Loading...
HomeMy WebLinkAboutNOI application for SW3171205.pdfervious area is defined as the built upon area including, but not Iitttited to, ,iaeewalks, gravel areas, etc. `* Report only that amount of existing BLIA that will remain after development. is to be removed and which will be replaced by new B UA. buildings, roads, parking areas, Do not report any existing BUA that 11. How was the off-site impervious area listed above determined? Provide documentation. See' Topographic Survey of: A Portion of Faith Church Road" by ESP Associates P.A. Dated 07/17/2017. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornnvater requirements as per 15R NCAC 02B. 0600 V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://E)ortal.ncdenr.ore/web/wa/ws/su/bmi)-rnanual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http/ /portal.ncdenr.orglweb/wg/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at ht!R.-/ /12ortal.ncdenr.orglweb/h:g/ws/su/mal2s.) PIease indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htW://12ortal.ncdenr.ore,/web/wg/ws/su/statesw/forms docs. Tar 1. Original and one copy of the stormwater Management Permit Application Form, 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the annlirahi,- Sunplement Forms) {sealed, signed and dated) and O&M agreement(s) for each MAN" 4. rm a'pplication prdssing fee of $505 payable to NCDENR. (For an Express review, refer to hfta:/ /www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. aw,. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. Wft j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. x'01. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-10I Version Oct. 31, 2013 Page 4 of 6