Loading...
HomeMy WebLinkAboutNC0004774_More Information Received_20180227t Water Resources Environmental Quahty February 27, 2018 Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Additional Information Request for and Requested Revisions to Compliance Boundary Maps Submitted February 15, 2018 Asheville Steam Electric Plant — NC0000396 Belews Creek Steam Station — NCO024406 Buck Combined Cycle Station — NC0004774 Cape Fear Steam Electric Plant — NC0003433 H. F. Lee Energy Complex — NC0003417 Mayo Steam Electric Plant — NCO038377 Dear Mr. Draovitch: On February 15, 2018, the North Carolina Department of Environmental Quality (DEQ) received compliance boundary (CB) maps for the subject facilities. DEQ has reviewed these CB maps and requests the following revisions be made or additional information be submitted to support Duke Energy's assertions. Asheville Steam Electric Plant The 1982 Ash Basin is not being considered part of the waste disposal system in the NPDES permit renewal. Therefore, please revise the CB map to not include the 1982 Ash Basin within the waste boundary footprint and revise the compliance boundary accordingly. The CB map indicates that a portion of the Interstate 26 corridor is included within Duke Energy's property boundary. Please submit documentation verifying proof of ownership of the land underlying this portion of Interstate 26 by Duke Energy. Belews Creek Steam Station • The CB map indicates that a portion of Middleton Loop Road and Pine Hall Road are included within Duke Energy's property boundary. Please submit documentation verifying proof of ownership of the land underlying Middleton Loop Road and Pine Hall Road by Duke Energy. --r�l'Nothing Compares`. -- State of North Carolina I Environmental Quality I Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919-707-9129 Buck Combined Cycle Station • DEQ compared the CB map with the Rowan County GIS website. The following issues will require resolution: o At the southwest portion of Duke Energy's property, the CB map includes two properties within the Duke Energy property boundary that are shown on the Rowan County GIS website as being owned by David & Barbara Brewer (Parcel No. 6502034) and Tames & Polly Lewis (Parcel No. 6502033). Please submit documentation verifying proof of ownership of these two parcels by Duke Energy. o At the southwest portion of Duke Energy's property, the CB map indicates that Duke Energy owns Parcel No. 6502016. This parcel contains a right-of-way that splits the parcel in half. Please submit documentation verifying proof of ownership of the right-of-way by Duke Energy that splits Parcel No. 6502016. o At the southwest portion of Duke Energy's property boundary, the CB map includes a portion of Dukeville Road (approximately 400 feet) that is shown on the Rowan County GIS website as not being owned by Duke Energy. Please submit documentation verifying proof of ownership of the land underlying this portion of Dukeville Road by Duke Energy. Cape Fear Steam Electric Plant • The CB map indicates that a railroad spur just south of the 1985 Ash Basin is included within Duke Energy's property boundary. In recent previously submitted maps to DEQ, this railroad spur was not included within Duke Energy's property boundary. Please submit documentation verifying proof of ownership of the land underlying this portion of this railroad spur by Duke Energy. H.F. Lee Energy Complex • The Triangle Pond is not considered part of the waste disposal system. Therefore, please revise the CB map to not include the Triangle Pond within the waste boundary footprint and revise the compliance boundary accordingly. Mayo Steam Electric Plant • The CB map indicates that a portion of Highway 501 is included within Duke Energy's property boundary. The CB map includes a footnote indicating that this Section of 501 is owned by Duke Energy, however, no documentation of proof of ownership was provided. Please submit documentation verifying proof of ownership of the land underlying this portion of Highway 501 by Duke Energy. Please submit the requested information and/or revised CB maps by March 7, 2018. If the requested information cannot be provided, then the CB maps must be 'resubmitted by March 7, 2018 with the property and compliance boundaries adjusted to not include the roadways or parcels noted above. Otherwise, DEQ will post the maps with the draft NPDES permits as submitted and there may be a need for a future permit modification when (and if) the requested information becomes available. If you have any questions, please contact Jay Zimmerman at (919) 707-9027. Sincerely, aJay Serman, PG Environmental Program Manager cc: ARO WQROS Regional Office WSRO WQROS Regional Office MRO WQROS Regional Office RRO WQROS Regional Office WARO WQROS Regional Office WQPS Chief, Jeff Poupart WQROS Central File Copy