Loading...
HomeMy WebLinkAbout20080965 Ver 3_More Info Received_20090305Mansour Edlin Consulting 1515 Mockingbird Ln. Suite 802 Charlotte, NC 28209 704-672-1560 Phone 704-672-1562 Fax March 4, 2009 Mr. Joseph Gyamfi Division of Water Quality 1650 Mail Service Center Raleigh, NC 27669 Re: Request for Additional Information Crate & Barrel Distribution Center DWQ Express #08-0965V3 Lincoln County Dear Joseph: )rY ?? 3jn ?, .J dj Attached, please find the revised plans and supporting documents for the storm water management plan for the above referenced project. The following documents are enclosed: 1. Two (2) copies of the revised plans (SWMP 2.0,2.1,2.2,3.0,4.0,5.0, 1-1) 2. Two (2) copies of the revised supporting calculations for each BMP 3. Two (2) copies of the revised supplement forms for each BMP We appreciate your continued assistance and cooperation and should you have further questions during the review process, please feel free to contact us. Sin erely, Mansour S. Edlin, PE Cc: Derek Salfia, TKC Attachment Project Name: CRATE & BARREL LINCOLN COUNTY POND #1 / PHASE I DETERMINE SURFACE AREA (S.A.) FOR 90%TSS REMOVAL Drainage area= 24 Ac. % Impervious= 50 Pond depth= 5 ft. SA/DA= 2 % aR ? ? Revised 3.3.2009;` Initial iteration S.A. required= 0.48 Ac. S.A. provided= 0.62 Ac. 27000 SF 0.620 AT NPWSEL 843.5 SURFACE AREA BASED AVERGAE DEPTH FROM SUPPLEMENT SHEET First iteration Drainage area= 24 Ac. % Impervious= 50 Avg. pond depth= 4 ft. SA/DA= 2.5% S.A. required= 0.60 Ac. S.A. provided= 0.62 Ac. 27000 SF DETERMINE VOLUME TO BE CONTROLLED BY 1" STORM 0.620 AT NPWSEL 843.5 Rv= 0.05 + 0.009(% impervious) 0.50 in/in Volume req'd=1" x Rv x 1/12 (ft/in) x Drainage area 1.00 Ac-ft = 43560 DRAWDOWN STORM IN 2-5 DAYS (ESTIMATE AN ORIFICE SIZE FOR WQ - CHECK TO FOLLOW) 2A x (sqrt(h)) t= Ca(sgrt(2g)) t= time to drawdown (sec)= 259,200 (3days) a= area of orifice (sq.ft.)= will solve A= pond s.a. (sq.ft.)= 27000.00 0.62 ac. g= gravity constant (ftls2)= 32.2 h= change in head (ft.)= 1.61 (vol/s.a.) C= orifice coefficient= 0.6 2A x (sqrt(h)) a= Ct(sgrt(2g)) a= 0.055 sq.ft. diameter of orifice, d= 3.18 in. TRY d= 3.0 in. orifice area= 0.049 sq.ft. therefore, t (now)= 290343.40 seconds = 3.4 days A DRAWDOWN STORM IN 2-5 DAYS (CHECK ORIFICE SIZE USED IN OUTLET STRUCTURE) NPWSEL = 843.5 d Used = 3.0 Peak elev. = 845.5 change in head = 0.7 S.A. at peak el = 0.68 S.A. at NWE = 0.53 S.A. to use for drawdown eq.= ft. in. orifice area= 0.049 sq.ft. ft. ft. (1 yr storm x 0.33) Ac. = 29620.8 sq.ft Ac. = 23086.8 sq.ft 26353.8 sq.ft (average area between peak and nwe) t (now)= 181259.74 seconds = 2.1 days SIZE POND EMERGENCY DRAIN Drain pond within 24 hours (86400 sec) t= time to drawdown (sec)= a= area of orifice (sq.ft.)= A= area at NWE _ A= area at bottom A= S.A. to use for drawdown eq.= g= gravity constant (ft/s2)= h= change in head ft)= C= orifice coefficient= 2A x (sqrt(h)) a= Ct(sgrt(2g)) a= diameter of orifice, d= 5.46 in. Okay 86,400 (1day) will solve 0.53 Ac. = 23086.8 sq.ft 0.30 Ac. = 13068 sq.ft 18077.4 sq.ft (average area between bottom and nwe) 32.2 3.5 0.6 0.163 sq.ft. (pond depth x 0.33) Use min. d= 8.0 in. orifice area= 0.349 sq.ft. therefore, t (now)= 40264.16 seconds= 11.2 hours Permit No. E x e o$ -o o v s 43 (to be provided by DWQ) AC*A WDENR "A T£5 pG STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT IF-ORMATION Project name Contact person Phone number Date Drainage area number 43,560.00 ft3 61,500.00 ft3 II. DESIGN INFORMATION Site Characteristics Drainage area 1;045,440.00 fe Impervious area 522,720.00 fe % impervious 50.00 % Design rainfall depth 1.00 -' in Storage Volume: Non-SR Waters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation SHWT elevation Top of shelf elevation Temporary pool elevation CRATE BA:REEL O ?"?1bEl1?I?Y Y wO1W^^ MANSOUR EDLIN CONSULTING 704 672 1560 1120/2009 Revised 313/2009 DRAINAGE AREA 1 I POND #1 in fP ft3 ft3 ft3 in (unitless) (unitless) in/hr ft3/sec ft3/sec ft3/sec 836.50 ft 838.00 ft 843.00 ft 843.50 ft 830.00 ft 844.00 ft 845.50 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 2.00 (unitless) Surface area at the bottom of shelf 24,000.00 ff Volume at the bottom of shelf 96,500.00 ft3 Permanent pool, surface area required 20,900.00 ff Permanent pool, surface area provided 27,000.00'' "fe OK Permanent pool volume 109,250.00 ft3 Average depth for SA/DA tables 4.05 ft OK Surface area at the top of shelf 30,000.00 fe Volume at the top of shelf 47,250.00 ft3 Forebay volume 21,750.00 ft3 Forebay % of permanent pool volume 19.91 % OK Temporary pool, surface area provided 33,000.00 ftz Drawdown Calculations Treatment volume drawdown time 3.10 days OK Treatment volume discharge rate 1.00 ft3/s Pre-development 1-yr, 24-hr discharge 3.60 ft3/s OK Post-development 1-yr, 24-hr discharge 1.50 ft3/s OK Additional Information Diameter of orifice 3 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.00 :1 OK Length to width ratio 2.50 :1 OK Trash rack for overflow & orifice? Y_ (Y or N) OK Freeboard provided 1.00 ft OK Vegetated filter provided? n - (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies DRAIN WITH VALVE Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Project Name: CRATE & BARREL Revised 3.3.2009 Project No.: LINCOLN COUNTY POND #2 / PHASE I DETERMINE SURFACE A REA (S.A.) FOR 90%TSS REMOVAL Initial iteration Drainage area= 18 Ac. % Impervious= 70 Pond depth= 5 ft. SA/DA= 2.8% S.A. required= 0.50 Ac. S.A. provided= 0.67 Ac. 29000 SF 0.666 AT NPWSEL 843.5 SURFACE AREA BASED ON AVERAGE DEPTH F ROM SUPPLEMENT SHEET First iteration Drainage area= 18 Ac. % Impervious= 70 Avg. Pond depth= 41 ft. SA/DA= 3.3% S.A. required= 0.59 Ac. S.A. provided= 0.67 Ac. 29000 SF 0.666 AT NPWSEL 843.5 M Rv= 0.05 + 0.009(% impervious) = 0.68 in/in Volume req'd=1" x Rv x 1/12 (ft/in) x Drainage area = 1.02 Ac-ft = 44431.2 cult DRAWDOWN STORM IN 2-5 DAYS (ESTIMATE AN ORIFICE SIZE FOR WQ - CHECK TO FOLLOW) 2A x (sqrt(h)) t= Ca(sgrt(2g)) t= time to drawdown (sec)= 259,200 (3days) a= area of orifice (sq.ft.)= will solve A= pond s.a. (sq.ft.)= 29000.00 0.67 ac. g= gravity constant (ft/s2)= 32.2 h= change in head ft)= 1.53 (vol/s.a.) C= orifice coeff icient= 0.6 2A x (sqrt(h)) a= Ct(sgrt(2g)) a= 0.058 sq.ft. diameter of orifice, d= 3.25 in. TRY d= 3.0 in. orifice area= 0.049 sq.ft. therefore, t (now)= 303898.92 seconds = 3.5 days "'0 311 c DRAWDOWN STORM IN 2-5 DAYS (CHECK ORIFICE SIZE USED IN OUTLET STRUCTURE) NPWSEL = 843.5 ft. d Used = 3.0 in. orifice area= 0.049 sq.ft. Peak elev. = 845.5 ft. change in head = 0.7 ft. (1yr storm x 0.33) S.A. at peak el = 0.80 Ac. = 34978.68 sq.ft S.A. at NWE = 0.62 Ac. = 27007.2 sq.ft S.A. to use for drawdown eq.= 30992.94 sq.ft (average area between peak and nwe) t (now)= 213167.45 seconds = 2.5 days Okay SIZE POND EMERGENCY DRAIN Drain pond within 24 hours (86400 sec) t= time to drawdown (sec)= 86,400 (1day) a= area of orifice (sq.ft.)= will solve A= area at NWE = 0.62 Ac. = 27007.2 sq.ft A= area at bottom = 0.36 Ac. = 15681.6 sq.ft A= S.A. to use for drawdown eq.= 21344.4 sq.ft (average area between bottom and nwe) g= gravity constant (ftls2)= 32.2 h= change in head ft)= 3.5 (pond depth x 0.33) C= orifice coefficient= 0.6 2A x (sqrt(h)) a= Ct(sgrt(2g)) a= 0.192 sq.ft. diameter of orifice, d= 5.93 in. Use min. d= 8.0 in. orifice area= 0.349 sq.ft. therefore, t (now)= 47540.82 seconds = 13.2 hours Permit No. (to be provided by DWQ) AA,'-KP)mwAA' pc GG NC ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. It. PROJECT INFORMATION Project name GRA I C a DARRELL Contact person MANSOUR EDLIN CONSULTING Phone number 704 672 1560 Date 1/20/2009 Revised 3.3.2009 D' DRAINA E A ramage area number G REA 2 / PO ND 442 11. DESIGN INFORMATION Site Characteristics Drainage area Impervious area % impervious Design rainfall depth Storage Volume: Non-SR Waters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1 -yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation SHWT elevation Top of shelf elevation Temporary pool elevation in 1.84,08U.00 f? 548,856.00 _ fe 70.00 % 1.00 in 44,431.00 ft3 67,250.00 ft3 ft3 ft3 ft3 ft3 in (unitless) (unitless) - in/hr ft3/sec ft3/sec ft3/sec 836.50 ft 838.00 ft 843.00 ft 843.50 ft 83000 ft 844.00 ft 845.50 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 f Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Volume and Surface Area Calculations SAMA ratio 2.80 (unitless) Surface area at the bottom of shelf 27;000.00 _ ft2 Volume at the bottom of shelf 105,500.00 ft3 Permanent pool, surface area required 21,780.00 ft2 Permanent pool, surface area provided 29,000.00 ft2 OK Permanent pool volume 119,500.00 fe Average depth for SA/DA tables 4.12 ft OK Surface area at the top of shelf 33,000.00 ff Volume at the top of shelf 51,750.00 W Forebay volume 23,650.00 fe Forebay % of permanent pool volume 19.79 % OK Temporary pool, surface area provided 36,000.00 ' ft2 Drawdown Calculations Treatment volume drawdown time 3.40 days OK Treatment volume discharge rate 1.00 fees Pre-development 1-yr, 24-hr discharge 2.70 ft31s OK Post-development 1-yr, 24-hr discharge 1.50 ft31S OK Additional Information Diameter of orifice 3 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.00 :1 OK Length to width ratio 2.50 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.00 ft OK Vegetated filter provided? n (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies DRAIN WITH VA LVE Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 K y Project Name: CRATE R BARREL Project No.: LINCOLN COUNTY POND #31 PHASE II DETERMINE SURFACE AREA (S.A.) FOR 90%TSS REMOVAL Drainage area= 16 Ac. % Impervious= 60 Pond depth= 5 ft. SA/DA= 2.5% S.A. required= 0.40 Ac. S.A. provided= 0.52 Ac. 22500 SF ET Drainage area= 16 Ac. % Impervious= 60 Avg. pond depth= 4 ft. SA/DA= 2.8% S.A. required= 0.45 Ac. S.A. provided= 0.52 Ac. 22500 SF DETERMINE VOLUME TO BE CONTROLLED BY 1" STORM Rv= 0.05 + 0.009(% impervious) 0.59 in/in Revised 3.3.2009 Initial iteration 0.517 AT NPWSEL 846.5 First iteration 0.517 AT NPWSEL 846.5 Volume req'd=1" x Rv x 1/12 (ftlin) x Drainage area 0.79 Ac-ft = 34267.2 cuft DRAWDOWN STORM IN 2-5 DAYS (ESTIMATE AN ORIFICE SIZE FOR WQ - CHECK TO FOLLOW) 2A x (sqrt(h)) t= Ca(sgrt(2g)) t= time to drawdown (sec)= 259,200 (3days) a= area of orifice (sq.ft.)= will solve A= pond s.a. (sq.ft.)= 22500.00 0.52 ac. g= gravity constant (ft/s2)= 32.2 h= change in head (ft.)= 1.52 (vol/s.a.) C= orifice coefficient= 0.6 2A x (sqrt(h)) a= Ct(sgrt(2g)) a= 0.044 sq.ft. diameter of orifice, d= 2.86 in. TRY d= 3.0 in. orifice area= 0.049 sq.ft. therefore, t (now)= 235080.55 seconds = 2.7 days a ?. DRAWDOWN STORM IN 2-5 DAYS (CHECK ORIFICE SIZE USED IN OUTLET STRUCTURE) NPWSEL = 846.5 ft. d Used = 3.0 in. orifice area= 0.049 sq.ft. Peak elev. = 848.5 ft. change in head = 0.7 ft. ( 1 yr storm x 0.33) S.A. at peak el = 0.60 Ac. = 26136 sq.ft S.A. at NWE = 0.46 Ac. = 20037.6 sq.ft S.A. to use for drawdown eq.= 23086.8 sq.ft (average area between peak and nwe) t (now)= 158789.52 seconds = 1.8 days okay SIZE POND EMERGENCY DRAIN Drain pond within 24 hours (86400 sec) t= time to drawdown (sec)= 86,400 (1day) a= area of orifice (sq.ft.)= will solve A= area at NWE = 0.46 Ac. = 20037.6 A= area at bottom = 0.27 Ac. = 11761.2 A= S.A. to use for drawdown eq.= 15899.4 sq.ft (average area between bottom and nwe) g= gravity constant (ftls2)= 32.2 sq.ft h= change in head (ft.)= 3.2 (pond depth x 0 sq.ft C= orifice coefficient= 0.6 2A x (sgrt(h)) a= Ct(sgrt(2g)) a= 0.137 sq.ft. diameter of orifice, d= 5.01 in. Use min. d= 8.0 in. orifice area= 0.349 sq.ft. therefore, t (now)= 33861.36 seconds= 9.4 hours AY"I NCDENR Permit No (to be provided by DWQ) U??F W ATehpG O 't 65P STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION A PPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. it. PROJECT INFORMATION Project name GRA11 & DARRELL Contact person MANSOUR EDLIN CONSULTING Phone number 704 672 1560 Date 1/20/2009 Revised 3.3.2009 Drainage area number DRAINAGE AREA. P-ID #3 11. DESIGN INFORMATION Site Characteristics Drainage area 696,96u.uu fe Impervious area 418,176.00 ft' % impervious 60.00 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 34,267.00 ft3 Volume provided 50,500.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: )-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Basin Elevations Basin bottom elevation 840.00 ft Sediment cleanout elevation 841.00 ft Bottom of shelf elevation 846.00 ft Permanent pool elevation 846.50 ft SHWT elevation 830 00 ft Top of shelf elevation 847.00 ft Temporary pool elevation 848.50 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & H. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) rll. DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 2.50 (unitless) Surface area at the bottom of shelf 20,000.00 ft2 Volume at the bottom of shelf 78,000.00 ft3 Permanent pool, surface area required 17,424.00 ft2 Permanent pool, surf ace area provided 22,500.00 ft2 OK Permanent pool volume 88,625.00 ft3 Average depth for SA/DA tables 3.94 ft OK Surface area at the top of shelf 25,000.00 ft2 Volume at the top of shelf 38,625.00 ft3 Forebay volume 18,263.00 ft3 Forebay % of permanent pool volume 20.61 % OK Temporary pool, surface area provided 26,500.00 ft2 Drawdown Calculations Treatment volume drawdown time 2.60 days OK Treatment volume discharge rate 1,50 fels Pre-development 1-yr, 24-hr discharge 3.00 ft3/S OK Post-development 1-yr, 24-hr discharge 1.20 ft31s OK Additional Information Diameter of orifice 3 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3,00 :1 OK Length to width ratio 2,50 :1 OK Trash rack for overf low & orifice? Y (Y or N) OK Freeboard provided 1.00 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90016 TSS removal Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies DRAIN WITH VALVE Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2