Loading...
HomeMy WebLinkAbout20081866 Ver 2_More Info Received_20090320 (2)Ex;p o8- IS6Ie Vz ? M ? Kimley-Horn and Associates, Inc. Suite 300 4651 Charlotte Park Drive Charlotte, North Carolina 28217 TEL 704 333 5131 FAX 704 333 0845 Transmittal Date: March 19, 2009 Job Number: 018253029 Project Name: North Belgate Multi-Family Stormwater Management Plans To: Joseph Gvamfi Division of Water Quality r,'r? 2321 Crabtree Blvd, Suite 250 Raleigh, NC 27604 MAR o P 2,000 ? 919-715-3473 DENR - YlER OtALIP? - WETLA1a0S MID S T ORIA,`TER BRF,NDl We are sending these by 0 U.S. Mail ® FedEx Hand Deliver ? Other: We are sending you ® Attached ? Shop Drawings R Other: Copies Date No. Description 2 03/19/09 1 North Belgate Multi-Family Stormwater Management Plans 2 03/19/09 2 North Belgate Multi-Family Stormwater Management Calculations fl 3 03/19/09 3 Financial Responsibility Form for Pond 2 (Forthcoming, see below) These are transmitted as checked below: ® For your use Approved as submitted Resubmit 0 Copies for approval As requested Approved as noted E] Submit E] Copies for distribution For review and comment E] Returned for corrections ? Return ? Corrected prints Joe, We raised the bottom elevation in the forebay of Pond 2. The client is re-signing the financial responsibility forms and sending them to you separately. Otherwise, you should have all the information you need. Please give me a call if you have any questions. Thanks! Copy to: Under separate cover via the following items: ® Prints/Plans ? Samples ? Specifications ? Change Orders Signed Beverly Rosenbloom, E.I. Page 1 I ?.x.p D 8 - t8 ?? v2 BELGATE MULTI-FAMILY DEVELOPMENT CHARLOTTE, NORTH CAROLINA REVISED STORMWATER MANAGEMENT CALCULATIONS v.° MAR 200.9 Prepared for: DENR - WATER QUALITY WETLANDS AND STORMA.WATER BRANCH Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 Prepared by: Kimley-Horn and Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 CAR 'S?o?oFESS/p - i9? ?NG [ N ???' 03? P? (.9.04 March 2009 KHA Ref: 018253029 t it C..n Kimley-Horn and Associates, Inc. WET DETENTION BASIN Project Information Project Name: KHA Project #: Designed by: Revised by: Revised by: Belgate Multifamily 018253029 TDR Date: 10/16/2008 BRR Date: 1/19/2009 Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 9.42 Acres Impervious Area (IA) = 6.28 Acres Percent Impervious (1) = 66.7 % Required Surface Area Permanent Pool Depth: 3.25 ft SA/DA = 3.85 (90% TSS Removal via Pond) Min Req'd Surface Area = 15798 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + .009 (1) = 0.65 in/in Storage Volume Required = 22,226 cf (above Permanent Pool) Elevations Bank Elevation = 675.00 ft Top of Pond Elevation = 675.00 ft Temporary Pool Elevation = 671.40 ft Forebay Weir = 670.00 ft Shelf Beginning Elevation = 670.50 ft Permanent Pool Elevation = 670.00 ft Shelf Ending Elevation = 669.50 ft Bottom Elevation = 663.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = Area @ Top of Permanent Pool = Volume of Temporary Storage = Side Slopes of Pond = Side Slopes of Shelf = Side Slopes of Pond (below shelf) = 20,847 sf 16,066 sf 25,839 cf 31 101 31 Is Permanent Pool Surface Area Sufficient (yes/no)? Volume of Storage Provided 25,839 cf Total Volume Sufficient (yes/no)? Yes Area (s.f.) 20,847 16,066 (Elevation = 671.40) (Elevation = 670.00) Yes ( 16066 > 15798 ) sf Orifice Size = 2.50 inches Drawdown Time = 2.77 days I WET DETENTION BASIN Project Information Project Name: Belgate Multifamily KHA Project #: 018253029 Designed by: TDR Revised by: BRR Revised by: Site Information 10/20/2008 1/19/2009 Date: Date: Date: Sub Area Location: Drainage Area 1 Drainage Area (DA) = 9.4 Acres Impervious Area (IA) = 6.3 Acres Percent Impervious (1) = 66.7 % (Drainage Area) Orifice Sizing Q2 Days = 0.1495 cfs Q5 Days - Orifice Size = Q office = Drawdown Time = 0.0598 cfs 2.50 in 0.108 cfs 2.77 days less than 5 days (yes/no) ? greater than 2 days (yes/no) ? Yes Yes Orifice Equation: Q=cAgV(2gh) (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Q2< Q< Q5 c = 0.6 A9= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter T I Kimley-Hom pP-Z? 11111- and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Belgate Multifamily KHA Project #: 018253029 Designed by: TDR Date: 10/16/2008 Revised by: BRR Date: 1/19/2009 Revised by: Date: Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 10.97 Acres Impervious Area (IA) = 7.96 Acres Percent Impervious (1) = 72.6 % Required Surface Area Permanent Pool Depth: 3.25 ft SA/DA = 3.95 (90% TSS Removal via Pond) Min Req'd Surface Area = 18875 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.70 in/in Storage Volume Required = 27996 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 679.00 ft Top of Pond Elevation = 679.00 ft Temporary Pool Elevation = 676.30 ft 27,100 Forebay Weir = 674.00 ft Shelf Beginning Elevation = 674.50 ft Permanent Pool Elevation = 674.00 ft 19,979 Shelf Ending Elevation = 673.50 ft Bottom Elevation = 667.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 27100 sf (Elevation = 676.30 ) Area @ Top of Permanent Pool = 19979 sf (Elevation = 674.00 ) Volume of Temporary Storage = 54141 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 10 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Is Permanent Pool Surface Area Sufficient (yes/no)? Yes ( 19979 > 18875) sf Volume of Storage Provided 54141 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.50 inches Drawdown Time = 2.1 days WET DETENTION BASIN Project Information Project Name: Belgate Multifamily KHA Project #: 018253029 Designed by: TDR Revised by: BRR Revised by: Site Information 10/21/2008 1/19/2009 Date: Date: Date: Sub Area Location: Drainage Area 2 Drainage Area (DA) = 11.0 Acres Impervious Area (IA) = 8.0 Acres Percent Impervious (1) = 72.6 % (Drainage Area) Orifice Sizing Q2 Days = 0.3133 cfs Q5 Days - Orifice Size = Q Office = Drawdown Time = 0.1253 cfs 2.50 in 0.140 cfs 2.1 days less than 5 days (yes/no) ? greater than 2 days (yes/no) ? Yes Yes Orifice Equation: Q=cAgV(2gh) (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Q2< Q< Q5 c = 0.6 Ay= Area of Pipe = rd4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter N C O u N N V a > M 11= 3 H 'O. ns ? u w R i d 3 E H W C O ? 07 OJ y E O 3 O m > O A O C Q E m¢ E? Y ?m C t' T E o rn LL N O 7 V) ? N 0) W 1] O) N CD O O C) 0 O O O n ?Iml N N 0) cc co M 0 00 0] I D] ,_ O E E u a n' o Z o v v O c v v w a oo ^ .+ o Q 0) 2 p C OC •? d Y a 0) u '^ t0 U 1 O) tD 7 ci 0) co Q c 0010 ; ? C LL 01 ? 0 E o en ci M to a) oo U) r ? V O O O n O n V) co V) '•i lx? M M M Q O .4 N t n 00 6 N .-I > OJ ^ E O n O O 00 N M LD O V O O O V) O V) V) tD O) rl i1 N N e-1 e1 14 6 > O F u N o ei M M M M 0) M O N 0 N 0 N 0 M 0 N 0 'D 0 n 0 00 O O) O W v 0 0 0 6 6 6 6 0 0 j O M 00 in Q lD r, N .-4 N N 00 N N M Vl M N M W W ?D to t m m n N u u ?D ? lD O O C o a Q C V a ?p E O ? a 9 O C Q) 00 N m Ln M co ci M m o v ci V1 I? d E a v 2 o E o in > w o "O > !n > c v E v `o d `O LL D. LL C O E M n lD u) n 00 co .-I 1-4 V) cT n N m O ? O O O O R N M Ot V) n lD n M n N C OJ N 8 O M N O 01 M ' n V) V1 > ? I ce LO _Z 00 O N V) L, U 'i N M co V In D , Q (E" N O 0) V) 0) M 00 O) n N D J w V tD Vi tD ? 00 n O o O) V tD V) oO' D m 0o i lD O O m O m V) M ID N O N O co M en O n V1 N n IT n V) M n 1-1 tt )D O M N M co -?T ID n O ?T M M Ip O O 'I N 'i e-1 N N N M tt t7 V) V) V) lD w 0 o o o 0 o 0 0 O O O O O O O O Q M M ^ N o0 n oO O) V) .-I O at 0) M e-i V) N n V 0) V co N V) ID oO Ll O E E M N to ci 0 ci V N D M N n O) M W N tD Ol N O C N O) 7 , 0 co O O) ?-1 00 M n u) n n Q M V V) t N N N N N Z 0 a pOp M " a ' N 1-0 O n O C O) M r O 4 n r4 n M n It n n l D l D DD ' ? l D ? w lD m n O n ID m m lD tD Q n m Lo -6 O ?- 7 0 0 y C O t ut d a LL r_ O O -C N l N m v a) C O O a 6 E O E Q O D o a F co ci M lD O N E O c a, c E v a Q 0 a c ra E a a m II 01 Q 0 ar v h 'a m N 1= O m uu co y u d > m 3 N •Q M N T > c u d m ? v 3 W "O a C C m m aC, Y C U 7 O O to O O c Q E.x m< 2. C T E m rn IL N O Cl) 7 to CN N ? O 0) O CO C O O O 00 O O ?I[hl UI N N co 0 0 =I CO D] ja 0) E E a v a o z c v a a c v a M y N U y > '> y° x p W CC •? a x a N d u '^ m V r-I 01 lD Ol C m N N d IT1 Q v c " 3 o °D M O C a u- GJ ? y O 0 O 7 N L rn N co N > 7 U N E 1 w N O O d1 N Y U N _ O O w 7 'C n m L ? Y U O co co O O 00 V ( LO ? D V co N V N P' C V N co Lo to (D Y II II II II II II N 11 11 II 11 U C f? N G _o '_ '_ v v (n v v m L L f6 a a Y w L v C .? N N N U J?'D O] O) L m E m C > J = C N) N N EL 0 Q Q O 7 7 E?? cLJ O Q 2 m m F o 65 > o ° o 0 0> N p V E of y U o a > Q CD c r L N Q 3 •D U rn 0 m N (D c m m 3 ? O. N N N N :1 0 E a 7 (0 E C E E O O O O LO O (fl O c, I- (0 T 11 11 II 11 II II 3 w N ? ? ? ? a N m cm m 3 3 N C7 c m° u ° '2 J N N N O (n T C a? W > 3 m n d o= a) E L U U W p T 3 o p c • to W m M I L N C D ld u u 10 v a, > N 'a M y) L u Q V V ? 10 ? 01 E LA W c c R f6 d y E u >o N O C Q 2 aTi Q E'er Y m C u E LL N O 7 LO CN N ? O _rn a1 m r_ O 0 O O O O O N ` ?IMI 0 o 0 of Of mlm N Jt j6 n E E ? ° o z o m-ov ? C N N d 00 . >.C d a Y p s m O a` d v ? m u N I? t\ 01 L..j O e-1 C R ? •? v Q co c " 3 o °D m o +J c - C •- LL d ? v p 0 o n ? .-1 0 0 0 o o rn M v M n Ql LD M m L`?D O L?D Q o 1-1 m Ln of y a E m m N 001 O m 000 7 u O O cn 01 LO M O N O" a-i ti N M N N N f6 > t6 M In Ol O Ln N cT N Ln .... ? N m N W C) ro 0 0 0 L n 0 ID 0 0 m 0 ? ? W v 0 0 0 0 0 0 0 0 0 ? Q O N m OM V LOD W 0m1 7 -4 O "' ^ N LO N m h N 1, N Ln Q N c-1 N N M v C m W cr- m m rn o N m m LD LD n n ^ n L V) LD to LD O LD O c o D O 2 _ C Lu u c v E p ? o_ 9 O O O N 1- m O ? LD I? co ri r 1 LD Q E a N 7 O E O V) 7 > y o a > N m R a,a, E tea, O v O LL D_ LL N 7 ^ Vl lb D1 O N n 1n -1 e-I 01 '•? Ln r- r-I N Ln 0 0 0 co v r4 D V r+ m rn M 1 ' L.n , ? n N O O LD 01 Ln N 00 co > N O r r" M m C V) 00 Lj H N M V V Ln LD I, M Q I? W M .-'I N lA m m m ti ON a 0 3 j) 0 0 LMD W .?-q Ln o rn m lD m o N W N O ` Ln LD m T -04 to lD l%1 N LI) 00 .a) 4 m N m f4 ra N _q O w W r4 l0 r1 M N a) V M 0) m n Ln O O1 00 W n O (? .-1 N N 00 m N m co dl .y V I? O M lD W Ln N Ln O N Ln .-L lp m N N N M 7 Ln lD LD LD 1- n v o O O O O O o O O 0 0 0 0 0 0 O Q W (p lb N a-I Ln c-I •-i N V 1? l0 LO a-I O L--I N -7 01 LD J ^ o N N n a m N m f` .-+ Ln LD N a N m N V o 1--4 rl LO t o [T O Q m m Ln lD N w OD 0 ,--1 N Ln -I 00 l V N lD N n N co N r-1 M M M H L--1 N c r Z °a i h N Ql o c-1 N M V ? 0 W 01 p p m ?D LO ?o r, rl r, r, r, ^ ^ ^ ^ O LD LD - O LD O n Lfl lD p lD lD lD to lp to C L O a v O a y c o n Ln m M o ra u E C O O` O E O O p m d F w F D_ F- at M ci I? ? dl M r- I D1 n m " '•I E > `c a c rt E `a a Q c a c ra E v LL N a 0 v LA c ca m N C O i+ m u U m N V d m N 'a m H Q U u ? m ? 3 H W = C m Cp N y E U 30 om >o m 0 dQ E9 2'. pp- a m am 1.L N O M 7 U-1 N ? O N m ??O I I ?IC', co m co 000 ?m of ? QM-1 0 •m bi it E E -o a o z o a o v C ? C ? h u a` oo ? Q N N N 2 O K •Q n. Y a N `u m u N I? t` Ol 'y o C m ? N ? m ¢ ? c o to m O LL d ? d 0 0 C O N L O) N U7 >> N N 6 E ? N Ol E N y U U ? A ? Y ?2 O O O N (D O co cD o v cD v M cc) t if V V (M CD .Y 11 II II 11 II II dj 11 II II II o c v N U G C to r L m -a v .Y ? w? v C 0) U N N N U 0 'O 01 O_) L O C U U O U> N N U y m Q m m m c J= C Ip J N O N N O Q Q ? j w d' ? ? U O c o Q o Q 2 m co 0 r m :? 3: 0 o ° 0 0 0> O L .U N 0 ?j E rn co U o .? > > N 0- aD c r L c?i n 3 ° U 01 w t0 C N ? C m °1 3 •.E-0 N N a) E a :3 m E E E O n t` O ? r 0 0 o r ? T 11 II II II 11 II m N N «" .Y'' ? ? CL N Co Of O m 3 N C7 O m >+ j _ ° O. J N N Cn C D T w M y ?` 3 C m O = m E r w 0 w 0 n m 0 3 co N N m N Permit NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) O?OF W ATF9OG O T I. PROJECT INFORMATION Belgate Multi-Family Project name Contact person Beverly Rosenbloom Phone number 704-319-7699 Date 311912009 Drainage area number 1 II. DESIGN` INFORMATION Site Characteristics Drainage area Impervious area, post-development % impervious Design rainfall depth Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 410,335 fe 273,557 ft 66.67 % 1.0 in 22,227 ft3 OK 25,839 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 0 ft3 ft3 Y (Y or N) 2.6 in 0.15 (unitless) 0.70 (unitless) 0.12 in/hr OK 4.71 ft3/sec 27.03 ft3/sec 22.32 ft3/sec 671.40 fmsl 670.00 fmsl fmsl 670.50 tmsl 669.50 fmsl Data not needed for calculation option #1, but OK if provided. 664.00 fmsl 663.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft Y (Y or N) 671.4 fmsl OK Form SW401-Wet Detention Basin-Rev.6-2120/09 Parts I. & II. Design Summary, Page t of 2 Permit (to be provided by DWQ) IC DESIGN INFORMATION - - Surface Areas Area, temporary pool 68,235 ft Area REQUIRED, permanent pool 15,798 ft SAIDA ratio 3.85 (unitless) Area PROVIDED, permanent pool, A,,,,,,_,,d 16,066 ft3 OK Area, bottom of 1 Oft vegetated shelf, Ab?t_a,,t 10,261 ffz Area, sediment cleanout, top elevation (bottom of pond), Abotp„d 4,138 ft? Volumes Volume, temporary pool 25,839 ft3 OK Volume, permanent pool, Vra, l 54,813 ft3 Volume, forebay (sum of forebays if more than one forebay) 10,385 ft3 Forebay % of permanent pool volume 18.9% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 3.85 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vv,-.ro 54,813 ft3 OK Area provided, permanent pool, A,._pd 16,066 ftz OK Average depth calculated 3.41 ft OK Average depth used in SAIDA, da,,, (Round to nearest 0.5ft) 3.5 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ap._pw ftz Area, bottom of 1 Oft vegetated shelf, Abt_sw ft? Area, sediment cleanout, top elevation (bottom of pond), Aboty.d ftz "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) ft Average depth calculated ft Average depth used in SAIDA, d., (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies Y (Y or N) 2.50 in in2 0.60 (unitless) 0.43 ft N (Y or N) (unitless) (unitless) ft ft 4.71 ft3/sec OK 0.79 ft3/sec OK 0.11 ft3/sec 2.80 days OK, draws down in 2-5 days. OK, drawdown time is correct. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.3 :1 OK Y (Y or N) OK 1.1 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Gravity Pipe Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & II. Design Summary, Page 2 of 2 Permit ATIMPA NcDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) W A TF9OG J ti O Y t.' PROJECT INFORMATION Project name Belgate MultWamily Contact person Beverly Rosenbloom Phone number 704-319-7699 Date 311912009 Drainage area number 2 II. DESIGN INFORMATION ? Site Characteristics Drainage area 477,853 ffz Impervious area, post-development 346,738 ffa % impervious 72.56 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 27,997 ft3 OK Volume provided 54,141 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1yr 24hrstorm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWf elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided ft3 ft3 ft3 0 ft3 ft3 Y (Y or N) 2.6 in 0.15 (unitless) 0.70 (unitless) 0.12 in/hr OK 4.93 ft3lsec 32.80 ft3lsec 27.87 ft3lsec 676.30 fmsl 674.00 fmsl fmsl 674.50 fmsl 673.50 fmsl Data not needed for calculation option #1, but OK if provided. 668.00 fmsl 667.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft Is there additional volume stored above the state-required temp. pool? Y (Y or N) Elevation of the top of the additional volume 676.3 fmsl OK Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & It, Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) it. DESIGN INFORMATION - - - Surface Areas Area, temporary pool 27,100 ftz Area REQUIRED, permanent pool 18,875 ft SAIDA ratio 3.95 (unitless) Area PROVIDED, permanent pool, Ap,.-pcd 19,979 ft3 OK Area, bottom of 1 Oft vegetated shelf, Ab. sheff 12,514 W Area, sediment cleanout, top elevation (bottom of pond), AW-, d 5,052 ftz Volumes Volume, temporary pool 54,141 ft3 OK Volume, permanent pool, Vpe--" 67,747 ft3 Volume, forebay (sum of forebays if more than one forebay) 13,610 ft3 Forebay % of permanent pool volume 20.1% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 3.95 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp--P d 67,747 ft3 OK Area provided, permanent pool, Ap,--" 19,979 ftz OK Average depth calculated 3.39 ft OK Average depth used in SAIDA, day, (Round to nearest 0.5ft) 3.5 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ate,, j fe Area, bottom of 10ft vegetated shelf, A ,hw ft3 Area, sediment cleanout, top elevation (bottom of pond), Awl.d ftZ "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) ft Average depth calculated It Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50 in Area of orifice (if-non-circular) in2 Coefficient of discharge (Co) 0.60 (unitless) Driving head (Hp) 0.73 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Cw) (unitless) Length of weir (L) It Driving head (H) It Pre-development 1-yr, 24-hr peak flow 4.93 ft3/sec OK Post-development 1-yr, 24-hr peak flow 0.92 ft3lsec OK Storage volume discharge rate (through discharge orifice or weir) 0.10 ft3lsec Storage volume drawdown time 2.90 days OK, draws down in 2-5 days. Drawdown time varvinq from expected value by more than a half dav. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.4 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.1 It OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Gravity Pipe Forth SW401-Wet Detention Basin-Rev.6-2 /2 010 9 Parts I. & It. Design Summary, Page 2 of 2 9S 10S 13S Pre-dev DA-2 Post-d v DA-2 Post-dev 2 Undetained 11 12 Multi-Family Wet Pond 2 Outfall 2 Subca Reach on Link Drainage Diagram for Mulit-Family North Pond 2 Prepared by Kimley-Horn and Associates, Inc., Printed 3/19/2009 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 9S: Pre-dev DA-2 Runoff = 4.93 cfs @ 12.18 hrs, Volume= 0.486 af, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 11.800 70 PRE - Woods/Meadow - Good condition HSG C 11.800 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.4 Direct Entry, From spreadsheet v 3 0 X Subcatchment 9S: Pre-dev DA-2 Hydrograph -------------- 4.93 cfs --------------------------- i-------; ----- - - ------- ------- ------ --------------- ------ ------ 5 Charlotte; 24-hr 1 1- r 'r -124 h r 4 Rainfall=2.68' Rulltioff Ar6aT11.800 air . ----- Riunoff VQlulme=0.486 of RUndff !DOth'0.49: :---- T ----------------------- :------- ---- , - r -. r z ' Tc=21.4 M: in QW7D ¦ Runoff 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 10S: Post-dev DA-2 Runoff = 32.80 cfs @ 11.96 hrs, Volume= 1.539 af, Depth= 1.68" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 10.970 91 POST - Pond Drainage Area 10.970 Pervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 10S: Post-dev DA-2 Hydrograph ¦ Runoff v 3 0 U. Time (hours) 1 . Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 13S: Post-dev 2 - Undetained Runoff = 1.31 cfs @ 11.97 hrs, Volume= 0.062 af, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 1.140 74 POST - Undetained Drainage Area 1.140 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: Post-dev 2 - Undetained Hydrograph ¦ Runoff v 3 0 U. ., ., ?., ?., ? .. .... .... .... ... ... ..- Time (hours) - - - Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Sumi Inflow Area = 10.970 ac, Inflow = 32.80 cfs @ Outflow = 0.28 cfs @ Primary = 0.28 cfs @ Secondary = 0.00 cfs @ mary for Pond 11 P: Multi-Family Wet Pond 2 0.00% Impervious, Inflow Depth = 1.68" for 1 yr - 24 hr event 11.96 hrs, Volume= 1.539 of 24.00 hrs, Volume= 1.442 af, Atten= 99%, Lag= 722.8 min 24.00 hrs, Volume= 1.442 of 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Peak Elev= 676.31'@24.00 hrs Surf.Area= 27,138 sf Storage= 56,125 cf Plug-Flow detention time= 2,467.7 min calculated for 1.442 of (94% of inflow) Center-of-Mass det. time= 2,432.6 min ( 3,239.3 - 806.8 ) Volume Invert Avail.Storage Storage Description #1 674.00' 137,143 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store _(feet) (sq-ft) (cubic-feet) (cubic-feet) 674.00 19,979 0 0 675.00 24,296 22,138 22,138 676.00 26,441 25,369 47,506 677.00 28,671 27,556 75,062 678.00 31,011 29,841 104,903 679.00 33,469 32,240 137,143 Device Routing Invert Outlet Devices #1 Primary 667.00' 24.0" x 90.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 666.00' S=0.0111'/' Cc= 0.900 n=0.013 #2 Device 1 674.00' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 676.30' 3.50' W x 0.50'H Vert. Orifice/Grate C=0.600 #4 Device 1 677.00' 3.50' W x 0.17'H Vert. Orifice/Grate C=0.600 #5 Secondary 677.50' 15.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 #6 Device 1 677.50' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=0.26 cfs @ 24.00 hrs HW=676.31' (Free Discharge) L1=Culvert (Passes 0.26 cfs of 43.61 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 7.16 fps) 3=Orifice/Grate (Orifice Controls 0.02 cfs @ 0.36 fps) -Orifice/Grate ( Controls 0.00 cfs) -Orifice/Grate (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=674.00' (Free Discharge) t5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 6 Pond 11 P: Multi-Family Wet Pond 2 Hydrograph I ¦ Inflow ? Outflow ¦ Primary ¦ Secondary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) A r+ Mulit-Family North Pond 2 Charlotte 24-hr 1-yr 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 3/19/2009 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 7 Summary for Pond 12P: Outfall 2 Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth > 1.49" for 1 yr - 24 hr event Inflow = 1.49 cfs @ 11.97 hrs, Volume= 1.504 of Primary = 1.49 cfs @ 11.97 hrs, Volume= 1.504 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Pond 12P: Ouffall 2 Hydrograph S 1.49 cfs IofidwAte&121.110 aC ------- --- ------- ------ -------------- ------- ------- ------- ------- ------- ------- 1 0 a 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ¦ Inflow ¦ Primary