HomeMy WebLinkAboutNC0074268_BIMS Compliance Report_20180221United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCO074268 111 12 I 18/02/21 I17 18 I S i 19 LG] i 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 1.0 70 Id I 71 In, I 72 I n, I 73I I I74 751 1 1 1 1 1 1 180
I—I I� I I i
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:25AM 18/02/21
17/04/01
Crowders Creek WWTP
5642 S York Rd
Exit Time/Date
Permit Expiration Date
Gastonia NC 28052
12:30PM 18/02/21
20/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Kevin Morgan Graves/ORC/704-214-9153/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kevin M Graves,PO Box 1748 Gastonia INC 28053/Senior Plant
Operator/704-854-6655/7048669405 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Maria Schutte Division of Water Quality//704-663-1699)
Ori A Tuvia MRO WQ//704-663-1699/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
A14CC681 AF27425...
Page#
NPDES yr/mo/day Inspection Type
NCO074268 111 121 18/02/21 1 17 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO074268 Owner - Facility: Crowders Creek WWTP
Inspection Date: 02/21/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
❑
❑
❑
0
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The subject permit expires on 8/31/2020. Permit requires quarterly Hardness sampling for
effluent and upstream but does not require the sampling to be done on the same day.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
❑
❑
0
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
❑
❑
❑
❑
Dates, times and location of sampling
COCs, ORC logs, Calibration lops and Bench sheets were reviewed for the period Janaury
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
0
❑
❑
❑
Comment: The records reviewed during the inspection were organized and well maintained.
DMRs,
COCs, ORC logs, Calibration lops and Bench sheets were reviewed for the period Janaury
2017 through December 2017.
Laboratory
Yes No NA NE
Page# 3
Permit: NCO074268 Owner - Facility: Crowders Creek WWTP
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
Inspection Date: 02/21/2018 Inspection Type: Compliance Evaluation
❑
Is sample collected above side streams?
0
❑
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
0
❑
❑
❑
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
0
❑
❑
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
❑
0
Comment: Influent and effluent analyses (including field) are performed under the on-site laboratory
inspection.
certification #210. Meritech Labs Inc, (#165) and Shealy (#329) have been contracted to
Provide analytical support.
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
0
❑
❑
❑
Comment: The subject permit requires composite BOD and TSS influent sampling.
Monthly aliquot
verifications are performed and documented. At the time of the inspection
the influent
sampler pulled 205 ml. Influent sampler tubing had some sagging at the time of the
inspection.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: The subject permit requires composite and grab effluent sampling. Monthly aliquot
verifications are performed and documented. At the time of the inspection the effluent
sampler pulled 208 ml.
Page# 4
Permit: NCO074268 Owner - Facility: Crowders Creek WWTP
Inspection Date: 02/21/2018 Inspection Type: Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The wastewater facilitv aDDeared to be Drooerlv oDerated and well maintained. The ORC
and staff incorporate a comprehensive process control program (including Chem -Scan Unit)
with all measurements beinq properly documented and maintained on-site.The facility is
equipped with a SCADA system to assist the staff with the operation of the treatment
units/processes. Selected plant alarms are also connected to a plant -wide audible system
to notify operators out in the plant of alarm conditions.
Bar Screens
Yes No NA NE
Type of bar screen
0
❑
❑
❑
a.Manual
❑
❑
❑
❑
b.Mechanical
0
❑
❑
❑
Are the bars adequately screening debris?
❑
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Flow Measurement - Influent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
0
Comment: Flow meter was calibrated on 9/17/2017 by Expert Services.
Grit Removal
Yes No NA NE
Type of grit removal
a.Manual
❑
b.Mechanical
0
Page# 5
Permit: NC0074268
Inspection Date: 02/21/2018
Owner - Facility: Crowders Creek WWTP
Inspection Type: Compliance Evaluation
Is the pump wet well free of bypass lines or structures?
0
❑
Grit Removal
Yes No NA NE
Is the grit free of excessive organic matter?
0
❑
❑
❑
Is the grit free of excessive odor?
0
❑
❑
❑
# Is disposal of grit in compliance?
0
❑
❑
❑
Comment:
Pump Station - Influent
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
0
Comment: All four pumps were operational.
Primary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the sludge blanket level acceptable?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately 1/4 of the sidewall depth)
0
❑
❑
❑
Comment: Both primaries were operational and in service.
Nutrient Removal
Yes No NA NE
# Is total nitrogen removal required?
0 ❑
❑
❑
# Is total phosphorous removal required?
0 ❑
❑
❑
Type
Biological
# Is chemical feed required to sustain process?
0 ❑
❑
❑
Page# 6
Permit: NCO074268
Inspection Date: 02/21/2018
Nutrient Removal
Is nutrient removal process operating properly?
Owner - Facility: Crowders Creek WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
■ ❑ ❑ ❑
Comment: The subject permit requires a total phosphorus and total nitrogen seasonal effluent loading.
Glycerin is added as a carbon source (anoxic basin).
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
❑
❑
Type of aeration system
Diffused
0
❑
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
❑ ❑
0
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
0 ❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
0 ❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
0 ❑
❑
❑
Comment: Foam was observed. No foam carry-over was observed in the secondaries.
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately 1/4 of the sidewall depth)
0
❑
❑
❑
Comment: Both secondaries were operational and in service. Alum is added on an as -needed basis to
enhance settling.
Pumps -RAS -WAS Yes No NA NE
Are pumps in place? 0 ❑ ❑ ❑
Are pumps operational? 0 ❑ ❑ ❑
Page# 7
Permit: NCO074268 Owner - Facility: Crowders Creek WWTP
Inspection Date: 02/21/2018 Inspection Type: Compliance Evaluation
Pumps -RAS -WAS Yes No NA NE
Are there adequate spare parts and supplies on site? 0 ❑ ❑ ❑
Comment:
Lagoons
Yes No NA NE
Type of lagoons?
❑
•
❑
❑
# Number of lagoons in operation at time of visit?
1
❑
❑
❑
Are lagoons operated in?
❑
❑
❑
■
# Is a re -circulation line present?
❑
❑
0
❑
Is lagoon free of excessive floating materials?
0
❑
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
0
❑
Are dike slopes clear of woody vegetation?
0
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
0
❑
❑
❑
Are dikes free of seepage?
0
❑
❑
❑
Are dikes free of erosion?
0
❑
❑
❑
Are dikes free of burrowing animals?
0
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
0
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
0
❑
Is the lagoon surface free of weeds?
0
❑
❑
❑
Is the lagoon free of short circuiting?
0
❑
❑
❑
Comment: The facility is equipped with two polishing ponds (both lined and operational); however, only
one pond was in service. The ponds are alternated approximately once every two years.
Disinfection -Gas
Are cylinders secured adequately?
Are cylinders protected from direct sunlight?
Is there adequate reserve supply of disinfectant?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No. 7782-50-5)?
If yes, then is there a Risk Management Plan on site?
If yes, then what is the EPA twelve digit ID Number? (1 000--)
If yes, then when was the RMP last updated?
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
100000067321
Page# 8
Permit: NCO074268 Owner - Facility: Crowders Creek WWTP
Inspection Date: 02/21/2018 Inspection Type: Compliance Evaluation
Disinfection -Gas Yes No NA NE
Comment: The chlorination and dechlorination systems are serviced annually.
De -chlorination
Yes No NA NE
Type of system ?
Gas
❑
❑
❑
Is the feed ratio proportional to chlorine amount (1 to 1)?
0
❑
❑
❑
Is storage appropriate for cylinders?
0
❑
❑
❑
# Is de -chlorination substance stored away from chlorine containers?
❑
❑
0
❑
Comment:
Are the tablets the proper size and type? ❑ ❑ 0 ❑
Are tablet de -chlorinators operational? ❑ ❑ 0 ❑
Number of tubes in use?
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0
❑
❑
❑
Comment: Flow meter was calibrated on 9/17/2017 by Expert Services.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: The effluent appeared clear with no floatable solids and trace foam (entrained air).
Anaerobic Digester
Yes No NA NE
Type of operation:
Floating cover
Is the capacity adequate?
❑ ❑
❑
# Is gas stored on site?
❑ ❑
❑
Is the digester(s) free of tilting covers?
0 ❑ ❑
❑
Is the gas burner operational?
❑ ❑
❑
Is the digester heated?
❑ ❑
❑
Page# 9
Permit: NCO074268
Inspection Date: 02/21/2018
Owner - Facility: Crowders Creek WWTP
Inspection Type: Compliance Evaluation
Anaerobic Digester Yes No NA NE
Is the temperature maintained constantly? 0 ❑ ❑ ❑
Is tankage available for properly waste sludge? 0 ❑ ❑ ❑
Comment: The facility is equipped with four digesters (1 -primary, 1 -secondary, 2 -holding tanks).
Bio -solids are land applied under Permit WQ0001793.
Solids Handling Equipment
Yes No NA NE
Is the equipment operational?
0
❑
❑
❑
Is the chemical feed equipment operational?
❑
❑
0
❑
Is storage adequate?
❑
❑
0
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
❑
❑
0
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
❑
❑
0
❑
Is the site free of excessive moisture in belt filter press sludge cake?
❑
❑
0
❑
The facility has an approved sludge management plan?
0
❑
❑
❑
Comment: Two DAF units. The DAF units are used to thicken the WAS prior to digestion. The DAF
supernate is returned to the head of the biological/nutrient removal treatment processes.
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Comment:
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: All three standby generators were operational. The generators are tested monthly under
load and are serviced annually by a contracted company (CAT).
Page# 10