March 1, 2018
Chris Grimes
Town of Fuquay-Varma
401 Old Honeycutt Road RECEIVED/DENR1"R
Fuquay-Vanna,NC 27526
Subject Compliance Evaluation Inspection MAR 13 2018
Terrible Creek WWTP
NPDES Permit No NC0066516 Water Resourc on
Wake County permitting Dear Mr Grimes
On February 22, 2018,Andy Neal of the Raleigh Regional Office(RRO) conducted an inspection at the
subject facility The cooperation of Mr Adam Stephenson, operator in responsible charge(ORC) of the
facility, along with several other facility crew members, was appreciated Fmdmgs during the inspection
were as follows
1 Your NPDES permit was issued effective January 1, 2016 and expires on April 30, 2019
2 The 1 0 MGD treatment plant consists of a mechanical bar screen, influent pump station, solids
cutter, flow splitter box, dual surge tanks, biological reactor, dual aeration basins, three clarifiers,
two sludge holding tanks, three tertiary filters, flow meter, two UV disinfection banks,post
aeration, on-site generator for back-up power
3 At the time of inspection, the plant was experiencing a major upgrade and preparing to shift from
the current 1 0 MGD system to a new 3 0 MGD system The current system was operatmg at
approximately 0 78 MGD at the time of inspection All aeration basins, clarifiers,tertiary filters,
and UV banks were in use and seemed to be operating properly Weirs m the secondary clanfier
were clean with no obstruction blocking flow Activated sludge is digested then gravity thickened
and land applied by McGill Environmental Systems of NC, Inc ,permit number WQ0006816
Effluent at the discharge point appeared clear with no observed negative effects to the receiving
stream, Terrible Creek
4 Mr Stephenson explained that the plant expansion will include upgrades of a SCADA system,
large and small bar screens and grit classifier, and two gravity belt thickeners McGill will
continue to manage sludge handling
5 Commercial lab results, chain of custody records, and bench sheets were compared with data
submitted on the DMRs for the months of April 2016 and June 2017 No discrepancies were
noted Terrible Creek WWTP laboratory analyzes the following parameters pH,DO,
temperature.Mentech analyzes all other parameters
6 Discharge Monitoring Reports (DMRs) for the period March 2015 through December 2017 were
reviewed for compliance with permit limits and monitoring requirements Violations noted are
Di ision of Water Resources,Raleigh Regional Office,Water Quality Opeiations Section http//poital ncdeni org/web/wqraps
1628 Mail Ser'.ice Center,Raleigh,NC 27699-1628 Phone (919)791-4200
Location 3800 Barrett Drive,Raleigh NC 27609 Fax (919)788-7159
Terrible Creek WWTP—NC0066516
Compliance Evaluation Inspection—page 2 of 2
listed in the table below Each of these violations has been addressed through a separate
correspondence
DMR Date Violation Type Parametet Action Limit Value Reported Value
Jun-16 6/4/16 Frequency NO2+NO;as Total N NOV
Jul-16 7/2/16 Frequency NH;as N NOV
Sep-16 9/30/16 Frequency Flow NOV
Sep-16 9/30/16 Frequency Total N NOV
Sep-16 9/30/16 Frequency Zinc NOV
Dec-16 12/31/16-- --- Frequency - -7-day Chronic Cenodaphnia NOV
Apr-17 4/29/17 Limit Fecal Coliform NOV 400 468 95
May-17 5/20/17 Limit Fecal Coliform NOD 400 419 18
I would like to thank all staff involved with this inspection for their time and assistance If you have
questions concerning this report or inspection, please contact Andy Neal at 919-791-4258 or
andy neal@ncdenr gov
3cer-
S Daniel Smith, Regional Supervisor
Water Quality Regional Operations Section
cc
RRO, SWP
Central Files
EPA
States Environmental Protection Agency Form Approved
EPA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A National Data System Coding(i e,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 I5 3 l NC0066516 111 12 1 18/02/22 117 18 I c I 19 I s I 20I I
21I11I11 IIII1IIII11II1IIII IIIII111IIIIIIIIII 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -------- Reserved--------------
671 70I 1 71 1 I 72 1 �, 731 I 174 751 1 1 1 1 1 1 180
Section B Facility Data I I
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01 30PM 18/02/22 16/01/01
Terrible Creek WWTP
Exit Time/Date Permit Expiration Date
NCSR 2751 Hilltop Rd
03 30PM 18/02/22 19/04/30
Fuquay Varina NC 27526
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Adam Parker Stephenson/ORC//
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Adam Mitche11,401 Old Honeycutt Rd Fuquay Varina NC
27526//919-552-1401/9195527481 No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
® Permit ■ Flow Measurement ® Operations&Maintenance ® Records/Reports
® Self-Monitoring Program ® Sludge Handling Disposal ® Facility Site Review NECompliance Schedules
• Effluent/Receiving Waters ® Laboratory
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Andrew W Neal RRO WQ//919-791-4248/
Sit .cure of Management m'A Reviewer; Agency/Office/Phone and Fax Numbers Date
G`i/2satro .rte P , �'
EPA Form 3:60-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type (Cant) 1
31 NC0066516 I11 121 18/02/22 117 18 [
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
1 Your NPDES permit was issued effective January 1, 2016 and expires on April 30, 2019
2 The 1 0 MGD treatment plant consists of a mechanical bar screen, influent pump station, solids
cutter, flow splitter box, dual surge tanks, biological reactor, dual aeration basins, three clarifiers, two
sludge holding tanks, three tertiary filters, flow meter, two UV disinfection banks, post aeration, on-site
generator-for-back-up power - - _ _ _ ____
3 At the time of inspection, the plant was experiencing a major upgrade and preparing to shift from
the current 1 0 MGD system to a new 3 0 MGD system The current system was operating at
approximately 0 78 MGD at the time of inspection All aeration basins, clarifiers, tertiary filters, and UV
banks were in use and seemed to be operating properly Weirs in the secondary clarifier were clean
with no obstruction blocking flow Activated sludge is digested then gravity thickened and land applied
by McGill Environmental Systems of NC, Inc, permit number WQ0006816 Effluent at the discharge
point appeared clear causing no negative effects in the receiving stream, Terrible Creek
4 Mr Stephenson stated that the plant expansion will include upgrades of a SCADA system, large
and small bar screens and grit classifier, two gravity belt thickeners, and more McGill will continue to
manage sludge handling
5 Commercial lab results, chain of custody records, and bench sheets were compared with data
submitted on the DMRs for the months of April 2016 and June 2017 No discrepancies were noted
Terrible Creek WVVTP laboratory analyzes the following parameters pH, DO, temperature Mentech
analyzes all other parameters
6 Discharge Monitoring Reports (DMRs)for the period March 2015 through December 2017 were
reviewed for compliance with permit limits and monitoring requirements Violations noted are listed in
the table below Each of these violations has been addressed through a separate correspondence
Page# 2
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less) Has the permittee submitted a new ❑ 0 ■ ❑
application'?
Is the facility as described in the permit'? ❑ 0 0 ❑
#Are there any special conditions for the permit'? ❑ El II El
Is access to the plant site restricted to the general public'? ® 0 0 0
Is the inspector granted access to all areas for inspection'? ® 0 0 0
Comment
Compliance Schedules Yes No NA NE
Is there a compliance schedule for this facility'? 0 0 • 0
Is the facility compliant with the permit and conditions for the review period'? ❑ ❑ • 0
Comment
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping'? I 0 0 0
Does the facility analyze process control parameters,for ex MLSS, MCRT, Settleable ® 0 0 0
Solids, pH, DO, Sludge Judge,and other that are applicable'?
Comment
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures'? ® 0 0 0
Is the wet well free of excessive grease'? ® 0 0 0
Are all pumps present'? ® 0 0 0
Are all pumps operable'? al 0 0 0
Are float controls operable'? I ❑ ❑ ❑
Is SCADA telemetry available and operational'? ❑ ❑ El
Is audible and visual alarm available and operational'? 111 ❑ ❑ ❑
Comment
Influent Sampling{ Yes No NA NE
#Is composite sampling flow proportional'? 0 ❑ ® 0
Is sample collected above side streams'? • El 0 0
Is proper volume collected'? MI 0 0 0
Is the tubing clean'? MI ❑ 0 0
Page# 3
•
N.
,
Permit NC0066516 Owner-Facility Terrible Creek WTP
W
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Influent Sampling Yes No NA NE
#Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees ® ❑ ❑ 0
Celsius)?'
Is sampling performed according to the permit? ® ❑ ❑ ❑
Comment
Bar Screens Yes No NA NE
Type of bar screen
a Manual 0
b Mechanical 0
Are the bars adequately screening debris'? ® 0 0 0
Is the screen free of excessive debris? ® 0 0 0
Is disposal of screening in compliance? ® ❑ ❑ 0
Is the unit in good condition? I 0 0 0
Comment
Grit Removal Yes No NA NE
Type of grit removal
a Manual 0
b Mechanical 0
Is the grit free of excessive organic matter? 0 0 E 0
Is the grit free of excessive odor? ❑ ❑ ® 0
#Is disposal of grit in compliance? 0 0 E 0
Comment
Grease Removal Yes No NA NE-
#Is automatic grease removal present? 0 0 E ❑
Is grease removal operating properly'? ❑ ❑ ® ❑
Comment
Equalization Basins Yes No NA NE
Is the basin aerated'? M 0 0 0
Is the basin free of bypass lines or structures to the natural environment'? E 0 0 0
Is the basin free of excessive grease'? E 0 0 0
Page# 4
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Equalization Basins Yes No NA NE
Are all pumps present'? ■ 0 0 ❑
Are all pumps operable'? I ❑ ❑ ❑
Are float controls operable'? • 000
Are audible and visual alarms operable'? • ❑ ❑ ❑
#Is basin size/volume adequate'? • ❑ ❑ ❑
Comment
Aeration Basins Yes No NA NE
Mode of operation
Type of aeration system
Is the basin free of dead spots'? ® ❑ ❑ ❑
Are surface aerators and mixers operational'? ® ❑ 0 0
Are the diffusers operational? ® ❑ ❑ ❑
Is the foam the proper color for the treatment process'? ® ❑ ❑ ❑
Does the foam cover less than 25%of the basin's surface'? ® ❑ ❑ ❑
Is the DO level acceptable'? ® ❑ ❑ 0
Is the DO level acceptable?(1 0 to 3 0 mg/I) ❑ ❑ ❑
Comment
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? ® ❑ 0 ❑
Is the site free of excessive buildup of solids in center well of circular clarifier'? U ❑ ❑ ❑
Are weirs level'? ® ❑ ❑ ❑
Is the site free of weir blockage'? E ❑ ❑ ❑
Is the site free of evidence of short-circuiting? ® ❑ ❑ ❑
Is scum removal adequate'? ® ❑ ❑ ❑
Is the site free of excessive floating sludge'? E ❑ ❑ ❑
Is the drive unit operational'? E ❑ ❑ ❑
Is the return rate acceptable(low turbulence)? E ❑ ❑ ❑
Is the overflow clear of excessive solids/pin floc'? M ❑ ❑ ❑
Is the sludge blanket level acceptable'?(Approximately 1/4 of the sidewall depth) ❑ ❑ 0
Comment Sludge blanket thickness was approximately 8 feet in clarifiers#1 and#3, and approximately
9 feet in depth in#2 All clarifiers are approximately 15'deep Mr Stephenson stated this is
the proper amount of blanket for their mixed liquor to operate properly
Page# 5
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Secondary Clarifier Yes No NA NE
Pumps-RAS-WAS Yes No NA NE
Are pumps in place'? U ❑ ❑ ❑
Are pumps operational'? 11000
-----__-_. -Are there adequate spare parts and supplies on site'? ® ❑ ❑ ❑
Comment
Aerobic Digester Yes No NA NE
Is the capacity adequate'? ® 000
Is the mixing adequate'? MOOD
Is the site free of excessive foaming in the tank'? C ❑ ❑ ❑
#Is the odor acceptable'? ® ❑ ❑ ❑
#Is tankage available for properly waste sludge'? 111101:10
Comment
Solids Handling Equipment Yes No NA NE
Is the equipment operational'? ❑ ❑ 011
Is the chemical feed equipment operational'? ❑ ❑ 011
Is storage adequate'? 000111
Is the site free of high level of solids in filtrate from filter presses or vacuum filters'? LI 000
Is the site free of sludge buildup on belts and/or rollers of filter press'? ❑ ❑ 011
Is the site free of excessive moisture in belt filter press sludge cake'? DUDE
The facility has an approved sludge management plan'? ' ❑ ❑ ❑
Comment
Filtration (High Rate Tertiary) Yes No NA NE
Type of operation Down flow
Is the filter media present'? 000
Is the filter surface free of clogging'? MI 000
Is the filter free of growth'? 000
Is the air scour operational'? DOD
Is the scouring acceptable'? 6S 000
Is the clear well free of excessive solids and filter media'? MOOD
Page# 6
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Filtration (High Rate Tertiary) Yes No NA NE
Comment
Disinfection -UV Yes No NA NE
Are extra UV bulbs available on site'? III 000
Are UV bulbs clean'? ® 000
Is UV intensity adequate'? • 000
Is transmittance at or above designed level'? i 000
Is there a backup system on site'? I 0 ❑ ❑
Is effluent clear and free of solids'? I 0 0 0
Comment
Chemical Feed Yes No NA NE
Is containment adequate'? ® 000
Is storage adequate'? I 0 ❑ ❑
Are backup pumps available'? ® 000
Is the site free of excessive leaking'? ® 000
Comment Alum is added for phosporous removal
Nutrient Removal Yes No NA NE
#Is total nitrogen removal required'? 111000
#Is total phosphorous removal required'? ® ❑ ❑ ❑
Type Chemical
#Is chemical feed required to sustain process'? U 0 ❑ ❑
Is nutrient removal process operating properly'? 000
Comment
Pump Station -Effluent Yes No NA NE
Is the pump wet well free of bypass lines or structures'? 000
Are all pumps present? 1=10
❑
Are all pumps operable'? ❑ ❑ ❑
Are float controls operable'? ❑ ❑ ❑
Is SCADA telemetry available and operational'? _ ❑ ❑ MO
Is audible and visual alarm available and operational'? MI ❑ ❑ ❑
Page# 7
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Pump Station -Effluent Yes No NA NE
Comment
Flow Measurement -Effluent Yes No NA NE
#Is flow meter used for reporting'? ■ 0 0 0
- __---- __ Is flout meter calibrated anntial -�- 0 —❑ ❑ Y
Is the flow meter operational'? ® 0 ❑ 0
(If units are separated)Does the chart recorder match the flow meter'? ® 0 0 0
Comment Flow meter calibrated quarterly
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained'? ® 0 0 0
Are the receiving water free of foam other than trace amounts and other debris'? ® 0 0 0
If effluent (diffuser pipes are required) are they operating properly'? ® 0 0 0
Comment
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional'? ® 0 0 0
Is sample collected below all treatment units'? ® 0 0 0
Is proper volume collected'? a 0 0 0
Is the tubing clean'? ® 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees a 0 0 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency, sampling type NE 0 0 0
representative)?
Comment
Upstream/Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit(frequency, sampling type,and E 0 0 0
sampling location)?
Comment
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit'? 'L 0 0 0
Is all required information readily available, complete and current'? 0 0 0
Page# 8
Permit NC0066516 Owner-Facility Terrible Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Record Keeping Yes No NA NE
Are all records maintained for 3 years(lab reg required 5 years)? ® ❑ 0 0
Are analytical results consistent with data reported on DMRs? IN ❑ ❑ ❑
Is the chain-of-custody complete? I 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs II
Are DMRs complete do they include all permit parameters? ® ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ MI
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator ❑ ❑ II ❑
on each shift'?
Is the ORC visitation log available and current'? ® El ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification'? ® ❑ 0 0
Is the backup operator certified at one grade less or greater than the facility classification? ® ❑ 0 ❑
Is a copy of the current NPDES permit available on site'? ® ❑ ❑ ❑
Facility has copy of previous year's Annual Report on file for review'? ® ❑ ❑ ❑
Comment
Standby Power Yes No NA NE
Is automatically activated standby power available'? ® 0 ❑ ❑
Is the generator tested by interrupting primary power source'? I ❑ ❑ ❑
Is the generator tested under load'? El ❑ ❑ ❑
Was generator tested&operational during the inspection'? ® ❑ ❑ El
Do the generator(s)have adequate capacity to operate the entire wastewater site'? ® El 0 ❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power'? I ❑ ❑ p
Is the generator fuel level monitored'? k;,; ❑ ❑ ❑
Comment
Page# 9