Loading...
HomeMy WebLinkAboutNC0000353_NOV2018PC0073_20180228DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 Wer ter Resources ENWROMME"TAL 4UALdTY February 28, 2018 Gregory Taveras, Manager Operations The Quartz Corp USA 8342 S. 226 Bypass PO Box 309 Spruce Pine, NC 28777 SUBJECT: NOTICE OF VIOLATION Tracking Number: NOV-2018-PC-0073 Permit No. NC0000353 Quartz Corp — Altapass WWTP Mitchell County Dear Permittee: ROY COOPER Goverwr MICH-kEL S. FECAL SE A=-� LI -\TD A CUIL.PEPPEF, lh,e 'on Direci The North Carolina Division of Water Resources (DWR) conducted an inspection of the Quartz Corporation Altapass facility on February 7, 2018. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0000353. A summary of the findings and comments noted during the inspection are provided in the enclosed copy of the inspection report. The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville Regional Office. The following violation(s) were noted during the inspection: Inspection Area Description of Violation Record Keeping Effluent characteristics/pollutants are analyzed daily but not reported on DMRs. Operations & Maintenance Significant rust and decay of structures, as well as excessive solids in the clarifier discharge troughs were observed. Clarifier/Thickeners Weirs observed are severely decayed. Excessive solids were present in the perimeter discharge trough. Units are covered restricting proper inspection. State of North Carolina I Environmental Quality I Water Resources 2090 U.S. 70 Highway, Swannanoa, NC 28778 828-296-4500 DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 In addition, the issues below must also be addressed: Compliance Issue(s): The wastewater treatment flow schematics submitted in the permit renewal are incorrect. These shall be updated and submitted to DWR. Effluent characteristics/pollutants are analyzed daily but not reported on DMRs. The results of all tests on the characteristics of the effluent, including but not limited to NPDES Permit Monitoring Requirements, shall be reported on DMRs. The August 2017 through January 2018 DMRs shall be resubmitted with all analyzed data. Remedial actions should have already been taken to correct this problem and prevent further occurrences in the future. The Division of Water Resources may pursue enforcement action for this and any additional violations of State law. To prevent further action, please respond in writing to this office within 30 days of the date of this Notice of Violation regarding your plans or measures to be taken to address the indicated violations and other identified issues. If you should have any questions, please do not hesitate to contact Linda Wiggs with the Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500. ATTACHMENTS -Inspection Report Ec: Teresa Morris (email) WQS ARO Server NPDES Laserfiche Sincerely, DocuSigned by: 7E617A38285848C... G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ State of North Carolina I Environmental Quality I Water Resources 2090 U.S. 70 Highway, Swannanoa, NC 28778 828-296-4500 DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 I 3 I NC0000353 111 12 I 18/02/07 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 67 70 I I 71 I I 72 I r l 73 I I 174 751 I I I 1 1 1 I80 u ty I I i Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:30AM 18/02/07 12/06/01 The Feldspar Corporation 530 Altapass Rd Exit Time/Date Permit Expiration Date Spruce Pine NC 28777 05:OOPM 18/02/07 16/02/28 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jim Garofalo,PO Box 99 Spruce Pine INC 28777//828-467-0788/8287662110 Yes Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Operations & Maintenance Records/Reports Self -Monitoring Program Facility Site Review Effluent/Receiving Waters Laboratory Storm Water Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Linda S Wiggs DS ARO WQ//828-296-4500 Ext.4653/ E�'W Signature of Manag ent°�ii���e Agency/Office/Phone and Fax Numbers Date 3/2/2018 7E617A38285848C... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 NPDES yr/mo/day Inspection Type (Cont.) NC0000353 111 121 18/02/07 1 17 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Linda Wiggs and Jason Smith with DWR met onsite at the Altapass facility with Glen Young, James Garafola, Teresa Morris, Ryan Fredsall, Joe Pitman and Chris Gentry with Quartz Corp. Jason Smith with DWR Laboratory Certification group performed a laboratory inspection. Linda Wiggs performed an inspection of the Altapass facility and it's WWTP. The wastewater treatment flow schematics submitted in the permit renewal are incorrect. These shall be updated and submitted to DWR. The clarifiers/thickeners are covered making inspection, operations and maintenance practically impossible. Inspection of the clarifiers was performed with great difficulty by glancing at small sections through the stair/walkway grates. The observations indicated significant rust and decay of structures, as well as excessive solids in the discharge troughs. Two of the three thickeners were in operation at the time of the inspection. Effluent characteristics/pollutants are analyzed daily but not reported on DMRs. The results of all tests on the characteristics of the effluent, including but not limited to NPDES Permit Monitoring Requirements, shall be reported on DMRs. The August 2017 through January 2018 DMRs shall be resubmitted with all analyzed data. A temporary portable manually activated pump is in place as a contingency for the tailings pumps. Staff stated sometime in June through a July 10th timeframe the plant will be shut down for maintenance activities including replacement of the tailings pumphouse apparatus, including new trough, pumps, tanks. The Altapass processing facility is covered under Stormwater Permit NCG020818. Quartz Corp has an updated site map for this facility; Shield Engineering, dated December 2017. This site map has delineated the drainage areas; the map delineates 5 drainage areas. The map also indicates outfalls and basin; 4 outfalls (1 WW/3 SW) and 5 basins are noted. Quartz Corp is working towards getting most of the processing facility's stormwater flows directed to the WWTP; 1 drainage area is indicated on the map draining to the WWTP, it is 14.2 acres. The four remaining drainage areas are associated with outfalls covered under the stormwater permit NCG020818 as wastewater discharges. Three outfalls and 5 basins are indicated on the map associated with the NCG020818. It had rained the day of the inspection and 4 of the 5 basins had water in them. The basins on this site appear to be "Sediment Basins with Rock Dams". They have been observed not functioning properly. The most notable improper function observed was piping along the bottom of the rock dam. These types of structures are not conducive to wastewater effluent sampling which is required at all the outfalls at the processing plant. Quartz Corp has attempted to put a pipe near the top of the rock dam for sampling, with limited success. This is most likely due to the piping. Three of the basins side slopes are not stabilized, allowing additional solids into the basins. During the facility shut down this summer an evaluation of the structural integrity and operational status of the thickeners and components needs to take place. Page# DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 Permit: NC0000353 Owner - Facility: The Feldspar Corporation Inspection Date: 02/07/2018 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ❑ 0 ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The clarifier/thickener structures are covered. It does not appear Operations and Maintenance can be performed. Significant rust and decay of structures, as well as excessive solids in the perimeter discharge troughs were observed. Quartz Corp staff monitor Fluoride, Turbidity and pH daily at the effluent for process controls, these results are to be reported. See summary. Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: The wastewater treatment flow schematics submitted in the See summary. Pump Station - Influent Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Yes No NA NE ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ renewal are incorrect. ❑ ■ ❑ ❑ ❑ ❑ ■ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ Comment: A temporary portable manually activated pump is in place as a contingency for the tailings pumps. Repairs are scheduled this summer. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Page# 3 DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 Permit: NC0000353 Owner - Facility: The Feldspar Corporation Inspection Date: 02/07/2018 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: See summary. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ❑ ❑ 0 ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ❑ ❑ ❑ 0 Are weirs level? ❑ ❑ ❑ 0 Is the site free of weir blockage? ❑ 0 ❑ ❑ Is the site free of evidence of short-circuiting? ❑ 0 ❑ ❑ Is scum removal adequate? ❑ 0 ❑ ❑ Is the site free of excessive floating sludge? ❑ 0 ❑ ❑ Is the drive unit operational? ❑ ❑ ❑ 0 Is the return rate acceptable (low turbulence)? ❑ ❑ 0 ❑ Is the overflow clear of excessive solids/pin floc? ❑ 0 ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) ❑ ❑ ❑ 0 Comment: Weirs observed are severely decaved. Excessive solids were present in the perimeter discharge trough. The clarifier/thickeners are covered restricting proper inspection. Regardless, what was observed indicated possible issues as checked above. See summary. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: See summary. Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑ sampling location)? Page# 4 DocuSign Envelope ID: 82D040DC-6650-4232-8D46-4B7B018Al2F1 Permit: NC0000353 Owner - Facility: The Feldspar Corporation Inspection Date: 02/07/2018 Inspection Type: Compliance Evaluation Upstream / Downstream Sampling Yes No NA NE Comment: Any additional upstream/downstream sampling is required to also be reported on the DMRs. See summary. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ❑ 0 ❑ ❑ Is the chain -of -custody complete? ❑ ❑ 0 ❑ Dates, times and location of sampling ❑ NPDES Permit Monitoring Requirements, shall be reported on DMRs. Name of individual performing the sampling ❑ See above and summary. Results of analysis and calibration ❑ Dates of analysis ❑ Name of person performing analyses ❑ Transported CM ❑ Are DMRs complete: do they include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ 0 Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: The results of all tests on the characteristics of the effluent, including but not limited to NPDES Permit Monitoring Requirements, shall be reported on DMRs. See above and summary. Page# 5