Loading...
HomeMy WebLinkAbout20090119 Ver 1_More Info Letter_20090320NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 20, 2009 DWQ# 09-0119 Guilford County CERTIFIED MAIL: 7008 0150 0002 7876 8607 RETURN RECEIPT REQUESTED Mr. Andrew LaRowe, Executive Director Guilford County Board of Education 617 West Market St. Greensboro, NC 27401 Re: Section 401 Water Quality Certification application Dear Mr. LaRowe: This letter is a correction to a letter issued on March 17, 2009. Additional text is in bold. On February 5, 2009, the North Carolina Division of Water Quality (Division) received your application for a 401 General Water Quality Certification to impact 0.31acres of wetland and 130 linear feet of stream to construct a road access for the Jamestown Middle School near Jamestown, NC in Guilford County. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H.0500. The Division will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following information so that we may continue to review your project. 1. Per the requirements of GC 3705, please enumerate all temporary impacts (in addition to permanent impacts already indicated) to the stream channel and any wetland areas. Temporary impacts also include areas of disturbance necessary for proper pipe installation as well as any impacts from temporary erosion control measures expected to be installed within any jurisdictional areas. Please note that temporary impacts should be minimized to the maximum extent practical. 2. Per the requirements of GC 3705, all work be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. Please provide a detailed engineering plan and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe alignment, pipe slope, and pipe burial. 4. Please provide a copy of your response to additional requests by Andrew Williams with the USACE dated March 6, 2009. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 One Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748 NorthCarolina Internet: www.ncwaterquality.org Natima!!y An Equal Opportunity 1 Affirmative Action Employer Andrew LaRowe DWQ # 09-0119 March 20, 2009 Page 2 of 2 5. Please clarify if the impacts to Randleman Buffers at Impact Area 3 will be temporary buffer impacts or permanent buffer impacts to Zone 1 and Zone 2 buffers. If temporary, please provide a re-vegetation plan for the buffer areas. The application notes that the stormwater management plan is to be reviewed by another agency. The Division understands that the area of this project has recently been annexed by the City of Jamestown and local jurisdiction has changed recently. Please clarify the review of the SMP information. Please refer to the Division's policy "Stormwater Management Plan (SMP) Requirements for Applicants other than the North Carolina Department of Transportation" found on the Division's website: http://h2o.enr.state.nc.us/ncwetlands/ Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your, application are not authorized (at this time) by the Division. If you have any questions, please me at 336-771-4964 or sue.homewood@ncmail.net. Sincerely, Sue Homewood DWQ Winston-Salem Regional Office cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Jim Cutler, MACTEC, 7347 West Friendly Ave, Suite E, Greensboro, NC 27410 DWQ Winston-Salem Regional Office DWQ Wetlands/4a1 Unite