Loading...
HomeMy WebLinkAbout20090106 Ver 1_More Info Letter_20090311N®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen R Sullins Governor Director March 11, 2009 Chuck Pickering Fhe Biltmore Company and West Side, LL,C 1 North Pack Square Asheville, North Carolina 28801 Subject: Request for More Information 401 Water Quality Certification Biltmore Estate Bridge DWQ Project # 09-0106 Buncombe County Response deadline: April 10, 2009 or 30 days from receipt REQUEST FOR MORE INFORMATION Dear Mr. Pickering: Dee Freeman Secretary The Division of Water Quality (DWQ) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced property. Additional information will be required in order to complete the review process. Please provide the following information so that we may continue to review your project. Additional Information Requested: I. The following information was provided in the application: B. 6a. Is this a phased project? No 6b. If yes, explain. "...however, once access is provided to the southwest portion ofproperty, additional development may occur in the future. At this time, development plans for the southwest portion of the property have not been started." Provide discussion about future plans for the southwest portion of the property. If considered a phased project, impacts to waters from all phases will have to be tallied and appropriate regulatory requirements met. Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX. 828-299-70431 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity' Affirmative Action Employer 011e Noi-thCarolina ;Vaturallil Chuck Pickering March 11, 2009 Page 2 of 2 2. The following information was provided in the application: D. I a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. "The project was designed to make use of piers/piles, which will be drilled into place. Piers/pies require less impact than supports that would span the entire width of the bridge." Provide the data used to justify the above statement (i.e., how piers/piles provide less impact than fully spanning the river). Please provide your response in writing to the addresses below prior to April 10, 2009 or 30 days from receipt. Four copies of the required information should be provided to the 401 Permitting Unit at: Ms. Cyndi Karoly 401 Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 and a single copy to the Asheville Regional Office at: Chuck Cranford Surface Water Protection Section 2090 US HWY 70 Swannanoa, NC 28778 If we do not hear from you by the deadline, we will assume that you no longer want to pursue this project and we will consider the project withdrawn. This letter only addresses the preliminary application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Chuck Cranford 828-296-4664, if you have any questions. Sincerely, Roger C. Edwards Regional Office Supervisor Surface Water Protection Section cc: Liz Hair - USACE Asheville David McHenry - NC WRC Cyndi Karoly - 401 Permitting Unit ARO File copy G:\WPDATA\DEMWQ\Buncombe\401s\Biltmore Company - Bridge\Add1nfo_3-10-09 .doc