ill, Paragraph 4: The Permittee shall maintain records of all of the modifications and extensions to the collection system permitted herein. The Permittee shall maintain a copy of the construction record drawings and specifications for modifications/extensions to the wastewater collection system for the life of the modification/extension. Information concerning the extension shall be incorporated into the map of the wastewater collection system within one year of the completion of construction. The system description contained within this permit shall be updated to include this modification/extension information upon permit renewal. Observations: The county maintains record drawings and specifications in the county offices. Maps are updated as soon as possible. Compliance Status: Compliant Part IV, Monitoring and Reporting Requirements aa Part IV, Paragraph 2: The Permittee shall verbally report to a Division of Water Quality staff member at the Winston-Salem Regional Office, at telephone number 336-776-9800 as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: 1.Any SSO and/or spill over 1,000 gallons; or 2.Any SSO and/or spill, regardless of volume,that reaches surface water. Observations: No conditions were observed during the inspection,which indicate noncompliance with this permit requirement. Compliance Status: Compliant • bb. Part IV,Paragraph 3: The Permittee shall meet the annual reporting and notification requirements provided in North Carolina General Statute§143-215.1C. Observations: Annual reports were available for review. All notification and reporting requirements have been met. Compliance Status: Compliant Part V, Inspections cc. Part V, Paragraph 1: The Permittee or the Permittee's designee shall inspect the wastewater collection system regularly to reduce the risk of malfunctions and deterioration, operator errors, and other issues that may cause or lead to the release of wastes to the environment, threaten human health or create nuisance conditions. The Permittee shall keep an inspection log or summary including, at a minimum, the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. Observations: The county is deemed compliant with this permit condition. Compliance Status: Compliant dd. Part V, Paragraph 2: Pump stations without Supervisory Control and Data Acquisition (SCADA) systems or telemetry shall be inspected everyday(i.e.365 days per year). Pump stations equipped with SCADA systems or telemetry shall be inspected at least once per week. Observations: Mr. Thompson stated that all PSs are inspected every Monday, Wednesday, and Friday.All PSs have telemetry and/or SCADA systems, along with audible/visual alarms. Compliance Status: Compliant ee. Part V, Paragraph 3: A general observation of the entire collection system shall be performed throughout the course of every year. Observations: Mr. Thompson provided a certification statement that the entire system has been observed throughout the course of the past year. Compliance Status: Compliant ff. Part V, Paragraph 4: Inspections of all high priority lines (i.e. aerial line, sub-waterway crossing, line contacting surface waters, siphon, line positioned parallel to stream banks that are subject to eroding in such a manner that may threaten the sewer line, or line designated as high-priority in a permit)shall be performed at least once per every six month period of time. New high priority lines installed or identified after permit issuance are incorporated by reference and subject to this permit condition until permit renewal where they shall be referenced in writing. Observations: High priority lines are being inspected as required. Compliance Status: Compliant 4. Please note that violations of the permit are subject to civil penalty assessments not to exceed$25,000 per day, per violation. a 5. Please encourage Mr. Thompson and his subordinates to keep up the excellent work in the operation and maintenance of the county's wastewater collection system. If you have any questions regarding the inspection or this letter, please call Ron Boone or me at (336) 776-9800. Thank you for your cooperation in this matter. Sincerely, >4 ge,i,“)-V-, eucgAlt--- Sherri V. Knight, P.E., Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Attachments: 1. BIMS Inspection Report CC: WSRO—SWP Central Files PERCS Unit Compliance Inspection Report Permit: WQCS00364 Effective. 11/01/16 Expiration: 10/31/24 Owner: Rockingham County SOC: Effective: Expiration: Facility. Rockingham County Collection System County: Rockingham Region: Winston-Salem Contact Person: Ronnie Tate Title: Dir Eng&Public Utilities Phone: 336-342-8104 Directions to Facility: System Classifications: CS2, Primary ORC: Eric Wayne Thompson Certification: 990703 Phone: 336-342-8407 Secondary ORC(s): On-Site Representative(s): Related Permits: NC0021873 Town of Mayodan-Mayodan VWVfP NC0025071 City of Eden-Mebane Bridge VWVTP Inspection Date: 02/27/2018 Entry Time: 09 OOAM Exit Time: 01 OOPM Primary Inspector: Ron Boone Phone: 336-776-9690 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status. II Compliant Not Compliant Question Areas: Miscellaneous Questions Performance Standards • Operation&Maint Reqmts El Records • Monitoring&Rpting Reqmts II Inspections Pump Station S Lines (See attachment summary) Page 1 Permit: WQCS00364 Owner-Facility.Rockingham County Inspection Date: 02/27/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary Please refer to the attached inspection summary letter. Page 2 Permit: WQCS00364 Owner-Facility.Rockingham County Inspection Date: 02/27/2018 Inspection Type.Collection System Inspect Non Sampling Reason for Visit: Routine Performance Standards Yes No NA NE Is Public Education Program for grease established and documented? • 0 0 0 What educational tools are used? Letters mailed Is Sewer Use Ordinance/Legal Authority available? • 0 0 0 Does it appear that the Sewer Use Ordinance is enforced'? • 0 0 0 Is Grease Trap Ordinance available'? • 0 0 0 Is Septic Tank Ordinance available(as applicable,i e annexation) 0 0 0 MI List enforcement actions by permittee,if any,in the last 12 months Has an acceptable Capital Improvement Plan(CIP)been implemented? • 0 0 0 Does CIP address short term needs and long term\"master plan\"concepts'? • 0 0 0 Does CIP cover three to five year period? • 0 0 0 Does CIP include Goal Statement'? • 0 0 0 Does CIP include description of project area'? • 0 0 0 Does CIP include description of existing facilities? • 0 0 0 Does CIP include known deficiencies? • 0 0 0 Does CIP include forecasted future needs? • 0 0 0 Is CIP designated only for wastewater collection and treatment? • 0 0 0 Approximate capital improvement budget for collection system? $185,000 00 Total annual revenue for wastewater collection and treatment? CIP Comments None Is system free of known points of bypass? • 0 0 0 If no,describe type of bypass and location Is a 24-hour notification sign posted at ALL pump stations'? U 0 0 0 #Does the sign include Instructions for notification? • 0 0 0 Pump station identifier? • 0 0 0 24-hour contact numbers • 0 0 0 If no,list deficient pump stations #Do ALL pump stations have an"auto polling"feature/SCADA? 0 II 0 0 Number of pump stations 14 Number of pump stations that have SCADA 7 Number of pump stations that have simple telemetry 14 Number of pump stations that have only audible and visual alarms 14 Number of pump stations that do not meet permit requirements 0 Page. 3 N 5 * 2 D > D v, o 3 w D yD g o C7 D O n 2 D * * > > > > D 5 n o Cl) .D'. y N (D (D co ill t0 .d. fm/, fm/, O) 0 co 0 0 CD CD CD CD m N 0 �< O cn < °' < `,° ca 7m v7, u7, c m = ID 3 m y < m o m m 7 m m 'D m °) y 7' d m a a a v, 7• 0) 7 fN N3 m 0 0 0 7 n 0 Cl) n 3 0- N co m m 5 Cl) m m m ° -o0m 5 m a o CD o o D o = (D fo m 3 v+ O. 30 a O. 0) v, c m CO m a .7.,. CT D (D CD m C) > CD j 7 7f Cl) CD m Cl) m m `—' , Cl) m cc cc co a CD Cl) Cl) o. m CD 0 Q° C Cl) Cr m < O o < n) w m CD o 7 v, co j tai, N p 7 7 0 7 fl. N m03. W O N Z < d cmi, N CD N CD Z , A Co m 7' o, co 0 'm m v_, m c ' m 0 o < < O c v a, Sr. m m 6 m O m m CD 3 D m 0 w y C x Q a, CD 0) 0 m 7, m Cl) N 7 N CD mm N CD 00 7 3 m 2 o EL m �' 0 0 a Cl) m n n o Q a < Cl) y CD N 5 m Z a N 7 m c .. 0 0. D O .< co m m fl: 0 m C -,, to m C O w m m CD < !2 a o 3 0) o a 3 5 7 > O. rt o o < a o J CD 0 o n o c o IQ n CJ C) C .m. CO CO 5 m m 0) f0 C) O C) 'O C) y N O Cl) 0 Cm0 < N 10 a Ol D3 CO y * N 0- X1 O C 5 7 c .0 0 C0 3 0 O Cl) CD 0 Cl) to 7 a — Cl) CD c 7 o co o 7 3 m 3 0. ao rn Cl) ▪ m 0, CS O O. Q N < Q m f0 3 co N N C 7. 0 '� C1 a .7.. 0 A 5 m m 1 CD d < 0. m a m c CD J 5 w 0 C Q J co f7D m ... CD CD 7 m3 a 0 3 Cl) N 3 a 3 CD O J CD 5 O' S 0 x N 0 <3 < 0 N 41 0 m ? m •fD 7 m a N a Cl) a 0) < • m Cl) O_ O0• C H O O Cl) N 0 W 0 ° 00)) co S x+CD m .7. c m 0 _0 < a 0 m o3) 3 Cl) O m 0 a 7 w 7 m 3 - J O m a c ID .� J 7 <D CT 5 -` 5 m 0) 0 7 J J J 7 N 7 3 co J = 3 3 - v 7 0 a y c5 5 w aai ca m - 3 0 7 m C `< Cl) 0. J 5 7' m O J N f) 0 '0 0 7 m J 7 -a m cc) - "0 0 7 C) (D 0 7 0 J CD 0 CD �p C a RD '�' m CD CD m Cl) 0 T CD 3 J 0 m x - 0 0 < fD -1 m c7) a m g 3 5 3 - m y m m J J 3 a 7 .0 CD o. 0 .. , 0 O 7' N C0 •o O CT 7 J fD J N C) �+ m3 m x CO 3 J 7 O CD N CD 7 m Cl)7 J ..< 0 a a 3 C a <- Q 3 N m -o 3 co 0) a 3 z 0 N 0 NCD J Cl) 3 v 5 to XI M D) 0 0 7 M O V, Fe • ❑ . ■ ■ ❑ ■ ■ ■ . fD ■ • • •■ •■ N ■ ■ ■ ■ ■ ❑ ■ ■ ■ CD 0 Elp O ❑ 0CD 00000000 , ❑ ❑ 000 ° ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Z ❑ CD ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ 0E10 ' z ❑ ❑ ❑ ❑ ❑ 000 Z 0 El El El El ID El GI 1:10 ❑ ❑ ❑ ❑ m El El El El El El El El m 0 • II Permit: WQCS00364 Owner-Facility:Rockingham County Inspection Date. 02/27/2018 Inspection Type:Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include 24-hour contact numbers • 000 Response time • 000 Equipment list and spare parts inventory • 000 Access to cleaning equipment • 000 Access to construction crews,contractors,and/or engineers • 000 Source of emergency funds • 000 Site sanitation and cleanup materials • 000 Post-overflow/spill assessment • 000 Is a Spill Response Action Plan available for all personnel? • 000 Is the spare parts inventory adequate'? • 000 Comment None Records Yes No NA NE Are adequate records of all SSOs,spills and complaints available? • 000 Are records of SSOs that are under the reportable threshold available'? • 000 Do spill records indicate repeated overflows(2 or more in 12 months)at same location'? 0100 If yes,is there a corrective action plan'? 00110 Is a map'of the system available'? • 000 Does the map include Pipe sizes • 000 Pipe materials • 000 Pipe location • 000 Flow direction • 000 Approximate pipe age II 000 Number of service taps • 000 Pump stations and capacity • 000 If no,what percent is complete' List any modifications and extensions that need to be added to the map #Does the permittee have a copy of their permit'? • 000 Comment None Monitoring and Reporting Requirements Yes No NA NE Are copies of required press releases and distribution lists available'? • 000 Are public notices and proof of publication available'? • 000 #Is an annual report being prepared in accordance with G S 143-215 1 C'? • 000 #Is permittee compliant with all compliance schedules in the permits? 0010 If no,which one(s)? Page 5 W ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ W ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ W ❑ ❑ ❑ ❑ ❑ ❑ CO < 00110111 • 01:10 < 0000 • 11101:10 « EIDDDD s ) ° El El • ❑ El El El a ❑ ❑ El • El El ❑ M m El El ❑ ❑ ❑ (13 o re &2 • • • 000 • • 1=1 / •u • ❑ ❑ ❑ i u ❑ ƒ ƒ • • • • • • I o( CL E Co k 7.5 0. CR \ { § / C 15 \ 0- :2 0 y a a, E t 2 2 f = o 2 C CD t c .c .c oc- c ° C c- 8 9 0 0 \ / a a) 2 0 c , 2 ecs - - 2 cp 0 Q g § 2 § Q CS - # 2 0 N 2 0" c0 2 q a o 0 0 o o C ƒ i k k # § ° ° ■ E 0 t f o E § § $ a 2 / C a / r ) co k / k k k k / a, a k 2 k f k \ k E m To a) a -o — o o = - 2 e e # -0 — 2 0 = 0. 0 0 . .0 ° 0 2 0 - o > Ti,' 0. / i t , C $ o & 2 { 0. 7 & » 2 ® _ $ 0 . k « 5 E k E / 2 < 2 k t k § Cl) k ECO / k k k CS 0 .. .. 2 ' 1 ° ° ° as k 2 / ' XI ° © \ / ` ct. 2 S k $ al k 0 z < J co 0 � k co J - § « f § \ ® C. m $ = o o g t E CO O. Ca @ = m § E _ o@ e k E 2 w 0. c § CL a) ce 9 7 k © 0 co > 0. 2 9 % ¥ u) -o al 2 # c & g 2 $ a o o. 7 / 7 CO o al ¢ ° o ° Zii a) y / - 7 7 � 2 a 0 o { 2 f 2 0 2 ° k 2 E 6 CR E / 7 C 2 a 0 .C § / § E / 2 7 7 k % k % ". .0 m 2 / d ) E q c - k 2 2 / 2 _ < \ § q c - .- < / P2 . - < \ E E E \ / f — — & O m n k k 9 ■ ■ < ■ 2 _ . 0 0 LI - k a _ < # 2 a 0 > 2 cL < a _ < < < L e6ed O 0 0 • a;uesand sdwnd ve any O 0 0 • 6e ge}daooe 6uidee esnoy lenaue6 sl# O 0 0 • i,suogIpuoo Jay;earn Ike ui aigisseooe O 0 0 • ‘,aigepene s6oi uol;e;s dwnd any xeIdna adl(}uoi;e}s dwnd 3N HN oN seA LWId !W - Sd HOS HOIH/31G IW auoN :;uawwo3 sac 4,sdwnd aldI lnw Jo;aigenedwoo sewq uni aJy O 0 0 • 4,nnognano;o su6is;o awl uoge;s dwnd all sl ❑ ❑ 0 • 4,6wdid Moweno;o eau uoi}e;s dwnd s� O 0 0 • e,pepwg sseme oggnd sl O ❑ 0 • Jegwnu euoyd/(oua6iew3 ❑ 0 0 • 6negi}uepi uo!}e;s dwnd ❑ ❑ 0 • e,uoileopou Jo;suogonJ;sub epniow;i saoa ❑ 0 0 • 4,pe sod u6is uo!}eoggou nnoy-bz a sl O 0 0 • 4,einpayos Jieq o;6uipn000e pepedsui no}enaue6 ay;SI ❑ 0 0 • a}ue og;ns pue Nue;w fan; # O 0 ❑ • 6algenado no;enaue6 et.;s� 0 . 0 0 tdn-jooq Nomb Jo;peddinbe uoi;e;s dwnd ay;SI 0 0 0 • tsdwnd ay}unJ Jo;eieue6 Aoue6iewe ey;uea O 0 0 • Jo}eieue6 Aoue6iewe ue si # O ❑ 0 • e,e geiedo senien;agai Jie aJy O 0 ❑ • ,e0eId w SeAlen;agaJ Jie aJy 0 0 0 • I 4,eigeuedo seolnep mopoeq any O 0 0 • 4,eoeid w seolnep nno ppeq any O 0 ❑ • i,peulnbeJ se pe oedsu!uoi;e;s dwnd all sl O 0 0 • 4,e geuedo suueje iensin pue oipne any O 0 0 • auesand sWJeie iensln pue oipne aJy O 0 0 • tleuogeuedo fuieweiel eidwis s� ❑ ❑ 0 • a;uesejd fuleweiel eidwis s� O 0 0 • deuogeJedo yaVOs/ann;ee;„6ulpod o;ne„sl ❑ ❑ 0 • a;ueseid yayos/ann}ea;„6wpod o;ne„si ❑ 0 0 • 4,algenado swiele/sdwnd Jo;sloi;uoo/s;eog any • 0 0 0 4MOIJeA0 jo su6is/sugep enisseoxe Jo eeu;se oquew wean;sdn aJy aw;noa :;lslA Jo;uosea2l 61111dweS UON Pedsul we;sits uogoapoa:adAl uol;aadsul 960Z/LZ/Z0 :a;ea uonaadsul IC;unoo wey6unpoa:I !I!3ed-num() 49£00SOOM limed Permit: WQCS00364 Owner-Facility.Rockingham County Inspection Date: 02/27/2018 Inspection Type.Collection System Inspect Non Sampling Reason for Visit. Routine Are all pumps operable? • 0 0 0 Are wet wells free of excessive debris? U 0 0 0 Are upstream manholes free of excessive debris/signs of overflow? 0 0 0 IN Are floats/controls for pumps/alarms operable? • 0 0 0 Is"auto polling"feature/SCADA present? • 0 0 0 Is"auto polling"feature/SCADA operational? • 0 0 0 Is simple telemetry present? • 0 0 0 Is simple telemetry operational? • 0 0 0 Are audio and visual alarms present? • 0 0 0 Are audio and visual alarms operable? • 0 ❑ ❑ Is the Pump station inspected as required? • 0 0 0 Are backflow devices in place? • 0 0 0 Are backflow devices operable? • 0 0 ❑ Are air relief valves in place? • 0 0 0 Are air relief valves operable? • 0 0 0 # Is an emergency generator available? • 0 0 0 Can the emergency generator run the pumps? • 0 0 0 Is the pump station equipped for quick hook-up? 0 0 U 0 Is the generator operable? • 0 0 0 #Is fuel in tank and sufficient? • 0 0 0 Is the generator inspected according to their schedule? • ❑ ❑ 0 Is a 24-hour notification sign posted? • ❑ ❑ ❑ Does it include Instructions for notification? • 0 0 ❑ Pump station identifier? • 0 0 ❑ Emergency phone number • 0 0 0 Is public access limited? • 0 0 0 Is pump station free of overflow piping? • 0 0 0 Is the pump station free of signs of overflow? • 0 0 0 Are run times comparable for multiple pumps? yes Comment None Page 8