Loading...
HomeMy WebLinkAbout20020089 Ver 2_Stormwater Approval_20090313NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 13, 2009 DWQ EXP # 02-0089v2 Wake County Mr. Al Hashemi ARH Development, LLC P. O. Box 97772 Raleigh, NC 27624 Project Name: Metropolitan I (formerly "Northwood Center P") APPROVAL OF STORMWATER MANAGEMENT PLAN On May 2, 2002, the Division of Water Quality (DWQ) issued an approval of Neuse River Riparian Buffer Protection Rules MINOR VARIANCE with ADDITIONAL CONDITIONS to you to construct the proposed "Northwood Center I, II, & III" now known as "Metropolitan I, II & III" in Wake County. On March 3, 2009, the 401 Oversight/Express Permitting Unit of the DWQ received your stormwater management plan (SMP) dated December 14, 2008 with revisions dated January 28, 2009 in order to meet the Stormwater Management Condition (Condition 1) of the Minor Variance for phase I of this project. On March 11, 2009 and March 13, 2009, the DWQ received additional information with revised SMP sealed, signed and dated March 13, 2009 by Mr. Azad Atashi, RLA. The revised SMP consisting of Sheet 10 (received on March 11, 2009) and Sheet 13 (received on March 13, 2009) has been approved by the DWQ and satisfies the stormwater condition required by the Water Quality Certification. You are required to meet the following conditions: The stormwater management system for phase I (consisting of a stormwater wetland and all associated appurtenances), all stormwater conveyances and the grading and drainage patterns depicted on the plans, as approved by this office must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. The stormwater management structures shall have maintenance access and at least 10-foot drainage easement on each side to allow for the ability to maintain the structures, and to perform corrective actions. The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners. 2. All operation and maintenance activities shall be followed as stipulated in the Operation and Maintenance Agreement signed and notarized on March 3, 2009, and received in our office on March 3, 2009. 3. The riparian buffer impacts shown on the site plans received by DWQ on March 11, 2009 are consistent with those approved on May 2, 2002. The required area of mitigation to compensate for impacts to the protected riparian buffers in Phase I of this project is 8,159 square feet. This amount was agreed upon by Mr. Al Hashemi and DWQ at a meeting on February 6, 2009 and the phase percentages were determined by Mr. Azad Atashi of Atashi Associates in his letter dated 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http://h2o.enr.state.nc.us/ncwetlands/ North Carolina naturally An Equal Opportunity 1 Affirmative Action Employer A] Hashemi Metropolitan I (formerly "Norwodd Center") SMP Page 2 of 2 March 13, 2009 February 12, 2009. The remainder of the required mitigation (31,831 credits of the original 39,990 credits) from the May 2, 2002 Minor Variance Approval shall be mitigated for after Phase I is complete and prior to the construction of Phases II and III. We understand that you wish to make a payment into the Riparian Buffer Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. In accordance with 15A NCAC 2B .0233(7), this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B.0233(10). Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 716-1921 if you have any questions concerning payment into the Riparian Buffer Restoration Fund. You have one month from the date of this approval to make this payment. If you change your project, you must notify us (DWQ) and you may be required to send us a new application for a minor variance and/or stormwater approval. If the property is sold, the new owner must be given a copy of the approval letters and is thereby responsible for complying with all conditions in the minor variance and stormwater management plan approval for this project. 4. That you must submit Stormwater Management Plans for phases II and III for review and approval by this office prior to any buffer impacts occurring as required by the May 2, 2002 Minor Variance. 5. Notification of Construction: The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Joseph Gyamfi or Lia M. Gilleski/t 919-733-1786. CBK/jg Sin r y, Cyndi Karoly, Supervisor 01/Express Review Oversight Unit cc: USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Matt Flynn, Town of Cary Engineering Dept., 316 North Academy St., Cary, NC 27511 Azad Atashi, Atashi & Associates, 2000 Regency Part, Ste 260, Cary, NC 27518