Loading...
HomeMy WebLinkAbout20180329 Ver 1_401 Application_20180318DWR Division of WaaerResources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edoes.deq. ne.govlWaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located: Johnston Is this project a public transportation project?*(?) r Yes r No 1a. Type(s) of approval sought from the Corps:* Pr Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* 17 Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nunbers you are applying for not on the drop dow n list. 39 - Commercial/Institutional Developments 1c. Type(s) of approval sought from the DWR:* check all that apply Pr 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization ............................................................................................................... * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: b Yes r No O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program 0 Yes r No 1f. Is the project located in any of NC's twenty coastal counties?* r Yes r No 1h. Is the project located in a designated trout watershed?* r Yes F No Link to trout information: http://www.saw.usace.army.miI/Missions/Regulatory-Permit-Prograni/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Wyatt Brown 1b. Primary Contact Email:* brownenvgrp@gmail.com 1c. Primary Contact Phone:* (XXX)XXX-XXXX (919)524-5956 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r- Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Leslie Collins 2b. Deed book and page no.: deed 04987 page 0793 2c. Responsible party: (for Corporations) 2d. Address Street Address 630 TURNAGE RD Address Line 2 City Smithfield Fbstal / Zip Code 27577 2e. Telephone Number: (xxx)xxx-xxxx (919)631-6999 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* les@collinsboating.com State / Province / Fbgion NC Country Johnston C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Collins Property 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Smithfield 1d. Driving directions* If it is a new project and can not easily be found in a GPS napping system Pease provide directions. Beside (east side) Collins Boating (4620 US HWY 70 BUS, Smithfield) 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 261300-73-7906 2b. Property size: (in acres) 1.9 ac. 2c. Project Address Street Address Address Line 2 City Postal / Zip Code State / Province / lbgion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.48985 -78.26864 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Bawdy Swamp 3b. Water Resources Classification of nearest receiving water:* C, NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Site is a wooded area located beside Mr. Collins boating sales, in the vicinity is mostly farm land. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent Get Maps _ topoView labeled.pdf 397.58KB File type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) nick the upload button or drag and drop files hereto attach docurrent soils aerial.pdf 191.05KB File type crust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0.089 4e. List the total estimated linear feet of all existing streams on the property: (intermttent and perennial) 0.00 4f. Explain the purpose of the proposed project:* fill a very small wetland in the middle of the property so the property can be used for commercial purposes 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used: There is a small wetland located approximately in the center of the wooded 2.052 acre tract Mr. Collins has purchased to add to his existing boat retail sales yard. The wet area is a small depression that drains to a non Neuse buffer man made drainage ditch. The filling of this marginal wet area should not have any adverse affect. Dump trucks and a track hoe should be used to fill this wetland. 4h. Please upload project drawings for the proposed project. dick the upload button or drag and drop files here to attach docurrent Collins property PLS map.pdf 389.29KB aerial labeled.pdf 789.72KB File type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Unknown r N/A Corps AID Number: Exarrple: SAW -2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other Wyatt Brown Brown's Environmental Group, Inc 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. September 20, 2016, Neuse Buffer determination, Carlos Bagley Johnston County 5d1. Jurisdictional determination upload Cick the upload button or drag and drop files here to attach docurrent Neuse Buffer determination. pdf 2.87MB File type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* f Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project?* f Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands r Streams -tributaries r Buffers F- Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland* fill wetland P lvbp label (e.g. Fbad Crossing 1 - Calvert, Fbrrrenent (F) or dewatering, etc) Temporary (T) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.880 2g. Total Wetland Impact 0.880 2h. Comments: Seep E. Impact Justification and Mitigation 1. Avoidance and Minimization 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* wetland Yes Both 0.880 (404, 10) or DVNR(401, (acres) other) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The 0.88 acre wetland is located in the center of the 2.052 acre tract, the central location makes it difficult to minimize the impact, we will avoid impact to surrounding trees and brush. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Silt fences will be installed to avoid sedimentation of the tract, the fill area will be seeded according to regulations. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Area of impact is 0.88 acres. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: not located in area of Neuse Buffer waters. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes F No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 2b. Is this an after -the -fact permit application?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. area is a fill of a small wetland, large natural buffer exists between the fill area and down stream jurisdictional waters, if development of this area is commenced an approved sediment and erosion control plan and storm water plan will be implemented as required. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No !' Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* r Yes r No 5g. Does this project involve bridge maintenance or removal?* r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?" r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* Natural Heritage 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* http://wm.habitat.noaa.gov/protection/efh/habitatmapper.htmi 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * r Yes f• No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Dept. Cultural Resources, Historic Preservation Office , No apparent buildings or building sites on the tract 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docunent File crust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes C No 8c. What source(s) did you use to make the floodplain determination?* FEMA maps link, Zone X Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent File rrust be FDF or IME Signature W By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Wyatt Brown Signature Initial Review Is this project a public transportation project?*(?) r Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process?* r Yes f No BIMS # Assigned * 20180329 Version#* Reviewing Office * Raleigh Regional Office - (919) 791-4200 Select Project Reviewer* Stephanie Goss:eads\szgoss Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed? * $240.00 r $570.00