HomeMy WebLinkAbout20180187 Ver 1_Mitigation Closeout Report_20180315Goss, Stephanie X113 L t —
Hi Stephanie,
Please find attached the Mitigation Credit Transfer Certificate and corresponding buffer credit ledger showing
the offset for the Pitch Pine Drive — Lot 13 project. If you have any questions or need anything please let me
know.
Thanks,
Cara
Cara Crier
Project Manager
RES I res.us
Direct: 919.209.1052 1 Mobile: 843.446.2312
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
March 15, 2018
Patrick Lamm
WJH, LLC
300 Battleground Avenue, Suite 230
Greensboro, NC 27410
Cedar Grove Bank Parcel ID: DWR Project # 2011-0720v2
Riparian Buffer Credits Purchased: 1,063.50 (ft')
8 digit -THTC — 03020201, Upper Falls Lake
Neuse River Basin
Project Name: Pitch Pine Drive — Lot 13 (DWR Project #18-01`87)
You have elected to fulfill your permitted buffer mitigation requirements for the Pitch Pine Drive — Lot 13 project
by paying into the Upper Neuse Riparian Buffer and Nutrient Bank (Cedar Grove Site).
The Bank has received full payment for buffer mitigation for the above referenced project for a total of 1,063.50
buffer credits. Riparian buffer impacts occurred in the Neuse River Basin, Falls Lake Watershed. The amount of
buffer mitigation required is specified and verified by DWR in project #18-0187 and is 1,063.50 ft'.
You must also comply with any other state, federal or local government permits or authorization associated with
this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the
Bank is not transferable. If you have any questions o' r need additional information, please contact Cara Conder at
919 -209 -1052 -or cconder@res.us.
Sincerely,
Cara S. Conder
Project Manager
Resource Environmental Solutions, LLC
cc: DWR --Katie Merritt, Nutrient Offset Bank Coordinator
Pilot Environmental —Brad Luckey
Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605
Transaction
Number
I
"j,
a
POurch
Na,he�
--U, "f
I
�Square Feat
I ,
A, 5 et,
, , , , , " � ii Feet`
, `i ,,
4 6%
, V , R64iuldrrd
1
11/26/2012
Task 1: Credits Released
132.422.40
3.04
132,422.40
3.04
2
1112712012
City of Durham I Carver Street Extension, SAW -2009-01175
03020201
132,422.40
3.04
. -
- Durham
3
11/3012012
1 Task 7: Credits Released
33,105.60
0.76
33,105.60
0.76
4
7/7/2013
City of Raleigh . ' Smith Creek interceptor Improvements
03020201
27,057.00
0.62
6,048.60-
0.14 Raleigh -
5
1214/2013
Credits Transferred to Forrest Creek Buffer Ledger
0.10
0.00
6,048.50
0.14 DWR
1115/2015
Concert MacGregor Downs, �LLC� MacGregor Downs Deck Addition
03020201
4,380.00
0.10
1,668.50
0.04 DWR
7
6123/2015
Task 2: Credits Released
123,772.00
2.84
.
125,440.50
2.88
8
6/23/2015
NCDENR I DENR DMS Contract #6124
03020201
125,440.00
2.88
. 0.50
0.00 NCDENR-DMS
9
6/29/2015
Task 3: Credits Released
64,048.60
1.47
64,049.10
1.47
10
6/29/2015
NCDENR I DENR DMS Contract #6124
03020201
64.048.00
1.47
1 1.10
0.00 NCDENR-DMS
11
1/6/2016
Task 4: Credits Released
64,048.60
1.47
64,049.70
1.47
12
71512016
Shotwell Landfill, Inc. I Shotwell Landfill Expansion
03020201
64,049.70
1.47
-
- DWR
13
10124/2016
Task 5: Credits Released
64.048.60
1.47
64,048.60
1.47
14
12/19/2016 Capital City Property Solutions, Inc. 611 N. Elizabeth Street
03020201
3,077.00
0.07
60,971.60
1.40 DWR
15
213/2017
Lerner Carolinas, LLC Waterstone - Tract 17
03020201
31,378.50
0.72
29,593.10
0.68 Hillsborouah
16
3/1312017
Lennar Carolinas, LLC Copley Farms West
03020201
18,687.00
0.431
10,906.10
0.25 DWR
17
3/21/2017
City of Durham North Durham Water Reclamation Facility
03020201
3.861.00
0.09
7,045.10
0.16 Durham
18
7/1112017
Mll Homes of Raleigh, LLC Andrews Chapel Impact Area #1
03020201
1,146.00
0.03
5,899.10
0.14 DWR
19
6/2017
Task 6: Credits Released Partial
32,024.30
0.74
37.923.40
0.87
20
12/8/2017
Task 6: Credits Released Partial
32,024.30
014
69,947.70
1.61
21
311112018I
WJH LLC Pitch Pine Drive - Lot 15
03020201
1,063.50
0.02
68,884.20
1.58 DWR
545,484.4U I 112.52 I 416,61U.WU I 1U.'J4 I tjtJ,tStJ4.ZU I 1.5t1
*Credits shown are only for mitigation credits approved by the LIMBI, BPDP, and As -Built