HomeMy WebLinkAboutWQ0039438_Fast Track Sewer Application_201803124 MCKIM&CREED ENGINEERS
SURVEYORS
PLANNERS
February 19, 2018 007710032 (40)
NC Department of Environmental Quality
Division of Water Resources
Water Quality Section
610 E. Center Avenue, Suite 301 RECEIVEDINCDENRIDWR
Mooresville, NC 28115 MAR O 9 7(118
Attention: Mr. Ori Tuvia WOROS
MOORESVILLE, REGIONAL OFFICE
RE: Modified Application for Permit FTA 04-16
Existing Permit No. WQ0039438
Blythe Creek Grinder Pump Eliminations
Union County
Dear Water Quality Reviewer:
On behalf of Union County Public Works we are submitting a Fast Track
Sewer System Extension Application (FTA 04-16) for modification to Existing
Permit #WQ0039438 - Blythe Creek Grinder Pump Eliminations project.
Union County Public Works decided to revise the design to someday
accommodate existing flow from an existing wastewater pump station
currently discharging to a different location. As a result, the lengths of the
various diameter gravity sewers have changed as shown below:
-- - ----------r - - - - - - - - - - - - - - - - - - r-- - -- — - -
- - -I
Size (inches)- _ _ c Permitted Lensth jfeet) _ Revised Length (feet)
1 18 1 171 1 5500
i______ ;643 -----------------
______�_________________y
------12------------------- --------
8 11200 8900
We are including the following:
8020 Tower Paint Onve
1) Original and one copy of the application form FTA 04-16
Charlotte NG 28227 2) $480.00 application fee
3) A copy of Flow Tracking/Acceptance for Sewer Extension Permit
Applications (FTSE 04-16) submitted with the original application.
704 841 2588
Fax 704 841 2587
www hick i m creed. com
If you have questions or need additional information, please feel free to
contact me at 704-841-2588 or by e-mail at CShue@mckimcreed.com. We look
forward to your prompt review and approval of this application.
Respectfully,
McKIM & CREED, Inc.
CL J SLt�
Charles E. Shue, PE
Senior Project Manager
PC: John Shutak, PE, UCPW
Michael Caldwell, PE, UCPW
� CKDA&CREED
State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: WAv�N39' (to be completed by DWR)
All items must be completed or the application will be returned
L APPLICANT INFORMATION:
1. Applicant's name: Union County (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation El General
❑ Federal ® State/County ❑ Municipal
3. Signature authority's name: John Shutak, PE per 15A NCAC 02T.0 106(b
Title: CIP Program Manager
4. Applicant's mailing address: 500 N. Main Street, Suite 500
City: Monroe State: NC Zip: 28112-
5. Applicant's contact information:
Phone number: (704) 283-3651 Email Address: iohn.shutak@unioncounWc.gov
IL PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
RECEIVED/NCDENR/DWR
MAR p 9 7(11P
WQROS
MOORESVILLE REGIONAL OFFICE
1. Project name: Blythe Creek Grinder Pump Eliminations
2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project
If a modification, provide the existing permit number: WQ003943yand issued date: August 22, 2017
If new construction but part of a master plan, provide the existing permit number: W000
3. County where project is located: Union
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.9400°
5. Parcel ID (if applicable): 06114003
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Charles E. Shue License Number: 10142
Firm: McKim & Creed. Inc.
Mailing address: 8020 Tower Point Drive
City: Charlotte State: NC Zip: 28227
Longitude: -80.7167°
Phone number: (704) 841-2588 Email Address: cshueamckimcreed.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Twelve Mile Creek WRF Permit Number: NCO0855359
Owner Name: Union County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): W00021594 Downstream (Receiving) Sewer Size: 18 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS00054
Owner Name(s): Union County
FORM: FTA 04-16 Page 1 of 5
VI, GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners' Association- has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No NN/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ® Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
Industrial (See 15A NCAC 02T.0103(20
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under 15A NCAC 02T .0114(f) ❑ Yes ® No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.01 14(
Daily Design Flow''"
No. of Units
Flow
gal/
GPD
gal/
GPD
gaU
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
0 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use
areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals
as defined in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall
be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T.01 14)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
® Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
® Flow has already been allocated in Permit Number:
® Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
18
5,500
DIP or PVC
12
3,200
DIP or PVC
8
8,900
DIP or PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude:
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
6
840
DIP or PVC
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be
provided in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ® Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS -I waters of Class 1 or
Class It impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS -1 or WS -V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboage
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ® No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer PermittingBranch
ranch
5. Does project comply with 15A NCAC 02T.0 105(c)(6 (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high-priority?"
Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
L4�■EN
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents
for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting
documents.
2. Professional Engineer's Certification:
L S rc. . Shy, 2 attest that this application for
(Professional Engineer's name from Application Item 111.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain
portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE – In accordance with General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:�.41Q (N CARO��••,
%FESS/0*-% vy
A
ti ......• ,,,7A,ES'E. -.40F
let.r47 Iq_ Zn I
Applicant's Certification per 15A NCAC 02T .0106(b):
that this application for
name & title from Application Item 1.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a
condition of this permit be violated. I also understand that if all required parts of this application package are not completed
and that if all required supporting information and attachments are not included, this application package will be returned to
me as incomplete.
NOTE – In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: — Date: VZO (01K
FORM: FTA 04-16 Page 5 of 5
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Union County
Project Name for which flow is being requested: Blythe Creek Grinder Pump Eliminations
More than one FTSE may be required for a single project if the owner of the WW77' is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Twelve Mile Creek WRF
b. W WTP Facility Permit 9: NCO0855359
Afi lows are in MGD
c. W WTP facility's permitted flow 6.0 (does not include 3.0
MGD diversion to Six Mile
Creek Pump Station)
d. Estimated obligated flow not yet tributary to the W WTP 1.6042 MGD
e. WWI'P facility's actual avg. flow 3.87 MGD
f. Total flow for this specific request 0
g. Total actual and obligated flows to the facility 5.5078 MGD
h. Percent of permitted flow used 91.80%
IL Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the W WTP:
(B)
(A)
(D)=(B+C)
Design
Pump
Average Daily
Station
Firm Flow**
(Name or
Capacity. * (Firm / pp,
Number)
MGD MGD
N/A
Tributary
(B)
(C)
(D)=(B+C)
(E)—(A-D)
Obligated,
Approx.
Not Yet
Total Current
Current Avg.
Tributary
Flow Plus
Daily Flow,
Daily Flow,
Obligated
Available
MGD
MGD
Flow
Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pt) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the W WTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Blythe Creek Outfall
Page 1 of 6
FTSE: 04-16
Downstream Permit Number: W00021594
III. Certification Statement:
I IsMN -C:+tuT4-4' certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Signature
Date
Page 2 of 6
FTSE 04-16
o _�