Loading...
HomeMy WebLinkAbout20090245 Ver 1_CAMA Application_20090310Beverly Eaves Perdue Governor March 9, 2009 A ? NCDENR North Carolina Department of Environment and Natura Division of Coastal Management James H. Gregson Director Q MAR 10 2009 DENR -1NATER QUALITY WE MMAND V MwATEItV*" MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Cyndi Karoly Division of Water Quality Doug Huggett Major Permits Processing Coordinator 9-0 2 45 CAMA/DREDGE & FILL Permit Application Review Annie M. Piner Family Partnership Dee Freeman Secretary The project site is located 200 Davis Blvd., Atlantic Beach, Carteret County. The applicant is proposing the creation of a fourth slip with boatlift and partial dock removal. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 03/30/2009. If you have any questions regarding the proposed project, please contact Heather Styron at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave., Morehead City, NC 28557--3421 One Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagement.net NofthCarohna Resources ¢@aorr111 An Equal Opportunity 1 Affirmative Action Employer Aatuta 1b, Major Permit Fee Schedule Circle One DCM % DWQ % Development Type Fee (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% ($250) 0% ($0) II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100%($400) 0%($0) 111. For development that involves I the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: $250 100%($250) 0%($0) III(B). Public or commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: $400 100%($400) 0%($0) III(C). If General Water Quality I Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60%($240) 40% ($160) III(D). If General Water Quality Certification No. 3490 (see attached) cannot be applied: $400 60%($240) 40%($160) IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60%($285) 40% ($190) Check # --L1 ,L' Amount 501 00 Project Name i?. -DIVISION OF COASTAL MANAGENIENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Annie M. Piner Family Partnership 2. LOCATION OF PROJECT SITE: 200 Davis Blvd. in Atlantic Beach, Carteret County Photo Index - 2000: 41-525 grid J (10&11) 2006: 41-8037 grid O (10&11), P (10) State Plane Coordinates - X: 2682770.247 Y: 363898.870 Rover # J011510A LAT 34°42'08.84522 LON 76°44'29.69995 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 1/15/09 Was Applicant Present -no 5. PROCESSING PROCEDURE: Application Received -2/5/09 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Atlantic Beach Land Classification from LUP - Developed Residential/Conservation (B) AEC(s) Involved: PTA, EW, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - onsite septic systems Planned - None (F) Type of Structures: Existing - Two mobile homes, sheds, bulkhead and existing dock. Planned - creation of a fourth slip with a boatlift and partial dock removal. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: nu?nr?Fr? FTT,TED OTHER (A) Open Water N/A N/A 165 ft2 incorp. (D) Total Area Disturbed: 165 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA, HQW Open: NO 8. PROJECT SUMMARY: The applicants are proposing the creation of a fourth slip with boatlift and partial dock removal. Annie M. Piner Family Limited Partnership 200 Davis Blvd. Page 02 9. Narrative Description: The Annie M. Piner Family Limited Partnership project is located at 200 Davis Blvd in Atlantic Beach Carteret County. The site is found by turning south off of Hwy. 70 East onto Atlantic Beach Causeway. Turn west onto Fort Macon Drive and north at the first paved road. Follow this and turn west onto Davis Blvd. The site is on a manmade canal which connects to and lies on the southern side of Bogue Sound. The subject property is 8,974 square feet in their entirety and averagse 5' in elevation above NHW. Currently on the high ground portion of the sites are mobile homes, and storage buildings. The high ground portions of the tracts are void of vegetation with the exception of the existing lawns. Along the existing canal in this area there are no coastal wetlands. The water depths are at an average of -5.4' to -5.9' at NLW at the new slip area. The shoreline has a total length along the NHW contour of 75ft. There are mobile homes to the east and west with private docks. The Division of Water Quality classifies this area as SA and HQW waters. This area is not a Primary Nursery Area and is not open to the taking of shellfish. The existing canal is approximately 92' wide from bulkhead to bulkhead at the project site. Atlantic Beach's Land Use Plan dated 1993 classifies this area as Developed Residential/Conservation within the AEC's. Substrate composition is mostly silt. 10. Project Description: The applicants propose to construct a fourth slip with a jet ski lift. The new slip/lift area would be located at the waterward end of the existing middle platform. A 1.25' x 14' section would be removed from the existing middle platform to allow for the new jetski lift. The proposed single pole lift would measure 5' x 8'. The water depths within the new slip/lift area range from - 5.4' to -5.9' at NLW. The existing canal is approximately 92' wide in this area with the proposed slip/lift area not extending farther than the maximum length of 23' from the edge of the bulkhead. Riparian lines are drawn as property line extensions along this canal and appear to coincide with aerial photography and the plat dated revised 1/17/09. All of the proposed work would meet the 15' minimum setback from the riparian corridors. 11. Anticipated Impacts: The proposed installation of the new boatlift would result in temporary turbidity. The project would incorporate 165ft2 of open water. There should be no hazard to navigation resulting from this project, as the proposed work is located no more than 23' waterward from the existing bulkhead with the canal width at 92'. Heather Styron Morehead City March 9, 2009 Berm N!-1 APPLICATION for Major Development Permit kJ 9- 0 2 4 5 (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if app licable) Annie M. Piner Family Limited Partnership n/a Applicant 1: First Name MI Last Name James W. Piner Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 2102 Atlantic Beach NC ZIP Country Phone No. FAX No. 28512 USA 252 - 247 - 5262 ext. n/a - - Street Address (if different from above) City State ZIP 302 Davis Boulevard Atlantic Beach NC 28512- Email n/a 2. Agent/Contractor Information Business Name Coastal Planning Services, Inc. Agent/ Contractor 1: First Name MI Last Name Kathy B. Vinson Agent/ Contractor 2: First Name MI Last Name n/a Mailing Address PO Box City State 827 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252-240-9297 - - ext. 252 - 354 - 4916 ext. FAX No. Contractor # 252 247 5875 n/a Street Address (if different from above) City State ZIP n/a _ Email kbvinson@ec.rr.com <Form continues on back> Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 200 Davis Boulevard n/a Subdivision Name City State Zip none Atlantic Beach NC 28512- Phone No. Lot No. (s) (if many, attach additional page with list) n/a - - ext. 6, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak unnamed canal c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. []Natural ®Manmade []Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ?No work falls within. Town of Atlantic Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 75' 8974 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 8974 square feet, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5' ®NHW or ?NWL e. Vegetation on tract grass and landscape vegetation f. Man-made features and uses now on tract Two residential manufactured homes, plus portions of two additional manufactured homes; shed; bulkhead; dock. g. Identify and describe the existing land uses adjacent to the proposed project site. residential manufactured homes h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? RA-3 (Attach zoning compliance certificate, if applicable) ®Yes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes No ?NA If yes, by whom? n/a 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? []Yes ®No No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No (Attach documentation, if available) Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment individual septic tanks o. Describe existing drinking water supply source. Town of Atlantic Beach p. Describe existing storm water management or treatment systems. None. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Project will enhance water access opportunities for residents of a manufactured home located on the lot. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Boatlift piling to be installed from barge that will be stored on the water. d. List all development activities you propose. Installation of a one-piling "swinger' lift for use with a personal watercraft (jet ski), including removal of 15" at waterward end of existing platform (to comply with existing pier line requirements). e. Are the proposed activities maintenance of an existing project, new work, or both? new f. What is the approximate total disturbed land area resulting from the proposed project? 0 ?Sq.Ft or ?Acres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Sheet flow runoff into unnamed canal. i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ®NA j. Is there any mitigation proposed? ?Yes ®No ?NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Edna Alderman Phone No. Address P.O. Box 308, Tarboro, NC 27886 Name Johnny Hudson Phone No. Address 2512 Greenbrook Drive, Wendell, NC 27591 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None found. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date -February 4, 2009 Print Name _Kathy B. Vinson, agent/J.W. Piner, Signature Please indicate application attachments pertaining to your proposed project. ?DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts ?DCM MP-3 Upland Development ®DCM MP-4 Structures Information PROJECT DESCRIPTION Annie M. Piner Limited Family Partnership 200 Davis Boulevard Atlantic Beach, NC February 4, 2009 The proposed project consists of the installation of one single-pole "swinger" personal watercraft (jet ski) lift at an existing dock located at the site. The dock currently contains three slips, including two boat lifts. The addition of the single-pole lift will result in a total of four slips. The lift will serve an individual residential lot owned by the Annie M. Piner Limited Family Partnership located at 200 Davis Boulevard in Atlantic Beach, North Carolina. The project site is located adjacent an unnamed man-made canal, with residential uses located on adjoining properties. Two manufactured homes (200A and 200B Davis Boulevard) are located on the lot. Portions of two additional manufactured homes are also located on the property. Copies of the tax property card for the lot and GIS map showing the lot location from the Carteret County website are attached. Individual lots adjoining the man-made canal were originally recorded in the Carteret County Registry in February 1950. At that time, the Piner family owned numerous adjoining lots. Soon after recording the individual parcels, the family began development of lots and adjoining canal-front areas. This development occurred prior to the implementation of the Coastal Area Management Act (1974) or the adoption of local zoning (1978). Since no zoning requirements or CAMA regulations were in effect at the time of the original development, the resulting (existing) development is non-conforming with current standards. Normal low water depths at the location of the proposed jet ski lift measure -5.6 feet. In order not to exceed allowed extension of the facility into the canal, 15" of the waterward side of the existing platform will be removed in the installation of the lift. Annie M. Piner Family Limited Partnership J.W. Piner 302 Davis Boulevard Atlantic Beach, NC 28512 December 10, 2008 To Whom It May Concern: I authorize Kathy Vinson, AICP and John Freshwater, PE to represent me and apply for CAMA and other development permits to develop property owned by the Annie M. Piner Family Limited Partnership, located at 200 Davis Boulevard, Atlantic Beach, Carteret County, North Carolina. This authorization extends to all permits and authorizations required by local, state, and federal agencies that may be required as part of the permitting process. I also authorize release of information related to the project site to Ms. Vinson and Mr. Freshwater, including boundary surveys, topographic maps, and results of wetland delineation and soil permeability tests. If you have questions or need additional information, please feel free to contact me at 252-247-5262. Sincerely, J.W. Piner Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ?This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ?Commercial ?Public/Government NPrivate/Community ?Yes ®No c. (i) Dock(s) and/or pier(s) (ii) Number 0 (iii) Length n/a (iv) Width n/a (v) Floating ?Yes ?No e. (i) Are Platforms included? ?Yes ®No If yes: (ii) Number n/a (iii) Length n/a (iv) Width n/a (v) Floating ?Yes ?No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 1 new slip (4 total) (ii) Number of slips existing 3 d. (i) Are Finger Piers included? ?Yes ®No If yes: (ii) Number n/a (iii) Length n/a (iv) Width n/a (v) Floating ?Yes ?No f. (i) Are Boatlifts included? ®Yes ?No If yes: (ii) Number 1 single Pole "swinger" lift for use with a personal watercraft (iii) Length 62" (iv) Width 96" h. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 1 new slip ? Dry storage; number of boats: ? Boat ramp(s); number of boat ramps: ? Other, please describe: i. Check the proposed type of siting: ? Land cut and access channel ?Open water; dredging for basin and/or channel ®Open water; no dredging required ?Other; please describe: k. Typical boat length: 11' jet ski m. (i) Will the facility have tie pilings? ?Yes ONo (ii) If yes number of tie pilings? n/a j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). personal watercraft (jet ski) 1. (i) Will the facility be open to the general public? ?Yes ®No 2. DOCKING FACILITY/MARINA OPERATIONS ?This section not applicable ?? a rye 17a74- 1dro,oss? -*) C-)rs???cf a a r.? ' . a. Check each of the following sanitary facilities that will be included in the proposed project. & Office Toilets ? Toilets for patrons; Number: ; Location: tl? Showers 0 ? Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. none c. Describe the disposal of solid waste, fish offal and trash. trash receptacles to be located on high ground d. How will overboard discharge of sewage from boats be controlled? none e. (i) Give the location and number of "No Sewage Discharge" signs proposed. none (ii) Give the location and number of "Pumpout Available" signs proposed. none f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. n/a g. Where will residue from vessel maintenance be disposed of? none h. Give the number of channel markers and "No Wake" signs proposed. none i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. none j. What will be the marina policy on overnight and live-aboard dockage? none k. Describe design measures that promote boat basin flushing? n/a 1. If this project is an expansion of an existing marina, what types of services are currently provided? Project is not an existing marina m. Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ONo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. n/a 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?PublictGovernment ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ?Commercial ?Public/Government ?Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b Existing dock is located 9' on the west and 17' on the east from the adjacent riparian property Iines.The location of the proposed jet ski lift is 28' from the western riparian property line and 39' from the eastern riparian property line. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 92' e. (i) Will navigational aids be required as a result of the project? ?Yes ONo ?NA (ii) If yes, explain what type and how they will be implemented. n/a Proximity of structure(s) to adjacent docking facilities. Adjacent docking facilities are located within the riparian corridor for 200 Davis Blvd. The existing dock for 200 Davis Blvd is located 6.5' from the western adjacent dock and 10' from the eastern adjacent dock. The location of the proposed jet ski lift is 26' from the adjacent western dock and 32' from the adjacent eastern dock. d. Water depth at waterward end of structure at NLW or NWL -5.6 NLW I& OTHER ®This section not applicable a. Give complete description: February 4, 2009 Date Project Name Annie M. Piner Family Limited Partnership Applicant Name Applicant i nature A ?A NCDENR North Carolina Department of Environment and Natural Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director MEMORANDUM: TO: DOUG HUGGETT FROM: HEATHER STYRON THROUGH: TERE BARRETT Resources Dee Freeman, Secretary SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT- ANNIE M. PINER LIMITED FAMILY PARTNERSHIP, 200 DAVIS BLVD., ATLANTIC BEACH DATE: 2/18/09 The following are my comments and recommendations regarding the aforementioned proposal. The proposal is for the addition of a fourth slip with a jet ski lift. The development proposed within the AEC, meets the requirements of 7H.0208 specific use standards for piers, platforms, boatlift design and location. With the reduction of the existing middle platform all parts of the new structure would meet the '/a limitation by not extending farther than the maximum distance of 23'. Therefore I recommend the project be authorized as proposed on plats dated received February 5, 2009, contingent upon the following specific conditions and all applicable standard conditions: 1. All parts of the single pole swinger lift shall not exceed 23' waterward from the existing bulkhead. 2. No more than four slips at this location (three existing and one new) should be authorized. Cc: Tere Barrett, DCM Ted Tyndall, DCM Dave Timpy, COE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer -50% Recycled 110% Post Consumer Paper HWY 70 West to Havelock (Morehead City) NWY 70 East to Beaufort Arendell Street - HWY 70 -?- e?e? Gal Gaffe ?G 2 Project Address: (BOGUS SOUND) 200 Davis Blvd Atlantic Beach, NC 28512 Canal W N? 65 Davis Blvd m Morehead Ave - > Atlantic Beach TO C Causeway ° (Bridge to 2 Y Morehead City) M Fort Macon Road NC 58 Vicinity Map {NTS) NOTES: This plan document is for CAMA permitting purposes. Owner &/or Contractor responsible to ensure all project construction is consistent with owner's intended uses. Owner Wor contractor responsibility for project compliance with all applicable manufacturer specifications & instructions, codes, ordinances and regulations including building codes, setbacks, etcetera. Contractor responsibility to inspect site and identify field conditions and related project cost implications thereof 11 BASE MAP -PER Carteret County GIS (http://carteret.connectgis.com) Legend Existing Boat Slip (?) Proposed PWC Lift Fil Normal Low Water Depth q? 's.1' (PWC = Personal Watercraft) Platform- Area to be Removed PERMITTING PLAN Not Released for Construction Until All Appropriate Permits Received CAMA Permit Application Draw Crystal Coast Engineering., !] t'.A. Property Owner: Annie M. Miner family Ltd Pa P.O. Box 95 Civil and Environmental Consulting Engineers Marshallber NC 28553 David K. Newsom, P.E. John R. Freshwater III, P.E. SCALE- NA 3817 FREEDOM WAY, HUBERT, N.C. 28539 DAM December 23, 2008 PROJECT- OS-061 PHONE. (910) 325-0006 - FAX: (910) 32"060 For: Mr. Engrassia I REVISIONS ship 1-17-09 nor DRA" BY- .RF SHEET: 1 of 4 r .,,•-V 10 Z '-133HS j Ae WVHG RDa -d 60-Lt-t digsiaulied pl-I Aliwe3 jauid •W aiuuV :jaumo A:padad •V'd I uu@@ui uD 4seo:) le4sAj:) swis" a eissea6u3 •aW :.ion 6uiMeaQ uoi4e0ilddd I!w.aad VW`dD d L90-80 Y?31021d 0900-SZ£ (%6) :XVd ' 9000-SZE (O L6) :3NOHd 6E99Z 'O'N `.LN38nH •,kVM WOO33N3 £-Lt8E Soot 'LZ Jaq?o0 3LV0 ,OZ =„ I 3n/0s '3•d 'III JalemgsaJ:l •d ugor 3 d 'wosmaN •>I p!AeO £SS8Z ON ` JagpegsJeW sJ9aui6u3 6ui4insuoO jejuawuonnu3 pue I!AiO S6 X09 'O'd • y°i 1 Riparian Corridor f LO 00 N U z > U M to Cn m > C) C) M N Q Permitting Plan Not R-eleased for Construction U-ntii All Appropriate/ Applicable Permits Received Canal-`??- Existing in Dock / Platform Existing Boat Lift O ' Proposed Single Pile Existing - Jet Ski / PWC Lift (Lifts & Rotates Over Dock) Platform [4 p 1.25 Wide platform area to be removed Existing Exisfing Z Ramp Boat Lift Existing Seawall wN 3 ) iq Exdsting, Dock / Platform Crysta-1 Coast f nNineering, P Civil and Environmental Consulting Engineers David K. Newsom, P.E. John R. Freshwater III, P. 3817-3 FREEDOM WAY, HUBERT, N.C. 28539 PHONE: {910) 325.0006 - FAX: 4910) 325-DOW NNORTH Existing Floating Dock Proposed Conditions (PWC Lift Added) Riparian Corridor CAMA Permit Application Drawing for: Mr. Engnssia .A. Property owner: Annie IT Piner Family Ltd Partnership P.O. Box 95 Marshallber NC 28553 E' SCALE: 1"= 10 DATi December 2-1 2008 PROJECTi 08-061 DRA#j BY, .RF SHEET 3 of 4 REVISIONS 1- t j0 y 133HS z1ar ae NMraa L90-80 ?1?3r0ad 0900SZE (OL6) ?XVj •- 9000iZE (OLB) ?3NOHd 31Nd 6em 'ow'"3enH'Jm iNommu e-me SOOL L -qua Z - os '3'd 'III Ja4em4saJ:i "d uyor •3•d 'wosmBN ')I plned £SSBZ 7N ?agllegsjew sj9aul6u3 6ul4Insuoa Ie4uawuwlnu3 pue IInI:) 0 m 80-LL-L dlysrau ed Rol AIlwej lauld 56 X09 'O'd -W aluuV :jaumo /:padold "Wd 1uuaaui ug ISpO? f els J SNOISI&3a eissei6ug '.jW ..Io_4 6uiMeaQ uoilealiddV I?uuad VWVD 1/ paniaoaa s31wJad algeolIddV / 93eudojddV IIV mun uolyonjlsuoo jo; poseelaN ION NVId 9NliilVY83d wo}}o8 leue? o!lewaps uo!loas ]J!l 3Md a!id 91OUIs posodOJd o=MIN- a!!d 10 aoeJ wail XULN 29 a11 ?2/ 1 b . a