Loading...
HomeMy WebLinkAbout20180310 Ver 1_Design/Maps/Site Plans_20180305PLAN TYPE:SHEET NUMBER 60% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION TITLE SHEET 1.1 APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # REVISION # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 PROJECT DIRECTORYLAND OWNERPARKER PLATT397 BENT RIVER FARM ROADPISGAH FOREST, NC 28768828.553.2723parker@plattarchitecture.comENGINEERJENNINGS ENVIRONMENTALGREG JENNINGS, PHD, PE919.600.4790greg@jenningsenv.comSHEET INDEXTITLE SHEET1.1PROPOSED STABILIZATION AND REPAIR PLAN2.1PROPOSED VEGETATION PLAN3.1PROPOSED STRUCTURE DETAILS4.1PLATT FRENCH BROAD RIVER BANK STABILIZATION397 BENT RIVER FARM ROAD, PISGAH FOREST, NC - TRANSYLVANIA COUNTY60% PLANS SUBMITTED FOR REVIEW ANDPERMITTING ON FEBRUARY 5, 2018GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION 0+000+250+500+751+001+251+501+752+002+252+502 + 7 5 2 + 9 0A'APROPOSED PLAN LEGENDEXISTING TOP OF BANKEXISTING CENTERLINEBANK GRADINGSOIL GEOLIFTSTOE WOOD REVETMENTBOULDER VANEPLAN TYPE:SHEET NUMBER APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION1 INCH = 30 FEETARBITRARY FBRCENTERLINE STATIONING60% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION PROPOSED 2.1TOE WOOD REVETMENTWITH SOIL GEOLIFTS.SEE DETAIL.STA 0 + 00 FT TO STA 1 + 90 FTMINIMIZE IMPACTS TO EXISTING TREES.INSTALL SOIL GEOLIFTS,GRADE RIGHT BANK AT 2:1 TO BKF STAGE,APPLY 700 GR COIR MATTING.STA. 1 + 90 FTTIE IN VANEARM AT 13 DBKF85 FTAPPROX. BKF STAGE20 FTFeet030603:1EXISTING BKF STAGELOW FLOW WSERIVER BEDPROPOSED SECTION A - A'PROPOSED PLAN10 - 12 FT6 - 8 FT20-25oSTA 1 + 90 FT TO STA 2 + 40 FTINSTALL TO WOOD REVETMENT WITH SOIL GEOLIFTS,GRADE RIGHT BANK AT 3:1 TO BKF STAGE,APPLY 700 GR COIR MATTING.STA 2 + 40 FT TO 2 + 90 FTMINIMIZE IMPACTS TO EXISTING TREES.INSTALL BOULDER TOE PROTECTION. 0+000+250+500+751+001+251+501+752+002+252+502 + 7 5 2 + 9 0 PLAN TYPE:SHEET NUMBER APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 GDJ 1 INCH = 30 FEETGENERAL VEGETATION PLAN NOTESA.GROUND COVER, SOIL PREP, TEMPORARY AND PERMANENT VEGETATION SHALL BE INSTALLED ON ALLAREAS DISTURBED DURING STABILIZATION, GRADING AND STRUCTURAL WORK.B.LIVE STAKES, TRANSPLANTS AND / OR CONTAINERIZED PLANTS SHALL BE LOCATED WHERE SHOWN ONPLAN. A VEGETATED BUFFER SHALL EXTEND FROM THE EXISTING BANKFULL STAGE OUT TO 30 FT.C.ADJUSTMENTS TO THE VEGETATION PLAN SHALL BE MADE ONLY IF APPROVED BY THE PROJECT OWNEROR PROJECT ENGINEER.LIVE STAKES AND CUTTINGSD.CUTTINGS SHOULD BE INSTALLED THE SAME DAY THEY ARE CUT. THE STAKE SHOULD BE ORIENTEDWITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTIONINTO THE GROUND.E.ABOUT 34 OF THE LENGTH OF THE STAKE SHOULD BE BELOW GROUND AND ANGLED DOWNSTREAM. ANIRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURINGINSTALLATION.TRANSPLANTS AND CONTAINER STOCKF.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVEDEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER.G.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTILPLANTING OCCURS.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT.H.THE DIAMETER OF THE PLANTING HOLES (PITS) FOR EACH PLANT SHOULD BE AT LEAST THREE TIMESTHE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION.I.SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BERESTING ON UNDISTURBED SOIL.J.PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLEBACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 23 FULL, WATERTHOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINALLAYER OF BACKFILL.VEGETATION PLAN SPECIFICATIONSLIVE STAKES, TRANSPLANTS AND / OR CONTAINERIZED PLANTS - 11,400 FT2 (0.26 AC)SCIENTIFIC NAMECOMMON NAMESIZE (CAL)SPACINGQTYLiriodendron tulipiferaTULIP POPLAR0.25" - 1.0"5 FT O.C.50Salix sericeaSILKY WILLOW0.50" - 1.0"5 FT O.C.50Platanus occidentalisSYCAMORE0.25" - 1.0"5 FT O.C.100Betula nigraRIVER BIRCH0.25" - 1.0"5 FT O.C.100Comus amomumSILKY DOGWOOD0.25" - 1.0"5 FT O.C.200PERMANENT SEEDING - 11,400 FT2 (0.26 AC)SCIENTIFIC NAMECOMMON NAMETYPEAPP. RATEQTY------RIPARIAN SEED MIXSEED4 LBS / 1000 SF55 LBSElymus virginicusVIRGINIA WILD RYESEED20 %.------Agrostis perennansAUTUMN BENT GRASSSEED15 %------Pancicum virgatumSWITCHGRASSSEED15 %------Redbeckia hirtaBLACK-EYED SUSANSEED10 %------Coreopsis lanceolataLANCELEAF COREOPSISSEED10 %------Andropogon gerardiiBIG BLUESTEMSEED10 %------Juncus effususSOFT RUSHSEED10 %------Schizachyrium scopariumLITTLE BLUESTEMSEED5 %------Sorghastrum nutansINDIAN GRASSSEED5 %------TEMPORARY SEEDING, MULCHING AND SOIL PREP - 11,400 FT2 (0.26 AC)SCIENTIFIC NAMECOMMON NAMETYPEAPP. RATEQUANTITYSecale CerealeMILLETSEED5 LBS / 1000 SF70 LBS------GROUND AG. LIMESTONEPELLET45 LBS / 1000 SF600 LBS------10-10-10 FERTILIZERPELLET17 LBS / 1000 SF230 LBS------WHEAT STRAW MULCHSTRAW90 LBS / 1000 SF1,200 LBS60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTIONVEGETATION PLAN LEGENDLIVE STAKES / CONTAINERIZED PLANTS PERMANENTSEED, TEMPORARY SEED AND SOIL PREP - 13,400 FT260% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION VEGETATION 3.1Feet0306030 FT B'B 1.THE BOULDER VANE IS A DESIGN FEATURE USED TO CONTROL GRADE IN HIGH IN GRADIENT REACHES ORAT CRITICAL JUNCTURES OF THE PROPOSED CHANNEL.THIS STRUCTURE WILL ALSO ENCOURAGE POOLMAINTENANCE AND CREATE A DIVERSITY OF AQUATIC HABITAT THROUGH SCOUR OF THE RIVER BED. THEBOULDER J-HOOK IS COMPOSED OF A BOULDER SILL, WHICH IS A ROW OF BOULDERS SET AT AN ELEVATIONPROVIDED IN THE PROPOSED PROFILE THAT SPANS PERPENDICULAR TO AND SLIGHTLY ARCED ACROSSTHE CHANNEL. THE BOULDER SILL EXTENDS EXTENDS FROM A BOULDER VANE ARM INTO THE OPPOSITESTREAMBANK. THE BOULDER VANE ARM EXTENDS UP AND TOWARDS THE OUTSIDE STREAM BANK,EVENTUALLY KEYING INTO THE BANK AT AN ELEVATION HIGHER THAN THE SILL BOULDERS.2.ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL ORRECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLEONSITE.3.DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGNENGINEER TO FIT CONDITIONS ONSITE.4.CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. GAPS BETWEEN BOULDERSSHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A AND SELECTMATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER. BOULDERS SHALL BE 3 FT X 4 FT X 2 FT+/- 0.5 FT.5.NON-WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENTWASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OFTHE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTHOF THE STRUCTURE. SELECT BACK FILL MATERIAL SHALL BE UPSTREAM OF THE GEOTEXTILE MATERIAL.13 WBKF13 WBKF13 WBKFWBKFSCOURPOOLDETAILED PLANNOT TO SCALEBOULDER VANENOTESSELECT BACKFILLUPSTREAM OF STRUCTURENON-WOVENGEOTEXTILEBANKFULLBOULDER VANEHIGH DENSITY LIVE STAKING,CONTAINERIZED PLANTSOR TRANSPLANTSEXTEND SILL BOULDERS INTO RIVER BANK MIN. 20 FTFLOWSECTION A - A'SCOUR POOLD/S OF VANENON-WOVENGEOTEXTILEHEADERBOULDERFOOTERBOULDERSECTION B - B'NOT TO SCALEBANKFULL WSETIE BOULDERS INTORIVER BANK @ 12 DBKF STAGEEXTEND SILL BOULDERS INTORIVER BANK MIN. 20 FT.EXTEND BOULDERS INTORIVER BEDSELECT BACKFILLNOT TO SCALEBOULDER VANEBOULDER VANEEXTEND VANE ARMINTO RIVER BEDTOE OF SLOPEA'A1 - 3%20-25oFLOWTIE VANE ARM INTORIVER BANK @ 13 BKF STAGEPLAN TYPE:SHEET NUMBER APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION BOULDER VANE 4.1 1.COARSE WOODY DEBRIS SHALL CONSIST OF LOGS, ROOTWADS, AND LARGE BRANCHES NOTSUITABLE FOR CONSTRUCTION OF LOG STRUCTURES. ALL MATERIALS ARE TO BE APPROVEDBY THE ENGINEER.2.COARSE WOODY DEBRIS SHALL BE CONSTRUCTED WITH THE LARGEST MATERIAL PLACEDFIRST. NO LOGS SHALL BE PLACED PARALLEL TO THE FLOW OF WATER, UNLESS DIRECTED BYTHE ENGINEER. LOGS SHALL BE PLACED IN A CROSSING PATTERN OR WEAVE SUCH THATEACH LOG IS ANCHORED BY ANOTHER LOG.3.SMALL/FINE WOODY DEBRIS SHALL CONSIST OF MEDIUM TO SMALL LIMBS, BRANCHES,BUSHES, AND/OR LOGS. INVASIVE SPECIES SHALL NOT BE USED.4.SMALL/FINE WOODY DEBRIS SHALL BE PLACED ABOVE THE COARSE WOODY DEBRIS WITH THELARGEST MATERIAL BEING PLACED FIRST AND THE SMALLEST MATERIAL PLACED LAST.5.ALL WOODY DEBRIS SHALL BE COMPACTED WITH THE EXCAVATOR BUCKET IN ORDER TOREDUCE THE PRESENCE OF VOIDS IN THE SMALL/FINE WOODY DEBRIS LAYER.6.GRAVEL LEVELING BASE SHALL BE INSTALLED ABOVE THE HIGHEST ELEVATION OF THEWOODY DEBRIS BEFORE THE SOIL LIFTS ARE INSTALLED.7.THE SOIL BACKFILL USED FOR LIFTS AND TOPSOIL USED FOR LAYERING WITH THELIVE BRANCHES SHALL BE FREE OF ANY LARGE ROOTS OR WOODY DEBRIS ANDSHALL GENERALLY BE FREE FROM ANY GRAVEL OR COBBLE MATERIAL.8.SOIL BACKFILL SHALL BE COMPACTED SUCH THAT FUTURE SETTLING WILL BE KEPTTO A MINIMUM; YET, NOT SUCH THAT THE UNDERLYING BRUSH IS DISPLACED ORDAMAGED.9.THE TOP OF THE BACKFILL FOR THE FIRST LIFT SHALL BE SLOPED ATAPPROXIMATELY 5% AWAY FROM THE STREAM.10.PLACE A LAYER OF TOPSOIL AND LIVE BRANCHES ON TOP OF EACH SOIL LIFT SUCHTHAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSEDAND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THENEXT SOIL LIFT.11.LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE STAKES ORAPPROVED BY THE ENGINEER.12.PLACE A LAYER OF 6.5 FEET WIDE GEOCOIR DEKOWE 700 EROSION CONTROLBLANKET, OR EQUIVALENT, ON TOP OF THE TOPSOIL AND LIVE BRANCHES SUCHTHAT 2.5 FEET OF THE BLANKET WILL BE BURIED BELOW THE NEXT SOIL LIFT. ALLOWTHE REMAINING 4.5 FEET OF BLANKET TO HANG OVER THE PRECEDING SOIL LIFT ORCOIR FIBER LOGS.13.PLACE A LAYER OF 6.5 FEET WIDE NON-WOVEN COIR MATTING OVER THE EROSIONCONTROL BLANKET TO THE SAME LIMITS.14.SOIL CAN BE COMPACTED BY STACKING A PIECE OF 2 X 6 SAWN LUMBER EDGEWAYSUP TO THE LIFT HEIGHT SPECIFIED IN THE STRUCTURE TABLE AND SECURING WITHWOODEN STAKES TO PROVIDE A RIGID BACKSTOP FOR COMPACTING SOIL LIFT.15.PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED.16.THE TOP OF THE SOIL BACKFILL SHALL BE FLAT WITHIN THE LIFT SETBACK DISTANCESPECIFIED IN THE STRUCTURE TABLE. BEYOND THE LIFT SETBACK DISTANCE, THESOIL BACKFILL SHALL BE SLOPED AT AN APPROXIMATE 5% SLOPE AWAY FROM THESTREAM.17.TOP DRESS THE SOIL LIFT WITH TOPSOIL FROM THE FACE OF THE SOIL LIFT BACKINTO THE FLOODPLAIN AT LEAST 4FT.18.REMOVE THE SAWN LUMBER AND WOODEN STAKES FROM THE FACE OF THE SOILLIFT AND WRAP THE FACE AND TOP OF THE SOIL LIFT USING THE WOVEN ANDNON-WOVEN COIR MATTING HANGING OVER THE PREVIOUS LIFT/COIR FIBER LOGS.19.THE EROSION CONTROL FABRIC SHALL BE PULLED AS TIGHT AS POSSIBLE WITHOUTTEARING OR EXCESSIVELY DISTORTING THE FABRIC.20.SECURE THE EROSION CONTROL AND NON-WOVEN MATTING IN PLACE BY STAKINGTHE END OF THE EROSION CONTROL FABRIC WITH WOODEN STAKES ON 1.5-FOOTCENTERS.21.BEGIN CONSTRUCTION OF THE NEXT SOIL LIFT BY REPEATING THE PREVIOUS NOTESSTARTING WITH NOTE 11.22.THE COIR BLANKETS AND GEOTEXTILE FABRIC USED FOR THE UPPER MOST SOIL LIFTWILL BE SECURED WITHIN A 6 INCH DEEP TRENCH AS SHOWN IN DETAIL. TRENCH ASSHOWN IN THE DETAIL.23.THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACTSURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS ORELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONSSHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVEDBY THE ENGINEER.A'ADIAMETER VARIES(TYP. 1/2" TO 1")BANKFULL STAGELAYER OF LIVEBRANCHES (TYP.)TOE WOODREVETMENTLIFT SETBACK =2.0 FT (TYP.)FLOWLAYER OF LIVE BRANCHESAND TOPSOIL (TYP.)700 GRAM COIR EROSIONCONTROL MATTING6" - 1'(TYP.)SOIL BACKFILL (TYP.)EXCAVATION / FILL LIMITSUNDISTURBED GROUNDOR PREVIOUS FILLBLEND GEOLIFTSINTO RIVER BANKBANKFULL STAGEFILL ALL VOIDS WITH FINEWOODY DEBRIS AND GRAVELLIVE BRANCHFINE WOODY MATERIALLIFT SETBACK = 2.0 FTLIFT HEIGHT= 1.0 FTSOIL GEOLIFTSLIVE STAKES, TRANSPLANTSOR CONTAINERIZED PLANTSDETAILED PROFILE - SECTION A - A'NOT TO SCALEDETAILED PLANNOT TO SCALETOE WOOD REVETMENT WITH SOIL GEOLIFTNOTESTOE WOOD REVETMENT WITH SOIL GEOLIFTTOE WOOD REVETMENT WITH SOIL GEOLIFTLIVE STAKES, TRANSPLANTS AND /OR CONTAINERIZED PLANTINGSRIVER BED5% (TYP.)GRADE BANK AT 3:1 TO BKF STAGESELECT GRAVEL BACKFILL FOR FIRST SOIL LIFTCOARSE WOODY DEBRISWIDTH OF TOE WOOD = 10 - 12 FTHEIGHT OFTOE WOOD = 6 - 8 FTPLAN TYPE:SHEET NUMBER APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION TOE WOOD W/LIFT 4.2 3'BANKFULL2.5' (TYP)6" MIN. HORIZONTALOVERLAP2.5'(TYP)2.5'(TYP)2'(TYP)2'(TYP)6" MIN. VERTICALOVERLAPAA'700 GRAM COIR FIBER MATTINGFROM TOE OF CHANNEL TO3 FT BEYOND BANKFULLBANKFULLCHANNEL TOE OF SLOPE700 GRAM COIRMATTING2' LONG 2" x 2" WOOD STAKESw/ 3" GALVANIZED ROOFING NAILAT THE TOP TO SECURE MATTING6" MIN. HORIZONTALOVERLAPEROSION CONTROL MATTINGDETAILED STAKING PLANNOT TO SCALEEROSION CONTROL MATTINGDETAILED PLANNOT TO SCALE1.EROSION CONTROL MATTING IS USED TO PROTECT RECENTLYCONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILLREMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES,PROVIDING CRITICAL BANK PROTECTION.2.BEFORE INSTALLING COIR FIBER BLANKET, RAKE SOIL LEVEL AND ADDSEED, FERTILIZER, LIME AND MULCH.3.700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACEDALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPEOUT TO A MINIMUM OF 3 FT BEYOND THE BANKFULL ELEVATION.4.SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING ATTHE SEEMS WITH A SHINGLE-TYPE METHOD SUCH THAT THEOVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAMFLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTORAT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOILMORE THAN ONE INCH UNDER A REASONABLE PULL.700 GRAM COIR FIBER MATTINGSUPPLEMENT WOODEN STAKESWITH 12" ECO-STAKES2' LONG 2" x 2" WOOD STAKESw/ 3" GALVANIZED ROOFING NAILAT THE TOP TO SECURE MATTINGEROSION CONTROL MATTINGDETAILED CROSS-SECTION A - A'NOT TO SCALEEROSION CONTROL MATTINGNOTESKEY INTO EARTHMIN 0.5'PLAN TYPE:SHEET NUMBER APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ FBR BANK STABL. AS NOTED FEBRUARY 5, 2018 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING PISGAH FOREST, NC 28768 397 BENT RIVER FARM ROAD PLATT FBR BANK STABILIZATION E&SC MATTING 4.3