HomeMy WebLinkAbout20060930 Ver 3_CAMA Permit Application_2009032006- DgBo U3
LINCEW NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
March 19, 2009
MEMORANDUM:
MAR n 0 200.9
OEM - WATER 00ALI Y
ASS ANDSTQ?WAmt l
TO: Cyndi Karoly, Supervisor
401 Oversight &-Express Permits Unit
Division of Water Quality-Surface Water Protection
FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator
400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA Major Permit Application Review
Applicant: Raiford Trask / Autumn Hall
Project Location: 1202 Eastwood Rd., adjacent to the headwaters of Bradley Creek,
in Wilmington, New Hanover County
Proposed Project: to construct a kayak/canoe launch dock
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by April 13, 2009. If you have any questions regarding the proposed project,
contact Holley Snider at (910) 796-7423, when appropriate, in-depth comments with supporting
data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
FIELD INVESTIGATION REPORT
DIVISION OF COASTAL MANAGEMENT
APPLICANT'S NAME: Autumn Hall- Raiford Trask
2. LOCATION OF PROJECT SITE: 1202 Eastwood Road, Wilmington, in New Hanover County,
adjacent to the headwaters of Bradley Creek
Photo Index - 2006: 24-7411: P, Q-7 2000: 24-308: H-18 1998: 11-219: G-4
1995: 24-289: J-18
State Plane Coordinates - X:172 420.744 Y: 2 364 218.945 GPS - 0-121612A
Lat: 34°13'03.58546" N Long: 77°47'43.06503" W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12/16/08, 1/27/09
Was Applicant Present - Yes No
5. PROCESSING PROCEDURE: Application Received - 03/12/08, 2/12/09 (Complete)
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Wilmington - New Hanover County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: ES, EW, PTA
(C) Water Dependent: Yes
(D) Intended Use: Private/Community
(E) Wastewater Treatment: Existing - Community System
Planned - None
(F) Type of Structures: Existing- Former Golf Course currently undergoing
redevelopment as a Residential/ Mixed Use Community
Planned- Fixed pier for kayak launching
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
[AREA]
nRFn(-.Fn FII I FIB OTNFR
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands 384 sq.ft.
(Open Water)-PTA Incor orated
(C) Other - PTS 112 sq.ft
Disturbed
(D) Total Area Disturbed: 496 sq.
(E) Primary Nursery Area: Yes
(F) Water Classification: SC-HQW
ft. (>0.01 acres)
Open: CLOSED
Field Investigation Report
Autumn Hall
Page 2
8. PROJECT SUMMARY: The applicant proposes to construct a kayak /canoe launch dock
adjacent to Bradley Creek, for private use of a mixed-use development, including but not
limited to: commercial and retail business spaces, residential home sites, access roads,
utilities, and amenities.
9. PROJECT DESCRIPTION:
The project is located at 1202 Eastwood Road (NC Hwy 74), adjacent to Bradley Creek,
Wilmington, New Hanover County. To locate the property from Market Street, travel East on
Eastwood Road approx. 1.7 miles towards Wrightsville Beach. The project site can be
accessed from Autumn Hall Road which is located on the southern property boundary. The
236 acre tract is irregular in shape and formerly operated as the Duck Haven Golf Course.
The property has an average elevation of 5 feet above mean sea level. The riparian
properties adjacent to the project site are residential mixed use developments. Existing man-
made features on the project site include an office building, stormwater retention devices, and
upland utility construction. The upland area transitions to a border of Section 404 Federal
Wetlands, adjacent to the south and east property boundaries, that are a part of the Bradley
Creek Watershed. Located along the southern property boundary, a natural basin exists at
the headwaters of Bradley Creek. The project site has approximately 235 feet of shoreline
frontage along the headwaters of Bradley Creek. Along the east bank of the basin, a large
area of sawgrass (Cladium jamaicense) is present for a width of approximately 20 feet,
landward of Normal High Water (NHW). A few isolated sawgrass plants are located along the
north shoreline of the basin and the west bank of the basin is void of wetland vegetation.
The Wilmington -New Hanover County Land Use Plan classifies the adjacent waters as
Conservation and the high ground as Resource Protection. In the project area, the waters of
Bradley Creek are classified as SC-HQW by the NC Division of Water Quality and are not
open to the harvest of shellfish. These waters are designated as Primary Nursery
Area (PNA) by the NC Division of Marine Fisheries.
10. PROPOSED PROJECT:
The applicant proposes to construct a kayak /canoe launch dock adjacent to Bradley Creek,
for private use of a mixed use development, including but not limited to: commercial and retail
business spaces, residential home sites, access roads, utilities, and amenities. The planned
mixed use development would consist of 300 residential home sites and space for 17
commercial and retail buildings. Upland development on the tract has been approved under
New Hanover County Land Disturbing Permit GP 64-06 and NC Division of Water
Quality Stormwater Permit SW8#040333. The proposed kayak/canoe launch dock would be
located along the southwest shoreline of the Bradley Creek basin. As proposed, the launch
dock would be comprised of a fixed platform connected by fixed ramp to a fixed "t-head"
platform that would be constructed at an angle on either end to allow for ease of launching
kayaks and canoes. As proposed, the launch dock would consist of a 16 feet wide by 16 feet
long platform
Field Investigation Report
Autumn Hall
Page 3
extending from highground. The platform would be connected by fixed ramp, measuring 8 feet
long by 6 feet wide, to a fixed "T-head" platform. The proposed "T-head" platform would have
a center platform measuring 16 feet long by 8 feet wide. Angled from either end of the fixed
platform would be an 8 feet wide by 8 feet long ramp. As proposed the overall length of the
"T-head" platform would be 32 feet, although as designed, the fixed "T-head" platform with
angled ramps would only impact a total of 24 linear feet of open water. The applicant
submitted a hydrographic survey which shows water depths ranging from -2 feet to -4 feet at
Normal Low Water (NLW), in the basin. The water depths in the area of the proposed
kayak/canoe launch dock would be approximately -2.6 feet at NLW. As proposed, the kayak/
canoe launch dock would extend in a waterbody that measures approximately 50 feet in width.
11. ANTICIPATED IMPACTS:
The proposed kayak/ canoe launch dock would result in 496 square feet of overall impact, to
both the Coastal Shoreline and the Public Trust Area AEC. A portion of the fixed platform,
located adjacent to the high ground, would measure approximately 7 feet long by 16 feet wide
and would result in 112 square feet of impact to the Coastal Shoreline AEC. The remaining
portion of the kayak/ canoe launch dock, consisting of the remainder of the fixed platform,
ramp and access platform, would be located within the Public Trust Area AEC and would
result in 384 of open water impact. The proposed construction of the kayak/canoe launch
dock would not impact any Coastal or 404 Wetlands. As proposed the kayak/canoe dock
would extend approximately 25 feet into a waterbody which measures approximately 50 feet
across. This distance would not conform to the Y4 width rule. Minor increases in turbidity
should be expected during construction.
Submitted by: H. Snider Date: 1113109 Office: Wilmington
M
IMP-1
APPLICATION for 01 2008
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Autumn Hall
Applicant 1: First Name
Raiford MI Last Name
Trask
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1202 Eastwood Road PO Box city
Wilmington State
NC
ZIP
28403 Country Phone No.
ext. FAX No.
- -
Street Address (if different from above) City State ZIP
Email
2. Agent/Contractor Information
Business Name
Waterline Marine Construction And Consulting
Agent/ Contractor 1: First Name MI Last Name
Jim D Hundley
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
1646 Wrightsville Beach NC
ZIP Phone No. 1 Phone No. 2
28480 910 - 264 - 997 7 ext. ext.
FAX No. Contractor #
910 792 0942 62058
Street Address (if different from above) City State ZIP
E, Cr -
Email
jimhundleyjr@ec.rr.com DEC 13 200
<Form continues on back> IDC M W 1 L M i N G ??" ` t'r
Form DCM MP-1 (Page 2 of 4)
ULM zNlt441AI APPLICATION for
DFC q z 2008 ON NC Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
New Hanover 1202 Eastwood Road
Subdivision Name City State Zip
Autumn Hall Wilmington NC 28403-
Phone No. Lot No.(s) (if many, attach additional page with list)
- - ext.
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
C, 04 Pi- 4?7'€tvc- Bradley Creek
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural ?Manmade ?Unknown AIWW
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ?No work falls within.
Wilmington, NC
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
235' 9,876,794 (236 acres)
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes, please attach additional page with a list) 5' ®NHW or ?NWL
e. Vegetation on tract
Naturally occurring vegetation
f. Man-made features and uses now on tract
Former golf course
g. Identify and describe the existing land uses admacent to the proposed project site.
Residential/mixed use
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
MX (Attach zoning compliance certificate, if applicable)
®Yes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA
If yes, by whom?
EINA
_
Y
1. Is the proposed project located in a National Registered Historic District or does it involve a Y ft
;
National Register listed or eligible property?
<Form continues on next page> DEC 1 a NO SS
Form DCM MP-1 (Page 3 of 4)
Ul0' APOLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ?No
(ii) Are there coastal wetlands on the site? ®Yes ?No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Community System
o. Describe existing drinking water supply source.
City
p. Describe existing storm water management or treatment systems.
Surface runoff/retention ponds
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? []Commercial ?Public/Government
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The project will serve as access for the residents of the proposed community of Autumn Hall to Bradley Creek for the
purpose of kayaking and exploring the surrounding creeks.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Standard marine construction practices will be employed with light equimpent requirements.
d. List all development activities you propose.
Installation of a fixed pier for the purpose of accessing Bradley Creek and launching kayaks
e. Are the proposed activities maintenance of an existing project, new work, or both? New work
f. What is the approximate total disturbed land area resulting from the proposed project? n/a ?Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Surface runoff
i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No RNA
j. Is there any mitigation proposed? Y
If yes, attach a mitigation proposal.
<Form continues on back> DEC 18 20108
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Infonnation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name New Hanover County Phone No.
Address 320 Chestnut Street, Wilmington, NC 28401
Name Russell Rehder Phone No.
Address 4134 Carribean Street, Oxnard, CA 93035
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
1 further certify that the information provided in this application is truthful to the best of my knowledge.
Date 1Aw8e___ 11) 1 it / Print Name Jim Hundley
•
Signature ?u P
Please indicate application attachments pertaining to your proposed project. -,,
DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts Q
?
?? Vii!
r 01
?
r
?DCM MP-3 Upland Developments C t?? v
®DCM MP-4 Structures Information
DEC I B NN
a
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures
proposed.. '
300 6 t1_5 `s C0rAI ,or'i`Q(
c. Density (give the number of residential units and the units per
acre).
500 /`l?kSCS +C- per
aL, rC_
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land-disturbing
activity begins.
(i) If applicable, has a sedimentation and erosion control plan been
su died to the Division of Land Resources?
es ?No ?NA
b. Number of lots or parcels.
?O
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
LA "l ezcrc, 5
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
CIS ph. 1f, CO k-, Cr4. It
-T
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and/or built upon surfaces, such as
pavement, building, rooftops, or to be used for vehicular driveways
or parking.
-3010
i. Give the percentage of the entire tract to be covered by impervious
and/or built-upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
-a/0
Describe proposed method of sewage disposal.
C N-Y Si?, vu a r
h. Projects that require a CAMA Major Development Permit may also
require a Stormwater Certification.
(i) Has a site development plan been submitted to the Division of
ter Quality for review?
es ?No ?NA
(ii) If yes, list the date submitted:
k. Have the cilities described in Item (i) received state or local
appro
es ?No ?NA
If yes, attach appropriate documentation.
Describe location and type of proposed discharges to waters of the
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, "wash down" and residential discharges).
S t4Cc /ctv.u-t c?"-gh
m. Does he proposed project include an innovative stormwater
d n?
Yes ?No ?NA
If yes, attach appropriate documentation C 13
FEB 12 2009
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
r,'?V k/ (A, V-
n. (I) Will water be impounded? ?Yes QKo' ?NA
(ii) If yes, how many acres?
o. When was the lot(s) platted and recorded? p. If prop ed development is a subdivision, will additional utilities be
mst d for this upland development?
-2 Z es ?No ?NA
7, l ??ff9
Date
Project Name
Applicant Name
pplicant Signature
FEB 12 2009
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
[]Commercial ?Public/Govemment OPrivate/Community
c. (i) Dock(s) and/or pier(s)
(ii) Number
(iii) Length
(iv) Width _
(v) Floating es ENo
e. (i) Are Platforms included? ®Yes ?No
If yes:
(ii) Number
(iii) Length 16 r 2 44
(iv) Width 16 r T
(v) Floating ?Yes ONo
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
2-kayak launches
(ii) Number of slips existing
n/a
i. Check the proposed type of siting:
? Land cut and access channel
[]Open water; dredging for basin and/or channel
[]Open water; no dredging required
®Other; please describe:
Headwaters of Bradley Creek
k. Typical boat length: 14'
m. (i) Will the facility have tie pilings?
?Yes ®No
00 If yes number of tie pilings?
[]This section not applicable
b. (i) Will the facility be open to the general public?
?Yes SNo
d. (i) Are Finger piers included? OYes %No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ONo
fi. (I) Are Boatlifts included? ?Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
? Full service, including travel lift and/or rail, repair or
maintenance service
? Dockage, fuel, and marine supplies
? Dockage ("wet slips') only, number of slips:
? Dry storage; number of boats:
? Boat ramp(s); number of boat ramps:
Other, please describe:
?i4yl? I? L /q k?tJC
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Kayaks.canoes
DC RJ Cat VJD
I. (i) Will the facili ?e open to the gener Ii?,NGrQ?, N
i, f L11f ego d? O120 C
? 08
? ? u;
2. DOCKING FACILITY/MARINA OPERATIONS (0 This section notapplicabie
a. Check each of the following sanitary facilities that will be included in the proposed project.
? Office Toilets
? Toilets for patrons; Number: ; Location:
? Showers
? Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and 'No Wake' signs proposed.
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
aCM IN?(.MIN V
I. If this project is an expansion of an existing marina, what types of services are currently provided? tvC
C V i ? 'DEC o ? 2nnR
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
?Yes ?No
DEC 18 2008
D M V1IL (41'II?'???t ?? NC
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
?Yes ?No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
?CW ?SAV ?SB
?WL ?None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3, BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
?Commercial ?Public/Government ?Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) This section not applicable
a• (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. is the structure(s):
?Commercial ?PublictGovemment ?Private/Community
c• Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
e. Arc of the swing
3
DEC 8 2Q08
L)CM
DEC Q
1 2008
y GENERAL
?b?tl:LsIt*rG a179' C
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
>15' n/a
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
--60'
e. (i) Will navigational aids be required as a result of the project?
OYes ®No ?NA
(ii) If yes, explain what type and how they will be implemented.
d. Water depth at waterward end of structure at NLW or NWL
-2 NLW
8.OTHER ?This section not applicable
a. Give complete description:
Installation of a 16' x 16' platform. A ramp will lead to a fixed pier section with a lower elevation.
The lower elevation will measure 8'x 24' to allow for access to the creek as a kayak launch.
'Jtws IIJ1 o 1n Q
Date
Autumn Hall
Project Name
Jim Hundley
Applicant Nam
Appli Sig ture
DcM ReLM?1 V,
INr-
DEC 0 1 2008
4%
a
Vt a t r t i ri
P-1 AR1NE CC}NSTI<JCTI ?N + C P1S'JLTIPJ
March 1, 2008
Mr. Robb Mairs
CAMA
127 Cardinal Drive Extension
Wilmington, NC 28405
Robb,
Please accept this Major Permit application on behalf of Raiford Trask. The intent of the
applicant is to install a fixed kayak launch area at the headwaters of Bradley Creek.
This launch area will service the proposed Autumn Hall development located on the
Trask property and is not for public use. The land has not been conveyed to Autumn
Hall, LLC at this time. The kayak launch will consist of '
1-3:- a "T" head with a 16' x 16' platform. A short ramp will allow access to an 8'
x 16' walkway with an 8' x 8' kayak launch ramp on either end.
The adjacent property owners have been notified. The proposed site plan is included in
this major permit application package.
Thank you for your help with this application. Please let me know if there is any
additional information you may need.
Regards,
Jim Hundley
I 'L)Ci'vI WILMING- TON, NC
MAR 1 2 2008
PO Box 1646 Wrightsville Beach, NC 28480 (c) 910.264.9977 (f) 910.792.0942
NC License # 62058
1202 eastwood road, wilmington, nc 22S4U3 - uoogle Maps
rage i or i
Address 1202 Eastwood Rd Get Google Maps on your phone
G(4 Wilmington, NC 28403 Texttheword °GMAPS"to 466453
u
0 17? P e?F4C $ k.. no rJc
e o
Gt ??: ,eK
t LJ
tie\S+ C? r3 - v
4Aa io a b? c
7 C?1 ?3 1.1 y 0?2`
17
74 a. ? G s a
S
:W tom` ?t a _
cf
'p IniardGreeis y C5
Gel( Cc6rse
00 _ .fir
a
r
.• :i3N12C?r?r r ? m
?a iL 7
l
??' C7' _ =ty rOvo alt °'riQRV Rp.
ry
74 rm !'W
V )BAs
- A-Irdemere 2 rias4 41
r?jt dr n O 'vZ3
rn` " d
far-. 4 ,?l b
Ij? byaa ?F a ?,
p Vie,
OP
ASE
?a? "uryA TkC,?,• ?+
C: V .a .;N n •? ?Cc
?'at4 Jr 9 Duck Heve 1
Self CI.ID
E r c
-
V"
Crew, fi
Car?Nr;r.1! ? tr _. ?
i. ? c
ts
i c°•?y e
hrs+a? C 1,97 +' 4,1 X12008 Google - Map dat;C02008 NAVTEQ- -Terms 0f? se
RECEIVED
DCM WILMINGTON, NC
MAR 1 2 2008
http://maps.google.com/maps?f=q&hl=en&geocode=&q=1202+eastwood+road,+wilmingt... 3/11/2008
.
Al
°-,.j c)
A ? ? ? ?u
CCFF
^ J er
v rr .?.
tw.•r' ? ? ? L)
idl
u;
L77
U j
Y -?
^O O
J? J Jd`
r r
I
. I
J V
r
CL
a;
W
KAYAK AREA PLAN
20 10 0 20
SCALE: 1 "=20'
SOUNDINGS BASED ON NHW
16'x16' 8'
DECK RAMP DECK
20 10 0 20
SCALE: 1"=20'
+2.6 NHW
BOTTOM t
RAMP RAMP
8' 16' 8'
16'
KAYAK SECTION B
20 10 0 20
SCALE: I"=20'
COMMUNITY KAYAK AREA
AT: AUTUMN HALL AREA
EASTWOOD ROAD
WILMINGTON, N.C.
NEW HANOVER COUNTY
BY: WATERLINE MARINE CONSTRUCTION
P.O. BOX 1646
WRIGHTSVILLE BEACH, N.C. C 04(t L
DRAWN BY: W""" ' """
January 28, 2009 SHEET 1 OF 66o7-ti
KAYAK SECTION A
r
3 3 a 2.,
c Z -?
? s
n
?I
w
i?
t`
`r
r
T
r'
r'
C
D ?
r 'I),
n ? ,I
4-1
f / ?I n D
cl,
?l
x
b
Z
r
L
r
i
0
U ?
Uct ?
? 4-? U p1 p
Q? a
" C14
h
d
U.J
V
1-1
M
M
r
1 ,
1
c It
I
1/T I
1
? I
o I
/ r 1 1 _ _ I
=1 O
00 Z = C ba \? ...?_
i
It
,
1 _ ,yep' 1 \ _rrr..
D
/ 1II
1?T
I
- -?_.- - - N1171 6161
--- -? -._.-----? r---- -- -Z -----
I I I WIN I 1 t I I I \\
Y
L!j
----------------
--? 1 T I is
??\\\
\
?-'-_----- ---- ------_? _--
j---?--- 4 --T--T--? - --7-7--l J
1 I I1 I: I I I I f
1 I I I I i 1 1 I
1 I
-L-- - -L_ _L
\.
1? I t 1V /
1
1
r I
I r
I I I l I - -_'
III
9940
Oh#H+fNp I
i
I LJIIIIn IV I
' 01HIHN110 - I
_ I
g FSK TER couar -
ON@
000
1 01i1MNNiD
cwn
ADVANCE ROAD
G?1fHfHt0ltfNN{410HH1{D
III
SALT CREEK LOOP ROAD
01111101110 Clld
?? I ? 0110
Il If '
?V'I1i?T?yNL1)m11 , cm
s???`•????' ? ' C?T1Tfif1 I? I
I ?
OHIN CN C9111o
I a+?a
_? o?+?0,110
SALT CREEK LOOP ROAD
' '? ?' OHIHOHIO g 0110
owo.
?'VI (911+10
I,\
I r '??:'?J \ VIfRfV
• OHIO ;LOW
I t - \
r l - _-I
I -
V
1
I
I
7 I
I I
? i
I ,
I I
I '
s
I
I
1
I I I
f ?I
i
fl ,
I
1
I
I
I
I
f
I
. 14 'I i
If
1
,I I
i
I
I
I
1 ?
l ?
1
ROAD _---_-__--
I
I
I?I
JI I
/ I I
I ? I
Noes° z v, c ° c _- c
u,
i Q
b
b DOLE
M '•..' .. .. ?? y A C 6D S 3 O S ?. 06
C7 o 0
i S *?e aj? ° a Z m c E z
N ?o m ^ S
Q w `I tu
S rF m''r1
40
o??p
? w
Ny?
g?
YY8
?"m
O
?1L31J?VW I = CD 2 `J
HiNON Of Q wQ
z
Du3NOM z
E
W `r1.1 Q o Q r? Z :s
?1i1 p0 Q(Z) W
0 U tu? W ? p V)
Y) LLJ Q o ti U *-y // 7 z a C?
Q 0 CL J LL-
ti a ?? rCn c? v a?
CL CN 11)
Jx i.J. '? pOrno? 3
Lo 't Q
~
U) IX) N ° Lu O ?Z o
m cc, ? 2a iu
a -Z Z
WY = o zu-j
cc
Im Z3
1z) CL Q: ;E
``,?11N1111r??1 m ? ~ cn
VA,
d \
\ o irk
\ d rOj
.0 co ? ? ? ? ? \ O z
Cf) \
-ff O 4
06 11 Ln
O \ x\
\ x x x
9 A\ x
°` 8.
`1\ l"x x 3
x
x x 11
° x
N rn o x` K
BRpDL WATERS Lr) \ x` x 61. O I ? Y
x / HEAD
O O N ? x °c'
UQ Z?+i OY `
z x
Q- ° Z
om
W o
ti
L'i O o u W
?p U LC F,
,ZC CL LL w Q
O
Y U
c J
CL Q)
Lo Lli
CL. Li-
W?YL,z ?
t~rINOOQL ?C
mLI) m?Q ?ti
C) CL ti"t pQlZil
Lo 0
m ? j Q CZ
`oo m Z j
J
J WnlVG 6Z,GAON 3 Q
0
-J \
O ° I z Jv /
56.0 .98.1
J d
`II N MI VG M77n nn1Ht7 M77n ^O e ? ? / ?
f N N N 0 0 W> o Q?? O
II it II II 0) II II ? J~ / \
?f \
03 00 L.Li
(A p CL
Z Z J Qo
U ?Q N ?2 Q?V)?
? > 'n tr N ° N?a =ZY
? Z Wn1dO M77W = `o Lli C)
Y
Z C)
0
z== m
o c
2 ZZ C)
t