Loading...
HomeMy WebLinkAbout20180320 Ver 1_Email_20180306Carpenter,Kristi From: Sent: To: Subject: Attachments: Follow Up Flag: Flag Status: NW 3 for Division 12 Hood, Donna Tuesday, March 06, 2018 10:47 AM Carpenter,Kristi FW: Pipe liner installation, Green Chapman Road (SR 2009), Gaston County SKM_C754e17053109430_Rev2.pdf; DS (003)jpg; Inlet (003)jpg; US (003)jpg Follow up Flagged I don't mind putting these in, but I don't have permission to do it. :( From: Beam, Patricia Sent: Tuesday, March 06, 2018 10:41 AM To: Kichefski, Steven L SAW (Steven.L.Kichefski@usace.army.mil) <Steven.L.Kichefski@usace.army.mil>; Hood, Donna <donna.hood@ncdenr.gov> Subject: Pipe liner installation, Green Chapman Road (SR 2009), Gaston County Per our previous discussions on non-notifying NW 3 pipe lining maintenance projects. The information below is taken from the minimum criteria checklist document that the district office has completed. I have included the "sketch" that they provided to me, which is an old set of plans where they have simply made additional notations and crossed out non-applicable items on the old plans. A bit messy, however, it does provide the necessary information. They did recently resurvey the stream profile to verify the streambed elevations. The project plans have been around several years (and was originally designed with a rock ladder when the proposal was to do an open cut). Gaston County Maintenance have since decided to use a pipe liner instead. I have also attached a few photos of the site. Due to 6 foot perched condition at the outlet and the staging area being from the roadway, the only impacts would be the minor fill impacts of a sandbag cofferdam on the upstream side. W.B.S. Project No Project Location: 1-2.203611 (Division 12 District 1) SR-2009 (Green Chapman Rd) from SR-2000 (Hickory Grove Rd) in Gaston County Project Description: SR-2009 (Green Chapman Rd) is an existing 2-lane secondary road near McAdenville, NC. An existing 30 inch CMP 54 ft long has failed and will be repaired with a new 55 ft long 28 inch HDPE pipeliner. During the pipe liner installation operation the trackhoe will be staged on the pavement/shoulder near the outlet end. Water will dammed with a hand-built impervious dike upstream from the proposed pipe inlet to prevent water from entering the construction area. By-pass pumping method clear water-to-clear water may be needed temporarily according to NCDOT specifications and BMPs. Erosion control measures may be placed around the repair area, spoil pile, equipment staging area, and any other area in need of EC measures. Upon completion of liner installation the cofferdam pump-around method will be converted to gravity flow into the new pipe liner and allow grout to dry 24 to 48 hours. Disturbed areas stabilized using Coir Coconut Fiber Matting and riparian seeding as needed. Matting will be toed in as needed. Purpose and Need: Failing pipe has bottom rusted out. Left shoulder has a 6 ft wide approximately 9 ft deep hole. A pipe section has broken off and dropped approximately 3 ft. Permit or Consultation Requirements: Nationwide 3(Non-notifying) Please let know if you need additional information. Thankyou Trish Beam Division 12 Environmental Supervisor 980 552 4218 office pdbeam(c�ncdot.qov PO Box 47 Shelby, NC 28151-0047 I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,