HomeMy WebLinkAbout20161255 Ver 2_Approval Letter_20180305ROY COOPER
u�„����„�,��
MICHAEL S. REGAN
��°rreo-u�r
Environmenfu( LINDA CULPEPPER
ln/�i'rnr Uirr�n�r
QUQ�((y
March 5, 2018
Mecklenburg Counry
NCDWR Project No.20161255v?
TIP Project No. I-5405AB
RENEWAL OF APPROVAL of 40I WATF.R QUALITY CF.RTIFICATION, with ADDITIONAL
CONDITIONS
Mr. Philip S. Harris, III, P.E.. CPM
NaWral Environment Section Head
Project Development and Environmen[al Analysis
Nonh Carolina Department of Transportation
I598 Mail Service Center
Raleigh, North Carolina, 27699-I �98
Dear Mc Harris:
You have our approval, in accordance with the condi[ions listed on the original 401 issuance, for the original
impacts with the purpose ofconstructins direct connectors [o the I-77 HOT lanes a[ Lakeview and Hambrigh[ Roads
in Mecklenbure Counry. This renewal is bein� issued to address the expiration of the General Certitication 3886,
which was previousl}� issued by NC DW R in accordance with Na[ionwide 14 Permi[ from by the Corps of
En�ineers. General Certification 3886 has been amended and replaced by General Certification 4135, which now
accompanies N W 14 and covers the afore mentioned project. No impact changes from Ihe original 401 permi[
issued February 17, ?017 are au[horized by this reissuance and all permit condi[ions s[ill apply.
In addition, you should acquire any other federal, s[ate or local permi[s before you proceed with your project
includin� (but no[ limi[ed [o) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed
regulations. l'his approval will ezpire with the accompanying 404 permi[.
This approval is valid solely for [he purpose and desi�n described in your applica[ion (unless modified below).
Should your project change, you mus[ notify [he NCDWR and submit a new applica[ion. Ifthe proper[y is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all [he condi[ions. If [o[al wetland tills for this project (now or in the future) esceed one acre, or of rotal
impacts ro streams (now or in ihe future) exceed I>0 linear feet, compensarory mitigation may be reyuired as
described in ISA NCAC 2H .Oi06 (h) (6) and (7). For this approval to remain valid, you must adhere to [he
conditions listed in the attached certification(s) and any addi[ional conditions.
If you wish to con[es[ any statement in [he attached Certification you must tile a pe[ition for an administra[ive
hearine. You ma}' obiain the petition form from [he o�ce of Administrative hearings. You must file the pe[i[ion
with the office of Administrative Hearines wi[hin sixty (60) da}�s of receipt of this notice. A peti[ion is considered
filed when it is received in the oftice of Administrative Flearings during normal office hours. The Office of
Administrative Hearings accepu filings Monday through Priday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The ori�inal and one ( I) copy of the petition must be filed with the Otiice of
Administrative Hearines.
The petition may be fased-provided the orieinal and one copy of the document is received by the Office of
Administrative Hearings within tive (5� business days following the faxed transmission.
The mailing address for Ihe Office of Administra[ive Hearings is:
S�atz ofNonh Carnlina I Envimnmental puaiity
1617 Maii Servlca Cen[er I ftal�igh, North Carolina 276I9-I617
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431300Q Facsimile: (919) 431-3100
A copy of [he petition must also be served on DEQ as follows:
Mr. Bill F. Lane, General Counsel
Departrnent of Environmental Quality
1601 Mail Service Center
7'his letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Donna Hood at (704)682-2839 or donna.hood@ncdenr.gov.
Sincerely,
, � ��
Linda ulpepper, Interi Director
Division of Water Resources
Electronic copy only distribution:
Steve Kichefski, US Army Corps of Engineers, Asheville Field Office
Nicholle Braspennicku, US Army Corps of Engineers, Charlotte Field Office
Lazry Thompson, Division 10 Environmental Officer
Colin Mellor, NC Department of Transportation
Carla Dagnino, NC Department of Transportation
Mazella Buncick, US Fish and Wildlife Service
Marla Chambers, NC Wildlife Resources Commission
Donna Hoad, NC Division of Water Resources Mooresville Regional Office
File Copy
Envrronmen �u I
Quality
NCDWR Project No.:
Applicant:
Project Name:
Da[e of Issuance of 401 Water Quality, Certification:
County:
ROY COOPER
(;nrerno,-
MICHAEL S. REGAN
c,���o-��r
LINDA CULPEPPER
Lilrrnu l)irri�lur
Certificate of Completion
Upon completion of all work approved within the 40I Water Qualiry Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required [o retum this certificate ro the 401 Transportation Permitting
Uni[, North Carolina Division of Wa[er Resources, 1617 Mail Service Center, Raleigh. NC, 27699-1617. This form
may be remmed to NCDW R by the applicant, the applicant's au[horized a�ent, or the project engineer. II is not
necessary to send certificaCes from alI of these.
Applicnw!'s CerNjlcalio�t
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such tliat the construction was observed to be built within substantial
compliance and in[en[ ofthe 401 Wa[er Quality Certitication and Buffer Rules, [he approved plans and
specifications, and o[her supporting materials.
Signa[�re: Date:
Agent's Certifrcutioa
I, , hereby state [ha[, to the best of my abilities, due care and diligence
was used in the observa[ion of the construction such [hat [he construc[ion was observed to be built within substan[ial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Siena[ure:
Ei�gineer's Ce�tifieation
Partial Final
1, , as a duly registered Professional Engineer in the State of North
Carolina, having been au[horized to observe (periodically, weekly, full time) [he construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and dili�ence was used in the observation of the
cons[ruc[ion such tha[ the construc[ion was observed to be buil[ wi[hin substantial compliance and in[ent of [he 401
Water Quality Certification and Buffer Rules, the approved plans and specifica[ions, and other supporting materials.
Signature
Date
Registra[ion No.
State of North Carolina I F.nvimnmental Quality
1617 Msil Szrvicr Cznlzr I Raleigh, North Carolina 27699-1617