HomeMy WebLinkAboutNC0024244_Compliance Evaluation Inspection_20180227r
Water Resources
Environmental Quality
27 February 2018
Mr. Michael Ferris, City Manager
City of Albemarle
Post Office Box 190
Albemarle, North Carolina 28002-0190
SUBJECT: Compliance Evaluation Inspection
Long Creek WWTP
NPDES Permit NCO024244
Stanly County, NC
Dear Mr. Ferris:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
RECEIVEDIDENR/DVVR
MAR 0 6 2018
Water Resources
n
Permitting
On February 22, 2018, Roberto Scheller of this Office conducted a compliance inspection at the
subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to
insure compliance with permit requirements and conditions. At the time of inspection, the facility
appeared to be well maintained and operated. We wish to thank you and the operating staff for
assistance regarding this inspection.
The enclosed report should be self-explanatory; however, should you have any questions, please
do not hesitate to contact myself or Roberto Scheller at (704) 235-2204 or
roberto. scheller@ncdenr. gov
Sincerely,
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosed
cc: Brandon Plyler - ORC, email: bplyler@albemarlenc.gov
Wastewater Branch
File
<-':-- `Nothing Compares ------
State of North Carolina I Environmental Quality
1611 Mail Service Center I Raleigh, North Carolina 27699-1611
919-707-9000
United States Environmental Protection Agency
Form Approved
EPA Washington, D C 20460
OMB No 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A National Data System Coding (i e, PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 1 3 I NC0024244 111 121 16/02/22 117 18 [C I 19 1 s I 201 I
21111111 11111111111 111 1111 1 111111 11111111111 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA -----Reserved--------
67 70 71 L] 72 I ti I 73 I I 174 7511 1 1 1 1 1 1 180
LJ LJ I I I
Section B Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10 23AM 18/02/22
13/01/01
Long Creek WWTP
Exit Time/Date
Permit Expiration Date
1040 Coble Ave Extension
Albemarle NC 28002
12 20PM 18/02/22
14/02/28
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Brandon Wesley Plyler/ORC/704-984-9630/
Name, Address of Responsible Official/Tifle/Phone and Fax Number
Contacted
Michael Ferris, 190 PO Box Albemarle NC 28002/C4
No
Managerf704-984-9410/7049849406
Section C Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
oberto Scheller MRO WQ//252-946-6481/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W Corey Basinger MRO WQ//704-235-2194/
EPA For 3560-3 (Rev 9-94) Previowkeditions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type
31 NCO024244 111 121 18/02/22 1 17 18 IC I
Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit NCO024244 Owner - Facility Long Creek WWTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires In 6 months or less) Has the permittee submitted a new
M
❑
❑
❑
application?
0
❑
❑
❑
Is the facility as described In the permit?
M
❑
❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the Inspector granted access to all areas for Inspection?
0
❑
❑
❑
Comment Permit expired February 28, 2014 with draft permit sent out for review
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab reg required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DM Rs?
M
❑
❑
❑
Is the chain -of -custody complete?
M
❑
❑
❑
Dates, times and location of sampling
and conducts field analyses under certification #5648 All other analyses are
performed by
Name of Individual performing the sampling
Statesville Analytical Inc , ETS Inc, Environmental 1
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete do they Include all permit parameters?
M
❑
❑
❑
Has the facility submitted Its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility Is = or> 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
0
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
M
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
M
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
0
❑
❑
❑
Comment Records were current and available for review Facility has in house lab for process
control
and conducts field analyses under certification #5648 All other analyses are
performed by
Statesville Analytical Inc , ETS Inc, Environmental 1
Operations $ Maintenance
Yes No NA NE
Page# 3
Permit NCO024244 Owner - Facility Long Creek WWTP
Inspection Date- 02/22/2018 Inspection Type Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? N ❑ ❑ ❑
Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable 0 ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment Treatment processes appeared to be well operated
Bar Screens
Yes No NA NE
Type of bar screen
0
❑
❑
❑
a Manual
❑
❑
❑
❑
b Mechanical
E
❑
❑
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening In compliance?
N
❑
❑
❑
Is the unit In good condition?
0
❑
❑
❑
Comment Facilty Is fitted with mechanical and manual by-pass bar screens
Grit Removal
Yes No NA NE
Type of grit removal
0
❑
❑
❑
a Manual
❑
❑
❑
❑
b Mechanical
N
❑
❑
❑
Is the grit free of excessive organic matter?
E
❑
❑
❑
Is the grit free of excessive odor?
N
❑
❑
❑
# Is disposal of grit In compliance?
0
❑
❑
❑
Comment Grit removal appeared to be operating properly at time of Inspection
E
❑
❑
❑
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
E
❑
❑
❑
Is proper volume collected? °
N
❑
❑
❑
Is the tubing clean?
E
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
E
❑
❑
❑
Comment Influent samples collected at headworks of treatment plant Influent sampler was noted at 3
degrees Celsius at time of Inspection
Page# 4
N
Permit NCO024244
Inspection Date 02/22/2018
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Owner - Facility Long Creek WJVTP
Inspection Type Compliance Evaluation
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ 1:11:1
E ❑ 1:11:1
❑ ❑ ❑ N
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Comment Influent Is pumped over to aeration basins by use of Influent screw pumps One of the four
screw pumps did not appera to be In good condition but was reported as operational
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1 0 to 3 0 mg/1)
Yes No NA NE
Ext Air
Surface
❑ ❑ E ❑
N ❑ ❑ ❑
❑ ❑ ■ ❑
E ❑ ❑ ❑
N ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Comment Aeration basins have the ability to step feed Influent It was noted that 2 of the 4 aeration
basins had white foam on the surface as If basins were In start-up
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ 1:11:1
E ❑ ❑ ❑
N ❑ ❑ ❑
■ ❑ ❑ ❑
E ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
N ❑ 1:113
E ❑ ❑ ❑
Page# 5
Permit NCO024244 Owner -Facility Long Creek VVNTP
Inspection Date 02/22/2018 Inspection Type Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) 0 ❑ ❑ ❑
Comment Secondary clarifiers appeared to be In qood operational condition During Inspection It was
noted that weirs on secondary clarifiers were exceptionally clean
Yes No NA NE
Type of operation
Cross flow
❑
❑
Pumps -RAS -WAS
Yes No NA NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
0
Comment
Filtration (High Rate Tertiary)
Yes No NA NE
Type of operation
Cross flow
❑
❑
Is the filter media present?
N ❑
❑
❑
Is the filter surface free of clogging?
E ❑
❑
❑
Is the filter free of growth?
N ❑
❑
❑
Is the air scour operational?
❑ ❑
❑
E
Is the scouring acceptable?
0 ❑
❑
❑
Is the clear well free of excessive solids and filter media?
❑ ❑
E
❑
Comment Review of Total Suspended Solids (TSS) data reported on DMR's for the year 2017,
Indicated that TSS Is unusually high for this facility It Is therefore recommended that tertiary
filters be Inspected for damage and repaired as necessary It was noted at time of
Inspection that new replacement filter material has been received at VWVfP
Disinfection -Gas
Yes No NA NE
Are cylinders secured adequately?
0
❑
❑
❑
Are cylinders protected from direct sunlight?
E
❑
❑
❑
Is there adequate reserve supply of disinfectant?
N
❑
❑
❑
Is the level of chlorine residual acceptable?
E
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
❑
❑
❑
E
Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No 7782-50-5)?
❑
❑
❑
If yes, then is there a Risk Management Plan on site?
❑
❑
❑
If yes, then what is the EPA twelve digit ID Number? (1000-_-____)
1000-0012-3092
If yes, then when was the RMP last updated?
10/14/2013
Comment
Page# 6
M
Permit NC0024244 Owner -Facility
Long Creek WWTP
Is there adequate drying bed space?
❑
❑
Inspection Date 02/22/2018 Inspection Type
Compliance Evaluation
Is the sludge distribution on drying beds appropriate?
❑
❑
Disinfection -Gas
Yes No NA NE
De -chlorination
Yes No NA NE
Type of system ?
Liquid
❑
# Is the site free of dry sludge remaining in beds?
❑
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
❑
❑
M
Is storage appropriate for cylinders?
❑
❑
0
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Are the tablets the proper size and type?
❑
❑
M
❑
Comment Facility is using Sodium Bisulfite for dechlorination
Are tablet de -chlorinators operational? ❑ ❑ M ❑
Number of tubes In use?
Comment
Drying Beds
Yes No NA NE
Is there adequate drying bed space?
❑
❑
0
❑
Is the sludge distribution on drying beds appropriate?
❑
❑
M
❑
Are the drying beds free of vegetation?
M
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
❑
❑
❑
❑
Is the site free of stockpiled sludge?
0
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
❑
❑
❑
❑
# Is the sludge land applied?
❑
❑
M
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
M
❑
Comment Drying beds are being used to dry alum sludge from water treatment plant
Standby Power
Yes No NA NE
Is automatically activated standby power available?
❑
❑
❑
Is the generator tested by Interrupting primary power source?
❑
❑
❑
Is the generator tested under load?
M
❑
❑
❑
Was generator tested & operational during the Inspection?
❑
0
❑
❑
Do the generator(s) have adequate capacity to operate the entire wastewater site?
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
❑
❑
❑
Is the generator fuel level monitored?
0
❑
❑
❑
Comment Generators are maintained by Kraft Power Equipment
Page# 7
Permit NCO024244
inspection Date 02/22/2018
Standby Power
Owner - Facility Long Creek WWTP
Inspection Type Compliance Evaluation
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment It was noted at time of Inspection that effluent sampler was 1 degree Celsius
Flow Measurement - Influent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment Flow meter was last calibrated on January 16, 2018
Yes No NA NE
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
N ❑ ❑ ❑
M ❑ ❑ ❑
M ❑ ❑ ❑
M ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
M ❑ ❑ ❑
Page# 8