Loading...
HomeMy WebLinkAboutfinal signed U 5951 scoping comments� .� ��I��%%i/� . � � � REPLY TO ATTENTION OF: DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 (electronically transmitted) December 28, 2017 Regulatory Division Action ID No. SAW-2017-02643 Onslow County STIP# U-5951 Mr. Brian Harding NCDOT-Division 3 DDC Design Engineer 5501 Barbados Blvd Castle Hayne, NC 28429 Dear Mr. Harding/Ms. Nichols: Ms. Alison Nichols RS&H 1520 South Blvd., Suite 200 Charlotte, NC 28203 Reference is made to your letter of December 20, 2017, regarding the start of study for Improvements to US 17 Business and US 17 Interchange Improvements in Onslow County (U- 5951). The letter requested any information the Corps may be able to supply to evaluate potential environmental impacts of the project. We have reviewed the subject documents and determined that, based upon a review of the information provided and available maps, the construction of this project may have impact to streams and/or wetlands depending on the scope of the project. Based on a review of our files the Corps has completed some recent jurisdictional determinations within the projected study area, specifically the Tallman Heirs property. The Department is encouraged to contact these owners for records of the jurisdictional determination. Additionally, there should be historic jurisdictional determinations associated with U-40071ocated in this same area that should assist in identifying aquatic resources. Before beginning any delineations, you are encouraged to coordinate with this office. Please be aware that impacts associated with the discharge of fill into jurisdictional waters of the United States including wetlands are subject to our regulatory authority pursuant to Section 404 of the Clean Water Act. Any discharge of excavated or fill material into waters of the United States and/or any adjacent wetlands would require Department of the Army (DA) permit authorization. The type of DA authorization required (i.e., general or individual permit) will be determined by the location, type, and extent of jurisdictional area impacted by the project, and by the project design and construction limits. Until additional data is furnished which details the extent of the construction limits of the proposed project, and an onsite inspection is completed with regard to determinations of the presence of jurisdictional waters on the property, we are unable to provide specifc comments concerning DA permit requirements. To assist you with determining permitting requirements, we recommend that you perform a detailed delineation of the streams and/or wetlands present on the project site. When this information becomes available, it should be forwarded to our office for review and comment, as well as a determination of DA permit eligibility. Should you have any further questions related to DA permits for this project, please contact me at 910-251-4611. Sincerely, Digitally signed by SH AV E R. 6 RA D SHAVER.BRAD.E.1276601756 DN: c=US, o=U.S. Government, .L.1276601756 on- HAVER.BRAD.E.127 601756 Date: 2017.12.28 10:45:20 -OS'00' Brad Shaver Regulatory Project Manager Wilmington Regulatory Field Offce cc (electronic): NCDENR-DWR attn: Ms. Joanne Steenhuis NCDOT-Division 3 attn: Mr. Mason Herndon