Loading...
HomeMy WebLinkAbout20180310 Ver 1_401 Application_20180318DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https:lledocs.deq.nc.govMaterResources101edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Transylvania Is this project a public transportation project?*(?) f Yes f• No 1a. Type(s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r% Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 27 - Restoration NWP Number Other: List all NW numbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply W 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non -404 Jurisdictional General Permit r Riparian Buffer Authorization * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: C Yes O No O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? V so, attach the acceptance letter from rr tigation bank or in -lieu fee program r Yes F No 1f. Is the project located in any of NC's twenty coastal counties?* r Yes r No 1h. Is the project located in a designated trout watershed?* G Yes r No Link to trout information: http://v wv.saw.usace.army.mil/Missions/Regulatory-Permit-Prograni/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Greg Jennings, PE 1b. Primary Contact Email:* greg@jenningsenv.com 1c. Primary Contact Phone:* (919)600-4790 1d. Who is applying for the permit? V Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Parker J. Platt 2b. Deed book and page no.: DOC 719; PG 87-89 2c. Responsible party: (for Corporations) 2d. Address Street Address 397 Bent River Farm Road Address Line 2 City Pisgah Forest Rbstal / Zip Code 28768 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: 2g. Email Address:* parker@plattarchitecture.com State/ Province/ Region NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* PLATT FRENCH BROAD RIVER BANK STABILIZATION 1b. Subdivision name: (if appropriate) Bent River Farm Road 1c. Nearest municipality/ town: Pisgah Forest 1d. Driving directions* V it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Turn North from Everett Road and travel 0.5 miles to end of Bent River Farm Road 2. Project Identification 2a. Property Identification Number: (tax PIN or parcel ID) 9517004126000 2b. Property size: (in acres) 10 2c. Project Address Street Address 397 Bent River Farm Road Address Line 2 aty State / Province / Region Pisgah Forest NC Pbstal / Zip Code Country 28768 USA 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.261652 -82.651325 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* French Broad River 3b. Water Resources Classification of nearest receiving water:* B Surface Water Lookup 3c. What river basin(s) is your project located in?* French Broad River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Right descending streambank is severely eroding due to very high bank erodibility and high near bank shear stress. Land use is agricultural and low-density residential. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) aick the upload button or drag and drop files here to attach docunent Platt USGS Map.pdf 269.46KB File type nest be pdf 4c. Attach an 8 112X1 I excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent Platt Soil Survey.pdf 213.9KB File type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0.5 4e. List the total estimated linear feet of all existing streams on the property: (internittent and perennial) 8,000 4f. Explain the purpose of the proposed project:* Stabilize the eroding streambank to improve water quality, aquatic habitats, and land protection. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used: The right streambank will be stabilized using boulder and wood toe revetments in combination with a boulder vane to reduce near -bank shear stress. The bank will be graded to a stable slope and planted with dense native trees and shrubs to support a native riparian buffer. 4h. Please upload project drawings for the proposed project. nick the upload button or drag and drop files here to attach docunent PLATT_FBR_02052018.pdf 2.92MB File type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* f Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Unknown f• N/A Corps AID Number: 6canple: SAW -2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload aick the upload button or drag and drop files here to attach docurent File type rust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes G No r Unknown 7. Future Project Plans 7a. Is this a phased project?* f Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): ❑ Wetlands V Streams -tributaries ❑ Buffers F' Open Waters F Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site # - Reason for 3b.lmpact 3c. Type of impact* 3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact impact* type* Type* Jurisdiction* width* length* Streambank P Bank Stabilization French Broad River Perennial Both stabilization Permanent (F� or Perennial (P9:� or Nep label (e.g. Fbad Qossing 1) Temporary (-0 intermittent (IIVr) ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 300 3i. Total temporary stream impacts: 0 3i. Total stream and tributary impacts: 300 3j. Comments: Impacts are necessary to establish stable streambank conditions. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Impacts are unavoidable to achieve stable streambank objective. 80 300 2 Average (feet) (linear feet) 4 0 0 0 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Construction work will take place only in the area of stabilization. During vane construction, baseflow water will be diverted away from excavation using a low cobble berm. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes C No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project will result in enhanced river conditions. F. Stormwater Management and Diffuse Flow Plan (required by DWR) — Recent changes to the stormwater rules have required updates to this section .- 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f Yes C No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Currently, the land use is agricultural and does not have adequate riparian buffer. The project will replace grassy buffer area with native woody vegetation. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* f Yes f• No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* F Yes f No To look up low density requirement click here 15A NCAC 02H.1003(2) G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* f Yes C No 2b. Is this an after -the -fact permit application?* f Yes C No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes C No 3b. If you answered "no," provide a short narrative description. No other development will result from this bank stabilization project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* f Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* f Yes r No 5g. Does this project involve bridge maintenance or removal?* r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* https://ecos.fvvs.gov/ecp/ 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? https://vmwv.habitat.noaa.gov/protection/efh/efhmapper/index.html 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http://vmw.hpo.ncdcr.gov/ 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docunent File crust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https:Hmsc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: No change will be made in channel/floodplain cross-section to cause a map revision. 8c. What source(s) did you use to make the floodplain determination?* https://msc.fema.gov/portal/search#searchresultsanchor Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent pisgah_forest_IMAGERY.pdf 1.03MB File rrust be FDF Signature V By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Greg Jennings Signature #411ft" Initial Review Is this project a public transportation project?* (? f Yes r No Change only ff needed. Has this project met the requirements for acceptance in to the review process?* r Yes f No BIMS # Assigned* 20180310 Version#* 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 Select Project Reviewer* Kevin Mitchell: eads\rkmitchelI Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed?* f $240.00 r $570.00